Amma Bhavani Constructions
AMMA BHAVANI CONSTRUCTIONS · Medchal-Malkajgiri · RERA P02200000519
AMMA BHAVANI CONSTRUCTIONS is a residential apartment project in RAMANTHEPUR, Uppal mandal, Medchal-Malkajgiri district, developed by the registered promoter AMMA BHAVANI CONSTRUCTIONS. The site area is 1168 sqmts, with one residential building, BLDG (RAMEELA), sanctioned as Cellar + Stilt + 5. The TG-RERA unit schedule records 25 2BHK homes, with a RERA-filed saleable area of 106.83 sqm per unit. The project is registered under TG-RERA registration P02200000519, and its proposed completion date is 01/01/2024.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
8 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Project record |
|---|---|
| Registered project name | AMMA BHAVANI CONSTRUCTIONS RERA record |
| Project type | Residential apartment project RERA record RERA filing |
| Phase / registered portion | Phase not separately identified in the supplied record; registration is for the project recorded under this name. RERA record |
| TG-RERA registration | P02200000519 RERA record |
| Registration validity | Certificate states valid from 22/03/2019 to 01/01/2024; it records no extension. Registration validity is distinct from the stated completion date and from occupancy-certificate status. |
| Registered promoter | AMMA BHAVANI CONSTRUCTIONS, recorded as a partnership. RERA record RERA filing |
| TG-RERA status | Recorded as On-Going Project. RERA record RERA filing |
Land and geographic identity
| Field | Project record |
|---|---|
| Locality | RAMANTHEPUR RERA record RERA filing |
| Revenue village | Uppal RERA record RERA filing |
| Mandal / district / PIN | Uppal / Medchal-Malkajgiri / 500013 RERA record RERA filing |
| Project survey numbers | 38/23 and 38/24; the RERA record also presents these together as 38/23&38/24. RERA record Land records |
| Plot / premises identifier | RERA certificate records 3-8-109. |
| Registered site area | 1168 sqmts total and 1168.00 sqmts net area in the RERA land record. The GHMC building-permit extraction records 1168.8 m2. RERA filing Land records |
| Boundaries in RERA land record | East: 30 FT ROAD; West: PRINCETON COLLEGE; North: PRINCETON COLLEGE; South: POONAM BHAVAN FUNCTION HALL. RERA filing |
Development identity
| Field | Project record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC) Approvals record |
| Principal building approval | Building Permit Order 1/C2/00002/2018, approved 01 January, 2018; file no. 1/HO/15985/2017. Approvals record |
| Approved building | One residential building, Building - BLDG (RAMEELA). |
| Sanctioned floors and height | Cellar + Stilt + 5; sanctioned height 14.89 m. |
| Approved area figures | Residential area: 2,390.40 m2; cellar: 574.32 m2; stilt: 640.08 m2. These are the figures identified in the permit extraction; they are not carpet or saleable-area figures. |
| Approved versus RERA-declared units | The RERA land record lists 1 total building unit and 1 proposed building unit; the RERA unit schedule records 25 2BHK units. The supplied extracts do not explain the distinction between the building-unit field and the apartment-unit schedule. RERA filing RERA unit table |
| Parking levels | Cellar and stilt are approved for parking; the permit says these areas are to be used exclusively for vehicle parking. A sanctioned space count is not provided in the supplied record. |
Offering and status
| Field | Project record |
|---|---|
| RERA-filed configuration | 2BHK RERA unit table RERA unit details |
| RERA-filed saleable area | 106.83 sqm per unit RERA unit table RERA unit details |
| Booked / available | 0 booked / 25 available, as last read from the TG-RERA portal; the portal record supplied here does not state an as-of date, so counts are indicative. RERA unit table |
| Construction stage | RERA record states 90% completeness; this is a filed figure, not an independent site inspection. RERA record |
| Original / revised completion date | 01/01/2024 / 01/01/2024, as recorded in the project data. RERA record RERA filing |
| Occupancy / completion certificate | The supplied building-permit extraction records completion_certified: false and requires an occupancy certificate before occupation. No project occupancy or completion certificate is supplied. The evidence does not establish the current certificate status beyond these records. |
2. The project story
The TG-RERA record describes a residential apartment development registered as AMMA BHAVANI CONSTRUCTIONS, on survey numbers 38/23 and 38/24 in revenue village Uppal, Uppal mandal, Medchal-Malkajgiri district. The land record identifies the locality as RAMANTHEPUR and gives the site boundaries and area shown above. RERA record Land records RERA filing
The GHMC building-permit extraction describes one residential building, BLDG (RAMEELA), with a cellar, stilt and five upper floors. The RERA unit schedule records 25 2BHK apartments. The project record reports 90% completeness, while the completion date recorded by the promoter was 01/01/2024. The completeness figure is a RERA-recorded status, not an independently verified construction measurement. RERA unit table RERA record
The supplied documents do not establish that an occupancy or completion certificate has been issued. The building permit expressly requires an occupancy certificate before occupation; its extracted record marks completion certification as false.
