Jvs Heights
JVS INFRA DEVELOPERS · Yadadri Bhuvanagiri · RERA P02000001905
JVS HEIGHTS is a plotted development at THUPRAN PET, Choutuppal mandal, Yadadri Bhuvanagiri district, developed by JVS INFRA DEVELOPERS. The registered site area is 75908 sq. m, and the layout drawing identifies 165 plot numbers; plot configurations are not stated. The project is registered with TG-RERA as P02000001905, with a proposed completion date of 04/06/2025.
More from Jvs Infra Developers · 3 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
11 items to check before you pay, 6 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Project record |
|---|---|
| Registered project name | JVS HEIGHTS |
| Project type | Plotted development / open-plot layout RERA record |
| Phase or registered portion | No phase is identified in the supplied registration record; the registered development is described as a plotted layout. RERA record |
| TG-RERA registration | P02000001905 |
| Registration validity | Issued 21/03/2020; valid from 21/03/2020 to 04/06/2025. The supplied certificate records no extension. Registration validity is distinct from the project’s completion deadline. |
| Registered promoter | JVS INFRA DEVELOPERS (certificate styling: “Jvs Infra Developers”) RERA record |
| RERA status | Registration certificate records the registration period above. A current registration status beyond its stated expiry is not established by the supplied records. |
Land and geographic identity
| Field | Project record |
|---|---|
| Revenue village | THUPRAN PET; the HMDA draft letter also spells the village Tupranpet/Toopranpet. RERA record RERA filing |
| Locality | THUPRAN PET, Choutuppal |
| Mandal | Choutuppal RERA record |
| District | Yadadri Bhuvanagiri in the project identity and RERA certificate; the HMDA letter states Yadadri District. RERA record |
| PIN | 508282 RERA record |
| Project survey numbers | 92, 93/P (as recorded in the project identity and TG-RERA certificate). The HMDA draft letter lists 92 and 93/P. RERA record |
| Registered site extent | 75908 sq. m in the RERA project fields. RERA filing |
| Total / net layout area | The layout drawing-derived record states 75907.69 sq. m total site area and 75907.69 sq. m net layout area. These are layout-record figures, not a survey measurement independently verified here. Layout record |
| Boundaries | North: ROAD; South, East and West: OTHERS LAND. RERA filing |
Development identity
| Field | Project record |
|---|---|
| Sanctioning authority | Hyderabad Metropolitan Development Authority (HMDA) Approvals record |
| Principal layout approval | 000153/LO/Plg/HMDA/2019, dated 04 June, 2019; described in the filed document as a Draft layout Letter. Approvals record |
| Filed plan-approval number | 000153/LO/Plg/HMDA/2 RERA record RERA filing |
| Approved built-up area | RERA filing states 75907.0 sq. m. The supplied records do not establish an apartment-building built-up area or building configuration for this plotted project. RERA filing |
| Buildings / floors | Not disclosed in the supplied project record; the development is recorded as a plotted layout, not a multi-storey residential building. RERA record |
| Layout arrangement | Drawing-derived record identifies 165 printed plot numbers (1 to 165); the plot list is not complete in the supplied extraction. Layout record |
| Road / open-space provision | Layout record lists 18808.50 sq. m roads and 6320.71 sq. m parks/open space. Layout record |
| HMDA-mortgaged plots | Plots 137 to 165, 29 plots, extent 7639.66 sq. m, mortgaged to HMDA under deed 7693/2019. Layout record |
Offering and status
| Field | Project record |
|---|---|
| Offering | Plots; no plot-size range is established in the supplied records. RERA record Layout record |
| Plot count | 165 plot numbers are read from the layout drawing; the drawing extraction is marked incomplete. Layout record |
| Booked / available | Not disclosed in the supplied evidence. RERA filing |
| Construction / development stage | The filing’s project status is New Project. A RERA filing completeness indicator is 80%, but it is not an independently verified construction-completion measurement. RERA record |
