Neelima Towers Block B

GUNTURU VENKANNA · Nizamabad · RERA P03100010867

NEELIMA TOWERS BLOCK B is a residential apartment project in Borgaon (P), MOGUPAL (NEW), Nizamabad. The registered promoter is GUNTURU VENKANNA. The project is on 895.11 sq.m and comprises one residential building with 1 Stilt + 5 Floors and 20 2BHK apartments, each with a RERA-filed saleable area of 118.45 sq.m. Its TG-RERA registration is P03100010867, valid 27 January 2026 to 26 January 2029, and the promoter’s proposed completion date is 26/01/2029.

01What we found

RegisteredTG-RERA - valid till 26 Jan 2029
18documents on file - each fact links to its page
0court cases on this project's land in the court records searched
10items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

10 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Project at a glance

Project identity

ItemTG-RERA/project record
Registered project nameNEELIMA TOWERS BLOCK B RERA record
Project typeResidential apartment project RERA record RERA filing
Phase / registered portionBlock B; this registration covers the building on Survey No. 115(PART). RERA record
TG-RERA registrationP03100010867; valid 27 January 2026 to 26 January 2029, unless extended by the Authority. This is registration validity, not the building’s completion date. RERA record Approvals record
Registered promoterGUNTURU VENKANNA RERA record
RERA statusNew Project; registration certificate issued. RERA record

Land and geographic identity

ItemRecord
Locality / revenue villageNizamabad locality; revenue village Borgaon (P) (also rendered “BORGOAN (P)” in the building-permit plan). RERA record RERA filing
Mandal / district / PINMOGUPAL (NEW) / Nizamabad / 503230 in the project identity record. RERA record RERA filing
Project survey number and subdivision115(PART). RERA record Land records
Registered site extent895.11 sq.m net plot area; the plan records the same 895.11 sq.m gross plot area and no plot-area deductions. RERA filing
BoundariesEast: neighbours’ land; West: 12M WIDE MAIN ROAD; North: proposed residential apartment Block A; South: 10 M WIDE MAIN ROAD. RERA filing
Road-affected / nala / water-body area shown on plan0 sq.m for each recorded category.

Development identity

ItemRecord
Sanctioning authorityBuilding permit order issued by Nizamabad Municipal Corporation; the filed plan also identifies DTCP.
Principal approval identifiersFile No. 008111/NIZA/00057/SWBP/2025; approval No. 0044/NIZA/SWBP/2026; both dated 27/01/2026 in the supplied approval records. Approvals record
Approved built-up areaPlan extraction records Total Proposed BUA excluding Parking 1991.9 sq.m and Total Proposed BUA including Parking 2432.39 sq.m. The permit extraction separately records residential upper-floor area 1991.9 sq.m.
Building count and configurationOne residential building, 1 Stilt + 5 Floors; 20 dwelling units in the building-permit record. RERA filing
ParkingPlan records Car Parking Spaces 9.00 and proposed visitor parking area 40.08 sq.m (10.06%). Permit extraction records total parking area 400.41 sq.m. The supplied extracts do not resolve the different parking-area figures into a single measure.
Approved versus RERA-filed units20 in the building-permit record and 20 in the TG-RERA unit filing. RERA unit table

Offering and status

ItemRecord
Unit type2BHK apartments; 20 filed units. RERA unit table RERA unit details
RERA-filed saleable area118.45 sq.m per unit in the supplied configuration record. RERA unit details RERA unit table
Booking availability0 booked; 20 available, as last read from the TG-RERA portal; no as-of date is provided, so counts are indicative. RERA unit details RERA unit table
Construction stageThe supplied TG-RERA records give approval and proposed dates, but no independently verified site-progress assessment. RERA amenities
Completion datesPromoter Form B undertaking: 26/01/2029; building-permit extraction: construction to be completed before 27/01/2029.
Occupancy / completion certificateThe permit requires an occupancy certificate before occupation; the supplied approval extraction records completion_certified: false. No occupancy certificate is supplied.

The project story

NEELIMA TOWERS BLOCK B is registered as a residential apartment project at Borgaon (P), Nizamabad, on 895.11 sq.m in Survey No. 115(PART). The approved building-permit record describes one residential building with a stilt and five floors, containing 20 dwelling units; the TG-RERA filing also records 20 2BHK apartments. RERA record Land records RERA unit details

The project’s RERA registration runs to 26 January 2029 unless extended. Separately, the promoter’s Form B states a completion undertaking of 26 January 2029, while the building-permit extraction states completion before 27 January 2029. These are recorded timelines, not evidence that construction has reached a particular stage. The supplied documents do not include an independently verified construction-progress report or an occupancy certificate.

