Kamadhenu Avenue

NEW SREENIDHI TOWNSHIP · Nizamabad · RERA P03100008909

KAMADHENU AVENUE is a new plotted development in Bodhan Municipality / Bodhan (R), Bodhan Mandal, Nizamabad District, Telangana. The registered promoter is NEW SREENIDHI TOWNSHIP. The project covers 40,367.39 sq. m and comprises 144 plots, with sizes from 125.41 sq. m (150.0 sq. yd) to 365.48 sq. m (437.1 sq. yd). It is registered under TG-RERA number P03100008909, effective 22 May 2024, with proposed completion on 30/11/2026.

01What we found

RegisteredTG-RERA
15documents on file - each fact links to its page
0court cases on this project's land in the court records searched
7items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

7 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Project at a glance

Project identity

FieldRecord
Registered project nameKAMADHENU AVENUE RERA record
Project typeNew plotted development / layout with open plots RERA record
Phase / registered portionNo separate phase is identified in the supplied registration record; the registered project is the plotted layout. RERA record
TG-RERA registrationP03100008909, effective 22 May 2024 RERA record
Registration validityCertificate states validity from 22/05/2024 to 21/05/2026, unless extended by the Authority. This is registration validity, not the same as a project-completion date.
Registered promoterNEW SREENIDHI TOWNSHIP, partnership RERA record Corporate record
RERA statusThe supplied record identifies the project as “New Project”; it does not establish a later extension or current registration status. RERA record

Land and geographic identity

FieldRecord
LocalityBodhan Municipality / Bodhan (R)
Revenue villages / shivarsAchanpally Shivar and Pandu Tarfa; the RERA certificate describes the land as Achanpally Shivar and Pandu Tarfa.
Mandal / district / PINBodhan Mandal, Nizamabad District, Telangana; PIN 503185
Survey numbers and subdivisions24/PART in Achanpally Shivar; 799/PART, 800/PART, 802/PART and 898/PART in Pandu Tarfa RERA record
Registered site extentTG-RERA land details state 40,367.39 sq. m total and net area. RERA filing
Drawing-stated net layout area40,366.31 sq. m in the layout drawing’s sanctioned parameters; its land-use table totals 40,366.33 sq. m.
Boundaries in RERA land detailsEast: neighbours’ land; west: 30 MT wide existing road; north: proposed 18 M wide road; south: neighbours’ land. RERA filing

Development identity

FieldRecord
Sanctioning authorityTentative layout plan issued by BODHAN Municipality/Municipal Corporation; the layout-plan file identifies TS-DTCP and delegation to Bodhan Municipality.
Principal approval0002/LO/3070/2024, dated 22 May 2024; application 002939/LO/DTCP/3070/0004/2024. Approvals record
Approved layout drawing referenceFile TS/015092/2024. Approvals record
Approved built-up area0.00 proposed built-up area, excluding and including parking, in the sanctioned parameters: this is a plotted layout, not a building approval.
Plots144 plots in the layout plan.
Buildings / floors / parking levelsNo buildings, floor configuration or parking levels are identified in the supplied layout approval.

Offering and status

FieldRecord
Offered unit typePlots; RERA registration classifies the project as plotted.
Plot count and areasThe drawing-derived schedule identifies 144 plots with sizes from 125.41 sq. m (150.0 sq. yd) to 365.48 sq. m (437.1 sq. yd); the size readings are software-measured from drawing text and should be checked against the drawing. Layout record
Booked / available plotsNot disclosed in the supplied evidence. RERA filing
Construction stageThe supplied material establishes tentative layout approval and stated development requirements, but does not provide a verified site-progress assessment.
Completion datesThe Form B declaration states 21/05/2026; the project header lists proposed completion as 30/11/2026. RERA record
Occupancy / completion certificateNot evidenced in the supplied documents. The approval on file is a tentative layout plan, not an occupancy or completion certificate.

The project story

KAMADHENU AVENUE is registered with TG-RERA as a plotted development by NEW SREENIDHI TOWNSHIP. The filed location is Bodhan (R), Bodhan Mandal, Nizamabad District, covering land identified in Achanpally Shivar and Pandu Tarfa under survey subdivisions 24/PART, 799/PART, 800/PART, 802/PART and 898/PART. RERA record

The tentative layout approval describes 144 plots on a site of approximately 40,366 sq. m, with internal roads, park/open space, social-infrastructure land and utility land. It does not approve residential buildings or provide building-floor plans; individual plot construction would be a separate matter from the layout approval.