| Completion date | Proposed completion date: 04/06/2025. The supplied evidence does not establish a revised completion date. RERA record RERA filing |
| Occupancy / completion certificate | No occupancy or completion certificate is supplied. The project is a plotted layout; the supplied HMDA document is a draft layout letter, not evidence of a final layout release. |
2. The project story
- JVS HEIGHTS is registered with TG-RERA as a plotted development at THUPRAN PET, Choutuppal mandal, Yadadri Bhuvanagiri district, on the project land recorded as survey numbers 92, 93/P. The registration certificate identifies the promoter as JVS INFRA DEVELOPERS and registration number P02000001905. RERA record
- The filed HMDA document describes an open-plot layout over approximately 75907.69 sq. m and identifies an HMDA draft layout approval dated 04 June, 2019. The layout record shows plots, internal roads and open-space/park land; its drawing-derived extraction counts plots numbered 1 to 165, but does not provide a complete plot-by-plot schedule or plot-size measurements. Layout record
- The record gives a proposed completion date of 04/06/2025 and labels the project “New Project.” The supplied materials do not establish site-verified progress, a final layout release, or an occupancy/completion certificate. The filing completeness figure of 80% is a record indicator and should not be read as independently verified physical completion. RERA record
3. Master plan, architecture & building design
This is a plotted layout rather than a documented apartment or tower development. The RERA land fields state a site area of 75908 sq. m; the drawing-derived layout record gives total and net layout area of 75907.69 sq. m. The layout record’s land-use schedule is:
| Layout use | Area | Share shown in drawing-derived record |
|---|---|---|
| Plots | 48869.78 sq. m | 64.4% |
| Roads | 18808.5 sq. m | 24.8% |
| Parks / open space | 6320.71 sq. m | 8.3% |
| Social infrastructure | 1908.7 sq. m | 2.5% |
| Amenities | 0.0 sq. m | 0.0% |
Layout record
- The layout extraction identifies 165 printed plot numbers, numbered 1 to 165, but notes that the plot extraction is incomplete and provides no plot sizes. The HMDA draft layout letter specifies roads of 18 mts and above and 60 feet and above; it also requires roads and open-space area to be handed over to the local body by registered gift deed before release of the final layout. Layout record
- No building count, floor configuration, apartment layouts, tower heights or building services drawings are established by the supplied evidence. The layout drawing record contains two sheets, but the available extraction does not provide a complete plot schedule. Floor plans Layout record
4. Homes, configurations & floor plans
The offering recorded for JVS HEIGHTS is plots. The supplied records do not disclose plot-size bands, plot-wise saleable areas, or booked and available inventory. The drawing-derived layout record counts 165 printed plot numbers, but does not include a complete plot-by-plot schedule. RERA record Layout record
No apartment configurations or measured carpet areas are applicable or established in the supplied evidence. The two drawing sheets recorded in the floor-plan data are layout sheets, with no apartment-floor plans or measurable flats identified. Floor plans
5. Parking & vehicle circulation
- The supplied project evidence does not establish a sanctioned parking count, visitor or accessible parking provision, parking allocation to individual plots, or a parking-per-unit ratio. This is a plotted layout, and no parking schedule is provided. Layout record
- The HMDA draft layout letter requires roads to be opened for access to neighbouring sites and identifies road widths of 18 mts and above and 60 feet and above. It also requires cycling tracks within the layout. These are stated conditions in the draft letter; delivery or completion is not independently verified in the supplied records.
