Sri Viswambhara Residency
VISWAMBHARA DEVELOPERS · Sangareddy · RERA P01100010636
SRI VISWAMBHARA RESIDENCY is a residential apartment project in POTHREDDIPALLE, SANGAREDDY Mandal, Sangareddy District, developed by registered promoter VISWAMBHARA DEVELOPERS. The project is on 668.8 sq. m. and comprises one apartment building with 1 Stilt + 5 Floors and 20 homes. The RERA filing lists 20 2BHK units. It is registered with TG-RERA as P01100010636, with registration valid from 30/12/2025 to 29/12/2028; the promoter’s proposed completion date is 29/12/2028.
More from Viswambhara Developers · 3 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
10 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Project record |
|---|---|
| Registered name | SRI VISWAMBHARA RESIDENCY RERA record |
| Project type and registered portion | Residential apartment project; registered portion is the project recorded under the registration number below. No separate phase name is disclosed. RERA record |
| TG-RERA registration | P01100010636; recorded as valid from 30/12/2025 to 29/12/2028. This is the registration-validity period, not a statement of completion or occupancy. RERA record Approvals record |
| Registered promoter | VISWAMBHARA DEVELOPERS RERA record Corporate record |
| RERA status | TG-RERA registration certificate is on file. The project is described as a new project; the available evidence does not establish independently verified construction progress. RERA record |
Land and geographic identity
| Field | Project record |
|---|---|
| Revenue village | POTHREDDIPALLE; approval documents also spell it POTHIREDDYPALLY / Pothireddy Pally. RERA record RERA filing |
| Locality | NA in the project filing. RERA record |
| Mandal / district / PIN | SANGAREDDY / Sangareddy / 502295 RERA record |
| Project survey number(s) | Survey No. 180. No project subdivision is identified in the supplied project filing. RERA filing |
| Registered site extent | 668.8 sq. m.; the approval extract records gross and net plot area as 668.8 sq. m. and road-affected area as 0 sq. m. RERA filing |
| Boundaries | East and west: 30 WIDE ROAD; north: PLOT NOS 348 AND 357; south: PLOT NOS 351 AND 354. RERA filing |
Development identity
| Field | Project record |
|---|---|
| Sanctioning authority / principal building approval | Sangareddy Municipality building permit order, approval no. 0010/SANG/SWBP/2025, approved 30/12/2025; file no. 009906/SANG/00010/SWBP/2025. The approval extract identifies HMDA in its authority field and Sangareddy Municipality as the issuing authority. Approvals record |
| Approved building | One residential APARTMENT BUILDING, described as 1 Stilt + 5 Floors. |
| Approved built-up area | 1783.75 sq. m. residential upper floors; approval-plan extract also states total proposed BUA of 1783.75 sq. m. excluding parking and 2140.5 sq. m. including parking. These are approval-record figures, not carpet or saleable area. |
| Parking provision shown in approval extract | 12.00 car parking spaces; total parking area 356.75 sq. m. Parking is stated to be in cellar/stilt in the approval conditions, while the sanctioned parameters list Cellar 0.0; Stilt 1.0. |
| Units | 20 dwelling units in the building permit record and 20 units in the RERA configuration record. RERA unit table |
| Building height | Approval-plan extract records proposed height 17.86 m and total height 20.36 m. |
Offering and status
| Field | Project record |
|---|---|
| RERA-filed configuration | 2BHK, 20 units; RERA-filed saleable area 109.16 sq. m. per configuration record. RERA unit table |
| Booked / available | 0 booked / 20 available, as last read from the TG-RERA portal; the portal record has no as-of date, so counts are indicative rather than a live availability confirmation. RERA unit table |
| Construction stage | No independently verified site-progress record is supplied. The project is identified as new, and the building permit sets a construction commencement deadline of 28/06/2026. RERA record |
| Completion dates | Promoter’s Form B undertakes completion by 29/12/2028; the building permit states construction is to be completed before 30/12/2028. |
| Occupancy / completion certificate | No occupancy or completion certificate is included in the supplied project documents. The building permit requires completion notice and an occupancy certificate before occupation. |
2. The project story
SRI VISWAMBHARA RESIDENCY is a single residential apartment building registered with TG-RERA as P01100010636, on 668.8 sq. m. in Survey No. 180, revenue village Pothreddipalle, Sangareddy Mandal and District. The building permit describes one apartment building with 1 Stilt + 5 Floors and sanctions 20 dwelling units; the RERA filing lists 20 two-bedroom units. RERA record RERA filing RERA unit table
The record sets out a proposed project and completion undertaking, but the evidence supplied does not verify the physical construction stage. Registration remains valid through 29/12/2028; that date is distinct from the promoter’s completion undertaking and from the building permit’s completion deadline. No occupancy or completion certificate is supplied, so the materials do not establish an occupied or certified portion of the project.
