Ybr Infras Avasa North
YBR INFRA DEVELOPERS · Rangareddy · RERA P02400007826
YBR INFRAS AVASA NORTH is a plotted residential development in Adibatla, Ibrahimpatnam mandal, Ranga Reddy district, developed by registered promoter YBR INFRA DEVELOPERS. The registered site extent is 8312.23 sq. m, and the project offers residential open plots; the supplied record does not state a complete plot count or plot-size configurations. Its TG-RERA registration number is P02400007826, and its proposed completion date is 20/06/2024.
More from Ybr Infra Developers · 4 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
13 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered project name | YBR INFRAS AVASA NORTH RERA record |
| Project type | Plotted development; the filed layout documents describe a residential layout with open plots. RERA record RERA filing |
| Phase / registered portion | Phase not separately identified; the RERA record identifies the registered project and land as 41/3A PART. RERA record |
| TG-RERA registration | P02400007826. The certificate records validity from 13/03/2024 to 20/06/2024; it states a period of “0 years.” Registration validity is distinct from the project completion date and from occupancy-certificate status. RERA record |
| Registered promoter | YBR INFRA DEVELOPERS. The Form B filing also names KUCHARLAPATTI CHANDRA SEKHAR RAJU as a promoter. RERA record |
| RERA status | The supplied certificate establishes registration; it does not establish an extension or current registration validity beyond the stated end date. |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality | Adibatla RERA record RERA filing |
| Revenue village | Adibatla in the project header/RERA fields; the filed layout and title documents identify Ramdaspally/Ramadaspally village. The supplied record therefore contains both village references; see the cited filed documents for their stated scopes. RERA record RERA filing |
| Mandal / district / PIN | Ibrahimpatnam / Ranga Reddy / 501510 RERA record RERA filing |
| Project survey identity | Survey No. 41/3A PART in the registration record; the approval and title documents refer to Sy.No. 41/3A. RERA record |
| Registered site extent | 8312.23 sq. m; recorded as total area and net area in the project land fields. RERA filing |
| Boundaries as filed | North: 30 FEET WIDE ROAD; South and East: LAND OF YBR INFRA DEVELOPERS; West: LAND OF VENDORS. RERA filing |
| Cadastral record | A Bhu Bharati record is supplied for whole Survey No. 41, with extent 6903.0 sq. m; it is not a project-parcel measurement. Cadastral map |
Development identity
| Item | Project record |
|---|---|
| Principal layout approval | HMDA layout permit 000213/LO/Plg/HMDA/2019, dated 15 July 2019; the filed final-layout letter is dated 20 January 2021. |
| Other approval reference on file | HMDA extended layout approval 000228/LO/PLG/HMDA/2018. Approvals record |
| Local-body proceeding | Adibatla Municipality file TPS/Adibatla/ 468 / 260, approved 20/06/2021, concerning release of a draft residential layout. Approvals record |
| Approved built-up area | 5624.51 sq. m is recorded as “Approved Built up Area” in the RERA project fields. The supplied layout records are for a plotted layout, not a building-floor schedule. RERA filing |
| Buildings / floor configuration | Building count, floors and building configuration are not disclosed in the supplied record. This is a plotted layout, rather than a tower or apartment development. RERA filing |
| Layout land-use figures on file | Plotted area 5624.51 sq. m; park 707.34 sq. m; social infrastructure 208.48 sq. m; layout roads 1771.63 sq. m; amenities area 0. |
| Plot count | The draft-layout extraction refers to “20, 21 TO 24 no of plots”; a complete plot schedule/count is not supplied here. |
| Parking | No project-wide parking-space count or plot-wise parking allocation is supplied. |
Offering and status
| Item | Project record |
|---|---|
| Unit type | Residential open plots; plot count and plot-size bands are not fully available in the supplied material. |
| RERA saleable-size range | Not disclosed in the supplied structured data. RERA record |
