Na
SSB INFRA DEVELOPERS · Yadadri Bhuvanagiri · RERA P02000002087
The project is a proposed residential open layout at CHOUTUPPAL- SHIVAJI NAGAR, Malkapur Village, Choutuppal Mandal, Yadadri Bhuvanagiri District, developed by registered promoter Ssb Infra Developers. The layout covers a site area of 280274.09 sq.m and shows 583 residential plots; no tower or floor configuration is stated. The TG-RERA registration number is P02000002087, and the RERA header records the proposed completion date as 31/01/2025.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
11 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Record |
|---|---|
| Registered project name | “NA” on the TG-RERA certificate; a project name is not disclosed there. |
| Project type | Plotted development / proposed residential open layout. RERA record |
| Phase / registered portion | Not identified as a named phase; the registration and layout records identify the plotted project. Approvals record |
| TG-RERA registration number | P02000002087. |
| Registration validity | 24/08/2020 to 31/01/2025; the certificate says validity is subject to extension, but no extension is recorded on the supplied certificate. |
| Registered promoter | Ssb Infra Developers (also shown in the filed records as SSB INFRA DEVELOPERS). Entity type: partnership. Corporate record |
| RERA status in supplied record | Registration certificate supplied; the recorded validity end date is 31/01/2025. Current status or any extension is not established by the supplied certificate. Approvals record |
Land and geographic identity
| Field | Record |
|---|---|
| Locality / registered location | CHOUTUPPAL- SHIVAJI NAGAR; the layout drawing identifies Malkapur (Choutuppal). RERA record |
| Revenue village | Malkapur Village (also rendered “Malkapur” and “Malkapur (Choutuppal)” in the filed layout documents). |
| Mandal | Choutuppal. RERA record |
| District | Yadadri Bhuvanagiri (also rendered “Yadadri” in the layout permission). RERA record |
| PIN | 500089 in the registration certificate. |
| Project survey numbers / subdivisions | 660, 661, 662P, 663P, 664, 666P. RERA record |
| Survey extents stated in the layout-release letter | 660 (17-20), 661 (17-20), 662p (1-17), 663p (13-12), 664 (17-20), 666p (2-16). |
| Site area in the layout area statement | 280274.09 sq.m; net area 278618.25 sq.m; road-widening area 1655.83 sq.m. |
| Extent described as sanctioned layout extent | 278618.26 Sq.m. |
| Boundaries | North, south, east and west are each recorded as “NAIGHBOURS LAND”; boundary details beyond that description are not supplied. RERA filing |
Development identity
| Field | Record |
|---|---|
| Sanctioning authority | Hyderabad Metropolitan Development Authority (HMDA); the supplied letter records release of HMDA draft-layout development permission by Gram Panchayat Malkapur. |
| Principal layout approval | Layout Permit 000361/LO/Plg/HMDA/2019, dated 21-12-2019. |
| Approval file number | 024450/GHT/LT/U6/HMDA/07062019. |
| Approved use / layout type | Residential open layout; the plan records “Plot Use: Residential,” “Plot SubUse: Residential Bldg,” “Project Type: Open Layout,” and “Land Use Zone: Peri-Urban use zone.” |
| Approved built-up area | 181641.13 sq.m is recorded in the RERA-filed land information as approved built-up area; the supplied layout area statement separately identifies 181641.13 as plotted area. RERA filing |
| Plots shown | 583 plots, as stated in the layout-plan extraction. |
| Buildings / floors / parking levels | Not applicable as a building configuration for this plotted layout; no tower, floor or building-parking schedule is supplied. |
Offering and status
| Field | Record |
|---|---|
| Unit type | Residential plots. |
| RERA-filed plot configuration / booked and available counts | Unit-wise RERA configuration, booked counts and available counts are not supplied in the evidence provided for this overview. |
| Completion dates | The promoter’s Form B declaration dated 27/01/2020 undertakes completion by “24T OCTOBER 2026”; the RERA header records proposed completion as 31/01/2025. RERA record |
| Construction / development stage | The supplied evidence does not establish current on-site progress. RERA amenity records show 0% progress for the listed items; this is a filed progress field, not independent site verification. RERA amenities |
| Occupancy / completion certificate | No occupancy or completion certificate is supplied. The project is a plotted layout; the supplied records do not establish a project-wide or phase-specific certificate status beyond this absence. Document index |
2. The project story
The TG-RERA-filed project is a residential open-plot layout at Malkapur Village, Choutuppal Mandal, Yadadri Bhuvanagiri District, covering survey numbers 660, 661, 662P, 663P, 664 and 666P. The plan identifies 583 plots and an internal layout of roads, open-space/park/utility land and social-infrastructure land. It is not documented here as an apartment, villa or multi-building project.
