JB s SERENE CITY PH 5 is a plotted development in Khanapur village, Ibrahimpatnam mandal, Ranga Reddy district, developed by registered promoter JBINFRAPROJECTS. The project filing records a total land area of 181775.79 sq.m and net area of 181006.55 sq.m; it is a layout rather than a tower or block development, and the overall layout drawing is software-read as showing 275 plots. The RERA certificate identifies the registered portion as plots 267 TO 273, 1 TO 8, 274, 275; apartment configurations do not apply. Its TG-RERA registration number is P02400002589, with a certificate registration end date of 04/06/2025, and the promoter’s Form B gives a completion undertaking of 28-6-2025.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
8 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Record |
|---|---|
| Registered project name | JB s SERENE CITY PH 5 RERA record |
| Project type | Plotted development / final residential layout with open plots RERA record |
| Phase / registered portion | Phase 5; the registration certificate identifies plots 267 TO 273, 1 TO 8, 274, 275 RERA record |
| TG-RERA registration | P02400002589, issued 23/02/2021; recorded validity 23/02/2021–04/06/2025 Approvals record |
| Registered promoter | JBINFRAPROJECTS (also styled “JB INFRA PROJECTS” in filed documents); entity type: partnership RERA record RERA filing Corporate record |
| RERA status | The certificate states the registration end date as 04/06/2025 and records no extension. Current status should be checked with TG-RERA; the available record does not establish a later extension. |
Land and geographic identity
| Item | Record |
|---|---|
| Locality / revenue village | Khanapur / Khaanapur village RERA record RERA filing |
| Mandal / district | Ibrahimpatnam / Ranga Reddy RERA record |
| PIN | 591302 (as recorded in the project filing) RERA record |
| Project survey numbers | 67P and 68; the final-layout letter and RERA certificate use 67p/67P and 68. RERA filing |
| Registered site extent | 181775.79 sq.m total area; 181006.55 sq.m net area; 769.24 sq.m affected by road widening/FTL/nala widening, as entered in the project filing RERA filing |
| Layout-letter areas | Draft layout records total site area 181775.8 sq.m, net site area 181006.56 sq.m, and master-plan-road-affected area 769.24 sq.m |
| Boundaries | East: ROAD; West: ROAD; North: NEIGHBOURS LAND; South: NEIGHBOURS LAND RERA filing |
Development identity
| Item | Record |
|---|---|
| Sanctioning authority | Hyderabad Metropolitan Development Authority (HMDA) Approvals record |
| Principal layout approval | HMDA layout permit 000154/LO/Plg/HMDA/2019, dated 04 June 2019; final layout letter dated 21 January 2021 |
| Approved built-up area | 105556.2 sq.m is recorded in the project filing as approved built-up area; the available material does not explain its calculation or scope. RERA filing |
| Buildings / floors | Not disclosed in the supplied project record. This is a plotted layout; individual building permissions are to be considered under the applicable building rules, as stated in the final-layout letter. |
| Parking levels / counts | Not disclosed in the supplied project record. |
| Plot offering | The registration certificate identifies plots 267 TO 273, 1 TO 8, 274, 275. The draft-layout extraction also lists those plots as mortgaged to HMDA; the available documents record subsequent relinquishment deeds concerning the mortgaged plots. |
| Overall layout plot count | 275, read by software from the approved layout drawing’s printed plot numbers (1 to 275); the drawing-derived count is not a RERA disclosure and is marked incomplete for plot-by-plot extraction. Layout record |
Offering and status
| Item | Record |
|---|---|
| RERA-filed unit type / count | Plots; registered portion as listed above. A complete registered-phase inventory count is not separately stated in the supplied material. RERA record |
| Plot-size examples | A vendor record lists plots of 1485 Sq. Ft., 2952 Sq. Ft., and 3525 Sq. Ft. These are vendor-supplied figures, not RERA-filed measurements. Promoter website |
| Booked / available counts | Not disclosed in the supplied material. |
| Completion undertaking | Form B declares a completion undertaking of 28-6-2025. |
| RERA certificate completion / validity end date | 04/06/2025 is the certificate’s registration end date; registration validity and the completion undertaking are distinct records. |
