Skylar Grand Lilly

SKYLAR BUILDERS · Medchal-Malkajgiri · RERA P02200001154

SKYLAR GRAND LILLY is a residential apartment project in DSR SCHOOL, Medchal Mandal, Medchal-Malkajgiri District. The registered promoter is SKYLAR BUILDERS. The project has a land area of 692 sq. m and one building with 1Stilt + 5 upper floors, comprising 15 apartments: 10 2BHK units of 101.5 sq. m each and 5 3BHK units of 114.0 sq. m each. It is registered under TG-RERA number P02200001154, and the promoter’s Form B declaration undertakes completion by 11.04.2024.

More from Skylar Builders · 4 projects →

01What we found

Period endedTG-RERA registration ran to 11 Apr 2024 - check its extension on TG-RERA
13documents on file - each fact links to its page
9court cases on this project's land (survey 2, 388, 523, 524, Dsr School)
9items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

9 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

FieldRecord
Registered project nameSKYLAR GRAND LILLY RERA record
Project typeResidential apartment project RERA record
Phase / registered portionNew Project; a separate phase description is not disclosed. The technical approval describes a proposed building on plot nos. 92/part south side portion, 93, 94 and 95. RERA filing
TG-RERA registrationP02200001154 Approvals record
Registration validity14/09/2019 to 11/04/2024; the supplied certificate records no extension. This is registration validity, not a statement of construction completion or occupancy certification. Approvals record
Registered promoterSKYLAR BUILDERS Corporate record
RERA status in supplied recordCertificate issued; its stated validity ended on 11/04/2024. Current registration status is not established by the supplied record. Approvals record

Land and geographic identity

FieldRecord
RERA-filed localityDSR SCHOOL RERA record RERA filing
Revenue villageGundla Pochampally is named in the technical approval and title records; the RERA identity fields separately give “Dsr School.”
Mandal / district / PINMedchal / Medchal-Malkajgiri / 500014 RERA record
Project survey numbers523/1 AND 2; 523/9; 524; 388/1; 388/2 in the technical approval. The RERA filing and registration certificate give 523/1AND2; 523/9; 524; 388.
Site extentRERA land details: total area 692 sq. m, net area 692.00 sq. m, affected area 0 sq. m. The technical approval states an extent of 692.14 Sq. Mt. RERA filing
Boundaries (RERA filing)East: DRS INTERNATINOAL SCHOOL; West: 40 FT ROAD; North: OTHERS LAND; South: PLOT NO 88. RERA filing
RERA-declared mortgage area158 sq. m RERA filing

Development identity

FieldRecord
Sanctioning / technical approval authorityHyderabad Metropolitan Development Authority (HMDA); the technical approval directs the applicant to obtain building-plan sanction and release from the Executive Authority of Gundla Pochampalle Gram Panchayat. Approvals record
Principal approval006644/MED/R1/U6/HMDA/30122017, approved 12/04/2018; the RERA filing also records 006644/MED/R1/U6/HMD. Approvals record RERA filing
Approved built-up areaThe technical approval lists Built up Area 1589.45 and Proposed Built-up Area 1923.67 (as recorded in the approval extraction). The RERA filing separately states approved built-up area of 1585 sq. m. These are reported as distinct filed/approval figures, not treated as interchangeable. RERA filing
Building count and floorsOne proposed residential building, described as 1Stilt + 5 upper floors. The approval extraction also lists building height 14.95; its unit is not specified in the supplied extraction.
Parking levelsStilt is identified in the technical approval; no verified parking-space count or allocation is supplied.
Unit countsRERA filing: 15 apartments in one building—10 2BHK and 5 3BHK. RERA unit table RERA unit details
RERA-filed completion undertaking11.04.2024

Offering and status

FieldRecord
Configurations and RERA saleable areas2BHK: 10 units, 101.5 sq. m each as filed; 3BHK: 5 units, 114.0 sq. m each as filed. RERA unit details RERA unit table
Booked / availablePortal counts read as 0 booked and 10 available 2BHKs; 0 booked and 5 available 3BHKs. The portal data has no as-of date, so counts are indicative. RERA unit table
Construction stageNo independently verified site-progress figure is supplied. The RERA amenity record contains 0% progress entries; these do not establish the overall construction stage. RERA amenities
Completion deadlinePromoter’s Form B declaration undertakes completion by 11.04.2024.
Occupancy / completion certificateNo occupancy or completion certificate is identified in the supplied records. Document index Approvals record