HMDA’s layout plan is dated 21-12-2019. The project’s TG-RERA certificate records registration from 24/08/2020 through 31/01/2025. A promoter-signed Form B declaration gives a separate completion undertaking of “24T OCTOBER 2026”; the supplied records do not verify construction progress on site or establish that the layout’s development works are complete.
3. Master plan, architecture & building design
The approved drawing is a proposed residential open layout, not a building plan for homes. Its area statement records total site area 280274.09, net area 278618.25, road-widening area 1655.83, plotted area 181641.13, road area 68304.74, organized open-space/park/utility area 21691.97, social-infrastructure area 6976.22, and amenity area 0.0. These are drawing/area-statement figures; no FSI-counted area, apartment carpet area or building-floor schedule is supplied.
The plan lists 583 plots and road widths of 30.00, 60ft, 50ft and 33ft. It identifies park and social infrastructure, and also lists STP, septic tank, OHT and dust bin among the layout’s amenities/utilities. The available drawing data does not provide plot-size bands, individual plot dimensions, building footprints, or a detailed internal-road or landscaping design description.
The drawing lists HMDA mortgage plots in favour of HMDA: plots 349–410, 433–438, 461–471, 496–507 and 532–538 (98 plots; 27889.78 Sq.mts), plus plots 20–35, 64–70 and 95–101 (30 plots; 8996.43 Sq.mts). It also records road-affected area of 1655.77 sq.mts under deed 15201/2019. These are approval-plan annotations, not evidence that the development works have been completed.
4. Homes, configurations & floor plans
This is a plotted layout, so apartment configuration and floor-plan fields do not apply. The layout-plan extraction states 583 plots, but the supplied records do not provide a verified plot-by-plot inventory, plot-size bands, booked/available counts or RERA-filed saleable areas.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Residential plots | 583 shown on layout drawing | Not disclosed | Not disclosed | Not disclosed | Not applicable | Not supplied |
Two layout sheets are recorded; neither is a floor plan containing homes. Software-measured carpet areas are therefore not available. Floor plans
5. Parking & vehicle circulation
The supplied evidence does not establish sanctioned parking-space counts, visitor or accessible parking, or an allocation arrangement for purchasers. The layout plan lists internal roads and road widths of 30.00, 60ft, 50ft and 33ft; detailed vehicle-entry, exit, driveway and pedestrian-separation arrangements are not described in the supplied extract.
6. Amenities, recreation & open spaces
The layout plan identifies park, social infrastructure, STP, septic tank, OHT and dust bin. TG-RERA amenity fields list infrastructure and common-facility categories, but the supplied progress fields are 0%; these are not independent confirmations of delivery. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Park / organized open space | 21691.97 area in the layout statement; units are not stated in that table. | Drawing-listed; completion not independently verified. | |
| Social infrastructure | 6976.22 area in the layout statement; units are not stated in that table. | Drawing-listed; completion not independently verified. | |
| Green strip / tot lot / park | Listed as available “YES”; no size supplied. | RERA amenities | Progress field 0%; not independently verified. |
| Internal roads and footpaths | Listed as available “YES”; no area or completion evidence supplied. | RERA amenities | Progress field 0%; not independently verified. |
| Street lighting | Listed as available “YES”; no quantity supplied. | RERA amenities | Progress field 0%; not independently verified. |
| Community buildings | Listed as a category; no specific building or size supplied. | RERA amenities | Progress field 0%; not independently verified. |
7. Utilities, building services & safety
The layout drawing lists STP, septic tank, OHT and dust bin. TG-RERA amenity fields list water supply, storm-water drains, sewerage (including chambers, lines, septic tank and STP), treatment and disposal of sewage and sullage water, solid-waste management, water conservation/rainwater harvesting, energy management, fire protection and electrical meter room/sub-station/receiving station. The supplied records do not provide capacities, engineering details or verified completion status for these items. RERA amenities
The RERA amenity fields mark water supply, storm-water drains, energy management and electrical meter room/sub-station/receiving station as available “YES,” while recording progress at 0%. This is the filed status in the supplied data and does not establish that the services are operational on site. No project-specific evidence is supplied for water source or treatment, power backup, EV charging, fire equipment or clearances, CCTV, access control, or accessible circulation. RERA amenities
8. Location, access & connectivity
The registered location is CHOUTUPPAL- SHIVAJI NAGAR, Malkapur Village, Choutuppal Mandal, Yadadri Bhuvanagiri District, PIN 500089. The location record places the project at Malkapur, Choutuppal mandal; it supplies a nearest sampled Outer Ring Road interchange distance of 19.4 km. No approach-road route, public-transport service or other measured nearby landmark distance is established in the supplied project-location data. RERA record Location record
9. Developer & development status
The TG-RERA certificate names Ssb Infra Developers as promoter. The project filing identifies the entity as a partnership. The supplied records name MADHU DERANGULA and RAGHUMA REDDY NALLA as authorized signatories. Corporate record Parties record
The promoter’s Form B affidavit-cum-declaration, dated 27/01/2020, is signed by Raghuma Reddy Nallam as an authorized signatory and declares a legal-title basis, states that the land is free from encumbrances, and undertakes completion by “24T OCTOBER 2026.” These are promoter declarations in the filed document.
