Sign in

Akshitha Marvel

KSR PROJECTS · Medchal-Malkajgiri · RERA P02200002681

AKSHITHA MARVEL is a residential apartment project in Uppal Bhagat, Uppal Mandal, Medchal-Malkajgiri District, developed by the registered promoter KSR PROJECTS. The project has a site extent of 836.48 sq. m. and one proposed residential building with 1 cellar, 1 stilt and 5 upper floors. The TG-RERA unit record lists 20 2BHK apartments, each with a filed saleable area of 89.95 sq. m. The TG-RERA registration number is P02200002681, and the proposed completion date is 30/03/2024.

More from Ksr Projects · 4 projects →

01What we found

Period endedTG-RERA registration ran to 30 Mar 2024 - check its extension on TG-RERA
13documents on file - each fact links to its page
9court cases on this project's land (survey 1, 282, Uppal)
8items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

8 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

FieldProject record
Registered project nameAKSHITHA MARVEL RERA record
Project typeResidential apartment project RERA record
Phase / registered portionPhase designation not disclosed; TG-RERA registration is for the project as registered
TG-RERA registration numberP02200002681
Registration validity17/03/2021 to 30/03/2024; the supplied certificate records a three-year validity and no extension
Registered promoterKSR PROJECTS; the certificate spells the name “Ksr Projects” RERA record
RERA statusListed as “On-Going Project” in the supplied project record. Registration validity and project completion are separate matters; the certificate’s stated registration period ended 30/03/2024. RERA record

Land and geographic identity

FieldProject record
Locality / plotUppal Bhagat; Plot No. 1414 RERA record RERA filing
Revenue villageUppal; the filed approval and title documents also use “Uppal Bhagat” / “Uppal Bhagath” RERA record
MandalUppal RERA record
DistrictMedchal-Malkajgiri RERA record
PIN500039 RERA record
Survey numbers, as stated in the TG-RERA certificate1 TO 40, 282 TO 368, 369/P, 370, 371, 372, 374/P, 375 TO 387, 395 TO 401, 454, 456 TO 459, 505/P, 510 TO 564
Survey numbers, as stated in HMDA technical approval1 TO 40, 282 TO 368, 369/p, 370 TO 373, 374/p, 375 TO 387, 395 TO 401, 454, 456 TO 459, 505/p, 510 TO 564
Registered site extent836.48 sq. m. in the HMDA technical approval
RERA land record areaTotal area 836.48 sq. m.; net area 836.48 sq. m.; affected area recorded as 0 RERA filing
Boundaries recorded in RERA filingNorth: ROAD WIDTH 24; South: PLOT NO 1437; East: PLOT NO 1415; West: PLOT NO 1413 RERA filing

Development identity

FieldProject record
Sanctioning authorityHyderabad Metropolitan Development Authority (HMDA); the technical approval states that building plans are to be sanctioned by the Executive Authority in conformity with HMDA’s technical approval
Principal approvalTechnical Approval No. 016664/GHT/R1/U6/HMDA/25102018, dated 30/03/2019 Approvals record
Plan approval number shown in project record016664/GHT/R1/U6/HMD RERA record
Approved built-up areaRERA project record: 1799.00 sq. m. RERA filing. The HMDA technical approval separately lists “Total Built up Area” as 1799 sq. m. and “Proposed Built-up Area” as 2169.4 sq. m.
Building count and configurationOne proposed residential building; 1 cellar + 1 stilt + 5 upper floors RERA filing
Building height14.9, as stated in the HMDA approval parameters
Parking provisionThe HMDA approval requires the cellar to be used exclusively for vehicle parking; a parking-space count, visitor allocation and unit-wise allocation are not supplied.
Unit count20 units in the TG-RERA unit record; the HMDA approval says the sanctioned number of units must not be increased without prior approval, but the extracted approval does not state a unit count. RERA unit table

Offering and status

FieldProject record
RERA-filed configuration2BHK; 20 units RERA unit table
RERA-filed saleable area89.95 sq. m. per unit RERA unit table
Booked / available0 booked / 20 available in the portal-derived unit record; no as-of date is supplied, so these counts are indicative rather than a current inventory confirmation RERA unit table
Construction stageThe project record labels the project “On-Going Project”; no independently verified site-progress percentage or current construction-stage report is supplied RERA record RERA amenities
Completion datesOriginal and revised proposed completion date: 30/03/2024 RERA record
Occupancy / completion certificateNo occupancy or completion certificate is supplied; the HMDA approval extraction records completion certification as false and requires an occupancy certificate before occupation. This states the available record, not a confirmation of current portal status.

