Spring Is In The Air
ALLIANCE INN (INDIA) PRIVATE LIMITED · Sangareddy · RERA P01100002200
SPRING IS IN THE AIR is a residential apartment / group-housing project in Vani Nagar, Ameenpur mandal, Sangareddy district, developed by registered promoter Alliance Inn (India) Private Limited. The TG-RERA land area is 22916.42 sqmts, and the project comprises three residential towers and one clubhouse building: Tower A has 1 Cellar + 1 Stilt + 10 Upper Floors, Towers B and C each have 1 Stilt + 10 Upper Floors, and the Club House has Ground + 3 upper floors. The TG-RERA unit record lists 57 homes: 10 1BHK, 36 2BHK and 11 3BHK. Its TG-RERA registration is P01100002200, and the proposed completion deadline is 31/10/2023.
More from Alliance Inn India Pvt Ltd · 5 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
9 items to check before you pay, 6 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Evidence-backed record |
|---|---|
| Registered project name | SPRING IS IN THE AIR RERA record |
| Project type | Residential apartment / group-housing project RERA record |
| Phase or registered portion | A phase-specific description is not stated in the supplied registration record. The building-permit documents describe three residential towers and a clubhouse. |
| TG-RERA registration | P01100002200 RERA record |
| Registration validity | The certificate states validity from 30/10/2020 through 31/10/2023; no extension is recorded on that certificate. This is registration validity, not a current occupancy certificate. |
| Registered promoter | Alliance Inn (India) Private Limited RERA record |
| RERA status in supplied record | Registered project; the supplied certificate’s validity period has ended. The supplied materials do not establish a later extension or current registration status. |
Land and geographic identity
| Field | Evidence-backed record |
|---|---|
| Locality | Vani Nagar in the RERA project identity; the approval documents describe the site as Ameenapur/Ameenpur. RERA record RERA filing |
| Revenue village | Ameenpur Village in the title and approval documents. |
| Mandal | Ameenpur; the HMDA approval extraction says “Ameenpur Muncipality Mandal.” RERA record |
| District | Sangareddy (also rendered “Sanga Reddy” in an approval). RERA record |
| PIN | 502032 RERA record |
| Project survey numbers and subdivisions | 178/P, 179/P, 180/P and 181/P in the RERA identity and HMDA technical approval; the municipality permit records 178/Part, 179/part, 180/part and 181/ part. The title reports refer to Sy. Nos. 178, 179, 180 and 181 in Ameenpur Village. RERA record |
| Site extent | 22,916.42 Sq. Mt. in the HMDA technical approval; the municipality building-permit extraction states 22,916.24 Sq.Mts. |
| RERA land area | Total area and net area are each stated as 22916.42 sqmts; affected area for road widening/FTL/nala widening is stated as 0. RERA filing |
| Boundaries filed with TG-RERA | East: NEIGHBOURS LAND; West: DEVELOPER LAND; North: DEVELOPER LAND; South: NEIGHBOURS LAND. RERA filing |
Development identity
| Field | Evidence-backed record |
|---|---|
| Principal sanctioning authority | Hyderabad Metropolitan Development Authority (HMDA), technical approval 031313/SKP/R1/U6/HMDA/03122019, dated 15/09/2020. Approvals record |
| Building permit | Ameenpur Municipality permit 689/2020-2021; application 337/2020-2021. Approvals record |
| Approved built-up area | 78257.21 in the RERA project fields and HMDA technical-approval extraction. The municipality permit separately states total built-up area 64934.38. RERA filing |
| Building count | Three residential towers and one clubhouse building in the building-permit extraction; the RERA land-details record lists 4 total and proposed building units. RERA filing |
| Sanctioned floor configuration | Tower A: 1 Cellar + 1 Stilt + 10 Upper Floors; Tower B: 1 stilt + 10 Upper Floors; Tower C: 1 Stilt + 10 Upper Floors; Club House: Ground + 3 upper floors. |
| Parking levels | Cellar/stilt areas are identified in the permit, and the approval conditions require cellar/stilt areas approved for parking to be used exclusively for vehicle parking. Parking-space counts and allocations are not supplied. |
| Unit counts | TG-RERA’s unit record lists 57 homes: 10 1BHK, 36 2BHK and 11 3BHK; it separately lists 4 “AMENITIES” entries, which are not homes for sale. The approval document does not provide an approved total apartment count in the extracted material. RERA unit table RERA unit table |
Offering and status
| Field | Evidence-backed record |
|---|---|
| RERA-filed home configurations | 1BHK, 2BHK and 3BHK. RERA unit table |
| RERA-filed saleable-area entries | 1BHK: 95.8; 2BHK: 1276.58; 3BHK: 2105.24 (the supplied unit record labels these values in square metres). RERA unit table |
