Ark Kushak is a residential apartment project in Uppal, Uppal Mandal, Medchal-Malkajgiri district, developed by registered promoter Ark Infra Developers Pvt Ltd. It is on a site recorded as 4499.98 sq. m. and comprises one building with 2 basements/cellars, 1 stilt and 10 upper floors. The project has 106 3BHK apartments, with a RERA-filed saleable area of 168.6 sq. m. per recorded 3BHK configuration. Its TG-RERA registration number is P02200009528, and the proposed completion date is 19 March 2030.

More from Ark Infra Developers Pvt Ltd · 6 projects →

01What we found

RegisteredTG-RERA - valid till 19 Mar 2030
25documents on file - each fact links to its page
2court cases on this project's land (survey 584, Uppal)
9items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

9 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemRecord
Registered project nameArk Kushak RERA record
Project typeResidential apartment project RERA record RERA filing
Phase / registered portionPhase not separately identified in the supplied record; one building is recorded RERA filing
TG-RERA registrationP02200009528 RERA record
Registration validity19 March 2025 to 19 March 2030; five years, subject to any extension by the Authority Approvals record
Registered promoterArk Infra Developers Pvt Ltd RERA record Corporate record
RERA statusRecorded as a new project registered with TG-RERA; registration validity is separate from the construction deadline and from the occupancy-certificate status RERA record Approvals record

Land and geographic identity

ItemRecord
LocalityOld Uppal / Uppal; the registered location is recorded as Uppal
Revenue villageUppal Khalsa in the building-permit documents; the RERA certificate records Uppal
MandalUppal RERA record
DistrictMedchal-Malkajgiri RERA record
PIN500039 RERA record RERA filing
Project survey number(s)Survey No. 584; no subdivision is stated in the supplied project identity or permit records Land records
Site extentBuilding-permit records state a plot area of 4499.98 sq. m., a road-affected area of 92.45 sq. m., and a net plot area of 4407.52 sq. m.
BoundariesEast: Survey of India; west: 40 feet road; north and south: neighbours’ property RERA filing

Development identity

ItemRecord
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC)
Principal building-permit number / date5030/GHMC/LBN/2025-BP, dated 19 March 2025 Approvals record
Approved built-up areaThe filed permit extraction gives multiple labelled areas: 17,598.91 sq. m. proposed built-up area excluding parking; 24,901.29 sq. m. including parking; and 25,758.09 sq. m. as “TOTAL BUA.” These are retained under their recorded labels, not treated as interchangeable measures.
Building count and configurationOne residential apartment building; 2 basements/cellars + 1 stilt + 10 upper floors RERA filing
Building height29.89 m in the permit parameters
Parking provisionBasements and stilt are approved for parking. The drawing extraction lists 7 cars proposed; the permit extraction also records parking areas, but no verified allocation of spaces to individual units is supplied.
Unit count106 units in the sanctioned-plan extraction and TG-RERA unit record RERA unit table

Offering and status

ItemRecord
RERA-filed configuration106 3BHK apartments RERA unit table RERA unit details
RERA-filed saleable area168.6 sq. m. per recorded 3BHK configuration RERA unit table RERA unit details
Booked / available26 booked; 80 available, as last read from the TG-RERA portal; the supplied record has no as-of date, so these counts are indicative RERA unit table RERA unit details
Construction stageNo independently verified site-progress assessment is supplied. The available registration and building-permit records establish registration and sanction, not the present construction stage. Approvals record
Completion deadlinePromoter’s Form B declaration and the building-permit extraction state 19 March 2030; the Form B also mentions a six-month grace period
Occupancy certificate (OC)The permit records say an OC is required before occupation. The permit extraction states that completion has not been certified; no OC is supplied in the reviewed documents.

2. The project story

Ark Kushak is registered as a residential apartment project on Survey No. 584 in Uppal Khalsa, Uppal Mandal, Medchal-Malkajgiri district. GHMC’s building-permit records describe one apartment building with two basement levels, a stilt level and ten upper floors. The sanctioned-plan extraction records 106 units, while the TG-RERA unit record identifies them as 3BHK apartments. RERA record Land records RERA unit table

The promoter’s declared completion date is 19 March 2030. The supplied evidence establishes a RERA registration and a GHMC building permit, but does not establish the current on-site construction progress or that any portion is complete or occupied. The permit requires an occupancy certificate before occupation; no such certificate is included in the supplied record.