2. The project story

SKYLAR GRAND LILLY is registered as a residential apartment project in the Medchal area. The filed land details describe a 692 sq. m site in the survey references shown above; the HMDA technical approval identifies the proposed building site by plots 92/part south side portion, 93, 94 and 95 at Gundla Pochampally. RERA record RERA filing

The RERA filing lists one building and 15 proposed homes: ten 2BHK apartments and five 3BHK apartments. The HMDA technical approval describes a 1Stilt + 5 upper-floor building. The supplied material does not establish the project’s present construction status through an independent site inspection, nor does it include an occupancy or completion certificate. The promoter’s Form B records a completion undertaking of 11.04.2024. RERA unit table Document index

3. Master plan, architecture & building design

The available technical approval describes one residential building on plots 92/part south side portion, 93, 94 and 95, with 1Stilt + 5 upper floors. It lists Built up Area 1589.45, Proposed Built-up Area 1923.67, and a building height of 14.95 (unit not stated in the extraction). The RERA filing separately records approved built-up area as 1585 sq. m. These labels and figures are retained as recorded; the supplied evidence does not provide a drawing-based reconciliation or a defined FSI-counted, carpet or gross built-up area. RERA filing

The RERA filing reports one building and 15 units. Detailed floor plans, floor-by-floor layouts, flat positions, footprint, lifts, stairs, circulation, landscape dimensions, and a residential/common-area breakdown are not established by the supplied drawing records. The technical approval calls for an approved plan to be displayed at the site and requires construction in accordance with the technically approved plan. RERA unit table Document index

4. Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK10010101.5 sq. m eachNot measured in supplied drawingsNot supplied
3BHK505114.0 sq. m eachNot measured in supplied drawingsNot supplied

Unit counts, booking counts and saleable areas are RERA-filed; booking figures have no supplied as-of date and are indicative. RERA unit details RERA unit table

Two drawing records are noted, but none has a completed software measurement: one scan is pending and one drawing has no flats. Accordingly, no drawing-based carpet area, room dimensions, orientation, balcony or utility measurements can be reported. Software-measured carpet area, where available, would be a drawing-derived measurement rather than a RERA disclosure; it is distinct from saleable area, which may include the home’s share of common areas. Floor plans

5. Parking & vehicle circulation

The technical approval identifies the stilt as a parking level and states that the silt/cellar area is to be used exclusively for vehicle parking, without partition walls or rolling shutters. It also requires one entry and one exit, each with a minimum width of 4.5 meters and height clearance of 5 meters. These are approval conditions, not evidence of completed works or a count of parking spaces.

No verified count of car or two-wheeler spaces, visitor or accessible spaces, EV charging provision, parking allocation by apartment, or legally documented exclusive parking rights is supplied. A parking bay shown or described in a plan would not by itself establish exclusive ownership. Document index RERA unit table

6. Amenities, recreation & open spaces

The RERA amenity record lists the following items with 0% progress where a progress figure is shown. The technical approval separately specifies certain building services and conditions. No supplied evidence independently verifies completion of these facilities.

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Green Strip/TOT LOT/ParkSize not suppliedRERA amenity record RERA amenitiesListed as available “YES”; progress 0%; completion not independently verified
Community BuildingsDetails and size not suppliedRERA amenity record RERA amenitiesProgress 0%; completion not independently verified
Aggregate recreational open spaceArea not suppliedRERA amenity record RERA amenitiesProgress 0%; completion not independently verified

The technical approval requires a transformer and garbage house within the premises; these are site services and are addressed under utilities below. Vendor-listed items such as a swimming pool, gym, children’s play area and clubhouse are not established by the supplied RERA amenity or approval records, so they are not presented as sanctioned or delivered facilities. Promoter website

7. Utilities, building services & safety

The HMDA technical approval sets out requirements and conditions for utilities and safety; these do not establish that the works have been completed.

