Sign in

Green Jay

DHARANI DEVELOPERS · Sangareddy · RERA P01100002536

GREEN JAY is a residential apartment project in Chitkul, Patancheru, Sangareddy, developed by registered promoter Dharani Developers. It is on a site of 668.86 sq. m and comprises 1 building with 1 stilt + 5 upper floors and 20 2BHK units. Its TG-RERA registration number is P01100002536, and the promoter’s declared completion date is 27/03/2022.

01What we found

Period endedTG-RERA registration ran to 27 Mar 2022 - check its extension on TG-RERA
12documents on file - each fact links to its page
0court cases on this project's land in the court records searched
11items to check - 5 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

11 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Photo from squareyards.com

1. Project at a glance

Project identity

ItemProject record
Registered project nameGREEN JAY
Project typeResidential apartment project RERA record RERA filing
Phase / registered portionNo separate phase name is stated. The registration is for the project on Plots 175, 176 and 177.
TG-RERA registrationP01100002536
Registration validity01/02/2021–27/03/2022; certificate states “1 years.” No extension is recorded in the supplied certificate. Registration validity is distinct from the promoter’s completion undertaking.
Registered promoterDharani Developers (also rendered “DHARANI DEVELOPERS” in the project record) RERA record
RERA status in supplied recordRegistration certificate issued; the certificate’s recorded validity ended 27/03/2022.

Land and geographic identity

ItemProject record
Locality / revenue villageCHITKUL RERA record
MandalPATANCHERU RERA record
DistrictSangareddy RERA record
PIN502307 RERA record
Project survey numbers / subdivisions301/A, 301/U and 301/UU RERA record Land records
Plot numbers175, 176 and 177 RERA filing
Registered site extent668.86 sq. m (RERA land details); the RERA-filed technical approval documents state 669.05 sq Mt. Land records
Net / total areaTotal area 668.86 sqmts; net area 668.86 sqmts; area shown affected by road widening/FTL/Nala widening: 0. RERA filing
Boundaries (RERA-filed)East: PLOT NO 216 217 218; West: 30FEET ROAD; North: PLOT NO 174; South: PLOT NO 178. RERA filing

Development identity

ItemProject record
Principal building-plan authority / approvalHMDA technical approval 012239/SKP/R1/U6/HMDA/31052018, dated 27/03/2019. Approvals record
Local technical permissionGram Panchayat Chitkul technical approval/permission, application 012239/SKP/R1/U6/HMDA/31052018, dated 20/04/2019.
Approved built-up area1674.50 sqmts in the RERA project fields. RERA filing
Building count1 approved building unit; 1 proposed building unit as per agreement. RERA filing
Sanctioned configuration1 stilt + 5 upper floors in the HMDA technical approval and Gram Panchayat permission.
Parking levels / provisionHMDA document states cellar and stilts approved for parking, with a condition that these be used exclusively for parking. The supplied record does not state a parking-space count.
Unit count20 total units in the RERA unit record; the RERA land-details field records 1 total building unit, not apartment count. RERA unit table RERA filing

Offering and status

ItemProject record
RERA-filed configuration2BHK RERA unit table RERA unit details
RERA-filed saleable area25.65 sq. m RERA unit table RERA unit details
Booked / available0 booked / 20 available, as last read from the TG-RERA portal; no as-of date is supplied, so counts are indicative. RERA unit table
Promoter-declared completionForm B undertaking states 27/03/2022.
Construction stageNo current construction-progress figure or independently verified site status is supplied. Document index RERA amenities
Occupancy / completion certificateNo occupancy or completion certificate is supplied in the reviewed project documents. The HMDA approval requires an occupancy certificate before occupation. Document index

2. The project story

GREEN JAY is registered as a residential apartment project on Plots 175, 176 and 177 in Chitkul, Patancheru, Sangareddy, over the project’s stated survey subdivisions 301/A, 301/U and 301/UU. The RERA record describes one building, and the technical approvals describe a residential apartment building with 1 stilt + 5 upper floors. RERA record Land records RERA filing

