Infocity Elite is a residential apartment project in Chowdariguda, Ghatkesar Mandal, Medchal-Malkajgiri district, developed by registered promoter STAR INFRA DEVELOPERS. The project has a site extent of 3,992.45 sq. m and one residential building with 1Cellar + 1Stilt + 5 floors; TG-RERA lists 24,680 homes: 9,375 2BHK and 15,305 3BHK. It is registered under TG-RERA **P02200006934**, and its proposed completion date is **18/03/2029**.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
7 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Record |
|---|---|
| Registered project name | Infocity Elite RERA record |
| Project type | Residential apartment project RERA record |
| Phase / registered portion | No phase name or phase number disclosed. The registration covers the land identified as Survey Nos. 793/A/1A and 793/A/1A/1. |
| TG-RERA registration | P02200006934; issued 11/09/2023; certificate states validity from 11/09/2023 to 18/11/2028. Registration validity is separate from the project’s completion deadline. |
| Registered promoter | STAR INFRA DEVELOPERS, recorded as a partnership. Corporate record |
| RERA status | “On-Going Project” in the project record. RERA record |
Land and geographic identity
| Field | Record |
|---|---|
| Locality | Chowdariguda RERA record RERA filing |
| Revenue village | Korremula (also rendered “Korremul” in approval-document text) RERA record |
| Mandal / district / PIN | Ghatkesar / Medchal-Malkajgiri / 500088 RERA record |
| Project survey numbers and subdivisions | 793/A/1A and 793/A/1A/1 |
| Registered site extent | 3,992.45 sq. m in the HMDA technical approval and RERA land record Land records |
| Net / total area | Total area 3,992.45 sq. m; net area 3,992.45 sq. m; area reported affected by road widening/FTL/nala widening: 0 sq. m. RERA filing |
| Boundaries | East: 30 feet wide road; West: neighbours’ land; North: land of Star Infra Developers; South: neighbours’ land of existing layout. RERA filing |
Development identity
| Field | Record |
|---|---|
| Sanctioning authority / principal approval | HMDA technical approval 056072/GHT/R1/U6/HMDA/01082022, dated 18/11/2022. The approval directs that building plans be sanctioned by the Executive Authority in conformity with HMDA’s technically approved plans. Approvals record |
| Additional permission on file | Gram Panchayath construction permission GPC/887/2022, dated 14.02.2023; the document describes a residential building of Stilt + 5 Upper Floors. Approvals record |
| Approved built-up area | 12,578.54 sq. m is listed as proposed built-up area in the HMDA approval extraction. The same extraction separately lists 10,131.55 as “Built up Area”; the supplied record does not specify a unit for that separate figure. |
| Building / tower count | The RERA record lists 1 building unit; the HMDA technical approval describes one residential building. RERA filing |
| Sanctioned floor configuration | HMDA technical approval: 1Cellar + 1Stilt + 5 floors. Gram Panchayath permission: Stilt + 5 Upper Floors. |
| Parking levels / provision | A cellar and stilt are identified in the HMDA approval; no parking-space count or allocation is established in the supplied evidence. RERA amenities |
| Unit counts | RERA filing lists 24,680 units in total: 9,375 2BHK and 15,305 3BHK. RERA unit table RERA unit details |
| Approved versus RERA-declared counts | The supplied approval extraction does not state a unit count. The RERA filing provides the counts above. RERA unit details |
Offering and status
| Field | Record |
|---|---|
| Unit types | 2BHK and 3BHK, as filed with TG-RERA. RERA unit details |
| Filed saleable area | 2BHK: 0.36 sq. m; 3BHK: 0.51 sq. m. These are the values recorded in the RERA unit data; they are not independently measured here. RERA unit details |
| Booked / available | 2BHK: 2,810 booked / 6,565 available; 3BHK: 1,834 booked / 13,471 available. Portal counts are indicative: the record gives no as-of date. RERA unit table RERA unit details |
| Construction stage | RERA infrastructure-status data reports internal roads and footpaths and water supply at 100%; sewerage and rainwater harvesting at 50%; electrical meter room/sub-station/receiving station at 70%. These are filed status figures, not independent site verification. RERA amenities |
