Ashoka Enclave
MADAM THIRUPATHI REDDY AND OTHERS · Nizamabad · RERA P03100004534
ASHOKA ENCLAVE is a plotted development in NIZAMABAD, NIZAMABAD SOUTH, Nizamabad District. The registered promoter is MADAM THIRUPATHI REDDY AND OTHERS. The tentative layout approval provides for 80 plots on a site of 5 Acer 18.85 Gts 26481 Sq. Yds; plot sizes are 110.14–276.18 sq. m (131.7–330.3 sq. yd). It is registered under TG-RERA P03100004534, and the promoter’s declared completion undertaking is 13.05.2025.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
6 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Record |
|---|---|
| Registered project name | ASHOKA ENCLAVE RERA record |
| Project type | Plotted development / plotted layout RERA record RERA filing |
| Phase / registered portion | No phase is identified in the TG-RERA project record. The registration is for ASHOKA ENCLAVE; phase scope is not separately stated. |
| TG-RERA registration | P03100004534 RERA record |
| Registration validity | 30/05/2022 to 13/05/2024; the certificate says registration is valid unless extended by the Authority. No extension is recorded in the supplied evidence. Registration validity is not the same as a completion deadline or an occupancy/completion certificate. Approvals record |
| Registered promoter | MADAM THIRUPATHI REDDY AND OTHERS RERA record |
| RERA status in supplied record | The project is registered; the registration period shown in the certificate has ended. The supplied evidence does not establish a later extension or current registration status. |
Land and geographic identity
| Field | Record |
|---|---|
| Locality | NIZAMABAD RERA record RERA filing |
| Revenue village | NIZAMABAD Revenue Village is stated in the tentative-layout approval; the title-search report identifies Mubaraknagar Revenue Village. The RERA registration certificate lists the project as Nizamabad. |
| Mandal | Nizamabad Mandal is stated in the tentative-layout approval. The registration certificate states NIZAMABAD SOUTH. |
| District / PIN | Nizamabad District; 503003 RERA record |
| Project survey numbers and subdivisions | 163/E, 164/UU/2/1, 163/EE/P3, 163/EEP2, 163/EE/P1 Land records |
| Site extent | The tentative-layout approval states 5 Acer 18.85 Gts 26481 Sq. Yds. The RERA filing states total/net area 22,141.49 sq. m. RERA filing |
| Layout drawing area statement | The layout drawing records a net layout area of 22,140.87 sq. m. Layout record |
| Boundaries in RERA filing | North: NEIGHBOURS LAND; South: NEIGHBOURS LAND; East: NAIGHBOURS LAND; West: 24 METER WIDE ROAD. RERA filing |
Development identity
| Field | Record |
|---|---|
| Sanctioning authority | NIZAMABAD Municipality/Municipal Corporation, as stated in the tentative-layout approval; the RERA filing also identifies DTCP as the authority for the plan approval. Approvals record |
| Principal layout approval | 0031/LO/3072/2022, dated 13 May, 2022; tentative layout plan. Application number: 003305/LO/DTCP/3072/0040/2022. Approvals record |
| Approved built-up area | 14,313.66 sq. m is recorded in the RERA filing. The supplied evidence does not describe this as a building-specific floor-area schedule. RERA filing |
| Development form / count | Tentative layout approval provides for 80 plots. The supplied project evidence does not identify apartment towers, building floors or a building-level configuration. |
| Layout land-use allocation | Plotted area 3 Acer 21.48 Gts 17119 Sq. Yds (64.65%); roads 1 Acer 9.97 Gts 6047 Sq. Yds (22.83%); open space 0 Acer 19.71 Gts 2384 Sq. Yds (9%); social infrastructure 0 Acer 5.48 Gts 663 Sq. Yds (2.5%); utilities 0 Acer 2.21 Gts 268 Sq. Yds (1.01%). |
| Mortgage-area entry | The RERA filing records 2,180.62 sq. m; the tentative-layout approval describes 0 Acer 21.55 Gts 2608 Sq. Yds, comprising 15.18% of plotted area, and identifies plots 43, 42, 53, 56, 55, 54, 59, 58, 57, 62, 60 and 61 under Mortgage Deed No. 3880, dated 06 May, 2022. RERA filing |
Offering and status
| Field | Record |
|---|---|
| Offered unit type | Plots; tentative layout approval specifies 80 plots. |
| Plot size range | Software-measured from the approved layout drawing: 110.14–276.18 sq. m (131.7–330.3 sq. yd). Drawing-derived measurements should be checked against the drawing. Layout record |
| Booked / available | Not established by the supplied evidence. RERA filing |
| Construction / development stage | The supplied record does not provide independently verified on-site progress. RERA amenity entries show 0% progress where a percentage is recorded. RERA amenities |
| Completion dates | The RERA registration certificate records validity through 13/05/2024. The two Form B declarations separately undertake completion by 13.05.2025. These are registration-validity and promoter-declared completion dates, respectively. |
| Occupancy / completion certificate | No occupancy or completion certificate is included in the supplied evidence. The project is a plotted layout; the supplied record does not specify a phase- or plot-level certificate status. Document index |
2. The project story
ASHOKA ENCLAVE is registered as a plotted-development project in Nizamabad. Its tentative layout approval describes a site of 5 Acer 18.85 Gts 26481 Sq. Yds and provides for 80 plots, with internal roads, reserved open space, social-infrastructure land and utility land. RERA record
The layout approval describes development works including road formation with black top, storm-water drains, underground drainage lines and a common septic tank/STP, internal water-supply pipelines and an overhead tank, an assured water-supply source, electrical lines and street lights, a transformer, avenue planting, park development and rainwater-harvesting pits. These are approval conditions and specified works; the available evidence does not independently confirm completion of those works.