6. Amenities, recreation & open spaces
The filed HMDA draft layout letter lists proposed layout infrastructure and amenities; the RERA amenities record indicates availability fields but records 0% progress where percentages are shown. The supplied evidence does not independently verify completion of these facilities. RERA amenities
| Description / size | 6320.71 sq. m |
|---|---|
| Evidence source | HMDA draft layout letter; layout drawing-derived land-use schedule Layout record |
| Declared progress / verified status | Required for handover to the local body before final layout release; completion/handover not verified. |
| Description / size | No quantity or area stated |
|---|---|
| Evidence source | HMDA draft layout letter |
| Declared progress / verified status | Listed as a layout provision; completion not verified. |
| Description / size | No length stated |
|---|---|
| Evidence source | HMDA draft layout letter |
| Declared progress / verified status | Listed as a requirement; completion not verified. |
| Description / size | No type, size or quantity stated |
|---|---|
| Evidence source | RERA amenities record RERA amenities |
| Declared progress / verified status | No progress percentage beyond the supplied record; completion not verified. |
| Description / size | Roads area 18808.50 sq. m; specified road widths 18 mts and above and 60 feet and above |
|---|---|
| Evidence source | Layout record and HMDA draft layout letter Layout record |
| Declared progress / verified status | Required provision; road completion and handover not verified. |
No clubhouse or indoor recreation facilities are identified in the supplied project-specific records. Vendor-listed recreational features are not treated here as confirmed sanctioned or delivered facilities. Promoter website
7. Utilities, building services & safety
The HMDA draft layout letter lists infrastructure for the layout, while the RERA amenities record includes corresponding utility categories. These records establish provisions or requirements in the project documentation, not independent confirmation that the facilities are installed or operational. RERA amenities
| Evidence in the project record | Potable-water connectivity arrangements; internal water-supply pipelines and overhead tank are listed in the HMDA document. |
|---|---|
| Status evidenced | Documented provision; source, capacity and completed status not supplied. |
| Evidence in the project record | Common septic tank / STP and underground drainage lines are listed. The HMDA letter states that layouts over 10 acres must provide an STP. |
|---|---|
| Status evidenced | Documented provision/condition; capacity and completion not verified. |
| Evidence in the project record | Underground storm-water drains are listed; the document also refers to drainage and channelisation of nalas for storm-water runoff. |
|---|---|
| Status evidenced | Documented provision; completion not verified. |
| Evidence in the project record | Rainwater-harvesting pits are listed; water conservation/rainwater harvesting is also marked available in the RERA amenities record. RERA amenities |
|---|---|
| Status evidenced | Listed provision; quantity and completion not verified. |
| Evidence in the project record | Transformer/transformer yard and street lights are listed; the HMDA letter specifies LED street lighting. |
|---|---|
| Status evidenced | Documented provision; capacity and completion not verified. |
| Evidence in the project record | Space for disposal and dumping of solid waste and a garbage-segregation mechanism are required; a bio-compost unit is listed. |
|---|---|
| Status evidenced | Documented provision/condition; completion not verified. |
| Evidence in the project record | A fire-protection category appears in the RERA amenities list, but no project-specific fire system details or clearance are supplied. RERA amenities |
|---|---|
| Status evidenced | Details and compliance status not established. |
| Evidence in the project record | No project-specific accessible routes or facilities are documented in the supplied evidence. |
|---|---|
| Status evidenced | Not disclosed. |
8. Location, access & connectivity
- The registered location is THUPRAN PET, Choutuppal mandal, Yadadri Bhuvanagiri district, PIN 508282. The HMDA draft layout letter identifies the site’s northern boundary as a road in the RERA land fields and requires layout roads to be opened for access to neighbouring sites. RERA record RERA filing
- The location data records the nearest sampled Outer Ring Road interchange at approximately 30.3 km. Location record No public-transport information or verified travel-time measurements are supplied. Location record
