Sign in

Gandra Riveredge

GANDRA PROJECTS PRIVATE LIMITED · Nizamabad · RERA P03100005225

GANDRA RIVEREDGE is a plotted development in ManikBhandar Revenue Village, NIZAMABAD RURAL (NEW) mandal, Nizamabad District. It is being developed by registered promoter GANDRA PROJECTS PRIVATE LIMITED. The project’s registered land extent is 877088.40 sqmts, and the tentative layout describes 2354 residential plots; plot sizes range from 117.06 sqm (140.0 sqyd) to 895.76 sqm (1071.3 sqyd). Its TG-RERA registration number is P03100005225, and its proposed completion date is 04/03/2024.

01What we found

Period endedTG-RERA registration ran to 4 Mar 2024 - check its extension on TG-RERA
132documents on file - each fact links to its page
1court case on this project's land (survey 537, 547, Manikbhandar Revenue)
11items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

11 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

FieldProject record
Registered project nameGANDRA RIVEREDGE RERA record
Project typePlotted development; the approval describes a tentative residential layout with open plots. RERA record
Phase / registered portionA plotted layout registered under this project name; no separate phase designation is disclosed. RERA record
TG-RERA registrationP03100005225 RERA record
Registration validity17/10/2022 to 04/03/2024; certificate records no extension. Registration validity is distinct from the completion deadline and does not establish completion or occupancy certification. RERA record
Registered promoterGANDRA PROJECTS PRIVATE LIMITED RERA record Corporate record
RERA statusRegistration certificate was issued; the recorded validity ended on 04/03/2024. Current registration status is not established by the supplied certificate.

Land and geographic identity

FieldProject record
Locality / revenue villageManikBhandar Revenue Village; the layout approval also identifies ManikBhandar Revenue Village. RERA record RERA filing
MandalNIZAMABAD RURAL (NEW) in the RERA project record; the layout approval identifies Nizamabad Mandal. RERA record RERA filing
DistrictNizamabad RERA record RERA filing
PIN503003 RERA record
All project survey numbers / subdivisions431, 432, 434, 439, 472, 475 to 479, 481 to 484, 486 to 498, 500 to 502, 504 to 511, 513, 515 to 526, 533 to 538, 544 to 547, 549 to 568, 570 to 638, 643 to 648. The registration certificate and layout approval list these survey-number ranges; the supplied record does not provide a complete subdivision-by-subdivision parcel schedule. RERA record Land records
Registered site extentRERA land details state 877088.40 sqmts. RERA filing
Layout drawing area statementDrawing-derived total site area 877059.31 SQ.MT.; the drawing separately lists 854818.52 as net layout area and 854818.50 as net area of plot. These are drawing figures, not measurements independently verified for this report. Layout record
BoundariesNorth: AMRAD ROAD; South: GANDI VAGU; East: BHEEM CHERUVU KATTA; West: Neighbours land. RERA filing

Development identity

FieldProject record
Sanctioning authorityNizamabad Municipality / Municipal Corporation, as identified in the tentative layout approval.
Principal approvalTentative LP No. 0043/LO/3072/2022, approved 03/05/2022 4:39:00 PM; application 005648/LO/DTCP/3072/0052/2021. Approvals record
Other approval identifier on filed layout drawingTS/064704/2021 appears as the drawing’s approval/inward number.
Approved built-up area0.00 in the supplied layout approval parameters; the RERA project fields separately report 548103.50 sqmts as approved built-up area. These are labelled figures in the records, not a building-area measurement in this overview. RERA filing
Buildings / floorsNot disclosed; the record is for a plotted layout, not a building project.
ParkingApproval parameters state 0 proposed parkings and reserve 0% common parking area. No separate parking allocation or count for individual plots is supplied.
Plot count2354 plots, stated in the tentative layout approval and the layout drawing.

Offering and status

FieldProject record
Unit typeResidential plots.
Plot sizesDrawing-derived schedule: 2354 plots; smallest 117.06 sqm (140.0 sqyd), median 222.97 sqm (266.7 sqyd) and largest 895.76 sqm (1071.3 sqyd). Software-read figures should be checked against the layout drawing. Layout record
Booked / availableNot disclosed in the supplied project data. RERA record
Construction / development stageA RERA-filed amenities record reports progress percentages for selected layout works; these are declarations, not independent site verification. RERA amenities
Completion datesThe RERA project record states proposed completion 04/03/2024; the Form B declaration gives a 3 Years undertaking. The supplied evidence does not establish a revised completion date. RERA record
Occupancy / completion certificateNo occupancy or completion certificate is supplied. The approval is expressly for a tentative layout plan.