Master plan, architecture & building design

The filed plan identifies a single residential block configured as 1 Stilt + 5 Floors on Survey No. 115(PART), Borgaon (P), with a net plot area of 895.11 sq.m. It records proposed coverage of 440.49 sq.m (49%) and vacant plot area of 429.33 sq.m. These are plan-extracted figures, not independent site measurements.

The plan’s area schedule distinguishes Total Proposed BUA excluding Parking: 1991.9 sq.m from Total Proposed BUA including Parking: 2432.39 sq.m. The building-permit extraction also gives residential upper floors area as 1991.9 sq.m. The supplied material does not provide a separate FSI-counted-area figure.

The plan records setbacks of Front 3.0 m, Rear Side 4.0 m, Side 1 4.0 m, and Side 2 4.1 m. Its listed site features include two tot-lots, peripheral green strips, a lift, transformer space, sump, septic tank, garbage house, rainwater-harvesting provision and EV charging infrastructure. The available extracts do not establish floor-by-floor apartment placement, lift capacity, detailed circulation, or completed delivery of these features.

Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK20020118.45 sq.mMedian 67.3 sq.m; measured range 54.9–76.3 sq.m43%

Unit counts, booking status and saleable area are from the TG-RERA configuration record; booking counts have no supplied as-of date. Carpet-area values are software measurements from the filed floor-plan drawing, not RERA-filed carpet-area disclosures, and are flagged as needing review. The drawing measurement covers 12 flat designs. RERA unit details Floor plans

The filed area is identified as saleable area, not carpet area. Saleable area is not interchangeable with the software-measured carpet area; the supplied drawing-measurement note says saleable area also counts the home’s share of common areas. The supplied data does not provide a separately measured balcony or utility area, or a room schedule complete enough to describe every apartment design. RERA unit details Floor plans

Parking & vehicle circulation

The building-permit plan records 9.00 car parking spaces and a total parking area of 400.41 sq.m in the permit extraction. The layout-plan extraction separately records a proposed visitor parking area of 40.08 sq.m (10.06%) and says the stilt and parking areas are to be used exclusively for parking. The supplied records do not give a verified parking-space allocation to individual apartments, a two-wheeler count, accessible-space count, or a distinct visitor-space count.

The plan lists EV charging infrastructure as a provision. No supplied evidence establishes its installation or operation. The available extracts do not detail ramps, vehicle-entry and exit arrangements, internal driveways, or pedestrian separation.

Amenities, recreation & open spaces

Clubhouse / indoor
Description / sizeNo clubhouse or indoor recreational facility is identified in the supplied project records.
Evidence sourceRERA amenities
Declared progress / verified statusNot disclosed.
Sports / recreation
Description / sizeTot-lot 1: 24.67 sq.m; Tot-lot 2: 21.68 sq.m.
Evidence sourceSanction-plan extraction
Declared progress / verified statusPlan-listed; no supplied evidence of completion.
Landscape / open space
Description / sizeGreen strips: 9.38 sq.m, 33.56 sq.m, 22.78 sq.m, 25.38 sq.m, and 14.17 sq.m.
Evidence sourceSanction-plan extraction
Declared progress / verified statusPlan-listed; RERA amenity record reports Green Strip/TOT LOT/Park at 0%.
Convenience / community
Description / sizeGarbage house is listed in the plan conditions and site features.
Declared progress / verified statusRequired/listed in the plan; completion not established.
Site infrastructure (not a recreation amenity)
Description / sizeWater supply, sewerage, storm-water drains and electrical meter room/sub-station/receiving station appear in the amenity-progress record; rainwater harvesting is also listed.
Evidence sourceRERA amenities
Declared progress / verified statusThe RERA amenity record states water supply 100%, sewerage 100%, storm-water drains 100%, rainwater harvesting 80%, and electrical facilities 90%. These are recorded progress percentages, not independent verification.

