GREEN HEIGHTS is a residential apartment project in Korremula, Ghatkesar Mandal, Medchal-Malkajgiri District. The registered promoter is M/S SREE PADMAVATHI BUILDERS AND DEVELOPERS. The project has a registered site extent of 3921 sq. m. and one building with Stilt + 5 Upper Floors and 95 homes: 5 1BHK, 70 2BHK and 20 3BHK units. It is registered under TG-RERA number P02200010326, with a proposed completion date of 19/02/2027.

01What we found

Period endedTG-RERA registration ran to 19 Oct 2026 - check its extension on TG-RERA
22documents on file - each fact links to its page
0court cases on this project's land in the court records searched
8items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

8 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Photo from nobroker.in

1. Project at a glance

Project identity

ItemProject record
Registered project nameGREEN HEIGHTS RERA record
Project type / registered portionResidential apartment project; the supplied record identifies one building and does not identify a separately named phase. RERA record RERA filing RERA filing
TG-RERA registrationP02200010326; granted under section 5. RERA record
Registration validity19/10/2023–19/10/2026; the certificate states three years, unless extended by the Authority. RERA record
Registered promoterM/S SREE PADMAVATHI BUILDERS AND DEVELOPERS, represented in the certificate by KOUKUNTLA RAJINIKANTH REDDY and others. RERA record Parties record
RERA project status“On-Going Project” in the filing. RERA filing

Land and geographic identity

ItemProject record
Locality / revenue villageKorremula; the supplied project and approval records identify Korremula as the revenue village. RERA record
Mandal / district / PINGhatkesar / Medchal-Malkajgiri / 500088. RERA record
Project survey numbers504/A and 504/AA. RERA record RERA filing
Registered site extent3921 sq. m. total, of which 33.44 sq. m. is recorded as affected by road widening/FTL of tanks/nala widening; the filing states 3887.56 sq. m. net area. RERA filing
Boundaries recorded in the filingEast: NALA; west: ROAD; north and south: NEIGHBOURS LAND. RERA filing

Development identity

ItemProject record
Sanctioning record and authorityGram Panchayat Korremula proceeding Proc No: GPK/02/2023-24, approved 02.11.2023; it cites HMDA technical approval 049773/GHT/R1/U6/HMDA/02102021, dated 19.10.2023. Approvals record
Approved building configurationOne residential building, Stilt + 5 Upper Floors, under the Gram Panchayat proceeding. RERA filing
Approved built-up area8547.15 sq. m. in the RERA filing. RERA filing
Buildings / towersOne building; one tower is recorded in the unit summary. RERA filing RERA unit table
Approved versus RERA-declared homesThe filing records 95 total building units and 95 proposed units as per agreement; the configuration schedule also totals 95 units. RERA filing RERA unit table
Parking levels and countNot established by the supplied records; the available extract does not give a parking-space count or identify a parking level. RERA unit table

Offering and status

ItemProject record
RERA-filed configurations1BHK, 2BHK and 3BHK; unit counts and filed saleable areas are detailed below. RERA unit table
Booking / availabilityThe portal-derived schedule shows 0 booked and 95 available; its as-of date is not supplied, so these counts are indicative. RERA unit table
Construction stageThe RERA amenity schedule reports percentages for infrastructure items, but the supplied evidence does not establish an independently verified overall construction stage or site inspection status. RERA amenities
Completion datesProposed and revised proposed completion: 19/02/2027 in the project filing. The Form B declaration separately records an undertaking for 19/10/2026. RERA filing
Occupancy / completion certificateNo completion certificate is recorded in the supplied project evidence. The commencement proceeding requires an Occupancy Certificate after construction; its extract does not establish that one has been issued. Approvals record

Registration validity, the stated completion timeline and occupancy certification are separate matters: the registration certificate gives a validity end date, the filing gives a proposed completion date, and no issued OC is evidenced in the supplied records.