| Occupancy / completion record | HMDA’s final-layout letter identifies OC number 040290/LT/SMD/FLT/U6/HMDA/04112020, dated 21-01-2021, and the accompanying architect’s certificate states the project was completed in all aspects. The document concerns the final layout; it does not provide a tower-by-tower or individual-building OC scope. |
| Development stage | The filed HMDA final-layout material records completed layout infrastructure and handover of roads, open spaces and social infrastructure; no independent current site inspection is supplied. |
2. The project story
JB s SERENE CITY PH 5 is a plotted residential phase in Khanapur village, Ibrahimpatnam mandal, Ranga Reddy district, on the project land identified as survey numbers 67P and 68. The RERA certificate identifies a registered portion comprising plots 267 TO 273, 1 TO 8, 274, 275. The wider layout drawing is software-read as showing plot numbers 1 to 275, but its plot extraction is incomplete. RERA record Layout record
HMDA’s 2019 draft-layout letter set development conditions for roads and drainage, water and sewerage systems, lighting, utilities, public open spaces and planting. HMDA’s final-layout letter, dated 21 January 2021, records the layout as completed in all aspects in the accompanying architect’s certificate, and records transfer of roads, open spaces and social-infrastructure land to the local authority by registered gift deed. These are filed-document assertions; no independent site inspection or present-day verification is supplied.
The RERA certificate’s validity ended on 04/06/2025, while the promoter’s Form B gives a completion undertaking of 28-6-2025. The file includes a layout-level occupancy-certificate number, but does not establish an occupancy certificate for any individual building or a current extension of the project’s RERA registration.
3. Master plan, architecture & building design
This is a plotted layout rather than a multi-storey apartment scheme. The project filing records total area of 181775.79 sq.m, net area of 181006.55 sq.m, and affected area of 769.24 sq.m. The HMDA draft-layout letter records corresponding areas as 181775.8 sq.m, 181006.56 sq.m, and 769.24 sq.m, respectively. RERA filing
The layout drawing’s area statement, read by software, gives the following distribution of the 181006.56 sq.m net layout area. These are drawing-derived figures, not individual plot measurements. Layout record
| Use | Area | Share of net layout area |
|---|---|---|
| Plots | 105556.02 sq.m | 58.3% |
| Roads | 49811.65 sq.m | 27.5% |
| Parks / open space | 21107.57 sq.m | 11.7% |
| Social infrastructure | 4529.74 sq.m | 2.5% |
| Amenities | 0.00 sq.m | 0.0% |
The HMDA draft-layout extraction separately lists 4529.74 sq.m as open space and marks the social-infrastructure entry illegible. The final-layout letter refers to social infrastructure and open spaces being handed over to the local authority.
The draft approval calls for a 60 mtrs-wide master-plan road and identifies 769.24 sq.m of affected area. It also identifies 17 mortgaged plots—plots 1–8, 267–273, 274 and 275—with recorded areas of 16089.09 sq.m and 5665.07 sq.m for the two mortgage groups. The final-layout letter records relinquishment deeds 1309/2021 and 1308/2021 concerning mortgaged plots.
No apartment floor plans, tower arrangements, building heights, floor configurations or individual-building layouts are provided in the supplied material. The project filing’s approved built-up area is 105556.2 sq.m; the available record does not define its measurement scope. RERA filing Floor plans
4. Homes, configurations & floor plans
This phase is a plotted development, so apartment configuration and carpet-area figures do not apply. Booked and available plot counts are not disclosed in the supplied material.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Plots | Registered portion identified by plot numbers; phase count not separately stated | Not disclosed | Not disclosed | Not disclosed | Not applicable | Not disclosed |
A vendor record lists plot-size examples of 1485 Sq. Ft., 2952 Sq. Ft., and 3525 Sq. Ft. These are vendor-supplied figures, not RERA-filed plot areas. Promoter website
The approved-layout drawing was software-read as containing plot numbers 1 to 275; the drawing-derived count is not a complete plot schedule, and the extracted data does not provide a reliable size for each plot. Layout record
5. Parking & vehicle circulation
No project-wide parking count, visitor or accessible parking provision, parking allocation, or vehicle-parking arrangement is disclosed in the supplied material.