| Booked / available | Counts are not supplied. The filed allotment letter is a form with plot number and payment particulars unfilled. |
| Construction stage | A site-progress percentage or independently verified current site condition is not supplied. The RERA amenities record lists several infrastructure items at 100%, but that is a filed progress field, not independent verification. RERA amenities |
| Completion date | The Form B declaration states 20-06-2024; the RERA header records proposed completion as 20/06/2024. RERA record |
| Occupancy certificate | An architect’s certificate identifies HMDA occupancy certificate 037931/LT/SMD/FLT/U6/HMDA/06082020, dated 20-01-2021, and certifies overall completion. The supplied record does not specify a tower scope; the project is a plotted layout. |
2. The project story
YBR INFRAS AVASA NORTH is registered as a plotted residential development in the Adibatla area of Ranga Reddy district. The RERA record identifies Survey No. 41/3A PART and a site extent of 8312.23 sq. m; the layout documents describe the land as Sy.No. 41/3A in Ramdaspally/Ramadaspally village and show plots, internal roads, park and social-infrastructure land. RERA record RERA filing
The filed layout material describes a residential open-plot layout, not apartment blocks or villas. A draft-layout letter refers to plots 20–24 as mortgage plots, while the final-layout record refers to registered gift and relinquishment deeds concerning roads, open spaces, social-infrastructure land and mortgaged plots. The supplied evidence does not provide a complete plot schedule, plot-size range, sold/unsold inventory, or a current independently verified construction report.
The RERA-filed amenities record reports internal roads and footpaths, water supply, sewerage, storm-water drains, green space/park, street lighting, rainwater harvesting and an electrical meter room/substation/receiving station at 100%. These are reported progress entries, not independent site verification. RERA amenities An architect’s certificate identifies an HMDA occupancy certificate dated 20-01-2021 and certifies project completion; the supplied record does not provide a separate current site inspection.
3. Master plan, architecture & building design
The approved design evidenced in the supplied documents is a plotted residential layout. The draft layout records a total site area of 8312.23 sq. m, a plotted area of 5624.51 sq. m, park area of 707.34 sq. m, social-infrastructure area of 208.48 sq. m, and layout-road area of 1771.63 sq. m. It records 0 amenities area.
The HMDA layout-plan extraction records a 9.14M road width and identifies utility land, open area, mortgage land and a 2.0m Wide Cycle & Walking Track. A separate filed plan extraction also records a 9.14M road width and utility/open-area annotations. The layout documents also refer to roads of 18 mts and above in the Adibatla Municipality proceeding.
The RERA fields list 5624.51 sq. m as approved built-up area; the supplied documents do not include a building schedule explaining that figure, nor a building count, floor configuration, building footprint, or apartment distribution. RERA filing The available drawing set is recorded as five drawings, with no flat plans and no software-measured drawings. Floor plans
4. Homes, configurations & floor plans
The project is recorded as a plotted development. No complete RERA unit-type schedule, plot-size bands, booked/available counts, or RERA-filed saleable-area figures are supplied. RERA record RERA filing The filed allotment letter identifies a project plot but leaves the plot number and payment particulars blank.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Residential plots | Not disclosed | Not disclosed | Not disclosed | Not disclosed | Not applicable / not supplied | Not supplied |
The supplied floor-plan data contains five drawings, all recorded as having no flats; no software-measured carpet-area results are available. Floor plans
5. Parking & vehicle circulation
A project-wide parking count, visitor or accessible parking provision, parking allocation by plot, and any dedicated parking arrangements are not supplied. The layout documents describe internal roads and road-access conditions, but do not establish exclusive parking rights for any plot.