No verified current construction or infrastructure-completion stage is established by the supplied records. The TG-RERA certificate records a registration validity end date of 31/01/2025 and states that extension may be granted by the Authority; the supplied certificate does not record an extension.
10. Approvals, official records & documents
| Record | What the supplied document establishes |
|---|---|
| TG-RERA registration certificate, P02000002087 | FORM C records registration under section 5 to Ssb Infra Developers, issued 24/08/2020 and valid through 31/01/2025, subject to extension; no extension is recorded on the certificate. |
| HMDA layout plan / Layout Permit 000361/LO/Plg/HMDA/2019 | Proposed residential open layout for survey numbers 660, 661, 662p, 663p, 664 and 666P, dated 21-12-2019; includes the layout area statement, plots and approval conditions. |
| Approval file 024450/GHT/LT/U6/HMDA/07062019 | File number stated on the layout plan. |
| Gram Panchayat Malkapur letter dated 18-02-2020 | Records release of HMDA draft-layout development permission for the listed survey extents at Malkapur Village, Choutuppal Mandal. |
| Form B declaration | Promoter affidavit dated 27/01/2020, including title, encumbrance and completion declarations. |
| Layout-plan mortgage and road-affected-area references | Mortgage deeds 15202/2019 and 15200/2019, dated 06.12.2019, and road-affected-area deed 15201/2019, dated 06.12.2019, are referenced in the layout plan. |
| Occupancy / completion certificate | No such certificate is included in the supplied documents. Document index |
1. Project at a glance
Project identity
Registered project name: “NA” on the TG-RERA certificate; a project name is not disclosed there.
Project type: Plotted development / proposed residential open layout.
Phase / registered portion: Not identified as a named phase; the registration and layout records identify the plotted project.
TG-RERA registration number: P02000002087.
Registration validity: 24/08/2020 to 31/01/2025; the certificate says validity is subject to extension, but no extension is recorded on the supplied certificate.
Registered promoter: Ssb Infra Developers (also shown in the filed records as SSB INFRA DEVELOPERS). Entity type: partnership.
RERA status in supplied record: Registration certificate supplied; the recorded validity end date is 31/01/2025. Current status or any extension is not established by the supplied certificate.
Land and geographic identity
Locality / registered location: CHOUTUPPAL- SHIVAJI NAGAR; the layout drawing identifies Malkapur (Choutuppal).
Revenue village: Malkapur Village (also rendered “Malkapur” and “Malkapur (Choutuppal)” in the filed layout documents).
Mandal: Choutuppal.
District: Yadadri Bhuvanagiri (also rendered “Yadadri” in the layout permission).
PIN: 500089 in the registration certificate.
Project survey numbers / subdivisions: 660, 661, 662P, 663P, 664, 666P.
Survey extents stated in the layout-release letter: 660 (17-20), 661 (17-20), 662p (1-17), 663p (13-12), 664 (17-20), 666p (2-16).
Site area in the layout area statement: 280274.09 sq.m; net area 278618.25 sq.m; road-widening area 1655.83 sq.m.
Extent described as sanctioned layout extent: 278618.26 Sq.m.
Boundaries: North, south, east and west are each recorded as “NAIGHBOURS LAND”; boundary details beyond that description are not supplied.
Development identity
Sanctioning authority: Hyderabad Metropolitan Development Authority (HMDA); the supplied letter records release of HMDA draft-layout development permission by Gram Panchayat Malkapur.