The HMDA draft-layout letter requires internal roads and an approach road to be formed, and says roads are to remain open for public and neighboring-site access. It also refers to roads of 18 Mtrs and above in its development conditions. These are approval conditions, not independent confirmation of completed road works.
6. Amenities, recreation & open spaces
The HMDA draft-layout letter and final-layout letter refer to layout infrastructure and open areas. The following table distinguishes the approval/document record from completion claims; no independent inspection is available.
| Description / size | 21107.57 sq.m in the drawing-derived area statement |
|---|---|
| Evidence source | Layout record |
| Declared progress / verified status | Final-layout letter records open spaces handed over to the local authority by registered gift deed; no independent present-day verification |
| Description / size | 4529.74 sq.m in the drawing-derived area statement |
|---|---|
| Evidence source | Layout record |
| Declared progress / verified status | Final-layout letter records social-infrastructure area handed over to the local authority; no independent present-day verification |
| Description / size | 49811.65 sq.m in the drawing-derived area statement |
|---|---|
| Evidence source | Layout record |
| Declared progress / verified status | Final-layout letter records roads taken over by the local authority; no independent present-day verification |
| Description / size | No size or facility details supplied |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | Not established |
| Description / size | Vendor lists a gazebo, palm sitting zones, cricket practice pitch, volleyball court, tennis court, basketball court, amphitheatre, landscaped open green spaces, clubhouse, gym, private theatre, multipurpose hall, cafeteria, spa, meditation zone and children’s play area |
|---|---|
| Evidence source | Promoter website |
| Declared progress / verified status | Vendor claims only; the supplied approval and RERA records do not establish that these facilities are sanctioned or delivered |
7. Utilities, building services & safety
HMDA’s draft-layout letter lists development requirements for protected water supply, an overhead tank and sumps, an independent sewerage-disposal system, storm-water drainage, street lighting, underground utility ducting, a transformer yard, greenery, waste-disposal arrangements and source segregation. The final-layout letter states that the layout is provided with water supply, sewerage and drainage-disposal systems, street lighting, rainwater-harvesting structure and other civic amenities, and refers to local-body maintenance. These are document statements; capacities and independent verification are not supplied.
| Service | Record and limitation |
|---|---|
| Water | HMDA documents refer to protected water supply and water-supply infrastructure; source, storage capacity and current operating status are not stated. |
| Sewerage and drainage | HMDA documents refer to sewerage, drainage disposal, storm-water drainage and rainwater harvesting. No treatment capacity or current operating data is supplied. |
| Electrical and lighting | The draft-layout letter lists street lighting, underground utility ducting and a transformer yard. The final-layout letter refers to street lighting. No supply capacity or backup-power details are supplied. |
| Waste | The draft-layout letter calls for space for solid-waste disposal and source segregation. Completion or operating details are not supplied. |
| Fire and accessibility | The supplied material does not provide project-specific fire-safety systems, accessibility provisions or related capacities. |
8. Location, access & connectivity
The registered project location is Khanapur village, Ibrahimpatnam mandal, Ranga Reddy district, PIN 591302. HMDA’s filed layout material also identifies Khanapur/Khaanapur village and the same mandal and district. RERA record
The project filing records roads on its east and west boundaries, with neighboring land to the north and south. HMDA’s draft-layout letter calls for an approach road, internal roads and public access through the roads. No independently verified public-transport information or project-specific distance measurements are supplied. RERA filing
9. Developer & development status
The registered promoter is JBINFRAPROJECTS, recorded as a partnership, with GSTIN 36AAMFJ3197R1ZD. The project filing lists its address as CHAITANYAGARDENS, MAIN ROAD, KHANAPUR, Ibrahimpatnam, Ranga Reddy, 591302. The TG-RERA certificate separately records a promoter office at Village: B.N.REDDY Nagar, Mandal: Hayathnagar, District: Ranga Reddy, Pin: 500070. Corporate record RERA filing RERA record
Form B, made by authorized signatory B. MANOHAR REDDY in November 2020, declares that the promoter has title-related documents and a development agreement, and undertakes completion by 28-6-2025. This is the promoter’s declaration, not independent verification of title or completion.