3. Master plan, architecture & building design

The filed GHMC plan is for a single residential apartment building on a site recorded as 4499.98 sq. m., with 92.45 sq. m. identified as road-affected and a net plot area of 4407.52 sq. m. The permit extraction records a building height of 29.89 m and several distinct built-up-area figures: 17,598.91 sq. m. excluding parking, 24,901.29 sq. m. including parking, and 25,758.09 sq. m. labelled “TOTAL BUA.” These labels are reproduced as supplied; the record does not provide a basis here to reconcile them into one area measure.

The sanctioned configuration is two basements/cellars, one stilt and ten upper floors. The drawing extraction lists first- and second-floor plans and typical plans for floors 3, 5, 7 and 9, and floors 4, 6, 8 and 10. It also identifies a 7 m driveway and a 5 m driveway, as well as a vehicular ramp. The supplied material does not establish the number of apartments per floor, lift or stair counts, or a detailed internal circulation arrangement.

The filed plan and permit list a tot-lot, rainwater-harvesting provision, STP, water sump, garbage house and transformer space. The plan includes a requirement to maintain greenery along the site periphery. No independently verified completion status or measured area for these features is supplied.

4. Homes, configurations & floor plans

The TG-RERA unit record lists 106 3BHK apartments, with 26 booked and 80 available in the portal snapshot; the snapshot has no as-of date. The filed saleable area is 168.6 sq. m. RERA unit table RERA unit details

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
3BHK1062680168.6 sq. m.Software-measured median 103.7 sq. m.; range 77.2–136.8 sq. m.38%

The carpet figures are software measurements from the filed floor-plan drawing, not RERA-filed carpet-area disclosures. They cover 40 measured 3BHK designs, with five noted as needing review. A measured example drawing shows three bedrooms, a living/dining area, kitchen, toilets, a balcony and a utility area. The supplied example labels the balcony and utility as excluded from carpet area. RERA saleable area is a separate figure and includes the home’s share of common areas; it must not be read as carpet area. Verify drawing measurements against the underlying plan. Floor plans RERA unit details

5. Parking & vehicle circulation

The sanctioned material identifies the two cellar/basement levels and stilt as parking areas and states that these spaces are to be used exclusively for vehicle parking. The plan extraction lists 7 cars proposed; the permit extraction records 5,606.96 sq. m. of cellar parking area and 1,695.42 sq. m. of stilt parking area. These are plan-recorded figures, not confirmation of delivered parking or unit-specific allocations.

The plan extraction records 7 m and 5 m driveways and a vehicular ramp, and the permit requires an entry and exit with a minimum width of 4.5 m and height clearance of 5 m. No resident-versus-visitor breakdown, accessible-space count, EV charger quantity, or legally documented parking allocation by apartment is supplied. GHMC’s permit conditions require EV charging infrastructure in building parking areas.

6. Amenities, recreation & open spaces

The following items are identified in the RERA-filed plan or the TG-RERA amenities record. The record marks the listed amenities as available/provided in the project schedule, but reports 0% progress for each; it does not independently establish completion. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Tot-lot / green stripTot-lot identified; no size suppliedRERA amenitiesRERA amenities record: 0%; completion not independently verified
GymListed in the filed plan extraction; no size suppliedNo progress or completion evidence supplied
Indoor gamesListed in the filed plan extraction; no size suppliedNo progress or completion evidence supplied
LibraryListed in the filed plan extraction; no size suppliedNo progress or completion evidence supplied
Multipurpose hallListed in the filed plan extraction; no size suppliedNo progress or completion evidence supplied
Community buildingsTG-RERA amenities schedule lists community buildings; no specification suppliedRERA amenitiesRERA amenities record: 0%; completion not independently verified
Internal roads and footpathsListed in the TG-RERA amenities schedule; no dimensions suppliedRERA amenitiesRERA amenities record: 0%; completion not independently verified
Street lightingListed in the TG-RERA amenities schedule; no specification suppliedRERA amenitiesRERA amenities record: 0%; completion not independently verified
Aggregate recreational open spaceListed in the TG-RERA amenities schedule; area not suppliedRERA amenitiesRERA amenities record: 0%; completion not independently verified