Principal layout approval: Layout Permit 000361/LO/Plg/HMDA/2019, dated 21-12-2019.
Approval file number: 024450/GHT/LT/U6/HMDA/07062019.
Approved use / layout type: Residential open layout; the plan records “Plot Use: Residential,” “Plot SubUse: Residential Bldg,” “Project Type: Open Layout,” and “Land Use Zone: Peri-Urban use zone.”
Approved built-up area: 181641.13 sq.m is recorded in the RERA-filed land information as approved built-up area; the supplied layout area statement separately identifies 181641.13 as plotted area.
Plots shown: 583 plots, as stated in the layout-plan extraction.
Buildings / floors / parking levels: Not applicable as a building configuration for this plotted layout; no tower, floor or building-parking schedule is supplied.
Offering and status
Unit type: Residential plots.
RERA-filed plot configuration / booked and available counts: Unit-wise RERA configuration, booked counts and available counts are not supplied in the evidence provided for this overview.
Completion dates: The promoter’s Form B declaration dated 27/01/2020 undertakes completion by “24T OCTOBER 2026”; the RERA header records proposed completion as 31/01/2025.
Construction / development stage: The supplied evidence does not establish current on-site progress. RERA amenity records show 0% progress for the listed items; this is a filed progress field, not independent site verification.
Occupancy / completion certificate: No occupancy or completion certificate is supplied. The project is a plotted layout; the supplied records do not establish a project-wide or phase-specific certificate status beyond this absence.
2. The project story
The TG-RERA-filed project is a residential open-plot layout at Malkapur Village, Choutuppal Mandal, Yadadri Bhuvanagiri District, covering survey numbers 660, 661, 662P, 663P, 664 and 666P. The plan identifies 583 plots and an internal layout of roads, open-space/park/utility land and social-infrastructure land. It is not documented here as an apartment, villa or multi-building project.
HMDA’s layout plan is dated 21-12-2019. The project’s TG-RERA certificate records registration from 24/08/2020 through 31/01/2025. A promoter-signed Form B declaration gives a separate completion undertaking of “24T OCTOBER 2026”; the supplied records do not verify construction progress on site or establish that the layout’s development works are complete.
3. Master plan, architecture & building design
The approved drawing is a proposed residential open layout, not a building plan for homes. Its area statement records total site area 280274.09, net area 278618.25, road-widening area 1655.83, plotted area 181641.13, road area 68304.74, organized open-space/park/utility area 21691.97, social-infrastructure area 6976.22, and amenity area 0.0. These are drawing/area-statement figures; no FSI-counted area, apartment carpet area or building-floor schedule is supplied.
The plan lists 583 plots and road widths of 30.00, 60ft, 50ft and 33ft. It identifies park and social infrastructure, and also lists STP, septic tank, OHT and dust bin among the layout’s amenities/utilities. The available drawing data does not provide plot-size bands, individual plot dimensions, building footprints, or a detailed internal-road or landscaping design description.
The drawing lists HMDA mortgage plots in favour of HMDA: plots 349–410, 433–438, 461–471, 496–507 and 532–538 (98 plots; 27889.78 Sq.mts), plus plots 20–35, 64–70 and 95–101 (30 plots; 8996.43 Sq.mts). It also records road-affected area of 1655.77 sq.mts under deed 15201/2019. These are approval-plan annotations, not evidence that the development works have been completed.
4. Homes, configurations & floor plans
This is a plotted layout, so apartment configuration and floor-plan fields do not apply. The layout-plan extraction states 583 plots, but the supplied records do not provide a verified plot-by-plot inventory, plot-size bands, booked/available counts or RERA-filed saleable areas.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Residential plots | 583 shown on layout drawing | Not disclosed | Not disclosed | Not disclosed | Not applicable | Not supplied |
Two layout sheets are recorded; neither is a floor plan containing homes. Software-measured carpet areas are therefore not available.
5. Parking & vehicle circulation
The supplied evidence does not establish sanctioned parking-space counts, visitor or accessible parking, or an allocation arrangement for purchasers. The layout plan lists internal roads and road widths of 30.00, 60ft, 50ft and 33ft; detailed vehicle-entry, exit, driveway and pedestrian-separation arrangements are not described in the supplied extract.