3. Master plan, architecture & building design
The approval record describes a single residential apartment building on a 668.8 sq. m. gross/net plot. It gives proposed coverage of 358.33 sq. m. (54%), vacant plot area of 301.28 sq. m., and approved proposed built-up area of 1783.75 sq. m. excluding parking and 2140.5 sq. m. including parking.
The building is recorded as 1 Stilt + 5 Floors, with 20 dwelling units. The approval-plan extract records proposed building height of 17.86 m and total height of 20.36 m. It also lists a 2.50m WIDE CORRIDOR, 4.5m Wide Drive Way, 1.0m WIDE GREENARY, and 1.50m height Compound Wall. No supplied drawing extraction establishes the detailed floor-by-floor unit arrangement, footprint geometry, number of lifts or stairs, or the distribution of common areas.
The site boundaries are recorded as 30-wide roads to the east and west, plots 348 and 357 to the north, and plots 351 and 354 to the south. The approval-plan extract records 0 sq. m. road-affected area and 0 sq. m. NALA-affected area. RERA filing
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 20 | 0 | 20 | 109.16 sq. m. | Software-measured range: 57.0–95.1 sq. m.; median 75.9 sq. m. | 30% |
RERA configuration, unit counts, booking counts and saleable area are from the project filing; the booked/available counts are indicative because the portal record has no as-of date. Carpet figures are software measurements from the approved floor-plan drawing geometry, not RERA-filed disclosures. Eight flat designs were measured; all eight are marked as needing review. The supplied drawing extract identifies one typical-floor flat’s kitchen/dining area, two bedrooms and two toilets, but does not provide a complete set of room dimensions. RERA unit table RERA unit details Floor plans
Saleable area and measured carpet area are different measures: the drawing-based carpet measurement is not a substitute for the RERA-filed saleable area, which may include the home’s share of common areas. The supplied record does not provide verified unit-specific balcony, utility or common-area allocations. Floor plans RERA unit details
5. Parking & vehicle circulation
The approval-plan extract records 12.00 car parking spaces and 356.75 sq. m. total parking area. The building permit identifies 1 Stilt and states that cellar/stilt parking approved in the plan is to be used exclusively for parking; its sanctioned parameters list Cellar 0.0; Stilt 1.0. The supplied materials do not establish visitor or accessible-space counts, two-wheeler spaces, EV-charging installation, parking assignments to individual units, or whether any particular bay is exclusively allocated.
The approval extract lists a 4.5m Wide Drive Way. Detailed ramp geometry, vehicle entry/exit arrangements and pedestrian separation are not established by the supplied evidence.
