Viviano Gbk Enclave

VIVIANO DEVELOPERS · Rangareddy · RERA P02400007972

VIVIANO GBK ENCLAVE is a residential apartment project in YASHODARA NAGAR, BAIRAMALGUDA VILLAGE, Saroornagar Mandal, Ranga Reddy District, developed by the registered promoter VIVIANO DEVELOPERS. The project has a total plot area of 793.05 sq.m. and one residential building, A (VS), with 1 Stilt + 5 upper floors and 15 apartments: five 2BHK units and ten 3BHK units. It is registered under TG-RERA number P02400007972, with proposed completion of 30/04/2027.

01What we found

RegisteredTG-RERA - valid till 31 Dec 2026
13documents on file - each fact links to its page
2court cases on this project's land (survey 29, Saroornagar)
10items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

10 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

FieldProject record
Registered project nameVIVIANO GBK ENCLAVE RERA record
Project typeResidential apartment project RERA record RERA filing
Phase / registered portionPhase not separately identified in the supplied record; one building is listed RERA filing
TG-RERA registrationP02400007972 RERA record
Registration validity1 April 2024 to 31 December 2026, subject to any extension by the Authority RERA record
Registered promoterVIVIANO DEVELOPERS, recorded as a partnership RERA record RERA filing
RERA statusRecorded as On-Going Project RERA filing

Land and geographic identity

FieldProject record
LocalityYASHODARA NAGAR, BAIRAMALGUDA VILLAGE RERA record RERA filing
Revenue villageBairamalguda Village in the building-permit record; the TG-RERA certificate’s village field says Saroornagar
MandalSaroornagar RERA record
DistrictRanga Reddy RERA record
PIN500079 RERA record
Project survey numbers29/1 and 29/2 RERA filing
Plot numbers stated in the RERA land record19, 20, 21, 22 NP North Side, 22 NP South Side, part of 22 part, 18 NP, 18 SP, 17 NP RERA filing
Total / road-affected / net site area793.05 sq.m. total plot area; 46.21 sq.m. road-affected area; 746.84 sq.m. net plot area RERA filing
Boundaries in the RERA recordEast: 25FT WIDE ROAD; West: 25FT WIDE ROAD; North: NEIGHBOURS LAND; South: PLOT NO 17 SP AND 22 NP SOUTH SIDE RERA filing

Development identity

FieldProject record
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC) Approvals record
Principal approvalBuilding Permit Order 1917/GHMC/LBN/2023-BP, approved 17 June 2023; file 005861/GHMC/2913/LBN2/2023-BP Approvals record
BuildingOne residential building, identified as A (VS) RERA filing
Sanctioned configuration1 Stilt + 5 upper floors; the permit records 6 floors and building height of 14.95 MT.
Approved built-up areaThe permit records 1762.15 sq.m. residential net BUA and total proposed built-up area of 2116.15 sq.m. including parking; see the permit record for its other area entries
Units15 units recorded in the building-permit extraction; the RERA unit schedule also lists 15 units RERA unit table
ParkingStilt parking is specified in the permit description and conditions; a reliable sanctioned parking-space count is not established in the supplied record

Offering and status

FieldProject record
RERA-filed configurations2BHK: 5 units; 3BHK: 10 units RERA unit table RERA unit details
RERA-filed saleable areas2BHK: 115.19 sq.m.; 3BHK: 146.09 sq.m. RERA unit table RERA unit details
Booked / availablePortal-derived schedule lists 0 booked and 5 available 2BHK units, and 0 booked and 10 available 3BHK units. The portal record has no as-of date, so counts are indicative RERA unit table RERA unit details
Construction stageNot established by the supplied evidence. The RERA status is On-Going Project; no independently verified site-progress evidence is provided RERA filing
Completion datesRERA record: proposed and revised proposed completion 30/04/2027 RERA record RERA filing. The filed Form B declaration states 15-06-2026
Occupancy / completion certificateNo occupancy or completion certificate is included in the supplied documents. The GHMC permit requires an occupancy certificate before occupation

2. The project story

VIVIANO GBK ENCLAVE is registered as a residential apartment project on land identified in the project records as Survey Nos. 29/1 and 29/2, at Yashodara Nagar, Bairamalguda Village, Saroornagar Mandal, Ranga Reddy District. The registered site is recorded as 793.05 sq.m. gross, including 46.21 sq.m. affected by road widening, with a net plot area of 746.84 sq.m. RERA record RERA filing