3. Master plan, architecture & building design
The supplied GHMC permit identifies one residential building on a site recorded as 1168.8 m2, with a sanctioned configuration of Cellar + Stilt + 5 and a height of 14.89 m. It lists residential area as 2,390.40 m2, cellar area as 574.32 m2, and stilt area as 640.08 m2. These are separate permit figures; no FSI-counted area, gross built-up area, or apartment carpet-area total is supplied.
The permit extraction records a 67.43 m2 tot-lot, 2 RWHPs, 55 trees, space for a transformer, a garbage house and an ETP. The supplied material does not include enough drawing detail to describe flat distribution by floor, building footprint, lifts, stairs, internal circulation, landscaped-area layout or phase organization. Document index
4. Homes, configurations & floor plans
TG-RERA records 25 2BHK units, all shown as available and none as booked in the portal data supplied; the booking figures have no stated as-of date. RERA-filed saleable area is 106.83 sqm. RERA unit table RERA unit details
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 25 | 0 | 25 | 106.83 sqm | 65.0–72.1 sqm; median 67.2 sqm | 37% |
Carpet-area figures and loading are software-measured from the supplied floor-plan drawings, not RERA-filed measurements; the record notes that the drawing geometry needs review. The measured sample covers 8 2BHK flat designs. The RERA saleable area includes the home’s share of common areas and should not be read as carpet area. A balcony is shown in the extracted example plan, but a complete balcony or utility-area measurement is not supplied. RERA unit details Floor plans
The example first-floor plan for flat 02 labels two bedrooms, a toilet, dining/kitchen and a balcony. The supplied extracted dimensions are 3.24 m × 3.55 m and 3.2 m × 5.16 m for the bedrooms; 1.5 m × 2.0 m for the toilet; and 6.55 m × 6.91 m for the combined dining/kitchen label. These are drawing-derived measurements, not RERA-filed room dimensions. RERA unit details
5. Parking & vehicle circulation
The GHMC permit identifies both cellar and stilt areas as approved for parking and states that they are to be used exclusively for vehicle parking, without partition walls or rolling shutters. The permit extraction lists the cellar as 574.32 m2 and stilt as 640.08 m2.