2. The project story

AKSHITHA MARVEL is registered as a residential apartment project on Plot No. 1414 in Uppal Bhagat, Uppal Mandal, Medchal-Malkajgiri District. The TG-RERA record identifies the project’s survey land as 1 TO 40, 282 TO 368, 369/P, 370, 371, 372, 374/P, 375 TO 387, 395 TO 401, 454, 456 TO 459, 505/P, 510 TO 564. HMDA’s technical approval describes the proposed development as one residential building with 1 cellar, 1 stilt and 5 upper floors. RERA record RERA filing

The RERA unit record lists 20 two-bedroom apartments, with 0 booked and 20 available as last read from the portal; the record provides no inventory as-of date. The proposed completion date recorded for the project is 30/03/2024. The supplied materials do not establish current physical progress through an independent site inspection, nor do they include an occupancy or completion certificate. RERA unit table RERA record

3. Master plan, architecture & building design

The project record identifies a site extent of 836.48 sq. m. and an approved built-up area of 1799.00 sq. m. The HMDA technical approval also records a proposed built-up area of 2169.4 sq. m.; these are the separate figures as stated in the supplied records and are not interchangeable. The approval describes one proposed residential building, with 1 cellar, 1 stilt and 5 upper floors, and a stated building height of 14.9. RERA filing RERA filing

The approval extract does not provide a floor-by-floor apartment arrangement, flats per floor, footprint, lift or stair count, internal circulation drawings, or a measured open-space plan. It names a tot-lot and a peripheral greenery requirement, but gives no dimensions for those areas. The approved floor-plan drawings supplied for measurement contain two drawings, neither identified as a flat plan; no software-measured unit carpet area is available. Floor plans

4. Homes, configurations & floor plans

The TG-RERA unit record lists 20 2BHK apartments, each with a filed saleable area of 89.95 sq. m. The portal-derived booking status is 0 booked and 20 available, without an as-of date. RERA unit table RERA unit details

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK2002089.95 sq. m.Not measured in the supplied drawingsNot supplied

Carpet area and saleable area are different measures: the supplied measurement note describes saleable area as also including the home’s share of common areas. No software-measured carpet area, room dimensions, balcony or utility measurements, or floor-by-floor arrangement is supplied for these apartments. RERA unit details Floor plans

5. Parking & vehicle circulation

The HMDA technical approval states that the cellar is to be used exclusively for vehicle parking and not converted or partitioned. It also specifies one entry and one exit to the premises, with minimum width of 4.5 m and height clearance of 5 m. The approval further refers to common parking and keeping setback areas clear for fire-vehicle manoeuvrability.

The supplied records do not give the number of parking spaces, a resident or visitor allocation, accessible spaces, EV charging provision, a ramp arrangement, or unit-specific parking rights. The drawing of a parking bay, if any, would not by itself establish exclusive allocation; no legally documented unit-wise parking allocation is supplied.

6. Amenities, recreation & open spaces

The TG-RERA amenity register contains 14 listed items. Its progress fields show 0% for the listed facilities; “available: YES” is recorded for the entries shown below, but that portal declaration does not establish independent completion or current operational status. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Green strip / tot-lot / parkNo size supplied; HMDA approval also requires a fenced tot-lot maintained as greenery and peripheral tree planting/greeneryRERA amenitiesRERA amenity record: available YES, 0%; not independently verified complete
Community buildingsNo description or size suppliedRERA amenities0%; completion not independently verified
Aggregate recreational open spaceNo area suppliedRERA amenities0%; completion not independently verified

A third-party vendor record lists a swimming pool, gym, children’s play area and clubhouse; these are vendor-reported marketing details, not established as RERA-declared, sanctioned or delivered facilities. Promoter website

7. Utilities, building services & safety

The TG-RERA amenity register marks water supply, sewerage (chamber, lines, septic tank, STP), rainwater harvesting, and electrical meter room/sub-station/receiving station as “available: YES”; the listed progress for these entries is 0%. No capacities, system specifications or independent completion verification are supplied. RERA amenities

HMDA’s technical approval sets out project conditions concerning water and sewerage, including a separate underground static water storage tank of 25,000 litres and a separate 25,000-litre terrace tank for residential buildings. It also specifies rainwater-harvesting structures, a transformer space, and an on-site garbage house. These are approval conditions, not evidence that the facilities have been installed or are operational.