2. The project story

  • GANDRA RIVEREDGE is presented in the TG-RERA record as a large residential plotted development in ManikBhandar Revenue Village, Nizamabad District. The filed layout describes 2,354 residential plots and a network of roads, parks/open space, social-infrastructure land and utility land. It is a land-and-layout offering, not a collection of apartments or towers. RERA record Layout record
  • The municipality’s document is titled an approval for a tentative layout plan and makes development of infrastructure and other works a responsibility of the applicant. It also requires roads, open space and utility areas to be handed over by registered gift deed before release of a final layout. The evidence supplied does not establish that the final layout has been released, that all works are complete, or that any occupancy/completion certificate has been issued.
  • The project’s RERA-filed amenities record reports progress on some infrastructure items—for example, water supply at 85%, internal roads and footpaths at 60%, and sewerage and storm-water drains at 40%. These are reported figures in the supplied record, not independently verified observations of current site conditions. RERA amenities

3. Master plan, architecture & building design

  • The project is a plotted layout. The filed drawing’s land-use table states a net layout area of 854818.52 sqm and allocates 548096.63 sqm (64.12%) to plotted area, 199610.27 sqm (23.36%) to roads, 77036.77 sqm (9.01%) to organized open space/parks, 21402.04 sqm (2.50%) to social infrastructure and 8672.81 sqm (1.01%) to utilities. It records 0.00 for amenity area and common parking area. These are drawing-stated figures; the drawing’s areas are not independently surveyed here. Layout record
  • The tentative approval describes 2354 residential plots and states that the applicant must develop roads, drains, greenery, street lighting, water and sewerage infrastructure, among other works. It also records a mortgage of plots in favour of the Municipality / Municipal Corporation as a measure to secure completion of layout-development conditions. The approval document does not provide a building count, floor configuration, building footprint or building design because the development is plotted.
  • The RERA fields report 548103.50 sqmts as approved built-up area, while the layout drawing’s approval parameters state built-up area 0.00. These are reported here as separate record entries; no building-area interpretation is made. RERA filing

4. Homes, configurations & floor plans

This is a plotted project, so the offering is plots rather than apartment configurations. The layout drawing’s schedule was software-read; the source itself cautions that plot counts and sizes should be verified against the drawing. The drawing-derived size range and distribution are:

Plot-size bandNumber of plots
100–150 sqyd (84–125 sqm)1
150–200 sqyd (125–167 sqm)25
200–250 sqyd (167–209 sqm)991
250–300 sqyd (209–251 sqm)872
300–400 sqyd (251–334 sqm)220
400–500 sqyd (334–418 sqm)178
500–1000 sqyd (418–836 sqm)66
1000+ sqyd (836+ sqm)1

Layout record

The most frequently recorded plot sizes are 222.97 sqm (266.7 sqyd), 659 plots; 183.95 sqm (220.0 sqyd), 561 plots; 168.62 sqm (201.7 sqyd), 153 plots; 200.67 sqm (240.0 sqyd), 107 plots; and 371.61 sqm (444.4 sqyd), 91 plots. These are software-read from the layout drawing, not RERA-filed plot-by-plot saleable areas. Layout record

No apartment floor plans are provided: the supplied drawing register reports one layout sheet and no flats. Consequently, apartment carpet area, balcony/utility area and saleable-area loading are not applicable or disclosed for this plotted offering. Floor plans

5. Parking & vehicle circulation

  • The tentative layout approval reserves 0 Acer 0 Gts (0%) for common parking, its approval parameters state 0 proposed parkings, and the layout drawing lists common parking area as 0.00. No visitor, accessible, two-wheeler or EV-parking provision, parking allocation arrangement, or individual plot parking entitlement is established by the supplied record.
  • The layout drawing lists internal road widths of 10.05 MT, 12.00 MT, 15.24 MT, 18.00 MT, 20.11 MT, 60' and 66'. The tentative approval requires roads to be formed and opened for access to neighbouring sites. The supplied evidence does not specify vehicle-entry locations, turning arrangements or pedestrian separation.

6. Amenities, recreation & open spaces

The tentative approval identifies open space/park and social-infrastructure land, while the RERA-filed amenities record reports percentage progress for layout works. The record does not establish independent completion verification for these facilities.

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Organized open space / park77036.77 sqm; 9.01% of net layout areaFiled layout drawing; tentative approvalAmenities record: Green Strip/TOT LOT/Park 50%; independent verification not supplied. RERA amenities
Social infrastructure21402.04 sqm; 2.50% of net layout areaFiled layout drawing; tentative approvalApproval reserves land; no completion status supplied.
Community buildingsNo size or building details disclosedRERA-filed amenities record RERA amenities0% reported.
Internal roads and footpathsRoad area 199610.27 sqm; 23.36% of net layout area; drawing lists multiple road widthsFiled layout drawing60% reported; not independently verified. RERA amenities
Street lightingNo capacity or fixture count suppliedTentative approval; RERA-filed amenities record RERA amenities40% reported; not independently verified.
Solid-waste management and disposalNo facility size or capacity suppliedTentative approval; RERA-filed amenities record RERA amenities50% reported; not independently verified.
Energy managementNo facility details suppliedRERA-filed amenities record RERA amenities0% reported.
Fire protection and fire-safety requirementsNo system details suppliedRERA-filed amenities record RERA amenities0% reported.