  • Water and sewerage: The approval refers to a water source and sewerage disposal source, specifies conditions for bore depth and water disinfection, and requires a septic tank for primary treatment. It also describes connecting treated sewerage to a Gram Panchayat drain or natural drain/nala where applicable, subject to the stated conditions.
  • Drainage and rainwater: The approval requires rainwater-harvesting structures and says drainage or effluent must not overflow onto a road or public place. The RERA amenity record lists storm-water drains and water conservation/rainwater harvesting, but reports 0% progress. RERA amenities
  • Electrical and waste: The approval requires provision for a transformer and garbage house and a generator as an alternate electricity source. The RERA amenity record lists an electrical meter room/sub-station/receiving station and solid-waste management, each with 0% progress; completion is not independently verified. RERA amenities
  • Fire and life safety: The approval specifies fire-safety measures including fire extinguishers, a manually operated alarm system, emergency lighting in corridors/common passages and staircases, fire-resistant lift swing doors, and sprinkler provision if the basement area exceeds 200 sq. m. It also requires compliance with Fire Service Department norms. These are conditions in the approval, not an independent finding of compliance or completion.
  • Access and circulation: The approval requires one entry and one exit with minimum width 4.5 meters and height clearance 5 meters, and calls for a joint open space with a neighbouring premises for fire-vehicle manoeuvrability. No accessible routes or ramp specifications are supplied.
  • Other services: The approval calls for safety provisions for construction workers and a comprehensive construction-worker insurance policy during construction. No lift count or capacity, water-storage capacity, STP capacity, backup capacity, CCTV or access-control details are established in the RERA records supplied. Document index

8. Location, access & connectivity

The project is identified in the RERA header as DSR SCHOOL, Medchal Mandal, Medchal-Malkajgiri District, PIN 500014. The technical approval and title records identify Gundla Pochampally as the village. RERA record

The supplied location dataset gives these distances from its cadastral-parcel-centroid reference; no travel times are provided: Location record

DestinationRecorded distance
Financial District (Nanakramguda)1.2 km
IndusInd Bank0.4 km
Unnamed bus station2.2 km
Manuu Polytechnic Hyderabad1.6 km
Sankaraya Eye Hospital1.6 km
ADP0.0 km
South india shopping mall2.6 km
Unnamed park1.2 km
Nanakramguda Govt primary school0.5 km

The technical approval requires one site entry and exit with a minimum width of 4.5 meters. No route, road name or public-transport service details are otherwise established in the supplied project records.

9. Developer & development status

The registered promoter is SKYLAR BUILDERS, identified in the RERA filing as a partnership. Its listed partners are Kiran Kumar Kairamkonda, Raji Reddy Mallesh and Savitha Mallesh; Santosh Kumar Mallesh is listed as authorised signatory. The supplied records do not establish a corporate registration identifier or a verified official website/contact channel. Corporate record Parties record

In its Form B affidavit-cum-declaration, SKYLAR BUILDERS, represented by Managing Partner M Santosh Kumar, declared a legal-title basis, that the land was free from encumbrances, and an undertaking to complete by 11.04.2024; the declaration is dated 17 August 2019. These are promoter declarations, not independent verification of title or completion.

The RERA record describes one building with 15 apartments. No independently verified construction-progress assessment or occupancy/completion certificate is supplied. RERA unit table Document index

10. Approvals, official records & documents

RecordSupplied evidence
TG-RERA registrationForm C for SKYLAR GRAND LILLY, registration P02200001154, issued 14/09/2019, valid through 11/04/2024; the supplied certificate states no extension.
HMDA technical approvalApproval 006644/MED/R1/U6/HMDA/30122017, dated 12/04/2018; residential 1Stilt + 5 upper floors. It directs the applicant to obtain sanction/release from the Executive Authority of Gundla Pochampalle Gram Panchayat.
Title-search reportAdvocate’s land title search report dated 25/02/2019, concerning the proposed Skylar Grand Lilly, Skylar Grand Lotus and Skylar Grand Tulip development on plots 85–95 at Gundla Pochampally Village.
Development Agreement-cum-GPARegistered instrument No. 9666/2017, dated 13/12/2017, described in the title records as a development-rights instrument for land at Gundla Pochampally.
Promoter Form B declarationAffidavit-cum-declaration by SKYLAR BUILDERS, represented by M Santosh Kumar, dated 17 August 2019.
Occupancy / completion certificateNone identified in the supplied document set. Document index

The RERA filing records plan approval number 006644/MED/R1/U6/HMD. The supplied material does not include a separately extracted local-authority building-sanction release or an occupancy/completion certificate. RERA filing Document index

Frequently asked questions

Is SKYLAR GRAND LILLY registered with Telangana RERA?

Yes. SKYLAR GRAND LILLY is registered with the Telangana Real Estate Regulatory Authority as P02200001154; the registration status is New Project.

Who is the developer of SKYLAR GRAND LILLY?

The promoter named in the RERA registration is SKYLAR BUILDERS.

Where is SKYLAR GRAND LILLY located?

SKYLAR GRAND LILLY is in DSR SCHOOL, Medchal, Medchal-Malkajgiri, Telangana (500014).

When will SKYLAR GRAND LILLY be completed?

The promoter's proposed date of completion filed with RERA is 11/04/2024. This is the promoter's declaration, not a guarantee.