6. Amenities, recreation & open spaces
The table below separates RERA-filed progress entries from facilities described in approval documents. A percentage in the RERA amenities record is a reported progress field, not independent verification. RERA amenities
| Description / size | Layout roads recorded as 1771.63 sq. m; approval records road widths including 9.14M and 18 mts and above. |
|---|---|
| Declared progress / verified status | RERA amenities record: 100%; not independently verified. RERA amenities |
| Description / size | Park recorded as 707.34 sq. m; approval materials also refer to park development and avenue plantation. |
|---|---|
| Declared progress / verified status | Green strip/tot lot/park: 100% in the RERA amenities record; not independently verified. RERA amenities |
| Description / size | 208.48 sq. m recorded in the draft-layout extraction. |
|---|---|
| Declared progress / verified status | Area recorded in the layout document; delivered facility or fit-out is not established. |
| Description / size | 2.0m Wide Cycle & Walking Track shown in the layout-plan extraction. |
|---|---|
| Declared progress / verified status | Drawing-derived approval-plan item; completion not independently verified. |
| Description / size | No size or facility details supplied. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA amenities record: 0%. |
| Description / size | Listed in the layout-plan extraction. |
|---|---|
| Declared progress / verified status | Approval-plan evidence; completion not independently verified. |
7. Utilities, building services & safety
| Evidence in the project record | RERA amenities record lists water supply at 100%. Layout approval conditions refer to protected water supply, internal water pipelines, an overhead tank and sumps. |
|---|---|
| Status shown | Filed progress entry; not independently verified. RERA amenities |
| Evidence in the project record | RERA amenities record lists sewerage at 100% and storm-water drains at 100%. Approval documents refer to underground drainage, a common septic tank/STP, storm-water drainage and sewage disposal. |
|---|---|
| Status shown | Filed progress entries and approval-document provisions; no current independent verification or capacity data supplied. RERA amenities |
| Evidence in the project record | Rainwater-harvesting pits/structure are listed in approval documents; the RERA amenities record lists water conservation/rainwater harvesting at 100%. |
|---|---|
| Status shown | Filed progress entry; not independently verified. RERA amenities |
| Evidence in the project record | The RERA amenities record lists an electrical meter room/substation/receiving station and street lighting at 100%. The layout approval conditions refer to street lighting, electricity facilities and a transformer yard. |
|---|---|
| Status shown | Filed progress entries and approval conditions; independent verification not supplied. RERA amenities |
| Evidence in the project record | Approval-plan extraction lists bio-compost and a garbage transfer yard; the draft-layout conditions require space for solid-waste disposal. |
|---|---|
| Status shown | Approval-document evidence; the RERA amenities record shows solid-waste management/disposal at 0%. RERA amenities |
| Evidence in the project record | No project-specific fire-protection details are supplied; the RERA amenities record shows 0% for fire protection and fire-safety requirements. |
|---|---|
| Status shown | Not evidenced as complete. RERA amenities |
| Evidence in the project record | The layout-plan extraction identifies a 2.0m cycle and walking track. No accessible-route or accessibility-feature schedule is supplied. |
|---|---|
| Status shown | Drawing-derived feature; no further accessibility status established. |
8. Location, access & connectivity
The registered location is Adibatla, Ibrahimpatnam mandal, Ranga Reddy district, PIN 501510. The project land record identifies Survey No. 41/3A PART; the filed layout documents use Ramdaspally/Ramadaspally village for Sy.No. 41/3A. RERA record RERA filing
The project’s northern boundary is recorded as a 30 FEET WIDE ROAD. The layout approval material describes internal roads and requires roads to remain open for access to neighboring sites and general public. RERA filing
A cadastral-centroid location record places the parcel at 17.237043274340696, 78.5508564316671. The supplied connectivity record gives the nearest sampled Outer Ring Road interchange at approximately 0.3 km. Cadastral map Location record No public-transport details or independently measured distances to other landmarks are supplied.
