TAARINI RESIDENCY is a residential apartment project at 30 KOTE ROAD , in Bodhan (R), BODHAN Mandal, Nizamabad District, developed by the registered promoter Bsconstructions. It is on a site of 3040.18 sq. m and comprises 1 building with 1 stilt + 5 upper floors and 70 homes, in 2BHK and 3BHK configurations. The project is registered under TG-RERA number P03100009576, with a proposed completion date of 05/08/2028.

More from Bs Constructions · 3 projects →

01What we found

RegisteredTG-RERA - valid till 5 Apr 2028
29documents on file - each fact links to its page
0court cases on this project's land in the court records searched
8items to check - 2 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

8 items to check before you pay, 2 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

FieldRecord
Registered project nameTAARINI RESIDENCY RERA record
Project typeResidential apartment project RERA record
Phase / registered portionPhase designation not separately disclosed; TG-RERA registration is for the project identified as TAARINI RESIDENCY RERA record
TG-RERA registrationP03100009576 Approvals record
Registration validity05/04/2025 to 05/04/2028; the certificate states three years, unless extended by the Authority Approvals record
Registered promoterBsconstructions, identified in the registration certificate; the project documents also identify the firm as B.S. Constructions / BS Constructions
RERA statusRegistered; the certificate is the TG-RERA Form C record

Land and geographic identity

FieldRecord
Locality / address in project record30 KOTE ROAD, RERA record RERA filing
Revenue villageBodhan (R) RERA record
MandalBODHAN RERA record RERA filing
DistrictNizamabad RERA record
PIN503185 RERA record RERA filing
All project survey numbers / subdivisions91, 91/B1/1, 91/B1/2, 23/1/1, 23/1/1/2, 24/4
Site extent3040.18 sq. m / m²; the filed approval records the same as site area and net area, with road-affected area 0 Land records
Boundaries stated in the RERA filingEast: PLACE OF SAILU; West: PLACE OF RAMCHANDER INNANI; North: PLACE OF SHANTHI DEVI AND GOVIND; South: PLACE OF RAMCHANDER INNANI AND PRIVATE PATH WAY RERA filing

Development identity

FieldRecord
Sanctioning authorityBodhan Municipality/Municipal Corporation; the filing also identifies DTCP as authority Approvals record
Principal building approval0001/BP/3070/2025, approved 05 April 2025; file no. 002226/BP/BODH/3070/0006/2025 Approvals record
Approved built-up areaTOTAL BUA: 8692.84; approval extraction separately records TOTAL PROPOSED BUILT UP AREA EXCLUDING PARKING: 7063.10, TOTAL PROPOSED BUILT UP AREA INCLUDING PARKING: 8655.28, and NET BUA: 7063.10. These are distinct figures as recorded in the filed material.
Building count and floors1 building; 1 stilt + 5 upper floors
HeightApproval extraction records 14.95 MT and also Total Ht.: 20.44mt.
Approved parking provisionNo of Cars Proposed: 38; approval extraction records Required Parking Area: 1553.88 and Proposed Parking Area: 1592.18
Unit count70 units in the building-plan extraction and TG-RERA unit filing RERA unit table

Offering and status

FieldRecord
Configurations2BHK and 3BHK RERA unit table
RERA-filed saleable area2BHK: 114.6 sqm; 3BHK: 149.39 sqm RERA unit table
Portal booking availability2BHK: 60 units, 0 booked, 60 available; 3BHK: 10 units, 0 booked, 10 available. The portal record has no stated as-of date, so these counts are indicative. RERA unit table
RERA completion undertakingForm B states completion by 04/04/2028
Proposed completion date in project header05/08/2028 RERA record
Construction stageNo independently verified site-progress record is supplied; the RERA amenity progress fields shown are 0%. RERA amenities
Occupancy / completion certificateNo occupancy or completion certificate is included in the supplied project records. The building approval requires a completion notice and occupancy certificate before occupation.

2. The project story

TAARINI RESIDENCY is registered as a residential apartment project in Bodhan (R), Bodhan Mandal, Nizamabad District, on a recorded site of 3040.18 sq. m. The project registration identifies the land by six survey references: 91, 91/B1/1, 91/B1/2, 23/1/1, 23/1/1/2 and 24/4. RERA record Land records

The filed building approval describes one residential building with one stilt and five upper floors, containing 70 units. The available configurations are 2BHK and 3BHK. The RERA portal’s displayed counts are 60 2BHK and 10 3BHK units, all shown as available; these counts have no as-of date in the supplied record. RERA unit table

The project is registered through 05/04/2028. The Form B completion undertaking states 04/04/2028, while the project header records a proposed completion date of 05/08/2028. No site-inspection evidence or occupancy/completion certificate is supplied to establish construction progress or completed and occupied portions. The RERA amenity progress entries provided are recorded as 0%. RERA record RERA amenities