The RERA amenity record reports 0% for internal roads and footpaths, street lighting, community buildings, sewage and sullage treatment/disposal, solid-waste management, energy management, fire protection/fire safety requirements and aggregate recreational open space. These percentages are reported declarations in the supplied record, not a site inspection. RERA amenities

Utilities, building services & safety

The project amenity record marks water supply, sewerage (including chambers, lines and septic tank/STP), and storm-water drains as available, each at 100%. It records rainwater harvesting at 80%. The plan lists a water sump measuring 4.00 x 3.00 x 1.5m, rainwater-harvesting provisions and a septic tank; the building-permit extraction specifies 3 rainwater-harvesting pits and 35 trees. No water-source details, storage capacity beyond the stated sump dimensions, treatment capacity or reuse volumes are supplied. RERA amenities

A lift, transformer space and EV charging infrastructure are listed in the plan. The amenity record gives electrical meter room/sub-station/receiving station 90%; it does not establish commissioned electrical supply, backup power, lift capacity, or EV charger installation. RERA amenities

The permit conditions require an occupancy certificate before occupation and state that a fire NOC is to be obtained before issue of the occupancy certificate. The plan lists fire-safety requirements, but the amenity record reports fire protection and fire-safety requirements at 0%. No fire NOC or occupancy certificate is supplied. The plan also lists a garbage house; the amenity record reports solid-waste management and disposal at 0%. No detailed accessibility design, accessible routes, CCTV or security system is identified in the supplied records. RERA amenities

Location, access & connectivity

The registered project location is Borgaon (P), MOGUPAL (NEW), Nizamabad, Telangana, 503230. The site boundaries identify a 12M WIDE MAIN ROAD to the west and a 10 M WIDE MAIN ROAD to the south. RERA record RERA filing RERA filing

The supplied location dataset contains a sampled connectivity entry for the Outer Ring Road, described as the nearest sampled interchange at approximately 9.2 km. The location record’s geocode is labelled “Nizamabad Road, Green Park, Jeedimetla Village” in Hyderabad; it is not identified in the supplied data as an independently verified project-site coordinate, so it is not used here to locate the registered site. No project-specific public-transport stops or other verified landmark distances are supplied. Location record RERA record

Developer & development status

The registered promoter is GUNTURU VENKANNA, identified in the project record as a proprietorship. The RERA registration certificate names him as promoter; the building-permit record names M/s. NEELIMA BUILDERS AND DEVELOPERS as applicant and identifies Gunturu Venkanna as its representative. The supplied project record does not provide a verified corporate registration identifier, official website, or project contact details. RERA record RERA filing

Form B is the promoter’s declaration and undertaking that the project will be completed by 26/01/2029. The permit extraction states that construction is to be completed before 27/01/2029. The supplied records do not provide independently verified construction progress; the RERA amenity percentages are recorded progress disclosures, not an independent site assessment. RERA amenities

Approvals, official records & documents

RecordSupplied evidence and scope
TG-RERA registrationForm C certificate for NEELIMA TOWERS BLOCK B, registration P03100010867, valid 27/01/2026–26/01/2029 unless extended.
Building permit / planFile No. 008111/NIZA/00057/SWBP/2025, dated 27/01/2026, for the residential building on Survey No. 115(PART); the permit extraction also records approval No. 0044/NIZA/SWBP/2026.
Government memoGovernment of Telangana Municipal Administration Department Memo 10658/Plg.I /2023, dated 16.07.2025, permits residential activities in a commercial zone shown in Nizamabad’s draft master plan; the supplied extraction says it does not approve a specific land parcel or layout.
Promoter declarationForm B filed by GUNTURU VENKANNA, including the promoter’s land-title and encumbrance declarations and completion undertaking.
Mortgage record noted in permitMortgage Deed No. 9348/2025, dated 04/11/2025, recorded in the permit extraction against the second and fifth floors; the permit states mortgaged built-up area is to be registered only after an occupancy certificate.
Occupancy / completion recordNo occupancy or completion certificate is supplied; the permit requires an occupancy certificate before occupation.

The building-permit plan contains conditions on commencement, completion notice, occupancy, parking, utilities and safety. The table above is an evidence index, not a full statement of those conditions.

Other registrations of Neelima Towers

Frequently asked questions

Is NEELIMA TOWERS BLOCK B registered with Telangana RERA?

Yes. NEELIMA TOWERS BLOCK B is registered with the Telangana Real Estate Regulatory Authority as P03100010867; the registration status is New Project.

Who is the developer of NEELIMA TOWERS BLOCK B?

The promoter named in the RERA registration is GUNTURU VENKANNA.

Where is NEELIMA TOWERS BLOCK B located?

NEELIMA TOWERS BLOCK B is in NIZAMABAD, Borgaon (P), MOGUPAL (NEW), Telangana (503230).

When will NEELIMA TOWERS BLOCK B be completed?

The promoter's proposed date of completion filed with RERA is 26/05/2029. This is the promoter's declaration, not a guarantee.