6. Amenities, recreation & open spaces
The layout plan identifies park, social infrastructure, STP, septic tank, OHT and dust bin. TG-RERA amenity fields list infrastructure and common-facility categories, but the supplied progress fields are 0%; these are not independent confirmations of delivery.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Park / organized open space | 21691.97 area in the layout statement; units are not stated in that table. | Drawing-listed; completion not independently verified. | |
| Social infrastructure | 6976.22 area in the layout statement; units are not stated in that table. | Drawing-listed; completion not independently verified. | |
| Green strip / tot lot / park | Listed as available “YES”; no size supplied. | Progress field 0%; not independently verified. | |
| Internal roads and footpaths | Listed as available “YES”; no area or completion evidence supplied. | Progress field 0%; not independently verified. | |
| Street lighting | Listed as available “YES”; no quantity supplied. | Progress field 0%; not independently verified. | |
| Community buildings | Listed as a category; no specific building or size supplied. | Progress field 0%; not independently verified. |
7. Utilities, building services & safety
The layout drawing lists STP, septic tank, OHT and dust bin. TG-RERA amenity fields list water supply, storm-water drains, sewerage (including chambers, lines, septic tank and STP), treatment and disposal of sewage and sullage water, solid-waste management, water conservation/rainwater harvesting, energy management, fire protection and electrical meter room/sub-station/receiving station. The supplied records do not provide capacities, engineering details or verified completion status for these items.
The RERA amenity fields mark water supply, storm-water drains, energy management and electrical meter room/sub-station/receiving station as available “YES,” while recording progress at 0%. This is the filed status in the supplied data and does not establish that the services are operational on site. No project-specific evidence is supplied for water source or treatment, power backup, EV charging, fire equipment or clearances, CCTV, access control, or accessible circulation.
8. Location, access & connectivity
The registered location is CHOUTUPPAL- SHIVAJI NAGAR, Malkapur Village, Choutuppal Mandal, Yadadri Bhuvanagiri District, PIN 500089. The location record places the project at Malkapur, Choutuppal mandal; it supplies a nearest sampled Outer Ring Road interchange distance of 19.4 km. No approach-road route, public-transport service or other measured nearby landmark distance is established in the supplied project-location data.
9. Developer & development status
The TG-RERA certificate names Ssb Infra Developers as promoter. The project filing identifies the entity as a partnership. The supplied records name MADHU DERANGULA and RAGHUMA REDDY NALLA as authorized signatories.
The promoter’s Form B affidavit-cum-declaration, dated 27/01/2020, is signed by Raghuma Reddy Nallam as an authorized signatory and declares a legal-title basis, states that the land is free from encumbrances, and undertakes completion by “24T OCTOBER 2026.” These are promoter declarations in the filed document.
No verified current construction or infrastructure-completion stage is established by the supplied records. The TG-RERA certificate records a registration validity end date of 31/01/2025 and states that extension may be granted by the Authority; the supplied certificate does not record an extension.
10. Approvals, official records & documents
TG-RERA registration certificate, P02000002087: FORM C records registration under section 5 to Ssb Infra Developers, issued 24/08/2020 and valid through 31/01/2025, subject to extension; no extension is recorded on the certificate.
HMDA layout plan / Layout Permit 000361/LO/Plg/HMDA/2019: Proposed residential open layout for survey numbers 660, 661, 662p, 663p, 664 and 666P, dated 21-12-2019; includes the layout area statement, plots and approval conditions.
Approval file 024450/GHT/LT/U6/HMDA/07062019: File number stated on the layout plan.
Gram Panchayat Malkapur letter dated 18-02-2020: Records release of HMDA draft-layout development permission for the listed survey extents at Malkapur Village, Choutuppal Mandal.
Form B declaration: Promoter affidavit dated 27/01/2020, including title, encumbrance and completion declarations.
Layout-plan mortgage and road-affected-area references: Mortgage deeds 15202/2019 and 15200/2019, dated 06.12.2019, and road-affected-area deed 15201/2019, dated 06.12.2019, are referenced in the layout plan.
Occupancy / completion certificate: No such certificate is included in the supplied documents.
Frequently asked questions
Is NA registered with Telangana RERA?
Yes. NA is registered with the Telangana Real Estate Regulatory Authority as P02000002087; the registration status is New Project.
Who is the developer of NA?
The promoter named in the RERA registration is SSB INFRA DEVELOPERS.
Where is NA located?
NA is in CHOUTUPPAL, CHOUTUPPAL- SHIVAJI NAGAR, Yadadri Bhuvanagiri, Telangana (500089).
When will NA be completed?
The promoter's proposed date of completion filed with RERA is 31/01/2025. This is the promoter's declaration, not a guarantee.