The available record describes a planned development, not independently verified completion. The Municipality’s approval conditions require the developer to complete layout infrastructure and amenities within two years of approval—by 22 May 2026—and set out a possible one-year extension on request and payment. Those are approval conditions, not evidence that the works have been completed.

Master plan, architecture & building design

This is a plotted layout rather than a multi-storey building project. The drawing identifies a net layout area of 40,366.31 sq. m and allocates land as follows; these are layout-plan figures, not building areas.

Layout useAreaShare shown on drawing
Plotted area24,424.80 sq. m60.51%
Roads10,852.25 sq. m26.88%
Organized open space / park3,675.07 sq. m9.10%
Social infrastructure1,010.42 sq. m2.50%
Utilities403.79 sq. m1.00%
Amenity area0.00 sq. m0.00%

The layout drawing identifies 144 individual plots. Internal road labels include 9.14M and 10.06M wide roads; it also labels a 30.00 MT wide existing road, a 30.00 MT wide proposed road, and an 18M [60'-0"] wide master plan road. The RERA land-details boundaries separately describe the west edge as a 30 MT existing road and the north edge as a proposed 18 M road. RERA filing

The drawing marks 24 plots for mortgage, with a proposed mortgage area of 3,705.84 sq. m in the sanctioned parameters; its listed reserved/mortgaged plots are 13, 10, 11, 12, 8, 15, 22, 1, 38, 39, 21, 3, 19, 5, 17, 7, 18, 6, 16, 2, 20, 4 and 14. The approval also records a mortgage deed, No. 3334, in favour of the Municipality.

No building arrangement, building footprint, floor configuration or building-design drawings are evidenced for this plotted project. The layout approval lists no proposed built-up area.

Homes, configurations & floor plans

The project offers plots, not apartments. The approved layout drawing’s schedule lists 144 plots; plot-size readings below are software-measured from drawing text, not RERA-filed saleable-area figures. Layout record

Plot-size bandNumber of plots
100–150 sq. yd (84–125 sq. m)1
150–200 sq. yd (125–167 sq. m)90
200–250 sq. yd (167–209 sq. m)38
250–300 sq. yd (209–251 sq. m)2
300–400 sq. yd (251–334 sq. m)10
400–500 sq. yd (334–418 sq. m)3

The software-measured minimum plot size is 125.41 sq. m (150.0 sq. yd), median 144.17 sq. m (172.4 sq. yd), and maximum 365.48 sq. m (437.1 sq. yd). The supplied floor-plan review found two layout sheets and no residential floor plans from which carpet area could be measured. Layout record Floor plans

Parking & vehicle circulation

The layout drawing allocates 0.00 sq. m to common parking area. No sanctioned parking-space count, visitor or accessible parking provision, parking levels, vehicle ramps, or plot-specific parking allocations are documented in the supplied evidence. No drawn or marketed parking provision can be treated as a legal exclusive allocation to a buyer without unit-specific supporting documents.

The approval drawing shows internal roads and identifies a road network, including labelled 9.14M and 10.06M wide internal roads. It does not document separate pedestrian routes, vehicle entry/exit arrangements or traffic-management features.

Amenities, recreation & open spaces

The layout drawing allocates land to parks/open space, social infrastructure and utilities. The Municipality’s approval conditions describe infrastructure and amenity works the developer is to provide; the record supplied does not confirm their completion.

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Park / organized open space3,675.07 sq. m; 9.10% of the layout area shown on the drawingLand allocation shown; completion not verified
Social infrastructure site1,010.42 sq. m; 2.50% shown on the drawingLand allocation shown; specific facility and completion status not supplied
Tot lotNamed in the layout-plan amenity/utility list; no size or quantity statedPlanned/listed; completion not verified
Utility area403.79 sq. m; 1.00% shown on the drawingLand allocation shown; see Utilities for specified services
Internal roads10,852.25 sq. m; 26.88% shown on the drawingRoad land allocated; works completion not verified

No clubhouse, indoor sports facility or other quantified recreation facility is established in the supplied evidence.

Utilities, building services & safety

The tentative layout approval describes proposed infrastructure works, including internal water supply lines, a water source and overhead tank/sump; storm-water drains and rainwater-harvesting pits; underground drainage and a common septic tank or sewage-treatment plant; electrical supply lines, street lighting and transformer; and solid-waste management. These are approval-condition requirements for development, not evidence that the infrastructure is installed or operational.