The registration certificate shows a registration period ending 13/05/2024. The Form B affidavits by Thummala Ashok Reddy and Madam Thirupati Reddy each declare a project completion undertaking of 13.05.2025. Neither the supplied record nor the amenity-progress entries establish current completion or on-site progress. RERA amenities
3. Master plan, architecture & building design
The evidence describes a plotted layout rather than a multi-storey residential building. The tentative-layout approval provides for 80 plots across a stated extent of 5 Acer 18.85 Gts 26481 Sq. Yds. The layout drawing’s area statement allocates 64.65% to plots, 22.83% to roads, 9% to park/open space, 2.5% to social infrastructure and 1.01% to utilities. Layout record
The layout approval requires roads to be opened for access to neighbouring sites and says the layout owner/developer is not to construct a compound wall or fencing around the site. It also specifies handing over the open-space, utility and road areas to the Municipality by registered gift deed before release of the tentative layout, subject to the stated conditions. These are approval terms; the supplied evidence does not confirm the later handover or final-layout release.
No building arrangement, floor configuration, building footprint, tower height, basement/stilt/podium levels or apartment circulation plan is established in the supplied project record. The approval also says only a detached dwelling house designed for one family may be built on a site, with future development requiring prior approval of the competent authority.
4. Homes, configurations & floor plans
This is a plotted layout. The tentative-layout approval specifies 80 plots. The software-measured plot schedule identifies 80 plots with sizes ranging from 110.14 sq. m (131.7 sq. yd) to 276.18 sq. m (330.3 sq. yd); the median is 185.81 sq. m (222.2 sq. yd). These are drawing-derived measurements, not RERA-filed carpet-area figures. Layout record
| Plot size band | Plot count | Measurement basis |
|---|---|---|
| 100–150 sq. yd (84–125 sq. m) | 3 | Software-measured from layout drawing Layout record |
| 150–200 sq. yd (125–167 sq. m) | 31 | Software-measured from layout drawing Layout record |
| 200–250 sq. yd (167–209 sq. m) | 37 | Software-measured from layout drawing Layout record |
| 250–300 sq. yd (209–251 sq. m) | 4 | Software-measured from layout drawing Layout record |
| 300–400 sq. yd (251–334 sq. m) | 5 | Software-measured from layout drawing Layout record |
The RERA filing does not provide a plot-by-plot saleable-area schedule, booked/available inventory or carpet-area measurements in the supplied evidence. No apartment floor plans or room dimensions are available; the supplied floor-plan records contain two layout sheets and no flat drawings. RERA filing Floor plans
5. Parking & vehicle circulation
The supplied evidence does not establish a sanctioned parking count, visitor or accessible parking provision, parking allocation to individual plots, or a dedicated parking facility. The tentative layout provides for roads and access routes, but no vehicle-space schedule, driveway dimensions or pedestrian-separation plan is supplied. Layout record
The layout approval states that roads are to be opened for accessibility to neighbouring sites and that the layout owner/developer shall not construct a compound wall or fencing around the site. This describes an approval condition, not a verified account of the layout’s current circulation arrangements.