No sanctioned car- or two-wheeler-space count, visitor or accessible-parking provision, ramp or driveway details, EV charging provision, or unit-specific parking allocation is established by the supplied evidence. The RERA unit schedule marks the units as mortgaged, but does not provide an individual parking allocation. RERA unit table
6. Amenities, recreation & open spaces
| Description / size | 67.43 m2 |
|---|---|
| Evidence source | GHMC building-permit extraction |
| Declared progress / verified status | Permit requires it to be fenced and maintained as greenery before issue of the occupancy certificate; completion is not established. |
| Description / size | 2 RWHPs |
|---|---|
| Evidence source | GHMC building-permit extraction |
| Declared progress / verified status | Required by the permit; RERA amenity data reports water conservation/rainwater harvesting at 100%, but this is a portal-declared figure, not independent verification. RERA amenities |
| Description / size | 55 |
|---|---|
| Evidence source | GHMC building-permit extraction |
| Declared progress / verified status | Listed in the permit; planting/completion is not independently verified. |
| Description / size | Size not supplied |
|---|---|
| Evidence source | TG-RERA amenity data RERA amenities |
| Declared progress / verified status | Portal-declared 100%. |
| Description / size | Size/quantity not supplied |
|---|---|
| Evidence source | TG-RERA amenity data RERA amenities |
| Declared progress / verified status | Portal-declared 70%. |
| Description / size | No sizes supplied |
|---|---|
| Evidence source | Vendor-supplied listing, not a TG-RERA filing Promoter website |
| Declared progress / verified status | Marketing claims only; sanction, delivery and independent completion are not established by the supplied project records. |
7. Utilities, building services & safety
The building permit requires a rainwater-harvesting structure, transformer space, a garbage house and an ETP. It also requires compliance with the sanctioned plan and an occupancy certificate before occupation. The supplied records do not provide capacities, commissioning evidence or independent verification for these facilities.
TG-RERA amenity data reports water supply at 100% and water conservation/rainwater harvesting at 100%. It records sewerage, storm-water drains, treatment and disposal of sewage and sullage, solid-waste management, energy management, fire protection and fire-safety requirements, and electrical meter room/substation/receiving station at 0%. These are portal-declared progress fields, not independent certification. RERA amenities
No supplied evidence establishes water source or storage capacity, sewerage or storm-water system design, electrical supply or backup capacity, lift details, fire-system specifications, CCTV/security arrangements, waste-segregation arrangements or accessible circulation. RERA amenities Document index
8. Location, access & connectivity
The official project identity places the development in RAMANTHEPUR, revenue village Uppal, Uppal mandal, Medchal-Malkajgiri district, PIN 500013. The land record gives 30 FT ROAD as the eastern boundary. The building-permit extraction separately records its locality as “Nehru Nagar, R-pur”; no further road-access description is supplied here. RERA record RERA filing Land records
The supplied location data lists these distances: Sankaraya Eye Hospital 0.4 km, an unnamed park 0.4 km, ICICI Bank 1.7 km, ADP 1.6 km, Financial District (Nanakramguda) 2.0 km, Keystone International School 1.3 km, and Holy Mary College 2.4 km. The records do not provide measured public-transport connections or verified travel times. Location record
9. Developer & development status
The registered promoter is AMMA BHAVANI CONSTRUCTIONS, recorded as a partnership. The RERA record names GANDHAM NAGESWARA RAO and GANDHAM LAXMAMMA as partners and GANDHAM KRISHNA as authorized signatory. Its listed address is Sai Harsha Residency, Sri Laxmi Nagar, Ramanthepur, Uppal, Medchal-Malkajgiri, 500013. The supplied record does not establish a company registration identifier, official contact details or official website. RERA filing Parties record
The promoter’s Form B declaration states a completion undertaking of 01/01/2024 and declares the land free from encumbrances; the extracted title-basis clause is incomplete. These are promoter declarations. The project record gives 90% completeness, with no independent site verification supplied. RERA record The supplied registration certificate records no extension and runs to 01/01/2024.
10. Approvals, official records & documents
| Record | Supplied evidence |
|---|---|
| TG-RERA registration | Form C certificate for AMMA BHAVANI CONSTRUCTIONS, registration P02200000519, issued 22/03/2019, valid to 01/01/2024; certificate records no extension. |
| GHMC building permit | Building Permit Order 1/C2/00002/2018, file no. 1/HO/15985/2017, approved 01 January, 2018; building identified as BLDG (RAMEELA). |
| Layout / subdivision identifier | Permit extraction records RC NO.440/86. |
| RERA land and unit records | Survey numbers 38/23 and 38/24; land extent 1168 sqmts; RERA unit schedule records 25 2BHK units. Land records RERA unit table |
| Building-plan document | Document 30822 is listed as a building-floor-plan/layout-plan record, but its extracted content is not supplied. Drawing-derived unit measurements are associated with this document. Document index |
| Occupancy/completion record | No occupancy or completion certificate is supplied; the GHMC permit requires an occupancy certificate before occupation, and the permit extraction records completion certification as false. |
| Other project-specific records | RERA-filed encumbrance statement (document 34539); Form B declaration (document 34541); title reports listed as documents 34540 and 40218. Document index |
1. Project at a glance
Project identity
Registered project name: AMMA BHAVANI CONSTRUCTIONS
Project type: Residential apartment project
Phase / registered portion: Phase not separately identified in the supplied record; registration is for the project recorded under this name.