3. Master plan, architecture & building design

The filed plan material describes one apartment building on a plot of 3040.18 sq. m, with net plot area also recorded as 3040.18 sq. m. It specifies 1 stilt + 5 upper floors, and its floor-area schedule lists the stilt and first through fifth floors, plus a terrace-floor entry. The approval extraction records TOTAL BUA: 8692.84, NET BUA: 7063.10, and TOTAL PROPOSED BUILT UP AREA INCLUDING PARKING: 8655.28; the approval certificate separately records 7,063.10 m² residential area and 1,562.34 m² stilt parking floors. These figures retain their respective document labels and are not interchangeable.

The plan extraction records road references of 15.00 MT WIDE EXISTING ROAD, 15.00 MT WIDE PROPOSED ROAD, 9.0m Wide Road, 30'0" Wide Road and 50'0" Wide Road. The building approval also records an 18M road width. The supplied material does not establish detailed internal circulation, building footprint, lifts per floor, or a complete floor-by-floor unit schedule.

The plan extraction lists a green strip and tot-lot, but the commencement-certificate extraction records tot-lot area as 0 m². It does not establish a measured recreational open-space area.

4. Homes, configurations & floor plans

The TG-RERA filing records the unit counts and saleable areas below. Carpet-area figures are software measurements taken from the approved floor-plan drawing, not RERA-filed disclosures; the measurement record notes that drawing geometry needs review. Saleable area includes the home’s share of common areas, so it is not the same measure as carpet area. RERA unit table Floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK60060114.6 sqm67.1–81.5 sqm; median 71.5 sqm (software-measured)38% (software-derived)
3BHK10010149.39 sqm94.4–98.7 sqm; median 97.0 sqm (software-measured)35% (software-derived)

The measured sample covers 24 2BHK and 4 3BHK flat designs in the supplied drawing record. A sample 2BHK drawing shows two bedrooms, a hall, kitchen, two toilets, balconies and a utility; the sample 3BHK shows bedrooms, drawing room, living/dining, kitchen, toilets, balconies and utility. Room dimensions are shown on the source drawing for the sample flats, but are drawing measurements rather than RERA area disclosures. Floor plans RERA unit details

5. Parking & vehicle circulation

The building-plan extraction states 38 proposed cars, Required Parking Area: 1553.88 and Proposed Parking Area: 1592.18. The commencement-certificate extraction records 1,562.34 m² as stilt parking floors; the plan schedule records 1,592.18 as parking area.

The approval conditions state that the approved stilt parking is to be used exclusively for vehicle parking. The supplied records do not establish a separate two-wheeler or visitor-parking count, parking allocation to individual units, accessible spaces, ramp arrangement, or pedestrian/vehicle separation. A parking bay shown on a plan does not by itself establish exclusive ownership.

6. Amenities, recreation & open spaces

The project filing lists infrastructure and amenity categories, while the building-plan extraction names several specific provisions. The RERA progress entries supplied for amenities are recorded as 0%; no independent completion verification is provided. RERA amenities

Green strip / tot-lot
Description / sizeGreen strip and tot-lot named in the plan extraction; no size supplied there. Approval conditions require the tot-lot to be fenced and maintained as greenery before occupancy certificate.
Declared progress / verified statusRERA progress record: 0%; no independent completion evidence supplied.
Rainwater harvesting
Description / sizePercolation pit / rainwater-harvesting structure; plan extraction records No. of RWHPs 1.
Declared progress / verified statusRERA progress record: 0%; no independent completion evidence supplied.
Water supply
Description / sizeRERA filing marks water supply “YES”; plan extraction lists sump, municipal sump and overhead water tank.
Evidence sourceRERA amenities
Declared progress / verified statusRERA progress record: 0%; no independent completion evidence supplied.
Sewerage
Description / sizeRERA filing lists sewerage and treatment/disposal of sewage and sullage; plan extraction lists a septic tank.
Evidence sourceRERA amenities
Declared progress / verified statusRERA progress record: 0%; no independent completion evidence supplied.
Electrical / energy
Description / sizeRERA filing marks energy management “YES”; plan extraction lists a distribution transformer and transformer.
Evidence sourceRERA amenities
Declared progress / verified statusRERA progress record: 0%; no independent completion evidence supplied.
Waste management
Description / sizePlan extraction lists a garbage bin; the approval conditions require a garbage house within the premises.
Declared progress / verified statusRERA progress record: 0%; no independent completion evidence supplied.
Lift
Description / sizeA lift is listed in the building-plan extraction.
Declared progress / verified statusNo capacity or completion status supplied.