6. Amenities, recreation & open spaces
| Description / size | Tot-lot is listed; the approval extract records Tot Lot (0 Sq. Mtrs) and a 1.0m WIDE GREENARY. |
|---|---|
| Declared progress / verified status | Approval-record item; no completion verification supplied. |
| Description / size | 25 trees listed in the building permit extract. |
|---|---|
| Declared progress / verified status | Approval-record item; no completion verification supplied. |
| Description / size | Listed in third-party vendor material; no size or capacity supplied. |
|---|---|
| Evidence source | Promoter website |
| Declared progress / verified status | Vendor-described; not established by the supplied RERA or approval extracts as sanctioned or delivered. |
| Description / size | Listed in the RERA amenities record without a supplied area or completion percentage above zero. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA-recorded items; progress is not independently verified. |
| Description / size | Listed as available “YES” in the amenities record. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA-recorded availability entries; no independent completion verification supplied. |
7. Utilities, building services & safety
The approval extracts list a 22,000.00 Ltrs. water tank, sump, OHT, rainwater harvesting, septic system, electrical transformer and garbage house. The building permit extract also lists 4 rain water harvesting pits. These are approval-record provisions; the supplied evidence does not verify installed capacity or completed operation.
Sewerage and storm-water drains are marked “YES” in the RERA amenities record, while treatment and disposal of sewage and sullage water are listed without a completion figure. No STP capacity, water source, reuse volume, electrical backup capacity, lift capacity, CCTV system, access-control arrangements or waste-segregation details are supplied. RERA amenities
The building permit requires fire-safety installations and an occupancy fire NOC before an occupancy certificate; it also lists a lift and staircase in the approval-plan extract. These are approval requirements or listed provisions, not evidence of completed installation or issued clearances. The supplied material does not establish lift count/capacity, escape-stair configuration, fire-system details or accessible circulation.
8. Location, access & connectivity
The registered site is in POTHREDDIPALLE, Sangareddy Mandal, Sangareddy District, PIN 502295, on Survey No. 180. The project filing records 30-wide roads on the east and west boundaries. RERA record RERA filing
A location record gives the nearest sampled Outer Ring Road interchange as approximately 19.4 km from the cadastral parcel centroid. This is a measured location-data distance, not a travel-time estimate. No public-transport details or project-verified nearby landmarks are supplied. Location record Cadastral map
9. Developer & development status
The TG-RERA registered promoter is VISWAMBHARA DEVELOPERS, identified in the filing as a partnership. Its GSTIN is 36ABBFV0363M1ZY. The RERA certificate lists the promoter address as Village Gajula Ramaram-1, Mandal Qutballapur, District Medchal-Malkajgiri, PIN 500055. Corporate record RERA filing
The project filing identifies VIJAY KUMAR MOKKA and SAI CHARAN PEDDAGOLLA as partners and authorized signatories. Form B, dated February 2026, declares completion on or before 29/12/2028 and includes the promoter’s project-fund and approval undertakings; these are promoter declarations, not independently verified progress evidence. Parties record
10. Approvals, official records & documents
| Identifier / date | P01100010636; valid 30/12/2025–29/12/2028 |
|---|---|
| What the supplied record establishes | Form C certificate for SRI VISWAMBHARA RESIDENCY and VISWAMBHARA DEVELOPERS. |
| Identifier / date | Approval no. 0010/SANG/SWBP/2025; file no. 009906/SANG/00010/SWBP/2025; approved 30/12/2025 |
|---|---|
| What the supplied record establishes | Permit record for one apartment building, 1 Stilt + 5 Floors, on Survey No. 180, with 20 dwelling units. The extract identifies Sangareddy Municipality as issuing authority and also names HMDA in its authority field. |
| Identifier / date | Approved 30/12/2025 |
|---|---|
| What the supplied record establishes | Records site-area, coverage, built-up-area, parking and building-design parameters for the apartment project. |
| Identifier / date | February 2026 |
|---|---|
| What the supplied record establishes | Promoter declaration of title basis, no encumbrances, project-fund obligations and completion by 29/12/2028. |
| Identifier / date | Building permit contains commencement and occupancy-related conditions |
|---|---|
| What the supplied record establishes | No separate commencement notice, completion certificate or occupancy certificate is supplied. The permit records construction to commence before 28/06/2026 and to be completed before 30/12/2028. |
| Identifier / date | Available project-file documents include a land-title search report, development agreement-cum-GPA, mortgage deed and encumbrance statement. |
|---|---|
| What the supplied record establishes | These are indexed here as project-file records; their title and encumbrance implications are addressed in the Land & Title section. Document index |
1. Project at a glance
Project identity
Registered name: SRI VISWAMBHARA RESIDENCY
Project type and registered portion: Residential apartment project; registered portion is the project recorded under the registration number below. No separate phase name is disclosed.