TG-RERA registration: P02200000519
Registration validity: Certificate states valid from 22/03/2019 to 01/01/2024; it records no extension. Registration validity is distinct from the stated completion date and from occupancy-certificate status.
Registered promoter: AMMA BHAVANI CONSTRUCTIONS, recorded as a partnership.
TG-RERA status: Recorded as On-Going Project.
Land and geographic identity
Locality: RAMANTHEPUR
Revenue village: Uppal
Mandal / district / PIN: Uppal / Medchal-Malkajgiri / 500013
Project survey numbers: 38/23 and 38/24; the RERA record also presents these together as 38/23&38/24.
Plot / premises identifier: RERA certificate records 3-8-109.
Registered site area: 1168 sqmts total and 1168.00 sqmts net area in the RERA land record. The GHMC building-permit extraction records 1168.8 m2.
Boundaries in RERA land record: East: 30 FT ROAD; West: PRINCETON COLLEGE; North: PRINCETON COLLEGE; South: POONAM BHAVAN FUNCTION HALL.
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC)
Principal building approval: Building Permit Order 1/C2/00002/2018, approved 01 January, 2018; file no. 1/HO/15985/2017.
Approved building: One residential building, Building - BLDG (RAMEELA).
Sanctioned floors and height: Cellar + Stilt + 5; sanctioned height 14.89 m.
Approved area figures: Residential area: 2,390.40 m2; cellar: 574.32 m2; stilt: 640.08 m2. These are the figures identified in the permit extraction; they are not carpet or saleable-area figures.
Approved versus RERA-declared units: The RERA land record lists 1 total building unit and 1 proposed building unit; the RERA unit schedule records 25 2BHK units. The supplied extracts do not explain the distinction between the building-unit field and the apartment-unit schedule.
Parking levels: Cellar and stilt are approved for parking; the permit says these areas are to be used exclusively for vehicle parking. A sanctioned space count is not provided in the supplied record.
Offering and status
RERA-filed configuration: 2BHK
RERA-filed saleable area: 106.83 sqm per unit
Booked / available: 0 booked / 25 available, as last read from the TG-RERA portal; the portal record supplied here does not state an as-of date, so counts are indicative.
Construction stage: RERA record states 90% completeness; this is a filed figure, not an independent site inspection.
Original / revised completion date: 01/01/2024 / 01/01/2024, as recorded in the project data.
Occupancy / completion certificate: The supplied building-permit extraction records completion_certified: false and requires an occupancy certificate before occupation. No project occupancy or completion certificate is supplied. The evidence does not establish the current certificate status beyond these records.
2. The project story
The TG-RERA record describes a residential apartment development registered as AMMA BHAVANI CONSTRUCTIONS, on survey numbers 38/23 and 38/24 in revenue village Uppal, Uppal mandal, Medchal-Malkajgiri district. The land record identifies the locality as RAMANTHEPUR and gives the site boundaries and area shown above.
The GHMC building-permit extraction describes one residential building, BLDG (RAMEELA), with a cellar, stilt and five upper floors. The RERA unit schedule records 25 2BHK apartments. The project record reports 90% completeness, while the completion date recorded by the promoter was 01/01/2024. The completeness figure is a RERA-recorded status, not an independently verified construction measurement.