| Booked / available counts | Portal-derived unit record: 0 booked and 10 available 1BHK; 0 booked and 36 available 2BHK; 0 booked and 11 available 3BHK. These figures have no supplied as-of date and should be treated as indicative. RERA unit table |
| Construction stage | No current construction-progress percentage or independently verified site-stage report is supplied. Document index Approvals record |
| Completion dates | The RERA registration certificate and Form B declaration state 31/10/2023 as the completion deadline. The municipality permit extraction states construction should be completed before 25.09.2026. These are documentary dates, not evidence of actual completion. |
| Occupancy / completion certificate | No occupancy or completion certificate is supplied. The HMDA technical approval says an Occupancy Certificate is compulsory before occupation. |
2. The project story
SPRING IS IN THE AIR is registered as a residential apartment project on the Ameenpur Village land identified in the RERA record as Survey Nos. 178/P, 179/P, 180/P and 181/P. The title and approval documents also identify the land as Sy. Nos. 178–181 in Ameenpur Village. The filed site identity places it in Vani Nagar, Ameenpur mandal, Sangareddy district, PIN 502032. RERA record RERA filing
The municipal building-permit extraction describes three residential towers and a clubhouse. It specifies cellar-and-stilt parking in Tower A and stilt parking in Towers B and C, with 10 upper floors in each tower; the clubhouse is Ground + 3 upper floors. The TG-RERA unit record lists 57 homes across 1BHK, 2BHK and 3BHK configurations. It also contains four “AMENITIES” entries, which are not sale homes. RERA unit table RERA unit table
The project’s completion deadline is recorded as 31/10/2023 in its RERA certificate and Form B declaration; the municipality permit extraction gives a separate completion date of 25.09.2026. Neither date establishes actual completion. No current progress report, site inspection finding, or occupancy/completion certificate is included in the supplied evidence.
3. Master plan, architecture & building design
The filed land area is 22916.42 sqmts, with the same figure recorded as total and net area. The HMDA technical-approval extraction describes a 22,916.42 Sq. Mt. site, while the municipality building-permit extraction states 22,916.24 Sq.Mts. The RERA fields record approved built-up area as 78257.21; the HMDA extraction gives total built-up area 78257.21, while the municipality permit extraction states 64934.38. RERA filing RERA filing
The municipality permit identifies four buildings: Tower A, Tower B, Tower C and the clubhouse. Tower A is recorded as 1 Cellar + 1 Stilt + 10 Upper Floors; Towers B and C each have 1 Stilt + 10 Upper Floors; the clubhouse is Ground + 3 upper floors. The supplied approval extraction gives the following building-specific heights: clubhouse 14.4, and Towers A, B and C each 29.5; units are not specified in the extracted record.
The approval material names a clubhouse, tot-lot, refuse chute, transformer, garbage house, rainwater-harvesting structure and STP among proposed or required site features. It also refers to internal services, storm-water disposal and sewerage. No supplied architectural drawings were measurable: the floor-plan record states 7 drawings, 0 measured and 7 scans pending. Accordingly, no drawing-based description of footprints, flats per floor, lift/stair arrangements, internal circulation, landscape area or room layout can be confirmed from the available evidence. Floor plans
4. Homes, configurations & floor plans
The following unit counts, booking figures and saleable-area entries are from the supplied TG-RERA unit record. No carpet-area measurements are available: all seven floor-plan scans remain pending measurement. RERA unit table RERA unit table Floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 1BHK | 10 | 0 | 10 | 95.8 | Not measured | Not supplied |
| 2BHK | 36 | 0 | 36 | 1276.58 | Not measured | Not supplied |
| 3BHK | 11 | 0 | 11 | 2105.24 | Not measured | Not supplied |
The supplied unit record labels the saleable-area figures in square metres. The floor-plan record explains that carpet area would be measured from drawing geometry and is distinct from RERA saleable area, which includes the home’s share of common areas; however, no such drawing measurements are available for this review. Booked and available counts have no supplied as-of date and are therefore indicative. RERA unit table Floor plans
5. Parking & vehicle circulation
The approvals identify a cellar in Tower A and stilt floors in Towers A, B and C. The HMDA technical approval states that cellar and stilt areas approved for parking are to be used exclusively for vehicle parking; the municipality permit likewise says cellar/stilt areas should be used for vehicle parking without partition walls or rolling shutters.