TG-RERA registration: P01100010636; recorded as valid from 30/12/2025 to 29/12/2028. This is the registration-validity period, not a statement of completion or occupancy.
Registered promoter: VISWAMBHARA DEVELOPERS
RERA status: TG-RERA registration certificate is on file. The project is described as a new project; the available evidence does not establish independently verified construction progress.
Land and geographic identity
Revenue village: POTHREDDIPALLE; approval documents also spell it POTHIREDDYPALLY / Pothireddy Pally.
Locality: NA in the project filing.
Mandal / district / PIN: SANGAREDDY / Sangareddy / 502295
Project survey number(s): Survey No. 180. No project subdivision is identified in the supplied project filing.
Registered site extent: 668.8 sq. m.; the approval extract records gross and net plot area as 668.8 sq. m. and road-affected area as 0 sq. m.
Boundaries: East and west: 30 WIDE ROAD; north: PLOT NOS 348 AND 357; south: PLOT NOS 351 AND 354.
Development identity
Sanctioning authority / principal building approval: Sangareddy Municipality building permit order, approval no. 0010/SANG/SWBP/2025, approved 30/12/2025; file no. 009906/SANG/00010/SWBP/2025. The approval extract identifies HMDA in its authority field and Sangareddy Municipality as the issuing authority.
Approved building: One residential APARTMENT BUILDING, described as 1 Stilt + 5 Floors.
Approved built-up area: 1783.75 sq. m. residential upper floors; approval-plan extract also states total proposed BUA of 1783.75 sq. m. excluding parking and 2140.5 sq. m. including parking. These are approval-record figures, not carpet or saleable area.
Parking provision shown in approval extract: 12.00 car parking spaces; total parking area 356.75 sq. m. Parking is stated to be in cellar/stilt in the approval conditions, while the sanctioned parameters list Cellar 0.0; Stilt 1.0.
Units: 20 dwelling units in the building permit record and 20 units in the RERA configuration record.
Building height: Approval-plan extract records proposed height 17.86 m and total height 20.36 m.
Offering and status
RERA-filed configuration: 2BHK, 20 units; RERA-filed saleable area 109.16 sq. m. per configuration record.
Booked / available: 0 booked / 20 available, as last read from the TG-RERA portal; the portal record has no as-of date, so counts are indicative rather than a live availability confirmation.
Construction stage: No independently verified site-progress record is supplied. The project is identified as new, and the building permit sets a construction commencement deadline of 28/06/2026.
Completion dates: Promoter’s Form B undertakes completion by 29/12/2028; the building permit states construction is to be completed before 30/12/2028.
Occupancy / completion certificate: No occupancy or completion certificate is included in the supplied project documents. The building permit requires completion notice and an occupancy certificate before occupation.
2. The project story
SRI VISWAMBHARA RESIDENCY is a single residential apartment building registered with TG-RERA as P01100010636, on 668.8 sq. m. in Survey No. 180, revenue village Pothreddipalle, Sangareddy Mandal and District. The building permit describes one apartment building with 1 Stilt + 5 Floors and sanctions 20 dwelling units; the RERA filing lists 20 two-bedroom units.
The record sets out a proposed project and completion undertaking, but the evidence supplied does not verify the physical construction stage. Registration remains valid through 29/12/2028; that date is distinct from the promoter’s completion undertaking and from the building permit’s completion deadline. No occupancy or completion certificate is supplied, so the materials do not establish an occupied or certified portion of the project.