6. Amenities, recreation & open spaces
| Description / size | 0 Acer 19.71 Gts 2384 Sq. Yds (9%) in the tentative-layout approval |
|---|---|
| Declared progress / verified status | Approval-reserved; RERA amenity entry records 0% progress. Completion or handover is not independently verified. RERA amenities |
| Description / size | 1 Acer 9.97 Gts 6047 Sq. Yds (22.83%); approval specifies road formation with black top |
|---|---|
| Declared progress / verified status | Approval condition / specified work; completion not independently verified. RERA amenities |
| Description / size | 0 Acer 5.48 Gts 663 Sq. Yds (2.5%) |
|---|---|
| Declared progress / verified status | Land reserved in the layout; the supplied evidence does not identify a built community facility or confirm progress. |
| Description / size | 0 Acer 2.21 Gts 268 Sq. Yds (1.01%) |
|---|---|
| Declared progress / verified status | Land reserved in the layout; utility infrastructure is addressed separately below. |
| Description / size | Approval lists avenue plantation and park development |
|---|---|
| Declared progress / verified status | Specified work; completion not independently verified. |
| Description / size | Listed in the RERA amenity record |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | Listed as available “YES”; progress percentage recorded as 0%. The evidence does not independently verify delivery. |
| Description / size | Listed in the RERA amenity record |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | No progress percentage beyond 0% is established; no facility size or delivery status supplied. |
7. Utilities, building services & safety
The tentative-layout approval specifies an overhead tank or sump, an assured water-supply source, internal water-supply pipelines, underground drainage and a common septic tank/STP, storm-water drains, rainwater-harvesting pits, electrical supply lines, street lights and a transformer. It also lists solid-waste management and disposal among the utility works. These are approval-described works; the supplied evidence does not establish capacities, completion or independent operational verification.
The RERA amenity record includes water supply, sewerage, treatment and disposal of sewage/sullage, storm-water drains, solid-waste management, energy management, fire protection and safety requirements, and electrical meter/substation/receiving-station facilities. Progress is recorded as 0% for entries where a percentage is supplied. No water-storage or treatment capacity, electrical capacity, backup provision, fire-system specification, security/CCTV system, accessibility design or completed-service certification is provided. RERA amenities
8. Location, access & connectivity
The project record identifies the locality as NIZAMABAD, with the approval document describing NIZAMABAD Revenue Village and Nizamabad Mandal; the RERA certificate lists NIZAMABAD SOUTH Mandal. The title-search report identifies Mubaraknagar Revenue Village. The supplied evidence does not establish a more precise street address for the project site. RERA record
The RERA filing records the west boundary as 24 METER WIDE ROAD and the tentative-layout approval requires roads to be opened for neighbouring-site access. The supplied location data lists Financial District (Nanakramguda), 1.2 km from a cadastral parcel-centroid location. The evidence does not establish this as a project-to-landmark travel distance or identify a public-transport connection. RERA filing Location record
9. Developer & development status
The registered promoter is MADAM THIRUPATHI REDDY AND OTHERS. The RERA filing classifies the organization type as “Others”; a more specific legal-entity form, corporate identifier, registered office, official contact details and official project website are not established by the supplied evidence. The registration certificate gives a promoter-office location as Village: Mandal: NIZAMABAD SOUTH, District: Nizamabad, Pin: 503003. RERA record RERA filing
Form B affidavits are filed by Thummala Ashok Reddy and Madam Thirupati Reddy. Both declare a completion undertaking of 13.05.2025 and make declarations concerning title, encumbrances, project funds, accounts audit and pending approvals; these are promoter declarations.
The supplied evidence does not provide current construction progress or establish that the layout’s listed infrastructure has been completed. The RERA amenity entries show 0% progress where a percentage is recorded. The registration certificate’s stated validity ended on 13/05/2024; no extension is included in the evidence provided. RERA amenities
10. Approvals, official records & documents
| Details | Form C; registration P03100004534; issued 30/05/2022; validity shown through 13/05/2024; lists surveys 163/E, 164/UU/2/1, 163/EE/P3, 163/EEP2, 163/EE/P1 |
|---|
| Details | 0031/LO/3072/2022, dated 13 May, 2022; issued by NIZAMABAD Municipality/Municipal Corporation; application 003305/LO/DTCP/3072/0040/2022; for 80 plots |
|---|
| Details | Two layout sheets; plot schedule and land-use statement are available as drawing-derived data. Plot sizes and counts are software-measured and should be checked against the drawing. |
|---|---|
| Evidence | Layout record |
| Details | Mortgage Deed No. 3880, dated 06 May, 2022; approval identifies specified plots and the mortgage area. |
|---|
| Details | Filed by Thummala Ashok Reddy and Madam Thirupati Reddy; each includes a declared completion date of 13.05.2025. |
|---|
| Details | Not included in the supplied evidence. |
|---|---|
| Evidence | Document index |
1. Project at a glance
Project identity
Registered project name: ASHOKA ENCLAVE
Project type: Plotted development / plotted layout
Phase / registered portion: No phase is identified in the TG-RERA project record. The registration is for ASHOKA ENCLAVE; phase scope is not separately stated.