No approved parking-space count, resident/visitor/accessible-space breakdown, parking allocation schedule, ramp or driveway plan, or EV-charging provision is supplied. A parking bay’s presence in a plan would not by itself establish exclusive ownership or allotment.
6. Amenities, recreation & open spaces
The amenities record shows 14 categories marked available in the RERA filing; all have a supplied progress value of 0. That is not evidence that the facilities are complete. The approval documents identify several specific amenities or site requirements. RERA amenities
| Description / size | One clubhouse building; Ground + 3 upper floors. |
|---|---|
| Declared progress / verified status | In building-permit extraction; no completion evidence supplied. |
| Description / size | RERA amenities record lists “Green Strip/TOT LOT/Park”; permit says the tot-lot is to be fenced and maintained as greenery. No size supplied. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA-listed; permit condition; completion not verified. |
| Description / size | Listed in the RERA amenities record; no dimensions supplied. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | Declared available; progress recorded as 0. |
| Description / size | Listed in the RERA amenities record. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | Declared available; progress recorded as 0. |
| Description / size | Listed in the RERA amenities record; the clubhouse is identified in the permit. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA-listed / permit-described; completion not verified. |
| Description / size | Named in the HMDA and municipality approval material. |
|---|---|
| Declared progress / verified status | Approval condition; completion not verified. |
| Description / size | Garbage house is specified in the permit; solid-waste management and disposal are listed in RERA amenities. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | Permit/RERA-listed; completion not verified. |
| Description / size | Promoter-site descriptions; no supplied size or capacity. |
|---|---|
| Evidence source | Promoter website |
| Declared progress / verified status | Promoter-marketed; not established as sanctioned or delivered by the supplied evidence. |
7. Utilities, building services & safety
| Evidence in supplied record | RERA amenities list water supply. The HMDA approval directs the applicant to approach HMWS & SB for bulk supply. |
|---|---|
| Status limitation | Listed / required; no source, storage or capacity is supplied. RERA amenities |
| Evidence in supplied record | RERA amenities list sewerage, storm-water drains, sewage/sullage treatment and disposal. HMDA approval refers to STP, sewerage and storm-water provisions; the municipality permit extraction also names rainwater harvesting. |
|---|---|
| Status limitation | Listed / approval-described; no capacities, drawings or completion evidence supplied. RERA amenities |
| Evidence in supplied record | Approval material calls for rainwater-harvesting structures and storm-water provisions; the municipality permit names a percolation pit. |
|---|---|
| Status limitation | Required / proposed in the approval record; completion not verified. |
| Evidence in supplied record | RERA amenities list electrical meter room/sub-station/receiving station; approval material requires a transformer space and names a transformer. |
|---|---|
| Status limitation | Listed / required; no supply capacity or backup provision supplied. RERA amenities |
| Evidence in supplied record | Approval material names a refuse chute and garbage house; RERA amenities list solid-waste management and disposal. |
|---|---|
| Status limitation | Listed / required; operational status not verified. RERA amenities |
| Evidence in supplied record | RERA amenities list fire protection and fire-safety requirements. HMDA approval refers to following conditions in the Fire Service NOC. |
|---|---|
| Status limitation | No fire-system details, clearance document or completion evidence supplied. RERA amenities |
| Evidence in supplied record | No lift count/capacity, accessible-circulation details, CCTV or access-control details supplied. |
|---|---|
| Status limitation | Not established in the supplied evidence. |
8. Location, access & connectivity
The project’s RERA identity records Vani Nagar, Ameenpur mandal, Sangareddy district, PIN 502032; the title and approval documents identify the site in Ameenpur Village. RERA record
The municipality permit records road widths of 18 mt. road widths and 4.5mts.; the HMDA technical approval refers to 18 mt. A gift deed for an approach-road area of 897.20 Sq.mtrs is recorded in the approval extraction as document 22557/2020, in favour of the Commissioner of Ameenapur Municipality.