HMDA’s final-layout letter, dated 21 January 2021, records completion of the layout in all aspects in the accompanying architect’s certificate and identifies a layout-level occupancy-certificate number. The supplied material does not provide a current site inspection or separate completion/OC scope for individual buildings.
10. Approvals, official records & documents
| Record | Reference and scope |
|---|---|
| TG-RERA registration certificate | Form C; P02400002589, issued 23/02/2021; stated validity through 04/06/2025; registered portion lists plots 267 TO 273, 1 TO 8, 274, 275. |
| HMDA draft-layout letter | Layout permit 000154/LO/Plg/HMDA/2019, dated 04 June 2019; surveys 67p and 68; includes layout areas, development conditions and mortgage details. |
| HMDA final-layout letter | Approval 000154/LO/Plg/HMDA/2019, dated 21 January 2021; identifies surveys 67p and 68, final layout extent 1,81,006.56 Sqm, and records handover of roads, open spaces and social infrastructure. |
| Layout-level occupancy record | Number 040290/LT/SMD/FLT/U6/HMDA/04112020, dated 21-01-2021, identified in the HMDA final-layout document; individual-building scope is not provided. |
| Registered gift deed | 12679/2020, dated 30-12-2020; cited in the final-layout letter for roads, open spaces and social infrastructure handed over to the local authority. |
| Relinquishment deeds | 1309/2021 and 1308/2021, dated 19/1/2021; cited in the final-layout letter concerning mortgaged plots. |
| Promoter’s Form B declaration | November 2020; declares title-related documentation, separate-account commitments and completion undertaking of 28-6-2025. |
The HMDA DPMS approved-layout lookup is recorded as unavailable through the public portal in the supplied evidence; this is a source-access limitation, not evidence that approval was refused. HMDA
1. Project at a glance
Project identity
Registered project name: JB s SERENE CITY PH 5
Project type: Plotted development / final residential layout with open plots
Phase / registered portion: Phase 5; the registration certificate identifies plots 267 TO 273, 1 TO 8, 274, 275
TG-RERA registration: P02400002589, issued 23/02/2021; recorded validity 23/02/2021–04/06/2025
Registered promoter: JBINFRAPROJECTS (also styled “JB INFRA PROJECTS” in filed documents); entity type: partnership
RERA status: The certificate states the registration end date as 04/06/2025 and records no extension. Current status should be checked with TG-RERA; the available record does not establish a later extension.
Land and geographic identity
Locality / revenue village: Khanapur / Khaanapur village
Mandal / district: Ibrahimpatnam / Ranga Reddy
PIN: 591302 (as recorded in the project filing)
Project survey numbers: 67P and 68; the final-layout letter and RERA certificate use 67p/67P and 68.
Registered site extent: 181775.79 sq.m total area; 181006.55 sq.m net area; 769.24 sq.m affected by road widening/FTL/nala widening, as entered in the project filing
Layout-letter areas: Draft layout records total site area 181775.8 sq.m, net site area 181006.56 sq.m, and master-plan-road-affected area 769.24 sq.m
Boundaries: East: ROAD; West: ROAD; North: NEIGHBOURS LAND; South: NEIGHBOURS LAND
Development identity
Sanctioning authority: Hyderabad Metropolitan Development Authority (HMDA)
Principal layout approval: HMDA layout permit 000154/LO/Plg/HMDA/2019, dated 04 June 2019; final layout letter dated 21 January 2021
Approved built-up area: 105556.2 sq.m is recorded in the project filing as approved built-up area; the available material does not explain its calculation or scope.