9. Developer & development status
The registered promoter is YBR INFRA DEVELOPERS, recorded as a Partnership. The project record names SRUNGAVARAPU SRIRANGA as a partner and Y BHAKTHAVATHSAL REDDY as authorized signatory; the Form B filing also names KUCHARLAPATTI CHANDRA SEKHAR RAJU as a promoter. Corporate record Parties record
The promoter address recorded in the project data is LR PLAZA, HYDERGUDA, RAMDASPALLI, ADIBATLA, Ibrahimpatnam, Ranga Reddy, 501510. The registration certificate gives the promoter name but its address field states “Village: Mandal: District: Hyderabad, Pin: 500029”; a complete verified registered-office address and corporate registration identifier are not established in the supplied record. Parties record
The RERA header and Form B state a completion date of 20/06/2024. The supplied evidence contains an architect’s certificate identifying an HMDA occupancy certificate dated 20-01-2021, but no current site-progress measurement or independent site verification. RERA record
10. Approvals, official records & documents
| Identifier / date | P02400007826; validity 13/03/2024–20/06/2024 |
|---|---|
| What it establishes in the supplied record | Registration of YBR INFRAS AVASA NORTH under Ybr Infra Developers; certificate states project obligations and validity. |
| Identifier / date | 000213/LO/Plg/HMDA/2019, 15 July 2019 |
|---|---|
| What it establishes in the supplied record | Draft plotted-layout approval for Sy.No. 41/3A, extent 8312.23 sq. m, including development conditions and mortgage plots. |
| Identifier / date | 000228/LO/PLG/HMDA/2018 |
|---|---|
| What it establishes in the supplied record | Layout-plan reference shown in the filed HMDA plan extracts. |
| Identifier / date | 000213/LO/Plg/HMDA/2019, dated 20 January 2021 |
|---|---|
| What it establishes in the supplied record | Final residential layout with open plots; records roads, open spaces and social-infrastructure land as handed over by registered gift deed and refers to a relinquishment deed for mortgaged plots. |
| Identifier / date | File TPS/Adibatla/ 468 / 260, approved 20/06/2021 |
|---|---|
| What it establishes in the supplied record | Proceeding releasing a draft residential layout in Sy.No. 41/3A, extent 8312.23 sq. m. |
| Identifier / date | HMDA OC 037931/LT/SMD/FLT/U6/HMDA/06082020, dated 20-01-2021 |
|---|---|
| What it establishes in the supplied record | Architect’s certificate states overall project completion and identifies the occupancy certificate. |
| Identifier / date | Form B, 20-06-2024 completion undertaking |
|---|---|
| What it establishes in the supplied record | Promoter-filed declaration concerning title, encumbrances, project completion and statutory declarations. |
| Identifier / date | Dated 07.07.2019 |
|---|---|
| What it establishes in the supplied record | Advocate’s title report concerning agricultural land in Sy.No. 41/3A at Ramdaspally Village. |
| Identifier / date | Allotment letter 403823; agreement for sale 403805 |
|---|---|
| What it establishes in the supplied record | Forms identify the project and land, but the supplied allotment form leaves plot number and payment particulars blank, and the agreement form lacks completed transaction particulars. |
1. Project at a glance
Project identity
Registered project name: YBR INFRAS AVASA NORTH
Project type: Plotted development; the filed layout documents describe a residential layout with open plots.
Phase / registered portion: Phase not separately identified; the RERA record identifies the registered project and land as 41/3A PART.
TG-RERA registration: P02400007826. The certificate records validity from 13/03/2024 to 20/06/2024; it states a period of “0 years.” Registration validity is distinct from the project completion date and from occupancy-certificate status.
Registered promoter: YBR INFRA DEVELOPERS. The Form B filing also names KUCHARLAPATTI CHANDRA SEKHAR RAJU as a promoter.
RERA status: The supplied certificate establishes registration; it does not establish an extension or current registration validity beyond the stated end date.
Land and geographic identity
Locality: Adibatla
Revenue village: Adibatla in the project header/RERA fields; the filed layout and title documents identify Ramdaspally/Ramadaspally village. The supplied record therefore contains both village references; see the cited filed documents for their stated scopes.
Mandal / district / PIN: Ibrahimpatnam / Ranga Reddy / 501510
Project survey identity: Survey No. 41/3A PART in the registration record; the approval and title documents refer to Sy.No. 41/3A.
Registered site extent: 8312.23 sq. m; recorded as total area and net area in the project land fields.
Boundaries as filed: North: 30 FEET WIDE ROAD; South and East: LAND OF YBR INFRA DEVELOPERS; West: LAND OF VENDORS.
Cadastral record: A Bhu Bharati record is supplied for whole Survey No. 41, with extent 6903.0 sq. m; it is not a project-parcel measurement.