The supplied location record gives a cadastral parcel-centroid coordinate of 17.41528, 78.35459. It lists Financial District (Nanakramguda) at 1.2 km. This is a supplied distance record; no travel time or route is provided. Location record
9. Developer & development status
The registered legal promoter is ALLIANCE INN (INDIA) PRIVATE LIMITED, a company. The RERA registration certificate gives a promoter office at Village: Madhapur, Mandal: Serilingampally, District: Ranga Reddy, Pin: 500081. The project filing separately lists the promoter address as PLOT 68 & 69, 1st FLOOR, JUBILEE HEIGHTS, JUBILEE ENCLAVE, VANI NAGAR, AMEENPUR, Sangareddy, 502032. Corporate record RERA filing
The project Form B affidavit is dated 22° day of September, 2020, is made by SUNIL BOMMI REDDY as director, and declares a completion deadline of 31" October, 2023. The supplied evidence does not provide current construction progress or independent site verification.
10. Approvals, official records & documents
| What the supplied document establishes | Form C certificate for SPRING IS IN THE AIR, registration P01100002200, issued 30/10/2020, valid through 31/10/2023; no extension is recorded on the certificate. |
|---|
| What the supplied document establishes | Technical Approval No. 031313/SKP/R1/U6/HMDA/03122019, dated 15/09/2020, for the group-housing project on the listed survey land; includes building descriptions and conditions. |
|---|
| What the supplied document establishes | Permit 689/2020-2021, application 337/2020-2021; describes three towers and a clubhouse, floor configurations and permit conditions. |
|---|
| What the supplied document establishes | Promoter affidavit/declaration by director SUNIL BOMMI REDDY, dated 22° day of September, 2020, including the promoter’s title and encumbrance declarations and completion undertaking. |
|---|
| What the supplied document establishes | Title-report materials concerning Sy. Nos. 178–181 in Ameenpur Village. |
|---|
| What the supplied document establishes | Project-filed encumbrance records. The supplied extracts do not establish a current search result. |
|---|
| What the supplied document establishes | Seven drawings are recorded; none has been measured because all seven are scans pending review. |
|---|---|
| Reference | Floor plans |
The supplied record does not include an occupancy/completion certificate or a current construction-progress assessment. The approval document states that an Occupancy Certificate is compulsory before occupation.
1. Project at a glance
Project identity
Registered project name: SPRING IS IN THE AIR
Project type: Residential apartment / group-housing project
Phase or registered portion: A phase-specific description is not stated in the supplied registration record. The building-permit documents describe three residential towers and a clubhouse.
TG-RERA registration: P01100002200
Registration validity: The certificate states validity from 30/10/2020 through 31/10/2023; no extension is recorded on that certificate. This is registration validity, not a current occupancy certificate.
Registered promoter: Alliance Inn (India) Private Limited
RERA status in supplied record: Registered project; the supplied certificate’s validity period has ended. The supplied materials do not establish a later extension or current registration status.
Land and geographic identity
Locality: Vani Nagar in the RERA project identity; the approval documents describe the site as Ameenapur/Ameenpur.
Revenue village: Ameenpur Village in the title and approval documents.
Mandal: Ameenpur; the HMDA approval extraction says “Ameenpur Muncipality Mandal.”
District: Sangareddy (also rendered “Sanga Reddy” in an approval).
PIN: 502032
Project survey numbers and subdivisions: 178/P, 179/P, 180/P and 181/P in the RERA identity and HMDA technical approval; the municipality permit records 178/Part, 179/part, 180/part and 181/ part. The title reports refer to Sy. Nos. 178, 179, 180 and 181 in Ameenpur Village.
Site extent: 22,916.42 Sq. Mt. in the HMDA technical approval; the municipality building-permit extraction states 22,916.24 Sq.Mts.
RERA land area: Total area and net area are each stated as 22916.42 sqmts; affected area for road widening/FTL/nala widening is stated as 0.