TG-RERA registration: P03100004534
Registration validity: 30/05/2022 to 13/05/2024; the certificate says registration is valid unless extended by the Authority. No extension is recorded in the supplied evidence. Registration validity is not the same as a completion deadline or an occupancy/completion certificate.
Registered promoter: MADAM THIRUPATHI REDDY AND OTHERS
RERA status in supplied record: The project is registered; the registration period shown in the certificate has ended. The supplied evidence does not establish a later extension or current registration status.
Land and geographic identity
Locality: NIZAMABAD
Revenue village: NIZAMABAD Revenue Village is stated in the tentative-layout approval; the title-search report identifies Mubaraknagar Revenue Village. The RERA registration certificate lists the project as Nizamabad.
Mandal: Nizamabad Mandal is stated in the tentative-layout approval. The registration certificate states NIZAMABAD SOUTH.
District / PIN: Nizamabad District; 503003
Project survey numbers and subdivisions: 163/E, 164/UU/2/1, 163/EE/P3, 163/EEP2, 163/EE/P1
Site extent: The tentative-layout approval states 5 Acer 18.85 Gts 26481 Sq. Yds. The RERA filing states total/net area 22,141.49 sq. m.
Layout drawing area statement: The layout drawing records a net layout area of 22,140.87 sq. m.
Boundaries in RERA filing: North: NEIGHBOURS LAND; South: NEIGHBOURS LAND; East: NAIGHBOURS LAND; West: 24 METER WIDE ROAD.
Development identity
Sanctioning authority: NIZAMABAD Municipality/Municipal Corporation, as stated in the tentative-layout approval; the RERA filing also identifies DTCP as the authority for the plan approval.
Principal layout approval: 0031/LO/3072/2022, dated 13 May, 2022; tentative layout plan. Application number: 003305/LO/DTCP/3072/0040/2022.
Approved built-up area: 14,313.66 sq. m is recorded in the RERA filing. The supplied evidence does not describe this as a building-specific floor-area schedule.
Development form / count: Tentative layout approval provides for 80 plots. The supplied project evidence does not identify apartment towers, building floors or a building-level configuration.
Layout land-use allocation: Plotted area 3 Acer 21.48 Gts 17119 Sq. Yds (64.65%); roads 1 Acer 9.97 Gts 6047 Sq. Yds (22.83%); open space 0 Acer 19.71 Gts 2384 Sq. Yds (9%); social infrastructure 0 Acer 5.48 Gts 663 Sq. Yds (2.5%); utilities 0 Acer 2.21 Gts 268 Sq. Yds (1.01%).
Mortgage-area entry: The RERA filing records 2,180.62 sq. m; the tentative-layout approval describes 0 Acer 21.55 Gts 2608 Sq. Yds, comprising 15.18% of plotted area, and identifies plots 43, 42, 53, 56, 55, 54, 59, 58, 57, 62, 60 and 61 under Mortgage Deed No. 3880, dated 06 May, 2022.
Offering and status
Offered unit type: Plots; tentative layout approval specifies 80 plots.
Plot size range: Software-measured from the approved layout drawing: 110.14–276.18 sq. m (131.7–330.3 sq. yd). Drawing-derived measurements should be checked against the drawing.
Booked / available: Not established by the supplied evidence.
Construction / development stage: The supplied record does not provide independently verified on-site progress. RERA amenity entries show 0% progress where a percentage is recorded.
Completion dates: The RERA registration certificate records validity through 13/05/2024. The two Form B declarations separately undertake completion by 13.05.2025. These are registration-validity and promoter-declared completion dates, respectively.
Occupancy / completion certificate: No occupancy or completion certificate is included in the supplied evidence. The project is a plotted layout; the supplied record does not specify a phase- or plot-level certificate status.
2. The project story
ASHOKA ENCLAVE is registered as a plotted-development project in Nizamabad. Its tentative layout approval describes a site of 5 Acer 18.85 Gts 26481 Sq. Yds and provides for 80 plots, with internal roads, reserved open space, social-infrastructure land and utility land.