Development identity
Principal layout approval: HMDA layout permit 000213/LO/Plg/HMDA/2019, dated 15 July 2019; the filed final-layout letter is dated 20 January 2021.
Other approval reference on file: HMDA extended layout approval 000228/LO/PLG/HMDA/2018.
Local-body proceeding: Adibatla Municipality file TPS/Adibatla/ 468 / 260, approved 20/06/2021, concerning release of a draft residential layout.
Approved built-up area: 5624.51 sq. m is recorded as “Approved Built up Area” in the RERA project fields. The supplied layout records are for a plotted layout, not a building-floor schedule.
Buildings / floor configuration: Building count, floors and building configuration are not disclosed in the supplied record. This is a plotted layout, rather than a tower or apartment development.
Layout land-use figures on file: Plotted area 5624.51 sq. m; park 707.34 sq. m; social infrastructure 208.48 sq. m; layout roads 1771.63 sq. m; amenities area 0.
Plot count: The draft-layout extraction refers to “20, 21 TO 24 no of plots”; a complete plot schedule/count is not supplied here.
Parking: No project-wide parking-space count or plot-wise parking allocation is supplied.
Offering and status
Unit type: Residential open plots; plot count and plot-size bands are not fully available in the supplied material.
RERA saleable-size range: Not disclosed in the supplied structured data.
Booked / available: Counts are not supplied. The filed allotment letter is a form with plot number and payment particulars unfilled.
Construction stage: A site-progress percentage or independently verified current site condition is not supplied. The RERA amenities record lists several infrastructure items at 100%, but that is a filed progress field, not independent verification.
Completion date: The Form B declaration states 20-06-2024; the RERA header records proposed completion as 20/06/2024.
Occupancy certificate: An architect’s certificate identifies HMDA occupancy certificate 037931/LT/SMD/FLT/U6/HMDA/06082020, dated 20-01-2021, and certifies overall completion. The supplied record does not specify a tower scope; the project is a plotted layout.
2. The project story
YBR INFRAS AVASA NORTH is registered as a plotted residential development in the Adibatla area of Ranga Reddy district. The RERA record identifies Survey No. 41/3A PART and a site extent of 8312.23 sq. m; the layout documents describe the land as Sy.No. 41/3A in Ramdaspally/Ramadaspally village and show plots, internal roads, park and social-infrastructure land.
The filed layout material describes a residential open-plot layout, not apartment blocks or villas. A draft-layout letter refers to plots 20–24 as mortgage plots, while the final-layout record refers to registered gift and relinquishment deeds concerning roads, open spaces, social-infrastructure land and mortgaged plots. The supplied evidence does not provide a complete plot schedule, plot-size range, sold/unsold inventory, or a current independently verified construction report.
The RERA-filed amenities record reports internal roads and footpaths, water supply, sewerage, storm-water drains, green space/park, street lighting, rainwater harvesting and an electrical meter room/substation/receiving station at 100%. These are reported progress entries, not independent site verification. An architect’s certificate identifies an HMDA occupancy certificate dated 20-01-2021 and certifies project completion; the supplied record does not provide a separate current site inspection.
3. Master plan, architecture & building design
The approved design evidenced in the supplied documents is a plotted residential layout. The draft layout records a total site area of 8312.23 sq. m, a plotted area of 5624.51 sq. m, park area of 707.34 sq. m, social-infrastructure area of 208.48 sq. m, and layout-road area of 1771.63 sq. m. It records 0 amenities area.
The HMDA layout-plan extraction records a 9.14M road width and identifies utility land, open area, mortgage land and a 2.0m Wide Cycle & Walking Track. A separate filed plan extraction also records a 9.14M road width and utility/open-area annotations. The layout documents also refer to roads of 18 mts and above in the Adibatla Municipality proceeding.
The RERA fields list 5624.51 sq. m as approved built-up area; the supplied documents do not include a building schedule explaining that figure, nor a building count, floor configuration, building footprint, or apartment distribution. The available drawing set is recorded as five drawings, with no flat plans and no software-measured drawings.