Boundaries filed with TG-RERA: East: NEIGHBOURS LAND; West: DEVELOPER LAND; North: DEVELOPER LAND; South: NEIGHBOURS LAND.
Development identity
Principal sanctioning authority: Hyderabad Metropolitan Development Authority (HMDA), technical approval 031313/SKP/R1/U6/HMDA/03122019, dated 15/09/2020.
Building permit: Ameenpur Municipality permit 689/2020-2021; application 337/2020-2021.
Approved built-up area: 78257.21 in the RERA project fields and HMDA technical-approval extraction. The municipality permit separately states total built-up area 64934.38.
Building count: Three residential towers and one clubhouse building in the building-permit extraction; the RERA land-details record lists 4 total and proposed building units.
Sanctioned floor configuration: Tower A: 1 Cellar + 1 Stilt + 10 Upper Floors; Tower B: 1 stilt + 10 Upper Floors; Tower C: 1 Stilt + 10 Upper Floors; Club House: Ground + 3 upper floors.
Parking levels: Cellar/stilt areas are identified in the permit, and the approval conditions require cellar/stilt areas approved for parking to be used exclusively for vehicle parking. Parking-space counts and allocations are not supplied.
Unit counts: TG-RERA’s unit record lists 57 homes: 10 1BHK, 36 2BHK and 11 3BHK; it separately lists 4 “AMENITIES” entries, which are not homes for sale. The approval document does not provide an approved total apartment count in the extracted material.
Offering and status
RERA-filed home configurations: 1BHK, 2BHK and 3BHK.
RERA-filed saleable-area entries: 1BHK: 95.8; 2BHK: 1276.58; 3BHK: 2105.24 (the supplied unit record labels these values in square metres).
Booked / available counts: Portal-derived unit record: 0 booked and 10 available 1BHK; 0 booked and 36 available 2BHK; 0 booked and 11 available 3BHK. These figures have no supplied as-of date and should be treated as indicative.
Construction stage: No current construction-progress percentage or independently verified site-stage report is supplied.
Completion dates: The RERA registration certificate and Form B declaration state 31/10/2023 as the completion deadline. The municipality permit extraction states construction should be completed before 25.09.2026. These are documentary dates, not evidence of actual completion.
Occupancy / completion certificate: No occupancy or completion certificate is supplied. The HMDA technical approval says an Occupancy Certificate is compulsory before occupation.
2. The project story
SPRING IS IN THE AIR is registered as a residential apartment project on the Ameenpur Village land identified in the RERA record as Survey Nos. 178/P, 179/P, 180/P and 181/P. The title and approval documents also identify the land as Sy. Nos. 178–181 in Ameenpur Village. The filed site identity places it in Vani Nagar, Ameenpur mandal, Sangareddy district, PIN 502032.
The municipal building-permit extraction describes three residential towers and a clubhouse. It specifies cellar-and-stilt parking in Tower A and stilt parking in Towers B and C, with 10 upper floors in each tower; the clubhouse is Ground + 3 upper floors. The TG-RERA unit record lists 57 homes across 1BHK, 2BHK and 3BHK configurations. It also contains four “AMENITIES” entries, which are not sale homes.
The project’s completion deadline is recorded as 31/10/2023 in its RERA certificate and Form B declaration; the municipality permit extraction gives a separate completion date of 25.09.2026. Neither date establishes actual completion. No current progress report, site inspection finding, or occupancy/completion certificate is included in the supplied evidence.
3. Master plan, architecture & building design
The filed land area is 22916.42 sqmts, with the same figure recorded as total and net area. The HMDA technical-approval extraction describes a 22,916.42 Sq. Mt. site, while the municipality building-permit extraction states 22,916.24 Sq.Mts. The RERA fields record approved built-up area as 78257.21; the HMDA extraction gives total built-up area 78257.21, while the municipality permit extraction states 64934.38.
The municipality permit identifies four buildings: Tower A, Tower B, Tower C and the clubhouse. Tower A is recorded as 1 Cellar + 1 Stilt + 10 Upper Floors; Towers B and C each have 1 Stilt + 10 Upper Floors; the clubhouse is Ground + 3 upper floors. The supplied approval extraction gives the following building-specific heights: clubhouse 14.4, and Towers A, B and C each 29.5; units are not specified in the extracted record.