2. The project story

GREEN HEIGHTS is a registered residential apartment development at Korremula, Ghatkesar Mandal, Medchal-Malkajgiri District, on project land identified as Survey Nos. 504/A and 504/AA. The RERA filing describes one building and records a total of 95 units. RERA record RERA filing

The building permission proceeding describes a residential building with Stilt + 5 Upper Floors. The RERA schedule lists 5 one-bedroom, 70 two-bedroom and 20 three-bedroom units. The available unit counts show none booked and all 95 available, but the portal extract has no as-of date. RERA unit table

The project is marked “On-Going Project.” RERA-filed infrastructure entries include progress percentages for several site works, but these are reported schedule figures rather than independent verification of physical completion. No issued occupancy or completion certificate is evidenced here. The filing’s proposed completion date is 19/02/2027. RERA filing RERA amenities RERA filing Approvals record

3. Master plan, architecture & building design

The RERA filing records a 3921 sq. m. total site area, 3887.56 sq. m. net area, 8547.15 sq. m. approved built-up area, and one building. These are separately reported filing figures; no FSI-counted area or carpet-area total is supplied. RERA filing RERA filing

The Gram Panchayat proceeding describes the approved building form as Stilt + 5 Upper Floors. It requires construction in accordance with the sanctioned plan and says the earmarked open space is to remain open and be maintained with greenery. It also requires internal roads and circulation to follow the approved pattern. The supplied extracts do not provide a floor-by-floor unit arrangement, footprint, lifts, stair count, detailed circulation drawing, or a measurable open-space area.

An HMDA Master Plan 2031 zoning sheet for the Ghatkesar area is available as an image, but the supplied record does not establish the exact zone at the project survey parcels. HMDA

4. Homes, configurations & floor plans

The following unit counts and saleable areas are from the RERA filing. Booked and available figures are portal-derived and indicative because no as-of date is provided. RERA unit table

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
1BHK50559.51 sq. m.Not measured from drawingsNot supplied
2BHK70070105.07 sq. m.Not measured from drawingsNot supplied
3BHK20020147.22 sq. m.Not measured from drawingsNot supplied

Two floor-plan drawings are recorded, but neither has been measured: both are listed as scans pending. Accordingly, no software-measured carpet areas, room dimensions, balcony or utility measurements, or drawing-based floor arrangements are available for this overview. RERA saleable area is the filed unit-area figure; the supplied evidence does not provide a separate carpet-area disclosure or loading calculation. Floor plans RERA unit details

5. Parking & vehicle circulation

The supplied evidence does not establish a sanctioned parking-space count, resident or visitor allocation, accessible parking, parking level, ramp arrangement, EV provision, or unit-specific parking allocation. The commencement proceeding says that the approved circulation pattern and earmarked parking area are not to be changed, but the available extract does not quantify that parking area or its spaces.

6. Amenities, recreation & open spaces

The RERA amenity schedule reports the following infrastructure and community entries. Percentages are the values in that schedule; they are not independent site-verification results. No sizes or capacities are supplied. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Internal roads & footpathsSize not suppliedRERA amenity schedule70% reported; not independently verified
Water supplySource and storage capacity not suppliedRERA amenity schedule60% reported; not independently verified
Sewerage (chamber, lines, septic tank, STP)Capacities not suppliedRERA amenity schedule60% reported; not independently verified
Storm-water drainsSize not suppliedRERA amenity schedule70% reported; not independently verified
Green strip / TOT LOT / parkArea and facilities not suppliedRERA amenity schedule70% reported; not independently verified
Street lightingDetails not suppliedRERA amenity schedule70% reported; not independently verified
Community buildingsUse, size and capacity not suppliedRERA amenity schedule70% reported; not independently verified
Treatment and disposal of sewage and sullage waterSystem details not suppliedRERA amenity schedule70% reported; not independently verified
Solid-waste management and disposalSystem details not suppliedRERA amenity schedule70% reported; not independently verified
Water conservation / rainwater harvestingSystem details not suppliedRERA amenity schedule70% reported; not independently verified
Energy managementSystem details not suppliedRERA amenity schedule75% reported; not independently verified
Fire protection and fire-safety requirementsDetails not supplied in the scheduleRERA amenity schedule0% recorded; not independently verified
Electrical meter room / sub-station / receiving stationCapacity and equipment details not suppliedRERA amenity schedule70% reported; not independently verified
Aggregate recreational open spaceArea not suppliedRERA amenity schedule70% reported; not independently verified

The building-permission extract also lists an STP, septic tank, water-harvesting pit, soak pit, garbage house and transformer among amenities/utilities. This is evidence of listed provisions in the approval record, not confirmation that they are installed or operating.