4. Homes, configurations & floor plans
The project is recorded as a plotted development. No complete RERA unit-type schedule, plot-size bands, booked/available counts, or RERA-filed saleable-area figures are supplied. The filed allotment letter identifies a project plot but leaves the plot number and payment particulars blank.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Residential plots | Not disclosed | Not disclosed | Not disclosed | Not disclosed | Not applicable / not supplied | Not supplied |
The supplied floor-plan data contains five drawings, all recorded as having no flats; no software-measured carpet-area results are available.
5. Parking & vehicle circulation
A project-wide parking count, visitor or accessible parking provision, parking allocation by plot, and any dedicated parking arrangements are not supplied. The layout documents describe internal roads and road-access conditions, but do not establish exclusive parking rights for any plot.
6. Amenities, recreation & open spaces
The table below separates RERA-filed progress entries from facilities described in approval documents. A percentage in the RERA amenities record is a reported progress field, not independent verification.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Internal roads and footpaths | Layout roads recorded as 1771.63 sq. m; approval records road widths including 9.14M and 18 mts and above. | RERA amenities record: 100%; not independently verified. | |
| Park / green open space | Park recorded as 707.34 sq. m; approval materials also refer to park development and avenue plantation. | Green strip/tot lot/park: 100% in the RERA amenities record; not independently verified. | |
| Social infrastructure area | 208.48 sq. m recorded in the draft-layout extraction. | Area recorded in the layout document; delivered facility or fit-out is not established. | |
| Cycle and walking track | 2.0m Wide Cycle & Walking Track shown in the layout-plan extraction. | Drawing-derived approval-plan item; completion not independently verified. | |
| Community buildings | No size or facility details supplied. | RERA amenities record: 0%. | |
| Bio-compost / garbage transfer yard | Listed in the layout-plan extraction. | Approval-plan evidence; completion not independently verified. |
7. Utilities, building services & safety
| Evidence in the project record | RERA amenities record lists water supply at 100%. Layout approval conditions refer to protected water supply, internal water pipelines, an overhead tank and sumps. |
|---|---|
| Status shown | Filed progress entry; not independently verified. |
| Evidence in the project record | RERA amenities record lists sewerage at 100% and storm-water drains at 100%. Approval documents refer to underground drainage, a common septic tank/STP, storm-water drainage and sewage disposal. |
|---|---|
| Status shown | Filed progress entries and approval-document provisions; no current independent verification or capacity data supplied. |
| Evidence in the project record | Rainwater-harvesting pits/structure are listed in approval documents; the RERA amenities record lists water conservation/rainwater harvesting at 100%. |
|---|---|
| Status shown | Filed progress entry; not independently verified. |
| Evidence in the project record | The RERA amenities record lists an electrical meter room/substation/receiving station and street lighting at 100%. The layout approval conditions refer to street lighting, electricity facilities and a transformer yard. |
|---|---|
| Status shown | Filed progress entries and approval conditions; independent verification not supplied. |
| Evidence in the project record | Approval-plan extraction lists bio-compost and a garbage transfer yard; the draft-layout conditions require space for solid-waste disposal. |
|---|---|
| Status shown | Approval-document evidence; the RERA amenities record shows solid-waste management/disposal at 0%. |
| Evidence in the project record | No project-specific fire-protection details are supplied; the RERA amenities record shows 0% for fire protection and fire-safety requirements. |
|---|---|
| Status shown | Not evidenced as complete. |
| Evidence in the project record | The layout-plan extraction identifies a 2.0m cycle and walking track. No accessible-route or accessibility-feature schedule is supplied. |
|---|---|
| Status shown | Drawing-derived feature; no further accessibility status established. |
8. Location, access & connectivity
The registered location is Adibatla, Ibrahimpatnam mandal, Ranga Reddy district, PIN 501510. The project land record identifies Survey No. 41/3A PART; the filed layout documents use Ramdaspally/Ramadaspally village for Sy.No. 41/3A.
The project’s northern boundary is recorded as a 30 FEET WIDE ROAD. The layout approval material describes internal roads and requires roads to remain open for access to neighboring sites and general public.