The approval material names a clubhouse, tot-lot, refuse chute, transformer, garbage house, rainwater-harvesting structure and STP among proposed or required site features. It also refers to internal services, storm-water disposal and sewerage. No supplied architectural drawings were measurable: the floor-plan record states 7 drawings, 0 measured and 7 scans pending. Accordingly, no drawing-based description of footprints, flats per floor, lift/stair arrangements, internal circulation, landscape area or room layout can be confirmed from the available evidence.
4. Homes, configurations & floor plans
The following unit counts, booking figures and saleable-area entries are from the supplied TG-RERA unit record. No carpet-area measurements are available: all seven floor-plan scans remain pending measurement.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 1BHK | 10 | 0 | 10 | 95.8 | Not measured | Not supplied |
| 2BHK | 36 | 0 | 36 | 1276.58 | Not measured | Not supplied |
| 3BHK | 11 | 0 | 11 | 2105.24 | Not measured | Not supplied |
The supplied unit record labels the saleable-area figures in square metres. The floor-plan record explains that carpet area would be measured from drawing geometry and is distinct from RERA saleable area, which includes the home’s share of common areas; however, no such drawing measurements are available for this review. Booked and available counts have no supplied as-of date and are therefore indicative.
5. Parking & vehicle circulation
The approvals identify a cellar in Tower A and stilt floors in Towers A, B and C. The HMDA technical approval states that cellar and stilt areas approved for parking are to be used exclusively for vehicle parking; the municipality permit likewise says cellar/stilt areas should be used for vehicle parking without partition walls or rolling shutters.
No approved parking-space count, resident/visitor/accessible-space breakdown, parking allocation schedule, ramp or driveway plan, or EV-charging provision is supplied. A parking bay’s presence in a plan would not by itself establish exclusive ownership or allotment.
6. Amenities, recreation & open spaces
The amenities record shows 14 categories marked available in the RERA filing; all have a supplied progress value of 0. That is not evidence that the facilities are complete. The approval documents identify several specific amenities or site requirements.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Clubhouse | One clubhouse building; Ground + 3 upper floors. | In building-permit extraction; no completion evidence supplied. | |
| Tot-lot / green strip | RERA amenities record lists “Green Strip/TOT LOT/Park”; permit says the tot-lot is to be fenced and maintained as greenery. No size supplied. | RERA-listed; permit condition; completion not verified. | |
| Internal roads and footpaths | Listed in the RERA amenities record; no dimensions supplied. | Declared available; progress recorded as 0. | |
| Street lighting | Listed in the RERA amenities record. | Declared available; progress recorded as 0. | |
| Community buildings | Listed in the RERA amenities record; the clubhouse is identified in the permit. | RERA-listed / permit-described; completion not verified. | |
| Refuse chute | Named in the HMDA and municipality approval material. | Approval condition; completion not verified. | |
| Garbage house / solid-waste management | Garbage house is specified in the permit; solid-waste management and disposal are listed in RERA amenities. | Permit/RERA-listed; completion not verified. | |
| Park by the lake; “Urbanrise Genius - Children learning hub” | Promoter-site descriptions; no supplied size or capacity. | Promoter-marketed; not established as sanctioned or delivered by the supplied evidence. |
7. Utilities, building services & safety
| Evidence in supplied record | RERA amenities list water supply. The HMDA approval directs the applicant to approach HMWS & SB for bulk supply. |
|---|---|
| Status limitation | Listed / required; no source, storage or capacity is supplied. |
| Evidence in supplied record | RERA amenities list sewerage, storm-water drains, sewage/sullage treatment and disposal. HMDA approval refers to STP, sewerage and storm-water provisions; the municipality permit extraction also names rainwater harvesting. |
|---|---|
| Status limitation | Listed / approval-described; no capacities, drawings or completion evidence supplied. |
| Evidence in supplied record | Approval material calls for rainwater-harvesting structures and storm-water provisions; the municipality permit names a percolation pit. |
|---|---|
| Status limitation | Required / proposed in the approval record; completion not verified. |
| Evidence in supplied record | RERA amenities list electrical meter room/sub-station/receiving station; approval material requires a transformer space and names a transformer. |
|---|---|
| Status limitation | Listed / required; no supply capacity or backup provision supplied. |
| Evidence in supplied record | Approval material names a refuse chute and garbage house; RERA amenities list solid-waste management and disposal. |
|---|---|
| Status limitation | Listed / required; operational status not verified. |
| Evidence in supplied record | RERA amenities list fire protection and fire-safety requirements. HMDA approval refers to following conditions in the Fire Service NOC. |
|---|---|
| Status limitation | No fire-system details, clearance document or completion evidence supplied. |
| Evidence in supplied record | No lift count/capacity, accessible-circulation details, CCTV or access-control details supplied. |
|---|---|
| Status limitation | Not established in the supplied evidence. |
8. Location, access & connectivity
The project’s RERA identity records Vani Nagar, Ameenpur mandal, Sangareddy district, PIN 502032; the title and approval documents identify the site in Ameenpur Village.