3. Master plan, architecture & building design
The approval record describes a single residential apartment building on a 668.8 sq. m. gross/net plot. It gives proposed coverage of 358.33 sq. m. (54%), vacant plot area of 301.28 sq. m., and approved proposed built-up area of 1783.75 sq. m. excluding parking and 2140.5 sq. m. including parking.
The building is recorded as 1 Stilt + 5 Floors, with 20 dwelling units. The approval-plan extract records proposed building height of 17.86 m and total height of 20.36 m. It also lists a 2.50m WIDE CORRIDOR, 4.5m Wide Drive Way, 1.0m WIDE GREENARY, and 1.50m height Compound Wall. No supplied drawing extraction establishes the detailed floor-by-floor unit arrangement, footprint geometry, number of lifts or stairs, or the distribution of common areas.
The site boundaries are recorded as 30-wide roads to the east and west, plots 348 and 357 to the north, and plots 351 and 354 to the south. The approval-plan extract records 0 sq. m. road-affected area and 0 sq. m. NALA-affected area.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 20 | 0 | 20 | 109.16 sq. m. | Software-measured range: 57.0–95.1 sq. m.; median 75.9 sq. m. | 30% |
RERA configuration, unit counts, booking counts and saleable area are from the project filing; the booked/available counts are indicative because the portal record has no as-of date. Carpet figures are software measurements from the approved floor-plan drawing geometry, not RERA-filed disclosures. Eight flat designs were measured; all eight are marked as needing review. The supplied drawing extract identifies one typical-floor flat’s kitchen/dining area, two bedrooms and two toilets, but does not provide a complete set of room dimensions.
Saleable area and measured carpet area are different measures: the drawing-based carpet measurement is not a substitute for the RERA-filed saleable area, which may include the home’s share of common areas. The supplied record does not provide verified unit-specific balcony, utility or common-area allocations.
5. Parking & vehicle circulation
The approval-plan extract records 12.00 car parking spaces and 356.75 sq. m. total parking area. The building permit identifies 1 Stilt and states that cellar/stilt parking approved in the plan is to be used exclusively for parking; its sanctioned parameters list Cellar 0.0; Stilt 1.0. The supplied materials do not establish visitor or accessible-space counts, two-wheeler spaces, EV-charging installation, parking assignments to individual units, or whether any particular bay is exclusively allocated.
The approval extract lists a 4.5m Wide Drive Way. Detailed ramp geometry, vehicle entry/exit arrangements and pedestrian separation are not established by the supplied evidence.
6. Amenities, recreation & open spaces
| Description / size | Tot-lot is listed; the approval extract records Tot Lot (0 Sq. Mtrs) and a 1.0m WIDE GREENARY. |
|---|---|
| Declared progress / verified status | Approval-record item; no completion verification supplied. |
| Description / size | 25 trees listed in the building permit extract. |
|---|---|
| Declared progress / verified status | Approval-record item; no completion verification supplied. |
| Description / size | Listed in third-party vendor material; no size or capacity supplied. |
|---|---|
| Declared progress / verified status | Vendor-described; not established by the supplied RERA or approval extracts as sanctioned or delivered. |
| Description / size | Listed in the RERA amenities record without a supplied area or completion percentage above zero. |
|---|---|
| Declared progress / verified status | RERA-recorded items; progress is not independently verified. |
| Description / size | Listed as available “YES” in the amenities record. |
|---|---|
| Declared progress / verified status | RERA-recorded availability entries; no independent completion verification supplied. |
7. Utilities, building services & safety
The approval extracts list a 22,000.00 Ltrs. water tank, sump, OHT, rainwater harvesting, septic system, electrical transformer and garbage house. The building permit extract also lists 4 rain water harvesting pits. These are approval-record provisions; the supplied evidence does not verify installed capacity or completed operation.
Sewerage and storm-water drains are marked “YES” in the RERA amenities record, while treatment and disposal of sewage and sullage water are listed without a completion figure. No STP capacity, water source, reuse volume, electrical backup capacity, lift capacity, CCTV system, access-control arrangements or waste-segregation details are supplied.