9. Developer & development status
- The registered promoter is JVS INFRA DEVELOPERS, identified in the project record as a company. Its RERA filing address is RK RESIDENCY, Choutuppal, Yadadri Bhuvanagiri, 508282; the registration certificate lists the promoter office as Village: VANASTHALIPURAM, Mandal: Hayathnagar, District: Ranga Reddy, Pin: 500070. RERA record Parties record
- The supplied records identify JAKKA SANJEEV REDDY as managing director and authorized signatory, and list directors J Ravinder Reddy, CHAPPIDI YADAGIRI REDDY, CHAPPIDI KUSHAL KUMAR REDDY, KUNDARAM JANGAIAH and CHAPPIDI VENKAT REDDY. Parties record The corporate registration identifier and official contact details or website are not established in the supplied evidence. Corporate record
- The promoter’s RERA record gives a proposed completion date of 04/06/2025. No revised completion date or independent site-progress report is supplied. The registration certificate records validity through 04/06/2025 and no extension in the supplied certificate. RERA record
10. Approvals, official records & documents
| Identifier / date | P02000001905, issued 21/03/2020; validity through 04/06/2025 |
|---|---|
| What the supplied record establishes | Certificate for JVS HEIGHTS, a plotted development, promoted by Jvs Infra Developers. The supplied certificate records no extension. |
| Identifier / date | Approval 000153/LO/Plg/HMDA/2019, dated 04 June, 2019 |
|---|---|
| What the supplied record establishes | An HMDA Draft layout Letter for an open-plot layout over 75907.69 sq. m in survey numbers 92, 93/P, at Tupranpet, Choutuppal mandal. The document states that permission is not proof of land title and sets conditions for the final layout release. |
| Identifier / date | 023413/GHT/LT/U6/HMDA/07052019; application date 07 May, 2019 |
|---|---|
| What the supplied record establishes | Application reference associated with the draft layout letter. |
| Identifier / date | 7693/2019, dated 27/5/2019 |
|---|---|
| What the supplied record establishes | Identifies the mortgage of plots 137 to 165, 29 plots, extent 7639.66 sq. m, in favour of the Metropolitan Commissioner, HMDA. |
| Identifier / date | Document 91864; two sheets Layout record |
|---|---|
| What the supplied record establishes | Drawing-derived layout data include plot numbering and land-use areas; the supplied extraction says plot details are incomplete and provides no plot sizes. |
| Identifier / date | Document 91854 |
|---|---|
| What the supplied record establishes | OCR extraction contains a declaration template and statements about title, encumbrances, funds and approvals, but does not identify the declarant, project registration number, completion period, or verification date and place. |
| Identifier / date | Not supplied |
|---|---|
| What the supplied record establishes | No final layout release or completion/occupancy certificate is established by the supplied materials. |
The HMDA layout lookup is recorded as unavailable through the public portal in the supplied evidence; that unavailability does not establish that an approval was refused. HMDA
1. Project at a glance
Project identity
Registered project name: JVS HEIGHTS
Project type: Plotted development / open-plot layout
Phase or registered portion: No phase is identified in the supplied registration record; the registered development is described as a plotted layout.
TG-RERA registration: P02000001905
Registration validity: Issued 21/03/2020; valid from 21/03/2020 to 04/06/2025. The supplied certificate records no extension. Registration validity is distinct from the project’s completion deadline.
Registered promoter: JVS INFRA DEVELOPERS (certificate styling: “Jvs Infra Developers”)
RERA status: Registration certificate records the registration period above. A current registration status beyond its stated expiry is not established by the supplied records.
Land and geographic identity
Revenue village: THUPRAN PET; the HMDA draft letter also spells the village Tupranpet/Toopranpet.
Locality: THUPRAN PET, Choutuppal
Mandal: Choutuppal
District: Yadadri Bhuvanagiri in the project identity and RERA certificate; the HMDA letter states Yadadri District.
PIN: 508282
Project survey numbers: 92, 93/P (as recorded in the project identity and TG-RERA certificate). The HMDA draft letter lists 92 and 93/P.
Registered site extent: 75908 sq. m in the RERA project fields.
Total / net layout area: The layout drawing-derived record states 75907.69 sq. m total site area and 75907.69 sq. m net layout area. These are layout-record figures, not a survey measurement independently verified here.