Buildings / floors: Not disclosed in the supplied project record. This is a plotted layout; individual building permissions are to be considered under the applicable building rules, as stated in the final-layout letter.
Parking levels / counts: Not disclosed in the supplied project record.
Plot offering: The registration certificate identifies plots 267 TO 273, 1 TO 8, 274, 275. The draft-layout extraction also lists those plots as mortgaged to HMDA; the available documents record subsequent relinquishment deeds concerning the mortgaged plots.
Overall layout plot count: 275, read by software from the approved layout drawing’s printed plot numbers (1 to 275); the drawing-derived count is not a RERA disclosure and is marked incomplete for plot-by-plot extraction.
Offering and status
RERA-filed unit type / count: Plots; registered portion as listed above. A complete registered-phase inventory count is not separately stated in the supplied material.
Plot-size examples: A vendor record lists plots of 1485 Sq. Ft., 2952 Sq. Ft., and 3525 Sq. Ft. These are vendor-supplied figures, not RERA-filed measurements.
Booked / available counts: Not disclosed in the supplied material.
Completion undertaking: Form B declares a completion undertaking of 28-6-2025.
RERA certificate completion / validity end date: 04/06/2025 is the certificate’s registration end date; registration validity and the completion undertaking are distinct records.
Occupancy / completion record: HMDA’s final-layout letter identifies OC number 040290/LT/SMD/FLT/U6/HMDA/04112020, dated 21-01-2021, and the accompanying architect’s certificate states the project was completed in all aspects. The document concerns the final layout; it does not provide a tower-by-tower or individual-building OC scope.
Development stage: The filed HMDA final-layout material records completed layout infrastructure and handover of roads, open spaces and social infrastructure; no independent current site inspection is supplied.
2. The project story
JB s SERENE CITY PH 5 is a plotted residential phase in Khanapur village, Ibrahimpatnam mandal, Ranga Reddy district, on the project land identified as survey numbers 67P and 68. The RERA certificate identifies a registered portion comprising plots 267 TO 273, 1 TO 8, 274, 275. The wider layout drawing is software-read as showing plot numbers 1 to 275, but its plot extraction is incomplete.
HMDA’s 2019 draft-layout letter set development conditions for roads and drainage, water and sewerage systems, lighting, utilities, public open spaces and planting. HMDA’s final-layout letter, dated 21 January 2021, records the layout as completed in all aspects in the accompanying architect’s certificate, and records transfer of roads, open spaces and social-infrastructure land to the local authority by registered gift deed. These are filed-document assertions; no independent site inspection or present-day verification is supplied.
The RERA certificate’s validity ended on 04/06/2025, while the promoter’s Form B gives a completion undertaking of 28-6-2025. The file includes a layout-level occupancy-certificate number, but does not establish an occupancy certificate for any individual building or a current extension of the project’s RERA registration.
3. Master plan, architecture & building design
This is a plotted layout rather than a multi-storey apartment scheme. The project filing records total area of 181775.79 sq.m, net area of 181006.55 sq.m, and affected area of 769.24 sq.m. The HMDA draft-layout letter records corresponding areas as 181775.8 sq.m, 181006.56 sq.m, and 769.24 sq.m, respectively.
The layout drawing’s area statement, read by software, gives the following distribution of the 181006.56 sq.m net layout area. These are drawing-derived figures, not individual plot measurements.
| Use | Area | Share of net layout area |
|---|---|---|
| Plots | 105556.02 sq.m | 58.3% |
| Roads | 49811.65 sq.m | 27.5% |
| Parks / open space | 21107.57 sq.m | 11.7% |
| Social infrastructure | 4529.74 sq.m | 2.5% |
| Amenities | 0.00 sq.m | 0.0% |
The HMDA draft-layout extraction separately lists 4529.74 sq.m as open space and marks the social-infrastructure entry illegible. The final-layout letter refers to social infrastructure and open spaces being handed over to the local authority.