7. Utilities, building services & safety

  • The tentative approval requires the applicant to provide a protected water-supply system, water reservoir and overhead tank/sump; sewerage disposal, septic tank and sewerage-treatment plant; storm-water drains and nala channelization; rainwater-harvesting pits; an electric transformer and street lighting; and solid-waste management. These are approval-stated works/conditions, not evidence that each facility is completed or operational.
  • The RERA-filed amenities record reports water supply at 85%, sewerage (chamber, lines, septic tank, STP) at 40%, storm-water drains at 40%, sewage and sullage treatment/disposal at 50%, water conservation/rainwater harvesting at 30%, solid-waste management at 50%, and electrical meter room/sub-station/receiving station at 40%. These are recorded progress declarations; independent verification and capacities are not supplied. RERA amenities
  • No building lifts, building fire systems, emergency access arrangements, accessibility features, security or CCTV details are established in the supplied evidence. The approval document’s stated layout conditions should not be read as proof that the works have been delivered.

8. Location, access & connectivity

The official project record locates the site at ManikBhandar Revenue Village, NIZAMABAD RURAL (NEW) mandal, Nizamabad District, PIN 503003. The filed layout gives AMRAD ROAD as the north boundary, GANDI VAGU as the south boundary, BHEEM CHERUVU KATTA as the east boundary and neighbouring land as the west boundary. RERA record RERA filing RERA filing

The supplied location data includes a cadastral-parcel centroid of 17.41528, 78.35459 and distances to listed points, but these coordinates and nearby-point distances do not establish the project’s official site access or travel times. Location record The approval drawing lists internal road widths of 10.05 MT, 12.00 MT, 15.24 MT, 18.00 MT, 20.11 MT, 60' and 66'; it does not specify external-route connectivity.

9. Developer & development status

  • The registered legal promoter is GANDRA PROJECTS PRIVATE LIMITED, a company, identified in the supplied corporate record by GSTIN 36AAECG4870B1ZT. Its RERA-listed project contact address is LMA, NAGARJUNA HILLS, ROAD NO. 1, ManikBhandar Revenue Village, NIZAMABAD RURAL (NEW), Nizamabad, 503003. The RERA certificate separately lists the promoter office as Village: PUNJAGUTTA, Mandal: KHAIRTABAD, District: Hyderabad, Pin: 500034. Corporate record Parties record
  • The RERA record lists 04/03/2024 as proposed completion. A Form B declaration by Prem Sagar Gandra states a 3 Years completion undertaking. The supplied evidence does not establish a revised completion date, current overall construction stage, final-layout release or occupancy/completion certificate. RERA record

10. Approvals, official records & documents

RecordWhat the supplied evidence identifies
TG-RERA certificateForm C for GANDRA RIVEREDGE, registration P03100005225, valid 17/10/2022–04/03/2024; certificate includes a separate-account condition.
Tentative layout approval0043/LO/3072/2022, issued by Nizamabad Municipality / Municipal Corporation; approved date 03/05/2022 4:39:00 PM; application 005648/LO/DTCP/3072/0052/2021.
Filed layout drawingLayout drawing with approval/inward number TS/064704/2021; shows 2,354 plots and a land-use table. Its extracted text does not identify a sanctioning authority or state that the plan is approved.
Form B declarationPromoter-authorised declarations include project-fund, approvals and completion undertakings. The supplied copies identify Prem Sagar Gandra; some contain incomplete or OCR-unclear project identification.
Completion / occupancy recordsNo completion or occupancy certificate is supplied. Document index
Building plans / commencement certificatesNo building plan or building commencement certificate is established for this plotted layout in the supplied evidence. Document index

The Municipality’s tentative approval states that the applicant must complete and hand over specified infrastructure and reserved areas and obtain release of the final layout; the full conditions are available in the approval document.

Frequently asked questions

Is GANDRA RIVEREDGE registered with Telangana RERA?

Yes. GANDRA RIVEREDGE is registered with the Telangana Real Estate Regulatory Authority as P03100005225; the registration status is New Project.

Who is the developer of GANDRA RIVEREDGE?

The promoter named in the RERA registration is GANDRA PROJECTS PRIVATE LIMITED.

Where is GANDRA RIVEREDGE located?

GANDRA RIVEREDGE is in ManikBhandar Revenue Village, NIZAMABAD RURAL (NEW), Nizamabad, Telangana (503003).

When will GANDRA RIVEREDGE be completed?

The promoter's proposed date of completion filed with RERA is 04/03/2024. This is the promoter's declaration, not a guarantee.

More projects in Nizamabad Rural