The project’s RERA unit schedule lists 20 2BHK units. Its registered completion undertaking was 27/03/2022, while the supplied record does not establish current construction progress, completion, or issuance of an occupancy certificate. The approval document says an occupancy certificate is required before occupation; it is an approval condition, not evidence that a certificate has since been issued. RERA unit details

3. Master plan, architecture & building design

The filed development is a single residential apartment building on a stated total/net site area of 668.86 sqmts, with approved built-up area recorded as 1674.50 sqmts. HMDA’s technical approval describes 1 stilt + 5 upper floors and identifies plots 175, 176 and 177 in survey numbers 301/A, 301/U and 301/UU, Chitkul. RERA filing RERA filing

The supplied plan approval record includes conditions for maintaining a peripheral strip of greenery and for providing a transformer, garbage house and rainwater-harvesting structures. The HMDA document also states that the cellar and stilt approved for parking are to be used exclusively for parking. The supplied drawings do not provide reviewable measurements or details of floor-by-floor unit arrangement, building footprint, lift/stair configuration, entrances, or circulation. Floor plans

4. Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK2002025.65 sq. mNot measured in the supplied drawingsNot supplied

The unit count, booking counts and saleable area above are RERA-filed values; the portal extract provides no booking-count as-of date. The floor-plan review records two drawings, but neither contains measurable flats, so no software-measured carpet area or room dimensions are available. Carpet area and saleable area are different measurement concepts; no drawing-based carpet figure is available here to compare or characterize. RERA unit table RERA unit details Floor plans

5. Parking & vehicle circulation

HMDA’s technical approval says the cellar and stilts shown for parking must remain exclusively for vehicle parking and must not be partitioned or repurposed. The supplied material does not state the number of parking spaces, whether they are allocated to particular units, visitor or accessible parking provision, or the location of ramps and vehicle entries. A parking provision in the approved plan does not by itself establish exclusive ownership or allocation to a buyer. Document index

6. Amenities, recreation & open spaces

The following items appear in the project’s RERA amenity record. The progress percentages shown there are 0; these are portal-reported progress fields, not independent confirmation of physical status. The approval document separately includes provisions for rainwater harvesting, a transformer and a garbage house. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Internal roads & footpathsSize not suppliedRERA amenity record RERA amenities0%; not independently verified
Water supplyAvailable: YES; capacity/source not suppliedRERA amenity record RERA amenities0%; not independently verified
Sewerage“Sewerage (Chamber, Lines, Septic Tank, STP)”; specific system/capacity not establishedRERA amenity record RERA amenitiesAvailable: YES; 0%; not independently verified
Storm-water drainsSize/details not suppliedRERA amenity record RERA amenities0%; not independently verified
Green strip / tot lot / parkArea/details not suppliedRERA amenity record RERA amenities0%; not independently verified
Street lightingDetails not suppliedRERA amenity record RERA amenities0%; not independently verified
Community buildingsDetails not suppliedRERA amenity record RERA amenities0%; not independently verified
Sewage and sullage-water treatment/disposalSystem/capacity not suppliedRERA amenity record RERA amenities0%; not independently verified
Solid-waste management and disposalDetails not suppliedRERA amenity record RERA amenities0%; not independently verified
Water conservation / rainwater harvestingApproval document calls for rainwater-harvesting structures; size/capacity not suppliedRERA amenity record RERA amenities0% in amenity record; completion not independently verified
Energy managementDetails not suppliedRERA amenity record RERA amenities0%; not independently verified
Fire protection and fire-safety requirementsSystems/details not suppliedRERA amenity record RERA amenities0%; not independently verified
Electrical meter room / sub-station / receiving stationApproval document provides for a transformer; detailed equipment/capacity not suppliedRERA amenity record RERA amenities0%; not independently verified
Recreational open spaceAggregate area not suppliedRERA amenity record RERA amenities0%; not independently verified
Garbage houseRequired by HMDA approval within the premises; size not suppliedHMDA technical approvalApproval condition; completion not independently verified