The layout approval describes development works including road formation with black top, storm-water drains, underground drainage lines and a common septic tank/STP, internal water-supply pipelines and an overhead tank, an assured water-supply source, electrical lines and street lights, a transformer, avenue planting, park development and rainwater-harvesting pits. These are approval conditions and specified works; the available evidence does not independently confirm completion of those works.
The registration certificate shows a registration period ending 13/05/2024. The Form B affidavits by Thummala Ashok Reddy and Madam Thirupati Reddy each declare a project completion undertaking of 13.05.2025. Neither the supplied record nor the amenity-progress entries establish current completion or on-site progress.
3. Master plan, architecture & building design
The evidence describes a plotted layout rather than a multi-storey residential building. The tentative-layout approval provides for 80 plots across a stated extent of 5 Acer 18.85 Gts 26481 Sq. Yds. The layout drawing’s area statement allocates 64.65% to plots, 22.83% to roads, 9% to park/open space, 2.5% to social infrastructure and 1.01% to utilities.
The layout approval requires roads to be opened for access to neighbouring sites and says the layout owner/developer is not to construct a compound wall or fencing around the site. It also specifies handing over the open-space, utility and road areas to the Municipality by registered gift deed before release of the tentative layout, subject to the stated conditions. These are approval terms; the supplied evidence does not confirm the later handover or final-layout release.
No building arrangement, floor configuration, building footprint, tower height, basement/stilt/podium levels or apartment circulation plan is established in the supplied project record. The approval also says only a detached dwelling house designed for one family may be built on a site, with future development requiring prior approval of the competent authority.
4. Homes, configurations & floor plans
This is a plotted layout. The tentative-layout approval specifies 80 plots. The software-measured plot schedule identifies 80 plots with sizes ranging from 110.14 sq. m (131.7 sq. yd) to 276.18 sq. m (330.3 sq. yd); the median is 185.81 sq. m (222.2 sq. yd). These are drawing-derived measurements, not RERA-filed carpet-area figures.
| Plot size band | Plot count | Measurement basis |
|---|---|---|
| 100–150 sq. yd (84–125 sq. m) | 3 | Software-measured from layout drawing |
| 150–200 sq. yd (125–167 sq. m) | 31 | Software-measured from layout drawing |
| 200–250 sq. yd (167–209 sq. m) | 37 | Software-measured from layout drawing |
| 250–300 sq. yd (209–251 sq. m) | 4 | Software-measured from layout drawing |
| 300–400 sq. yd (251–334 sq. m) | 5 | Software-measured from layout drawing |
The RERA filing does not provide a plot-by-plot saleable-area schedule, booked/available inventory or carpet-area measurements in the supplied evidence. No apartment floor plans or room dimensions are available; the supplied floor-plan records contain two layout sheets and no flat drawings.
5. Parking & vehicle circulation
The supplied evidence does not establish a sanctioned parking count, visitor or accessible parking provision, parking allocation to individual plots, or a dedicated parking facility. The tentative layout provides for roads and access routes, but no vehicle-space schedule, driveway dimensions or pedestrian-separation plan is supplied.
The layout approval states that roads are to be opened for accessibility to neighbouring sites and that the layout owner/developer shall not construct a compound wall or fencing around the site. This describes an approval condition, not a verified account of the layout’s current circulation arrangements.
6. Amenities, recreation & open spaces
| Description / size | 0 Acer 19.71 Gts 2384 Sq. Yds (9%) in the tentative-layout approval |
|---|---|
| Declared progress / verified status | Approval-reserved; RERA amenity entry records 0% progress. Completion or handover is not independently verified. |
| Description / size | 1 Acer 9.97 Gts 6047 Sq. Yds (22.83%); approval specifies road formation with black top |
|---|---|
| Declared progress / verified status | Approval condition / specified work; completion not independently verified. |
| Description / size | 0 Acer 5.48 Gts 663 Sq. Yds (2.5%) |
|---|---|
| Declared progress / verified status | Land reserved in the layout; the supplied evidence does not identify a built community facility or confirm progress. |
| Description / size | 0 Acer 2.21 Gts 268 Sq. Yds (1.01%) |
|---|---|
| Declared progress / verified status | Land reserved in the layout; utility infrastructure is addressed separately below. |
| Description / size | Approval lists avenue plantation and park development |
|---|---|
| Declared progress / verified status | Specified work; completion not independently verified. |
| Description / size | Listed in the RERA amenity record |
|---|---|
| Declared progress / verified status | Listed as available “YES”; progress percentage recorded as 0%. The evidence does not independently verify delivery. |
| Description / size | Listed in the RERA amenity record |
|---|---|
| Declared progress / verified status | No progress percentage beyond 0% is established; no facility size or delivery status supplied. |
7. Utilities, building services & safety
The tentative-layout approval specifies an overhead tank or sump, an assured water-supply source, internal water-supply pipelines, underground drainage and a common septic tank/STP, storm-water drains, rainwater-harvesting pits, electrical supply lines, street lights and a transformer. It also lists solid-waste management and disposal among the utility works. These are approval-described works; the supplied evidence does not establish capacities, completion or independent operational verification.