The approval further requires fire-safety provisions including fire extinguishers, a manually operated alarm system, hose reel/down corner, emergency lighting in corridors/common passages and staircases, and an automatic sprinkler system if the basement area exceeds 200 sq. m. It requires fire-resistant swing doors for collapsible lifts and generator backup. The supplied record does not confirm installation, testing, capacities beyond the specified water tanks, or final fire-safety clearance.

8. Location, access & connectivity

The registered location is Plot No. 1414, Uppal Bhagat, Uppal Mandal, Medchal-Malkajgiri District, PIN 500039. The filing records the north boundary as “ROAD WIDTH 24”; the supplied materials do not identify the road by name or establish public-transport access. RERA record RERA filing

A separate location record provides nearby points and measured distances: Sankaraya Eye Hospital (0.4 km), an unnamed park (0.4 km), Keystone International School (1.3 km), ADP (1.6 km), ICICI Bank (1.7 km), Financial District (Nanakramguda) (2.0 km), and Holy Mary College (2.4 km). These are location-record distances; no travel times are supplied. Location record

9. Developer & development status

The registered promoter is KSR PROJECTS, identified in the project record as a partnership. The recorded authorized signatory is KANCHARLA RAVI KUMAR REDDY; the supplied RERA record also names five partners. RERA record Corporate record Parties record

The Form B affidavit is a promoter declaration by the authorized signatory, dated 04/0712021 in the extracted record. It declares a legal-title basis, states that the land is free from encumbrances, and gives a completion undertaking transcribed in the extraction as “91 091 2024”; the project record separately states the proposed and revised completion date as 30/03/2024. RERA record

The project is recorded as ongoing, with a proposed completion date of 30/03/2024. No independently verified construction-progress percentage or occupancy certificate is supplied. RERA record

10. Approvals, official records & documents

TG-RERA registration certificate
What the supplied evidence identifiesForm C registration for AKSHITHA MARVEL, P02200002681, issued 17/03/2021; stated validity ends 30/03/2024. The certificate also records the separate-account condition.
HMDA technical building approval
What the supplied evidence identifiesTechnical Approval No. 016664/GHT/R1/U6/HMDA/25102018, dated 30/03/2019, for a proposed residential building on Plot No. 1414; includes the stated floor configuration and approval conditions.
HMDA mortgage record cited in approval
What the supplied evidence identifiesMortgage deed No. 4460/2019, dated 19/03/2019, concerning 181.44 sq. m. of built-up area in favour of MC, HMDA, as recorded in the approval extract.
Promoter Form B declaration
What the supplied evidence identifiesAffidavit-cum-declaration by KANCHARLA RAVI KUMAR REDDY, authorized signatory of KSR PROJECTS.
Occupancy / completion certificate
What the supplied evidence identifiesNot supplied in the reviewed project documents; the HMDA approval states that an occupancy certificate is required before occupation.

The HMDA approval is a technical approval and states that building plans are to be sanctioned by the Executive Authority in conformity with it. The supplied evidence does not include a separate local-authority building sanction or an occupancy/completion certificate.

Frequently asked questions

Is AKSHITHA MARVEL registered with Telangana RERA?

Yes. AKSHITHA MARVEL is registered with the Telangana Real Estate Regulatory Authority as P02200002681; the registration status is On-Going Project.

Who is the developer of AKSHITHA MARVEL?

The promoter named in the RERA registration is KSR PROJECTS.

Where is AKSHITHA MARVEL located?

AKSHITHA MARVEL is in UPPAL BHAGAT, Uppal, Medchal-Malkajgiri, Telangana (500039).

When will AKSHITHA MARVEL be completed?

The promoter's proposed date of completion filed with RERA is 30/03/2024. This is the promoter's declaration, not a guarantee.

More projects in Uppal