7. Utilities, building services & safety

The RERA amenity record marks water supply and sewerage as available, but reports 0% progress and provides no source, storage, treatment, or capacity details. It also lists storm-water drainage, sewage/sullage treatment, solid-waste management, water conservation/rainwater harvesting, and energy management, without technical specifications. HMDA’s technical approval calls for rainwater-harvesting structures, a transformer and a garbage house within the premises. These are recorded requirements or declarations; the supplied material does not independently verify installation or completion. RERA amenities

The RERA amenity schedule lists fire protection and fire-safety requirements, but the supplied documents do not specify equipment, escape-stair arrangements, fire-access details, lift provision, backup-power capacity, CCTV, or accessibility features. HMDA’s approval states that the applicant is responsible for structural safety and safety requirements in accordance with the National Building Code of 2005, and requires an occupancy certificate before occupation. Those approval conditions do not establish that the facilities are complete or that statutory compliance has been independently verified. RERA amenities

8. Location, access & connectivity

The registered location is Chitkul, Patancheru, Sangareddy, Telangana 502307. The RERA-filed plot boundaries identify a 30FEET ROAD on the west; the HMDA technical approval also records an 18 mt. road-width entry and refers to service-road provision where required. RERA record RERA filing

A supplied map-based location record gives an approximate 4.5 km distance to the nearest sampled Outer Ring Road interchange. This is a location-data estimate, not a stated travel time. The RERA record does not provide measured distances to public transport, schools, hospitals, or other landmarks. Location record

9. Developer & development status

The registered promoter is Dharani Developers, identified in the project record as a partnership. The supplied promoter address is BUDDHAS VIRTUE HEIGHTS, MAYURI NAGAR, RICE MILL ROAD, CHITKUL, PATANCHERU, Sangareddy, 502307. RERA records identify SURYANARAYANA RAJU RUDRARAJU as authorized signatory and list partners VIJAYA LAKSHMI ALLURI, DINESH VARMA RUDRARAJU, and VIJAYA LATHA RUDRARAJU. No corporate registration identifier, official website, or contact details are supplied. Corporate record Parties record

The promoter’s Form B affidavit, dated 01.04.2019, undertakes completion by 27/03/2022 and declares that 70% of allottee realizations would be deposited in a separate account for land and construction costs, with withdrawals proportionate to completion and supported by professional certification. These are promoter declarations. The supplied record does not establish current construction progress or provide an occupancy/completion certificate. Document index

10. Approvals, official records & documents

RecordSupplied evidence
TG-RERA registrationForm C certificate for GREEN JAY, registration P01100002536, issued 01/02/2021, with validity through 27/03/2022.
HMDA building-plan technical approvalApproval 012239/SKP/R1/U6/HMDA/31052018, dated 27/03/2019, for the residential building on Plots 175, 176 and 177, survey numbers 301/A, 301/U and 301/UU.
Gram Panchayat technical approval/permissionChitkul permission dated 20/04/2019, for 1 stilt + 5 floors on the stated plots and survey numbers.
Form B declarationPromoter affidavit dated 01.04.2019, including the completion undertaking and project-fund declarations.
Title and development documents filedAdvocate title investigation reports 140511 and 140512; Development Agreement-cum-GPA document 148850.
Encumbrance statement filedEncumbrance statement 52260013, document 148849.
Layout / approved drawing materialA layout-plan filing is listed, but the supplied document record does not extract its contents; floor-plan review reports two drawings with no measurable flats. Document index Floor plans
Occupancy / completion certificateNot supplied in the reviewed documents. HMDA’s technical approval states that an occupancy certificate is required before occupation. Document index

Frequently asked questions

Is GREEN JAY registered with Telangana RERA?

Yes. GREEN JAY is registered with the Telangana Real Estate Regulatory Authority as P01100002536; the registration status is New Project.

Who is the developer of GREEN JAY?

The promoter named in the RERA registration is DHARANI DEVELOPERS.

Where is GREEN JAY located?

GREEN JAY is in CHITKUL, PATANCHERU, Sangareddy, Telangana (502307).

When will GREEN JAY be completed?

The promoter's proposed date of completion filed with RERA is 27/03/2022. This is the promoter's declaration, not a guarantee.

More projects in Chitkul