A cadastral-centroid location record places the parcel at 17.237043274340696, 78.5508564316671. The supplied connectivity record gives the nearest sampled Outer Ring Road interchange at approximately 0.3 km. No public-transport details or independently measured distances to other landmarks are supplied.
9. Developer & development status
The registered promoter is YBR INFRA DEVELOPERS, recorded as a Partnership. The project record names SRUNGAVARAPU SRIRANGA as a partner and Y BHAKTHAVATHSAL REDDY as authorized signatory; the Form B filing also names KUCHARLAPATTI CHANDRA SEKHAR RAJU as a promoter.
The promoter address recorded in the project data is LR PLAZA, HYDERGUDA, RAMDASPALLI, ADIBATLA, Ibrahimpatnam, Ranga Reddy, 501510. The registration certificate gives the promoter name but its address field states “Village: Mandal: District: Hyderabad, Pin: 500029”; a complete verified registered-office address and corporate registration identifier are not established in the supplied record.
The RERA header and Form B state a completion date of 20/06/2024. The supplied evidence contains an architect’s certificate identifying an HMDA occupancy certificate dated 20-01-2021, but no current site-progress measurement or independent site verification.
10. Approvals, official records & documents
| Identifier / date | P02400007826; validity 13/03/2024–20/06/2024 |
|---|---|
| What it establishes in the supplied record | Registration of YBR INFRAS AVASA NORTH under Ybr Infra Developers; certificate states project obligations and validity. |
| Identifier / date | 000213/LO/Plg/HMDA/2019, 15 July 2019 |
|---|---|
| What it establishes in the supplied record | Draft plotted-layout approval for Sy.No. 41/3A, extent 8312.23 sq. m, including development conditions and mortgage plots. |
| Identifier / date | 000228/LO/PLG/HMDA/2018 |
|---|---|
| What it establishes in the supplied record | Layout-plan reference shown in the filed HMDA plan extracts. |
| Identifier / date | 000213/LO/Plg/HMDA/2019, dated 20 January 2021 |
|---|---|
| What it establishes in the supplied record | Final residential layout with open plots; records roads, open spaces and social-infrastructure land as handed over by registered gift deed and refers to a relinquishment deed for mortgaged plots. |
| Identifier / date | File TPS/Adibatla/ 468 / 260, approved 20/06/2021 |
|---|---|
| What it establishes in the supplied record | Proceeding releasing a draft residential layout in Sy.No. 41/3A, extent 8312.23 sq. m. |
| Identifier / date | HMDA OC 037931/LT/SMD/FLT/U6/HMDA/06082020, dated 20-01-2021 |
|---|---|
| What it establishes in the supplied record | Architect’s certificate states overall project completion and identifies the occupancy certificate. |
| Identifier / date | Form B, 20-06-2024 completion undertaking |
|---|---|
| What it establishes in the supplied record | Promoter-filed declaration concerning title, encumbrances, project completion and statutory declarations. |
| Identifier / date | Dated 07.07.2019 |
|---|---|
| What it establishes in the supplied record | Advocate’s title report concerning agricultural land in Sy.No. 41/3A at Ramdaspally Village. |
| Identifier / date | Allotment letter 403823; agreement for sale 403805 |
|---|---|
| What it establishes in the supplied record | Forms identify the project and land, but the supplied allotment form leaves plot number and payment particulars blank, and the agreement form lacks completed transaction particulars. |
Frequently asked questions
Is YBR INFRAS AVASA NORTH registered with Telangana RERA?
Yes. YBR INFRAS AVASA NORTH is registered with the Telangana Real Estate Regulatory Authority as P02400007826; the registration status is New Project.
Who is the developer of YBR INFRAS AVASA NORTH?
The promoter named in the RERA registration is YBR INFRA DEVELOPERS.
Where is YBR INFRAS AVASA NORTH located?
YBR INFRAS AVASA NORTH is in ADIBATLA, Ibrahimpatnam, Rangareddy, Telangana (501510).
When will YBR INFRAS AVASA NORTH be completed?
The promoter's proposed date of completion filed with RERA is 20/06/2024. This is the promoter's declaration, not a guarantee.
More projects in Adibatla