Boundaries: North: ROAD; South, East and West: OTHERS LAND.
Development identity
Sanctioning authority: Hyderabad Metropolitan Development Authority (HMDA)
Principal layout approval: 000153/LO/Plg/HMDA/2019, dated 04 June, 2019; described in the filed document as a Draft layout Letter.
Filed plan-approval number: 000153/LO/Plg/HMDA/2
Approved built-up area: RERA filing states 75907.0 sq. m. The supplied records do not establish an apartment-building built-up area or building configuration for this plotted project.
Buildings / floors: Not disclosed in the supplied project record; the development is recorded as a plotted layout, not a multi-storey residential building.
Layout arrangement: Drawing-derived record identifies 165 printed plot numbers (1 to 165); the plot list is not complete in the supplied extraction.
Road / open-space provision: Layout record lists 18808.50 sq. m roads and 6320.71 sq. m parks/open space.
HMDA-mortgaged plots: Plots 137 to 165, 29 plots, extent 7639.66 sq. m, mortgaged to HMDA under deed 7693/2019.
Offering and status
Offering: Plots; no plot-size range is established in the supplied records.
Plot count: 165 plot numbers are read from the layout drawing; the drawing extraction is marked incomplete.
Booked / available: Not disclosed in the supplied evidence.
Construction / development stage: The filing’s project status is New Project. A RERA filing completeness indicator is 80%, but it is not an independently verified construction-completion measurement.
Completion date: Proposed completion date: 04/06/2025. The supplied evidence does not establish a revised completion date.
Occupancy / completion certificate: No occupancy or completion certificate is supplied. The project is a plotted layout; the supplied HMDA document is a draft layout letter, not evidence of a final layout release.
2. The project story
- JVS HEIGHTS is registered with TG-RERA as a plotted development at THUPRAN PET, Choutuppal mandal, Yadadri Bhuvanagiri district, on the project land recorded as survey numbers 92, 93/P. The registration certificate identifies the promoter as JVS INFRA DEVELOPERS and registration number P02000001905.
- The filed HMDA document describes an open-plot layout over approximately 75907.69 sq. m and identifies an HMDA draft layout approval dated 04 June, 2019. The layout record shows plots, internal roads and open-space/park land; its drawing-derived extraction counts plots numbered 1 to 165, but does not provide a complete plot-by-plot schedule or plot-size measurements.
- The record gives a proposed completion date of 04/06/2025 and labels the project “New Project.” The supplied materials do not establish site-verified progress, a final layout release, or an occupancy/completion certificate. The filing completeness figure of 80% is a record indicator and should not be read as independently verified physical completion.
3. Master plan, architecture & building design
This is a plotted layout rather than a documented apartment or tower development. The RERA land fields state a site area of 75908 sq. m; the drawing-derived layout record gives total and net layout area of 75907.69 sq. m. The layout record’s land-use schedule is:
| Layout use | Area | Share shown in drawing-derived record |
|---|---|---|
| Plots | 48869.78 sq. m | 64.4% |
| Roads | 18808.5 sq. m | 24.8% |
| Parks / open space | 6320.71 sq. m | 8.3% |
| Social infrastructure | 1908.7 sq. m | 2.5% |
| Amenities | 0.0 sq. m | 0.0% |
- The layout extraction identifies 165 printed plot numbers, numbered 1 to 165, but notes that the plot extraction is incomplete and provides no plot sizes. The HMDA draft layout letter specifies roads of 18 mts and above and 60 feet and above; it also requires roads and open-space area to be handed over to the local body by registered gift deed before release of the final layout.
- No building count, floor configuration, apartment layouts, tower heights or building services drawings are established by the supplied evidence. The layout drawing record contains two sheets, but the available extraction does not provide a complete plot schedule.
4. Homes, configurations & floor plans
The offering recorded for JVS HEIGHTS is plots. The supplied records do not disclose plot-size bands, plot-wise saleable areas, or booked and available inventory. The drawing-derived layout record counts 165 printed plot numbers, but does not include a complete plot-by-plot schedule.