The GHMC permit describes one residential building, A (VS), with 1 Stilt + 5 upper floors. The filed offering comprises 15 apartments: five 2BHK and ten 3BHK. The records establish the proposed and registered development, but do not establish current construction progress or completion of any building portion. No occupancy certificate is supplied. RERA unit details RERA filing

3. Master plan, architecture & building design

The GHMC building permit is for a residential building on a stated plot area of 793.05 sq.m., with 746.84 sq.m. net plot area after a 46.21 sq.m. road-affected portion. The plan extraction records 354.03 sq.m. proposed coverage area (47.4%), 392.81 sq.m. vacant plot area, 1762.15 sq.m. residential net BUA and 2116.15 sq.m. total proposed built-up area including parking. These are separate plan-recorded measures; they should not be treated as carpet or saleable area.

The sanctioned scheme is one building, A (VS), with 1 Stilt + 5 upper floors, recorded as six floors and 14.95 MT. building height. The plan names residential use and lists 15 units. The supplied extracts do not provide a dependable account of flats per floor, lift and stair arrangements, internal circulation, or a complete breakdown of common areas.

The plan lists 177.06 sq.m. as mortgage area. It also includes a tot-lot/greenery, periphery planting and rainwater-harvesting requirements. The available records do not establish completed delivery of these features.

4. Homes, configurations & floor plans

The RERA schedule lists 15 apartments: five 2BHK and ten 3BHK. The following filed saleable areas and unit counts are from the project schedule. Software measurements from the submitted plan drawing are shown separately and are not RERA-filed carpet-area disclosures. RERA unit table RERA unit details

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK505115.19 sq.m.Not suppliedNot supplied
3BHK10010146.09 sq.m.103.9 sq.m. (software-measured)29% (software-derived)

The 3BHK drawing measurement is based on two measured flat designs in the GHMC plan; the reported median is 103.9 sq.m. (1119 sq.ft.). It is a software measurement from drawing geometry, not a RERA-filed figure, and is identified as needing review. Carpet area is distinct from saleable area, which can include a home’s share of common areas. RERA unit details Floor plans

The drawing extraction also measures a 4BHK design at 121.4 sq.m. carpet area (1307 sq.ft.), but marks it as not matched to the RERA configuration schedule. It is therefore not included as a RERA-filed offering or unit count. RERA unit details Floor plans

5. Parking & vehicle circulation

The permit describes a stilt level and states that approved cellar/stilt parking is to be used exclusively for vehicle parking, without partition walls or rolling shutters. It separately records 354.00 sq.m. parking area and 354.00 sq.m. net void; these figures do not establish the number or allocation of parking spaces. The plan’s sanctioned parameters list proposed number of parkings as 0, so a reliable space count cannot be confirmed from the supplied extracts.

No evidence provided establishes resident-versus-visitor spaces, accessible bays, two-wheeler spaces, parking allotments to particular apartments, ramp arrangements, or EV charging. A parking area or drawn bay does not by itself establish exclusive ownership or allocation.

6. Amenities, recreation & open spaces

The RERA amenity schedule records facilities and infrastructure with declared progress percentages. These figures are portal declarations, not independent verification of construction or delivery. The building permit also lists certain site provisions and conditions. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Green Strip / Tot Lot / ParkGreen strip/tot-lot/park listed; permit requires a fenced tot-lot and peripheral greeneryRERA amenitiesRERA schedule: available “YES,” 0%; not independently verified
Community buildingsListed in the RERA scheduleRERA amenities0%; not independently verified
Recreational open spaceAggregate area listed; no area suppliedRERA amenities0%; not independently verified
Water conservation / rainwater harvestingListed; permit specifies a percolation pit plan of 1.50 × 0.75 × 1.50 MRERA amenitiesRERA schedule: available “YES,” 0%; not independently verified
Internal roads and footpathsListed; no dimensions supplied hereRERA amenities0%; not independently verified
Street lightingListedRERA amenities0%; not independently verified

The supplied RERA-filed amenity schedule does not establish a clubhouse, gym, swimming pool, or indoor-games facility. Such facilities are not included here as confirmed project provisions.

7. Utilities, building services & safety

The permit lists a separate underground static water-storage tank with capacity 25,000 lits. and a separate terrace tank of 25,000lits capacity for Residential buildings. It also lists a transformer space, generator, emergency lighting, rainwater harvesting/percolation pit, garbage house, hose reel, down corner, automatic sprinkler system and fire-fighting installations. These are plan-listed provisions, not evidence of installation or operational readiness.