7. Utilities, building services & safety

The project records identify water supply, a water sump, a sewage treatment plant, storm-water drainage, rainwater harvesting/percolation pits, a garbage house, transformer space and a generator. The permit conditions require a storm-water drain connected to the nearest drain, and construction of the STP and water sump. The supplied record does not state the STP capacity, water-sump capacity in the relevant permit extraction, water source, or generator capacity. RERA amenities

The plan extraction specifies separate underground and terrace water tanks of 25,000 litres each and calls for dual piping for non-potable uses in buildings over 10,000 sq. m. and group housing buildings with 100 units or more. It also lists emergency lighting in common passages and staircases, fire-fighting installations, hose reels/downcomers, and an automatic sprinkler system where basement area exceeds 200 sq. m. These are plan conditions or listed provisions, not evidence of installed or commissioned systems.

GHMC’s permit makes an occupancy fire NOC a prerequisite before an OC and includes fire-safety, electrical-safety and construction-worker-safety conditions. The supplied record does not establish that these conditions have been completed or that an OC has been issued. No lift count or capacity, CCTV/security specification, accessible-unit details, or accessible-circulation plan is supplied.

8. Location, access & connectivity

The registered project location is Uppal, in Uppal Mandal, Medchal-Malkajgiri district, PIN 500039; the building-permit documents identify Uppal Khalsa village and Old Uppal locality. The permit references an 18 m road width and the filed plan extraction records a 15.00 m existing road and an 18.00 m proposed road. It also records 7 m and 5 m driveways. RERA record

The supplied location data gives the Financial District (Nanakramguda) as 2.0 km from a cadastral parcel-centroid reference. It does not provide verified distances to public transport, schools, hospitals or other local services. Location record

9. Developer & development status

The registered promoter is Ark Infra Developers Pvt Ltd, a private limited company. The corporate record gives GSTIN 36AAICA3369H1ZJ. The promoter’s listed address is SLN Terminus, Beside Botancial Garden, Uppal Khalsa Village, Uppal, Uppal, Medchal-Malkajgiri, 500039; no official contact details are supplied here. Corporate record RERA filing

The promoter’s Form B declaration states a completion undertaking of 19 March 2030 and mentions a six-month grace period. The RERA registration itself is valid to 19 March 2030 unless extended by the Authority. These dates describe different matters: the declared project completion timeline and the registration validity. The supplied evidence does not establish present construction progress.

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP02200009528; valid 19 March 2025–19 March 2030
What the supplied record establishesForm C certificate for Ark Kushak and Ark Infra Developers Pvt Ltd
GHMC building permit
Identifier / date5030/GHMC/LBN/2025-BP; 19 March 2025
What the supplied record establishesPermit for a residential apartment building on Survey No. 584, with two basements, stilt and ten upper floors; the permit states that it does not confer ownership rights
Filed plan / approval-plan material
Identifier / dateLTP licence numbers CA/1999/25227 and TS/043681/2024
What the supplied record establishesPlan extraction includes building configuration, site and built-up-area figures, parking and listed facilities
Promoter Form B declaration
Identifier / dateDated 20 March 2025 as extracted
What the supplied record establishesPromoter declaration concerning title basis, project funds, approvals and completion timeline
Occupancy/completion certificate
Identifier / dateNot supplied
What the supplied record establishesPermit conditions require an OC before occupation; the permit extraction records completion as not certified

The supplied project records do not include an occupancy certificate or independent evidence of construction completion. The building permit and plan materials are the principal sanctioned-development documents identified for this overview.

Frequently asked questions

Is Ark Kushak registered with Telangana RERA?

Yes. Ark Kushak is registered with the Telangana Real Estate Regulatory Authority as P02200009528; the registration status is New Project.

Who is the developer of Ark Kushak?

The promoter named in the RERA registration is Ark Infra Developers Pvt Ltd.

Where is Ark Kushak located?

Ark Kushak is in Uppal, Medchal-Malkajgiri, Telangana (500039).

When will Ark Kushak be completed?

The promoter's proposed date of completion filed with RERA is 19/07/2030. This is the promoter's declaration, not a guarantee.