The building permit requires fire-safety installations and an occupancy fire NOC before an occupancy certificate; it also lists a lift and staircase in the approval-plan extract. These are approval requirements or listed provisions, not evidence of completed installation or issued clearances. The supplied material does not establish lift count/capacity, escape-stair configuration, fire-system details or accessible circulation.
8. Location, access & connectivity
The registered site is in POTHREDDIPALLE, Sangareddy Mandal, Sangareddy District, PIN 502295, on Survey No. 180. The project filing records 30-wide roads on the east and west boundaries.
A location record gives the nearest sampled Outer Ring Road interchange as approximately 19.4 km from the cadastral parcel centroid. This is a measured location-data distance, not a travel-time estimate. No public-transport details or project-verified nearby landmarks are supplied.
9. Developer & development status
The TG-RERA registered promoter is VISWAMBHARA DEVELOPERS, identified in the filing as a partnership. Its GSTIN is 36ABBFV0363M1ZY. The RERA certificate lists the promoter address as Village Gajula Ramaram-1, Mandal Qutballapur, District Medchal-Malkajgiri, PIN 500055.
The project filing identifies VIJAY KUMAR MOKKA and SAI CHARAN PEDDAGOLLA as partners and authorized signatories. Form B, dated February 2026, declares completion on or before 29/12/2028 and includes the promoter’s project-fund and approval undertakings; these are promoter declarations, not independently verified progress evidence.
10. Approvals, official records & documents
| Identifier / date | P01100010636; valid 30/12/2025–29/12/2028 |
|---|---|
| What the supplied record establishes | Form C certificate for SRI VISWAMBHARA RESIDENCY and VISWAMBHARA DEVELOPERS. |
| Identifier / date | Approval no. 0010/SANG/SWBP/2025; file no. 009906/SANG/00010/SWBP/2025; approved 30/12/2025 |
|---|---|
| What the supplied record establishes | Permit record for one apartment building, 1 Stilt + 5 Floors, on Survey No. 180, with 20 dwelling units. The extract identifies Sangareddy Municipality as issuing authority and also names HMDA in its authority field. |
| Identifier / date | Approved 30/12/2025 |
|---|---|
| What the supplied record establishes | Records site-area, coverage, built-up-area, parking and building-design parameters for the apartment project. |
| Identifier / date | February 2026 |
|---|---|
| What the supplied record establishes | Promoter declaration of title basis, no encumbrances, project-fund obligations and completion by 29/12/2028. |
| Identifier / date | Building permit contains commencement and occupancy-related conditions |
|---|---|
| What the supplied record establishes | No separate commencement notice, completion certificate or occupancy certificate is supplied. The permit records construction to commence before 28/06/2026 and to be completed before 30/12/2028. |
| Identifier / date | Available project-file documents include a land-title search report, development agreement-cum-GPA, mortgage deed and encumbrance statement. |
|---|---|
| What the supplied record establishes | These are indexed here as project-file records; their title and encumbrance implications are addressed in the Land & Title section. |
Frequently asked questions
Is SRI VISWAMBHARA RESIDENCY registered with Telangana RERA?
Yes. SRI VISWAMBHARA RESIDENCY is registered with the Telangana Real Estate Regulatory Authority as P01100010636; the registration status is New Project.
Who is the developer of SRI VISWAMBHARA RESIDENCY?
The promoter named in the RERA registration is VISWAMBHARA DEVELOPERS.
Where is SRI VISWAMBHARA RESIDENCY located?
SRI VISWAMBHARA RESIDENCY is in POTHREDDIPALLE, SANGAREDDY, Telangana (502295).
When will SRI VISWAMBHARA RESIDENCY be completed?
The promoter's proposed date of completion filed with RERA is 29/04/2029. This is the promoter's declaration, not a guarantee.
More projects in Pothreddipalle