The draft approval calls for a 60 mtrs-wide master-plan road and identifies 769.24 sq.m of affected area. It also identifies 17 mortgaged plots—plots 1–8, 267–273, 274 and 275—with recorded areas of 16089.09 sq.m and 5665.07 sq.m for the two mortgage groups. The final-layout letter records relinquishment deeds 1309/2021 and 1308/2021 concerning mortgaged plots.
No apartment floor plans, tower arrangements, building heights, floor configurations or individual-building layouts are provided in the supplied material. The project filing’s approved built-up area is 105556.2 sq.m; the available record does not define its measurement scope.
4. Homes, configurations & floor plans
This phase is a plotted development, so apartment configuration and carpet-area figures do not apply. Booked and available plot counts are not disclosed in the supplied material.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Plots | Registered portion identified by plot numbers; phase count not separately stated | Not disclosed | Not disclosed | Not disclosed | Not applicable | Not disclosed |
A vendor record lists plot-size examples of 1485 Sq. Ft., 2952 Sq. Ft., and 3525 Sq. Ft. These are vendor-supplied figures, not RERA-filed plot areas.
The approved-layout drawing was software-read as containing plot numbers 1 to 275; the drawing-derived count is not a complete plot schedule, and the extracted data does not provide a reliable size for each plot.
5. Parking & vehicle circulation
No project-wide parking count, visitor or accessible parking provision, parking allocation, or vehicle-parking arrangement is disclosed in the supplied material.
The HMDA draft-layout letter requires internal roads and an approach road to be formed, and says roads are to remain open for public and neighboring-site access. It also refers to roads of 18 Mtrs and above in its development conditions. These are approval conditions, not independent confirmation of completed road works.
6. Amenities, recreation & open spaces
The HMDA draft-layout letter and final-layout letter refer to layout infrastructure and open areas. The following table distinguishes the approval/document record from completion claims; no independent inspection is available.
| Description / size | 21107.57 sq.m in the drawing-derived area statement |
|---|---|
| Declared progress / verified status | Final-layout letter records open spaces handed over to the local authority by registered gift deed; no independent present-day verification |
| Description / size | 4529.74 sq.m in the drawing-derived area statement |
|---|---|
| Declared progress / verified status | Final-layout letter records social-infrastructure area handed over to the local authority; no independent present-day verification |
| Description / size | 49811.65 sq.m in the drawing-derived area statement |
|---|---|
| Declared progress / verified status | Final-layout letter records roads taken over by the local authority; no independent present-day verification |
| Description / size | No size or facility details supplied |
|---|---|
| Declared progress / verified status | Not established |
| Description / size | Vendor lists a gazebo, palm sitting zones, cricket practice pitch, volleyball court, tennis court, basketball court, amphitheatre, landscaped open green spaces, clubhouse, gym, private theatre, multipurpose hall, cafeteria, spa, meditation zone and children’s play area |
|---|---|
| Declared progress / verified status | Vendor claims only; the supplied approval and RERA records do not establish that these facilities are sanctioned or delivered |
7. Utilities, building services & safety
HMDA’s draft-layout letter lists development requirements for protected water supply, an overhead tank and sumps, an independent sewerage-disposal system, storm-water drainage, street lighting, underground utility ducting, a transformer yard, greenery, waste-disposal arrangements and source segregation. The final-layout letter states that the layout is provided with water supply, sewerage and drainage-disposal systems, street lighting, rainwater-harvesting structure and other civic amenities, and refers to local-body maintenance. These are document statements; capacities and independent verification are not supplied.
Water: HMDA documents refer to protected water supply and water-supply infrastructure; source, storage capacity and current operating status are not stated.
Sewerage and drainage: HMDA documents refer to sewerage, drainage disposal, storm-water drainage and rainwater harvesting. No treatment capacity or current operating data is supplied.