The RERA amenity record includes water supply, sewerage, treatment and disposal of sewage/sullage, storm-water drains, solid-waste management, energy management, fire protection and safety requirements, and electrical meter/substation/receiving-station facilities. Progress is recorded as 0% for entries where a percentage is supplied. No water-storage or treatment capacity, electrical capacity, backup provision, fire-system specification, security/CCTV system, accessibility design or completed-service certification is provided.
8. Location, access & connectivity
The project record identifies the locality as NIZAMABAD, with the approval document describing NIZAMABAD Revenue Village and Nizamabad Mandal; the RERA certificate lists NIZAMABAD SOUTH Mandal. The title-search report identifies Mubaraknagar Revenue Village. The supplied evidence does not establish a more precise street address for the project site.
The RERA filing records the west boundary as 24 METER WIDE ROAD and the tentative-layout approval requires roads to be opened for neighbouring-site access. The supplied location data lists Financial District (Nanakramguda), 1.2 km from a cadastral parcel-centroid location. The evidence does not establish this as a project-to-landmark travel distance or identify a public-transport connection.
9. Developer & development status
The registered promoter is MADAM THIRUPATHI REDDY AND OTHERS. The RERA filing classifies the organization type as “Others”; a more specific legal-entity form, corporate identifier, registered office, official contact details and official project website are not established by the supplied evidence. The registration certificate gives a promoter-office location as Village: Mandal: NIZAMABAD SOUTH, District: Nizamabad, Pin: 503003.
Form B affidavits are filed by Thummala Ashok Reddy and Madam Thirupati Reddy. Both declare a completion undertaking of 13.05.2025 and make declarations concerning title, encumbrances, project funds, accounts audit and pending approvals; these are promoter declarations.
The supplied evidence does not provide current construction progress or establish that the layout’s listed infrastructure has been completed. The RERA amenity entries show 0% progress where a percentage is recorded. The registration certificate’s stated validity ended on 13/05/2024; no extension is included in the evidence provided.
10. Approvals, official records & documents
| Details | Form C; registration P03100004534; issued 30/05/2022; validity shown through 13/05/2024; lists surveys 163/E, 164/UU/2/1, 163/EE/P3, 163/EEP2, 163/EE/P1 |
|---|
| Details | 0031/LO/3072/2022, dated 13 May, 2022; issued by NIZAMABAD Municipality/Municipal Corporation; application 003305/LO/DTCP/3072/0040/2022; for 80 plots |
|---|
| Details | Two layout sheets; plot schedule and land-use statement are available as drawing-derived data. Plot sizes and counts are software-measured and should be checked against the drawing. |
|---|
| Details | Mortgage Deed No. 3880, dated 06 May, 2022; approval identifies specified plots and the mortgage area. |
|---|
| Details | Filed by Thummala Ashok Reddy and Madam Thirupati Reddy; each includes a declared completion date of 13.05.2025. |
|---|
| Details | Not included in the supplied evidence. |
|---|
Other registrations of Ashoka Enclave
Frequently asked questions
Is ASHOKA ENCLAVE registered with Telangana RERA?
Yes. ASHOKA ENCLAVE is registered with the Telangana Real Estate Regulatory Authority as P03100004534; the registration status is New Project.
Who is the developer of ASHOKA ENCLAVE?
The promoter named in the RERA registration is MADAM THIRUPATHI REDDY AND OTHERS.
Where is ASHOKA ENCLAVE located?
ASHOKA ENCLAVE is in NIZAMABAD, Telangana (503003).
When will ASHOKA ENCLAVE be completed?
The promoter's proposed date of completion filed with RERA is 13/05/2024. This is the promoter's declaration, not a guarantee.