7. Utilities, building services & safety

The RERA amenity schedule reports water supply at 60%, sewerage (including septic tank and STP) at 60%, storm-water drains at 70%, water conservation/rainwater harvesting at 70%, solid-waste management at 70%, energy management at 75%, and electrical meter room/sub-station/receiving station at 70%. These are reported progress figures; the supplied evidence does not give capacities, sources, equipment specifications or independent completion verification. RERA amenities

The commencement proceeding lists an STP, septic tank, water-harvesting pit, soak pit, garbage house and transformer. It also requires a BT road before an Occupancy Certificate application and an Occupancy Certificate after construction. The proceeding includes fire-protection and fire-safety requirements, while the RERA amenity schedule records 0% for that item. Neither record establishes final fire clearance or completed fire systems. RERA amenities

No lift numbers or capacities, backup-power capacity, CCTV or access-control specifications, accessibility provisions, or independently verified operational utility details are supplied in the project records reviewed here.

8. Location, access & connectivity

The registered project location is Korremula, Ghatkesar Mandal, Medchal-Malkajgiri District, Telangana, PIN 500088. The parcel-centroid coordinate supplied is 17.40104704229694, 78.67004542780575; this is a cadastral location reference, not a surveyed entrance point. RERA record Location record Cadastral map

The location record identifies the nearest sampled Outer Ring Road interchange at approximately 5.5 km. The supplied evidence does not provide a project approach-road route, measured distance to public transport, or verified travel times. Location record

9. Developer & development status

The registered promoter is M/S SREE PADMAVATHI BUILDERS AND DEVELOPERS, identified in the project records as a partnership. Its GSTIN is 36AENFS6602K1ZL. KOUKUNTLA RAJINIKANTH REDDY is listed as partner and authorized signatory. RERA record Corporate record Parties record

The supplied project records give the promoter’s address as SAI NAGAR, CHOWDARIGUDA, KORREMULA, Ghatkesar, Medchal-Malkajgiri, 500088. The registration certificate separately prints the promoter office as Chowdariguda, Ghatkesar, Medchal-Malkajgiri, PIN 501218. No official promoter website or contact details are supplied in the reviewed evidence. Parties record

The project filing records a proposed completion date of 19/02/2027 and a revised proposed completion date of 19/02/2027. No independently verified construction-stage assessment or issued OC is evidenced in the supplied records. RERA filing Approvals record

10. Approvals, official records & documents

RecordSupplied evidence
TG-RERA registrationForm C for GREEN HEIGHTS, registration P02200010326, valid 19/10/2023–19/10/2026.
Principal building permissionKorremula Gram Panchayat Proc No: GPK/02/2023-24, dated 02.11.2023, for a residential building at Survey Nos. 504/A and 504/AA; the proceeding describes Stilt + 5 Upper Floors.
Technical approval cited in the permissionHMDA technical approval 049773/GHT/R1/U6/HMDA/02102021, dated 19.10.2023.
Commencement / completion statusThe permission proceeding is available; its extract records that the building is not completion-certified and requires an Occupancy Certificate after construction. No issued OC is supplied.
Form B declarationPromoter declaration dated 3 May 2025, including a completion undertaking of 19/10/2026.
Layout approval recordA layout-plan document was requested in the filing, but the supplied record says the document was not extracted. The public HMDA DPMS lookup is recorded as unavailable from the public internet; this does not establish approval or refusal. Document index HMDA
Registered development agreementDevelopment Agreement Cum General Power of Attorney with Possession dated 30 May 2025, between named owners and the registered promoter, recorded over Survey Nos. 504/es, 504/e and 504/2. The supplied extract describes development rights and a built-up-area sharing arrangement; it is not itself a title-conveyance deed.

The project identity and permission records name Survey Nos. 504/A and 504/AA. The development-agreement extract is included here as a document-index entry; it does not replace the project’s registered survey identity. The full title-document chain and approval conditions are addressed in their respective report sections.

Frequently asked questions

Is GREEN HEIGHTS registered with Telangana RERA?

Yes. GREEN HEIGHTS is registered with the Telangana Real Estate Regulatory Authority as P02200010326; the registration status is On-Going Project.

Who is the developer of GREEN HEIGHTS?

The promoter named in the RERA registration is M/S SREE PADMAVATHI BUILDERS AND DEVELOPERS.

Where is GREEN HEIGHTS located?

GREEN HEIGHTS is in KORREMULA, Ghatkesar, Medchal-Malkajgiri, Telangana (500088).

When will GREEN HEIGHTS be completed?

The promoter's proposed date of completion filed with RERA is 19/02/2027. This is the promoter's declaration, not a guarantee.