The supplied documents do not establish that an occupancy or completion certificate has been issued. The building permit expressly requires an occupancy certificate before occupation; its extracted record marks completion certification as false.
3. Master plan, architecture & building design
The supplied GHMC permit identifies one residential building on a site recorded as 1168.8 m2, with a sanctioned configuration of Cellar + Stilt + 5 and a height of 14.89 m. It lists residential area as 2,390.40 m2, cellar area as 574.32 m2, and stilt area as 640.08 m2. These are separate permit figures; no FSI-counted area, gross built-up area, or apartment carpet-area total is supplied.
The permit extraction records a 67.43 m2 tot-lot, 2 RWHPs, 55 trees, space for a transformer, a garbage house and an ETP. The supplied material does not include enough drawing detail to describe flat distribution by floor, building footprint, lifts, stairs, internal circulation, landscaped-area layout or phase organization.
4. Homes, configurations & floor plans
TG-RERA records 25 2BHK units, all shown as available and none as booked in the portal data supplied; the booking figures have no stated as-of date. RERA-filed saleable area is 106.83 sqm.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 25 | 0 | 25 | 106.83 sqm | 65.0–72.1 sqm; median 67.2 sqm | 37% |
Carpet-area figures and loading are software-measured from the supplied floor-plan drawings, not RERA-filed measurements; the record notes that the drawing geometry needs review. The measured sample covers 8 2BHK flat designs. The RERA saleable area includes the home’s share of common areas and should not be read as carpet area. A balcony is shown in the extracted example plan, but a complete balcony or utility-area measurement is not supplied.
The example first-floor plan for flat 02 labels two bedrooms, a toilet, dining/kitchen and a balcony. The supplied extracted dimensions are 3.24 m × 3.55 m and 3.2 m × 5.16 m for the bedrooms; 1.5 m × 2.0 m for the toilet; and 6.55 m × 6.91 m for the combined dining/kitchen label. These are drawing-derived measurements, not RERA-filed room dimensions.
5. Parking & vehicle circulation
The GHMC permit identifies both cellar and stilt areas as approved for parking and states that they are to be used exclusively for vehicle parking, without partition walls or rolling shutters. The permit extraction lists the cellar as 574.32 m2 and stilt as 640.08 m2.
No sanctioned car- or two-wheeler-space count, visitor or accessible-parking provision, ramp or driveway details, EV charging provision, or unit-specific parking allocation is established by the supplied evidence. The RERA unit schedule marks the units as mortgaged, but does not provide an individual parking allocation.
6. Amenities, recreation & open spaces
| Description / size | 67.43 m2 |
|---|---|
| Evidence source | GHMC building-permit extraction |
| Declared progress / verified status | Permit requires it to be fenced and maintained as greenery before issue of the occupancy certificate; completion is not established. |
| Description / size | 2 RWHPs |
|---|---|
| Evidence source | GHMC building-permit extraction |
| Declared progress / verified status | Required by the permit; RERA amenity data reports water conservation/rainwater harvesting at 100%, but this is a portal-declared figure, not independent verification. |
| Description / size | 55 |
|---|---|
| Evidence source | GHMC building-permit extraction |
| Declared progress / verified status | Listed in the permit; planting/completion is not independently verified. |
| Description / size | Size not supplied |
|---|---|
| Evidence source | TG-RERA amenity data |
| Declared progress / verified status | Portal-declared 100%. |
| Description / size | Size/quantity not supplied |
|---|---|
| Evidence source | TG-RERA amenity data |
| Declared progress / verified status | Portal-declared 70%. |
| Description / size | No sizes supplied |
|---|---|
| Evidence source | Vendor-supplied listing, not a TG-RERA filing |
| Declared progress / verified status | Marketing claims only; sanction, delivery and independent completion are not established by the supplied project records. |
7. Utilities, building services & safety
The building permit requires a rainwater-harvesting structure, transformer space, a garbage house and an ETP. It also requires compliance with the sanctioned plan and an occupancy certificate before occupation. The supplied records do not provide capacities, commissioning evidence or independent verification for these facilities.