Water
Evidence in the project recordInternal water-supply pipelines, assured water-supply source, and overhead tank/sump are specified in the approval conditions.
Status established by supplied materialRequired/planned; capacity and completion not supplied
Sewerage and drainage
Evidence in the project recordUnderground drainage lines and a common septic tank/STP are specified; storm-water drains are also required.
Status established by supplied materialRequired/planned; capacity and completion not supplied
Rainwater management
Evidence in the project recordRainwater-harvesting pits are specified in the approval conditions.
Status established by supplied materialRequired/planned; quantity and completion not supplied
Electrical
Evidence in the project recordElectrical supply lines, transformer and street lights are specified.
Status established by supplied materialRequired/planned; capacity and completion not supplied
Solid waste
Evidence in the project recordSolid-waste management is included in the listed utility works.
Status established by supplied materialRequired/planned; design and completion not supplied
Fire and building services
Evidence in the project recordNo project-specific fire system, lifts, emergency access or building services are documented for the plotted layout.
Status established by supplied materialNot evidenced
Accessibility
Evidence in the project recordNo accessible circulation or accessibility provisions are specified in the supplied evidence.
Status established by supplied materialNot evidenced

Location, access & connectivity

The registered location is Bodhan (R), Bodhan Mandal, Nizamabad District, Telangana 503185, with the land identified in Achanpally Shivar and Pandu Tarfa. The RERA land details describe an existing 30 MT wide road on the west and a proposed 18 M wide road on the north. The layout drawing labels 9.14M and 10.06M internal roads, a 30.00 MT wide existing road, a 30.00 MT wide proposed road, and an 18M [60'-0"] wide master plan road. A cadastral parcel centroid is recorded at 18.65569, 77.88394. RERA filing Cadastral map

The supplied location data records the nearest sampled Outer Ring Road interchange at approximately 130.3 km. Location record No public-transport information or verified distances to other local landmarks are supplied. A third-party listing makes additional connectivity claims, but those are not used here as TG-RERA evidence.

Developer & development status

The registered promoter is NEW SREENIDHI TOWNSHIP, identified as a partnership firm, with GSTIN 36ABYFM8662P1ZW. Its stated address is B, SHARBATHI CANEL ROAD, BODHAN, BODHAN, BODHAN, Nizamabad, 503185. An RERA-filed resolution records authorization of Ganji Venkatesham to act for the partnership in connection with project registration. Corporate record Parties record Document index

The project record identifies a plotted layout with 144 plots. The promoter’s Form B declaration states a completion undertaking of 21/05/2026, while the project header records a proposed completion date of 30/11/2026. The supplied evidence does not establish construction progress, a revised completion approval, or an occupancy/completion certificate. RERA record

Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP03100008909, effective 22 May 2024
What it establishesRegistration of KAMADHENU AVENUE as a plotted project by New Sreenidhi Township; certificate states validity through 21/05/2026, unless extended.
Tentative layout plan approval
Identifier / date0002/LO/3070/2024, 22 May 2024; application 002939/LO/DTCP/3070/0004/2024
What it establishesTentative approval for a 144-plot layout, subject to stated development conditions.
Layout drawing
Identifier / dateFile TS/015092/2024
What it establishesDrawing and area allocation for the proposed layout, including plots, roads, park/open space, social infrastructure and utilities.
Form B declaration
Identifier / dateFiled by New Sreenidhi Township through Ganji Venkatesham
What it establishesPromoter declarations concerning title, encumbrances, project account and proposed completion date.
Occupancy/completion certificate
Identifier / dateNot supplied
What it establishesNo such certificate is established by the documents reviewed. Document index

The approval conditions state that layout infrastructure and amenities were to be completed within two years from approval, by 22 May 2026, with a possible one-year extension on request and payment. They also state that final layout release follows completion of development works and release of mortgaged land.

Frequently asked questions

Is KAMADHENU AVENUE registered with Telangana RERA?

Yes. KAMADHENU AVENUE is registered with the Telangana Real Estate Regulatory Authority as P03100008909; the registration status is New Project.

Who is the developer of KAMADHENU AVENUE?

The promoter named in the RERA registration is NEW SREENIDHI TOWNSHIP.

Where is KAMADHENU AVENUE located?

KAMADHENU AVENUE is in BODHAN, Bodhan (R), Nizamabad, Telangana (503185).

When will KAMADHENU AVENUE be completed?

The promoter's proposed date of completion filed with RERA is 30/11/2026. This is the promoter's declaration, not a guarantee.