No apartment configurations or measured carpet areas are applicable or established in the supplied evidence. The two drawing sheets recorded in the floor-plan data are layout sheets, with no apartment-floor plans or measurable flats identified.
5. Parking & vehicle circulation
- The supplied project evidence does not establish a sanctioned parking count, visitor or accessible parking provision, parking allocation to individual plots, or a parking-per-unit ratio. This is a plotted layout, and no parking schedule is provided.
- The HMDA draft layout letter requires roads to be opened for access to neighbouring sites and identifies road widths of 18 mts and above and 60 feet and above. It also requires cycling tracks within the layout. These are stated conditions in the draft letter; delivery or completion is not independently verified in the supplied records.
6. Amenities, recreation & open spaces
The filed HMDA draft layout letter lists proposed layout infrastructure and amenities; the RERA amenities record indicates availability fields but records 0% progress where percentages are shown. The supplied evidence does not independently verify completion of these facilities.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Park / open space | 6320.71 sq. m | HMDA draft layout letter; layout drawing-derived land-use schedule | Required for handover to the local body before final layout release; completion/handover not verified. |
| Avenue plantation | No quantity or area stated | HMDA draft layout letter | Listed as a layout provision; completion not verified. |
| Cycling tracks | No length stated | HMDA draft layout letter | Listed as a requirement; completion not verified. |
| Community buildings | No type, size or quantity stated | RERA amenities record | No progress percentage beyond the supplied record; completion not verified. |
| Internal roads and footpaths | Roads area 18808.50 sq. m; specified road widths 18 mts and above and 60 feet and above | Layout record and HMDA draft layout letter | Required provision; road completion and handover not verified. |
No clubhouse or indoor recreation facilities are identified in the supplied project-specific records. Vendor-listed recreational features are not treated here as confirmed sanctioned or delivered facilities.
7. Utilities, building services & safety
The HMDA draft layout letter lists infrastructure for the layout, while the RERA amenities record includes corresponding utility categories. These records establish provisions or requirements in the project documentation, not independent confirmation that the facilities are installed or operational.
| Evidence in the project record | Potable-water connectivity arrangements; internal water-supply pipelines and overhead tank are listed in the HMDA document. |
|---|---|
| Status evidenced | Documented provision; source, capacity and completed status not supplied. |
| Evidence in the project record | Common septic tank / STP and underground drainage lines are listed. The HMDA letter states that layouts over 10 acres must provide an STP. |
|---|---|
| Status evidenced | Documented provision/condition; capacity and completion not verified. |
| Evidence in the project record | Underground storm-water drains are listed; the document also refers to drainage and channelisation of nalas for storm-water runoff. |
|---|---|
| Status evidenced | Documented provision; completion not verified. |
| Evidence in the project record | Rainwater-harvesting pits are listed; water conservation/rainwater harvesting is also marked available in the RERA amenities record. |
|---|---|
| Status evidenced | Listed provision; quantity and completion not verified. |
| Evidence in the project record | Transformer/transformer yard and street lights are listed; the HMDA letter specifies LED street lighting. |
|---|---|
| Status evidenced | Documented provision; capacity and completion not verified. |
| Evidence in the project record | Space for disposal and dumping of solid waste and a garbage-segregation mechanism are required; a bio-compost unit is listed. |
|---|---|
| Status evidenced | Documented provision/condition; completion not verified. |
| Evidence in the project record | A fire-protection category appears in the RERA amenities list, but no project-specific fire system details or clearance are supplied. |
|---|---|
| Status evidenced | Details and compliance status not established. |
| Evidence in the project record | No project-specific accessible routes or facilities are documented in the supplied evidence. |
|---|---|
| Status evidenced | Not disclosed. |
8. Location, access & connectivity
- The registered location is THUPRAN PET, Choutuppal mandal, Yadadri Bhuvanagiri district, PIN 508282. The HMDA draft layout letter identifies the site’s northern boundary as a road in the RERA land fields and requires layout roads to be opened for access to neighbouring sites.