The municipality permit records road widths of 18 mt. road widths and 4.5mts.; the HMDA technical approval refers to 18 mt. A gift deed for an approach-road area of 897.20 Sq.mtrs is recorded in the approval extraction as document 22557/2020, in favour of the Commissioner of Ameenapur Municipality.
The supplied location record gives a cadastral parcel-centroid coordinate of 17.41528, 78.35459. It lists Financial District (Nanakramguda) at 1.2 km. This is a supplied distance record; no travel time or route is provided.
9. Developer & development status
The registered legal promoter is ALLIANCE INN (INDIA) PRIVATE LIMITED, a company. The RERA registration certificate gives a promoter office at Village: Madhapur, Mandal: Serilingampally, District: Ranga Reddy, Pin: 500081. The project filing separately lists the promoter address as PLOT 68 & 69, 1st FLOOR, JUBILEE HEIGHTS, JUBILEE ENCLAVE, VANI NAGAR, AMEENPUR, Sangareddy, 502032.
The project Form B affidavit is dated 22° day of September, 2020, is made by SUNIL BOMMI REDDY as director, and declares a completion deadline of 31" October, 2023. The supplied evidence does not provide current construction progress or independent site verification.
10. Approvals, official records & documents
| What the supplied document establishes | Form C certificate for SPRING IS IN THE AIR, registration P01100002200, issued 30/10/2020, valid through 31/10/2023; no extension is recorded on the certificate. |
|---|
| What the supplied document establishes | Technical Approval No. 031313/SKP/R1/U6/HMDA/03122019, dated 15/09/2020, for the group-housing project on the listed survey land; includes building descriptions and conditions. |
|---|
| What the supplied document establishes | Permit 689/2020-2021, application 337/2020-2021; describes three towers and a clubhouse, floor configurations and permit conditions. |
|---|
| What the supplied document establishes | Promoter affidavit/declaration by director SUNIL BOMMI REDDY, dated 22° day of September, 2020, including the promoter’s title and encumbrance declarations and completion undertaking. |
|---|
| What the supplied document establishes | Title-report materials concerning Sy. Nos. 178–181 in Ameenpur Village. |
|---|
| What the supplied document establishes | Project-filed encumbrance records. The supplied extracts do not establish a current search result. |
|---|
| What the supplied document establishes | Seven drawings are recorded; none has been measured because all seven are scans pending review. |
|---|
The supplied record does not include an occupancy/completion certificate or a current construction-progress assessment. The approval document states that an Occupancy Certificate is compulsory before occupation.
Other registrations of Spring Is In The Air
Frequently asked questions
Is SPRING IS IN THE AIR registered with Telangana RERA?
Yes. SPRING IS IN THE AIR is registered with the Telangana Real Estate Regulatory Authority as P01100002200; the registration status is New Project.
Who is the developer of SPRING IS IN THE AIR?
The promoter named in the RERA registration is ALLIANCE INN (INDIA) PRIVATE LIMITED.
Where is SPRING IS IN THE AIR located?
SPRING IS IN THE AIR is in VANI NAGAR, AMEENPUR, Sangareddy, Telangana (502032).
When will SPRING IS IN THE AIR be completed?
The promoter's proposed date of completion filed with RERA is 31/10/2023. This is the promoter's declaration, not a guarantee.
More projects in Vani Nagar