The RERA amenity schedule lists water supply, sewerage, storm-water drains, sewage/sullage treatment and disposal, solid-waste management, energy management, fire protection and fire-safety requirements, and an electrical meter room/sub-station/receiving station. Water supply, rainwater harvesting and electrical meter room/sub-station/receiving station are marked “YES”; the electrical item shows 20% progress, while other listed progress entries are 0%. These are declared portal figures, not independently verified completion. RERA amenities

The supplied record does not establish water source or treatment capacity, an STP capacity, wastewater-reuse arrangements, electrical supply or backup capacity, lift count/capacity, CCTV or access-control installation, accessibility features, or fire-clearance status. The permit requires an occupancy certificate before occupation and states that an Occupancy FIRE NOC is to be obtained before issue of the occupancy certificate.

8. Location, access & connectivity

The registered project location is Yashodara Nagar, Bairamalguda Village, Saroornagar Mandal, Ranga Reddy District, PIN 500079. The cadastral record provides a parcel-centroid coordinate of 17.35458, 78.53229. RERA record Location record Cadastral map

The project record identifies 25FT WIDE ROAD on the east and west boundaries. The building-permit extraction also lists road widths including 7.62MT WIDE, 18.00 MT WIDE EXISTING, 18.00 MT WIDE PROPOSED ROAD, 9.14m PROPOSED ROAD, 7.62m EXISTING ROAD, and 60' ROAD; the supplied information does not establish the precise relationship of each listed road to the site. RERA filing

A supplied location measurement places the nearest sampled Outer Ring Road interchange at approximately 10.1 km. No public-transport information or independently verified distances to local services are supplied. Location record

9. Developer & development status

The registered promoter is VIVIANO DEVELOPERS, recorded as a partnership. The RERA record identifies OHM REDDY BOMEDI as an authorized signatory and partner, and ANJUM ISMATH IQUBAL as a partner. The supplied promoter address is Renuka Shakthi Apartment, Basheerbagh, Ward No 7 Block No 2, Yashodara Nagar, Bairamalguda Village, Saroornagar, Ranga Reddy, 500079. RERA filing Parties record Corporate record

The registration certificate gives a registered-office address field for Viviano Developers as Village/Mandal/District: Hyderabad, PIN 500029. A separate company identifier is masked in the project record as xxxxxx891Q; its identifier type is not specified. No official project website, contact details, or separate marketing-brand identity is established in the supplied evidence. RERA filing

The RERA record gives proposed and revised completion as 30/04/2027. The filed Form B declaration states a completion undertaking of 15-06-2026; these are recorded here as the respective statements in the RERA materials. The supplied records do not establish current construction progress, an extension order, or an occupancy certificate. RERA record

10. Approvals, official records & documents

TG-RERA registration
Reference / scopeP02400007972; VIVIANO GBK ENCLAVE; validity 1 April 2024–31 December 2026
EvidenceRERA record
GHMC building permit
Reference / scopeBuilding Permit Order 1917/GHMC/LBN/2023-BP, approved 17 June 2023; file 005861/GHMC/2913/LBN2/2023-BP; Survey Nos. 29/1 and 29/2; building A (VS), 1 Stilt + 5 upper floors
EvidenceApprovals record
Layout / building-plan document
Reference / scopeGHMC plan extraction for proposed residential construction; includes plot areas, building configuration, unit count, permit conditions and site provisions
RERA Form B declaration
Reference / scopePromoter declaration includes title/encumbrance statements, project-fund statements and completion undertaking
Occupancy / completion certificate
Reference / scopeNot included in the supplied documents; GHMC permit requires occupancy certification before occupation

The supplied material does not include an issued occupancy certificate, a completion certificate, or independent construction-progress verification.

Frequently asked questions

Is VIVIANO GBK ENCLAVE registered with Telangana RERA?

Yes. VIVIANO GBK ENCLAVE is registered with the Telangana Real Estate Regulatory Authority as P02400007972; the registration status is On-Going Project.

Who is the developer of VIVIANO GBK ENCLAVE?

The promoter named in the RERA registration is VIVIANO DEVELOPERS.

Where is VIVIANO GBK ENCLAVE located?

VIVIANO GBK ENCLAVE is in YASHODARA NAGAR, BAIRAMALGUDA VILLAGE, Saroornagar, Rangareddy, Telangana (500079).

When will VIVIANO GBK ENCLAVE be completed?

The promoter's proposed date of completion filed with RERA is 30/04/2027. This is the promoter's declaration, not a guarantee.

More projects in Saroornagar