- The location data records the nearest sampled Outer Ring Road interchange at approximately 30.3 km. No public-transport information or verified travel-time measurements are supplied.
9. Developer & development status
- The registered promoter is JVS INFRA DEVELOPERS, identified in the project record as a company. Its RERA filing address is RK RESIDENCY, Choutuppal, Yadadri Bhuvanagiri, 508282; the registration certificate lists the promoter office as Village: VANASTHALIPURAM, Mandal: Hayathnagar, District: Ranga Reddy, Pin: 500070.
- The supplied records identify JAKKA SANJEEV REDDY as managing director and authorized signatory, and list directors J Ravinder Reddy, CHAPPIDI YADAGIRI REDDY, CHAPPIDI KUSHAL KUMAR REDDY, KUNDARAM JANGAIAH and CHAPPIDI VENKAT REDDY. The corporate registration identifier and official contact details or website are not established in the supplied evidence.
- The promoter’s RERA record gives a proposed completion date of 04/06/2025. No revised completion date or independent site-progress report is supplied. The registration certificate records validity through 04/06/2025 and no extension in the supplied certificate.
10. Approvals, official records & documents
| Identifier / date | P02000001905, issued 21/03/2020; validity through 04/06/2025 |
|---|---|
| What the supplied record establishes | Certificate for JVS HEIGHTS, a plotted development, promoted by Jvs Infra Developers. The supplied certificate records no extension. |
| Identifier / date | Approval 000153/LO/Plg/HMDA/2019, dated 04 June, 2019 |
|---|---|
| What the supplied record establishes | An HMDA Draft layout Letter for an open-plot layout over 75907.69 sq. m in survey numbers 92, 93/P, at Tupranpet, Choutuppal mandal. The document states that permission is not proof of land title and sets conditions for the final layout release. |
| Identifier / date | 023413/GHT/LT/U6/HMDA/07052019; application date 07 May, 2019 |
|---|---|
| What the supplied record establishes | Application reference associated with the draft layout letter. |
| Identifier / date | 7693/2019, dated 27/5/2019 |
|---|---|
| What the supplied record establishes | Identifies the mortgage of plots 137 to 165, 29 plots, extent 7639.66 sq. m, in favour of the Metropolitan Commissioner, HMDA. |
| Identifier / date | Document 91864; two sheets |
|---|---|
| What the supplied record establishes | Drawing-derived layout data include plot numbering and land-use areas; the supplied extraction says plot details are incomplete and provides no plot sizes. |
| Identifier / date | Document 91854 |
|---|---|
| What the supplied record establishes | OCR extraction contains a declaration template and statements about title, encumbrances, funds and approvals, but does not identify the declarant, project registration number, completion period, or verification date and place. |
| Identifier / date | Not supplied |
|---|---|
| What the supplied record establishes | No final layout release or completion/occupancy certificate is established by the supplied materials. |
The HMDA layout lookup is recorded as unavailable through the public portal in the supplied evidence; that unavailability does not establish that an approval was refused.
Frequently asked questions
Is JVS HEIGHTS registered with Telangana RERA?
Yes. JVS HEIGHTS is registered with the Telangana Real Estate Regulatory Authority as P02000001905; the registration status is New Project.
Who is the developer of JVS HEIGHTS?
The promoter named in the RERA registration is JVS INFRA DEVELOPERS.
Where is JVS HEIGHTS located?
JVS HEIGHTS is in THUPRAN PET, Choutuppal, Yadadri Bhuvanagiri, Telangana (508282).
When will JVS HEIGHTS be completed?
The promoter's proposed date of completion filed with RERA is 04/06/2025. This is the promoter's declaration, not a guarantee.