TG-RERA amenity data reports water supply at 100% and water conservation/rainwater harvesting at 100%. It records sewerage, storm-water drains, treatment and disposal of sewage and sullage, solid-waste management, energy management, fire protection and fire-safety requirements, and electrical meter room/substation/receiving station at 0%. These are portal-declared progress fields, not independent certification.
No supplied evidence establishes water source or storage capacity, sewerage or storm-water system design, electrical supply or backup capacity, lift details, fire-system specifications, CCTV/security arrangements, waste-segregation arrangements or accessible circulation.
8. Location, access & connectivity
The official project identity places the development in RAMANTHEPUR, revenue village Uppal, Uppal mandal, Medchal-Malkajgiri district, PIN 500013. The land record gives 30 FT ROAD as the eastern boundary. The building-permit extraction separately records its locality as “Nehru Nagar, R-pur”; no further road-access description is supplied here.
The supplied location data lists these distances: Sankaraya Eye Hospital 0.4 km, an unnamed park 0.4 km, ICICI Bank 1.7 km, ADP 1.6 km, Financial District (Nanakramguda) 2.0 km, Keystone International School 1.3 km, and Holy Mary College 2.4 km. The records do not provide measured public-transport connections or verified travel times.
9. Developer & development status
The registered promoter is AMMA BHAVANI CONSTRUCTIONS, recorded as a partnership. The RERA record names GANDHAM NAGESWARA RAO and GANDHAM LAXMAMMA as partners and GANDHAM KRISHNA as authorized signatory. Its listed address is Sai Harsha Residency, Sri Laxmi Nagar, Ramanthepur, Uppal, Medchal-Malkajgiri, 500013. The supplied record does not establish a company registration identifier, official contact details or official website.
The promoter’s Form B declaration states a completion undertaking of 01/01/2024 and declares the land free from encumbrances; the extracted title-basis clause is incomplete. These are promoter declarations. The project record gives 90% completeness, with no independent site verification supplied. The supplied registration certificate records no extension and runs to 01/01/2024.
10. Approvals, official records & documents
TG-RERA registration: Form C certificate for AMMA BHAVANI CONSTRUCTIONS, registration P02200000519, issued 22/03/2019, valid to 01/01/2024; certificate records no extension.
GHMC building permit: Building Permit Order 1/C2/00002/2018, file no. 1/HO/15985/2017, approved 01 January, 2018; building identified as BLDG (RAMEELA).
Layout / subdivision identifier: Permit extraction records RC NO.440/86.
RERA land and unit records: Survey numbers 38/23 and 38/24; land extent 1168 sqmts; RERA unit schedule records 25 2BHK units.
Building-plan document: Document 30822 is listed as a building-floor-plan/layout-plan record, but its extracted content is not supplied. Drawing-derived unit measurements are associated with this document.
Occupancy/completion record: No occupancy or completion certificate is supplied; the GHMC permit requires an occupancy certificate before occupation, and the permit extraction records completion certification as false.
Other project-specific records: RERA-filed encumbrance statement (document 34539); Form B declaration (document 34541); title reports listed as documents 34540 and 40218.
Frequently asked questions
Is AMMA BHAVANI CONSTRUCTIONS registered with Telangana RERA?
Yes. AMMA BHAVANI CONSTRUCTIONS is registered with the Telangana Real Estate Regulatory Authority as P02200000519; the registration status is On-Going Project.
Who is the developer of AMMA BHAVANI CONSTRUCTIONS?
The promoter named in the RERA registration is AMMA BHAVANI CONSTRUCTIONS.
Where is AMMA BHAVANI CONSTRUCTIONS located?
AMMA BHAVANI CONSTRUCTIONS is in RAMANTHEPUR, Uppal, Medchal-Malkajgiri, Telangana (500013).
When will AMMA BHAVANI CONSTRUCTIONS be completed?
The promoter's proposed date of completion filed with RERA is 01/01/2024. This is the promoter's declaration, not a guarantee.
More projects in Uppal