No clubhouse or sports facility is identified in the supplied project records. The approval extraction records Aggregate area of recreational Open Space: 0%, and the commencement-certificate extraction records tot-lot area as 0 m². RERA amenities

7. Utilities, building services & safety

The RERA filing marks water supply, water conservation/rainwater harvesting and energy management as “YES,” but provides no capacities or operating-status evidence. The building-plan extraction lists a sump, municipal sump, overhead water tank, rainwater-harvesting percolation well, septic tank, transformer, lift and staircase head room. It does not provide storage capacities, water sources beyond the listed municipal sump, treatment capacity, sewage-treatment plant details, backup-power provision, or lift capacity. RERA amenities

The building approval requires a rainwater-harvesting structure, transformer space, a garbage house, and fire-safety installations as a responsibility of the owner, builder, architect and site engineer. It also states that sanitation, plumbing, fire-safety requirements, lifts and electrical installations are to be executed under qualified technical supervision. These are approval conditions, not evidence that the installations are complete or independently verified.

The supplied material does not specify accessible routes or facilities, CCTV, security/access systems, EV charging provision in the project’s specific installation schedule, or detailed fire-equipment and escape-stair arrangements. The approval records that occupancy certification is required before occupation.

8. Location, access & connectivity

The registered project location is Bodhan (R), BODHAN, Nizamabad, 503185, with the RERA filing giving the locality as 30 KOTE ROAD,. The filed building-plan instrument describes the site as within Bodhan Town municipal limits and identifies Ward No. 03, Block No. 01 of Thattikote Road, Bodhan Town. RERA record

The plan material lists road references including 15.00 MT WIDE EXISTING ROAD, 15.00 MT WIDE PROPOSED ROAD, 9.0m Wide Road, 30'0" Wide Road and 50'0" Wide Road; the commencement certificate records an 18M road width. The supplied location data gives the nearest sampled Outer Ring Road interchange at approximately 129.9 km. No public-transport details or other measured landmark distances are supplied. Location record

9. Developer & development status

The registered promoter is named Bsconstructions in the TG-RERA certificate. Project and approval records identify M/S. B.S Constructions / BS Constructions as a partnership. The RERA filing lists GSTIN 36AATFB4782H1ZY and identifies SADULA DHEERAJ and SADULA RAMESH as authorized signatories. Corporate record Parties record

The registration certificate gives the promoter’s registered-office address as Village: Pothangal, Mandal: KOTAIGIRI, District: Nizamabad, Pin: 503207. The project record separately gives the project location in Bodhan (R), Bodhan Mandal, Nizamabad, PIN 503185. RERA record

The promoter’s Form B declaration, dated 29/04/2025, undertakes completion by 04/04/2028. The project header records proposed completion on 05/08/2028, and the TG-RERA registration certificate is valid through 05/04/2028 unless extended by the Authority. No independently verified construction-progress percentage or occupancy certificate is supplied. RERA record

10. Approvals, official records & documents

RecordEvidence available
TG-RERA registrationForm C certificate for TAARINI RESIDENCY, registration P03100009576, valid 05/04/2025–05/04/2028 unless extended.
Building permissionApproval 0001/BP/3070/2025, dated 05 April 2025, by Bodhan Municipality/Municipal Corporation; file no. 002226/BP/BODH/3070/0006/2025.
Commencement / building approval documentFiled document describes approval for one residential building on the listed project land, with one stilt and five upper floors; the approval requires commencement notice and occupancy certification before occupation.
Plan materialFiled plan extraction for the proposed residential apartment building records site extent, floor schedule, parking provision, road references and listed utilities.
Project declarationForm B affidavit-cum-declaration by SADULA RAMESH and SADULA DEERAJ, dated 29/04/2025, including the promoter’s completion undertaking and project-account declarations.
Occupancy / completion certificateNot present in the supplied records. Document index
Environmental clearance searchThe supplied result is a promoter-name search with no project-specific environmental-clearance match; it is not a project clearance determination. Regulatory record

Frequently asked questions

Is TAARINI RESIDENCY registered with Telangana RERA?

Yes. TAARINI RESIDENCY is registered with the Telangana Real Estate Regulatory Authority as P03100009576; the registration status is New Project.

Who is the developer of TAARINI RESIDENCY?

The promoter named in the RERA registration is BSCONSTRUCTIONS.

Where is TAARINI RESIDENCY located?

TAARINI RESIDENCY is in 30 KOTE ROAD ,, Bodhan (R), BODHAN, Nizamabad, Telangana (503185).

When will TAARINI RESIDENCY be completed?

The promoter's proposed date of completion filed with RERA is 05/08/2028. This is the promoter's declaration, not a guarantee.

More projects in Bodhan