Electrical and lighting: The draft-layout letter lists street lighting, underground utility ducting and a transformer yard. The final-layout letter refers to street lighting. No supply capacity or backup-power details are supplied.
Waste: The draft-layout letter calls for space for solid-waste disposal and source segregation. Completion or operating details are not supplied.
Fire and accessibility: The supplied material does not provide project-specific fire-safety systems, accessibility provisions or related capacities.
8. Location, access & connectivity
The registered project location is Khanapur village, Ibrahimpatnam mandal, Ranga Reddy district, PIN 591302. HMDA’s filed layout material also identifies Khanapur/Khaanapur village and the same mandal and district.
The project filing records roads on its east and west boundaries, with neighboring land to the north and south. HMDA’s draft-layout letter calls for an approach road, internal roads and public access through the roads. No independently verified public-transport information or project-specific distance measurements are supplied.
9. Developer & development status
The registered promoter is JBINFRAPROJECTS, recorded as a partnership, with GSTIN 36AAMFJ3197R1ZD. The project filing lists its address as CHAITANYAGARDENS, MAIN ROAD, KHANAPUR, Ibrahimpatnam, Ranga Reddy, 591302. The TG-RERA certificate separately records a promoter office at Village: B.N.REDDY Nagar, Mandal: Hayathnagar, District: Ranga Reddy, Pin: 500070.
Form B, made by authorized signatory B. MANOHAR REDDY in November 2020, declares that the promoter has title-related documents and a development agreement, and undertakes completion by 28-6-2025. This is the promoter’s declaration, not independent verification of title or completion.
HMDA’s final-layout letter, dated 21 January 2021, records completion of the layout in all aspects in the accompanying architect’s certificate and identifies a layout-level occupancy-certificate number. The supplied material does not provide a current site inspection or separate completion/OC scope for individual buildings.
10. Approvals, official records & documents
TG-RERA registration certificate: Form C; P02400002589, issued 23/02/2021; stated validity through 04/06/2025; registered portion lists plots 267 TO 273, 1 TO 8, 274, 275.
HMDA draft-layout letter: Layout permit 000154/LO/Plg/HMDA/2019, dated 04 June 2019; surveys 67p and 68; includes layout areas, development conditions and mortgage details.
HMDA final-layout letter: Approval 000154/LO/Plg/HMDA/2019, dated 21 January 2021; identifies surveys 67p and 68, final layout extent 1,81,006.56 Sqm, and records handover of roads, open spaces and social infrastructure.
Layout-level occupancy record: Number 040290/LT/SMD/FLT/U6/HMDA/04112020, dated 21-01-2021, identified in the HMDA final-layout document; individual-building scope is not provided.
Registered gift deed: 12679/2020, dated 30-12-2020; cited in the final-layout letter for roads, open spaces and social infrastructure handed over to the local authority.
Relinquishment deeds: 1309/2021 and 1308/2021, dated 19/1/2021; cited in the final-layout letter concerning mortgaged plots.
Promoter’s Form B declaration: November 2020; declares title-related documentation, separate-account commitments and completion undertaking of 28-6-2025.
The HMDA DPMS approved-layout lookup is recorded as unavailable through the public portal in the supplied evidence; this is a source-access limitation, not evidence that approval was refused.
Other registrations of JB s SERENE CITY
Frequently asked questions
Is JB s SERENE CITY PH 5 registered with Telangana RERA?
Yes. JB s SERENE CITY PH 5 is registered with the Telangana Real Estate Regulatory Authority as P02400002589; the registration status is New Project.
Who is the developer of JB s SERENE CITY PH 5?
The promoter named in the RERA registration is JBINFRAPROJECTS.
Where is JB s SERENE CITY PH 5 located?
JB s SERENE CITY PH 5 is in KHANAPUR, Ibrahimpatnam, Rangareddy, Telangana (591302).
When will JB s SERENE CITY PH 5 be completed?
The promoter's proposed date of completion filed with RERA is 04/06/2025. This is the promoter's declaration, not a guarantee.