| Completion timeline | Proposed and revised proposed completion date: 18/03/2029 in the project record. A Form B declaration states an undertaking to complete by 18th Nov 2028. RERA record RERA filing |
| Occupancy / completion certificate | The supplied evidence does not include an occupancy certificate or completion certificate for the project or building. The Gram Panchayath permission requires an occupancy certificate after construction and states that it does not certify completion. |
2. The project story
Infocity Elite is registered as a residential apartment project in Chowdariguda, in Korremula revenue village, Ghatkesar Mandal, Medchal-Malkajgiri district. Its registered land identity is Survey Nos. 793/A/1A and 793/A/1A/1, with a recorded site extent of 3,992.45 sq. m. RERA record Land records
The project record describes one residential building. The HMDA technical approval specifies 1Cellar + 1Stilt + 5 floors, while the Gram Panchayath permission describes Stilt + 5 Upper Floors. These documents establish their respective stated approval descriptions; the supplied evidence does not establish completed construction or an issued occupancy certificate.
TG-RERA’s unit data records 2BHK and 3BHK configurations and portal booking/availability figures. The filed infrastructure updates report different completion percentages for certain site services; these are reported progress figures, not a site inspection or independent confirmation of construction progress. RERA unit details RERA amenities
3. Master plan, architecture & building design
The RERA land record gives a total and net site area of 3,992.45 sq. m. The HMDA technical approval describes one residential building and lists a proposed built-up area of 12,578.54 sq. m. It also separately lists 10,131.55 as “Built up Area,” without a unit specified in the supplied extraction; these figures are therefore reported as recorded rather than reconciled. RERA filing
The HMDA approval describes the building as 1Cellar + 1Stilt + 5 floors. The Gram Panchayath permission describes Stilt + 5 Upper Floors. The supplied material does not include readable floor-plan drawings from which to establish footprint, flats per floor, circulation, entrances, lift or stair arrangements, open-space layout, or residential/common-area distribution. Floor plans
The HMDA approval records a mortgage of 10.26% of built-up area, stated as 1,039.37 sq. m on the First floor, in favour of the Metropolitan Commissioner, HMDA.
4. Homes, configurations & floor plans
The following unit counts and saleable-area figures are from the TG-RERA filing. The portal counts have no stated as-of date and should be treated as indicative. RERA unit details RERA unit table
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 9,375 | 2,810 | 6,565 | 0.36 sq. m | Not available | Not supplied |
| 3BHK | 15,305 | 1,834 | 13,471 | 0.51 sq. m | Not available | Not supplied |
Two floor-plan drawings are recorded, but neither has been measured; both are listed as scans pending. Accordingly, no software-measured carpet area, room dimensions, orientation, balcony or utility-area measurements, or typical-floor arrangement can be reported. Carpet area is distinct from RERA saleable area, which can include the home’s share of common areas; no loading figure is supplied. Floor plans
5. Parking & vehicle circulation
The HMDA technical approval identifies a cellar and stilt, but the supplied evidence does not establish the number of parking spaces, whether spaces are resident, visitor or accessible, or how any spaces are allocated to individual units. The HMDA approval states that parking or construction must not be placed in setback areas.
The project record includes an internal-roads-and-footpaths status entry, but does not provide drawings or details sufficient to describe ramps, vehicle entries/exits, driveways, pedestrian separation, mechanical parking or EV charging. RERA amenities
6. Amenities, recreation & open spaces
RERA’s filed infrastructure-status data and the HMDA technical-approval extraction provide the following information. Percentages are reported status entries and are not independent verification of completion. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Internal roads and footpaths | No size supplied | RERA infrastructure-status data | 100% reported; not independently verified RERA amenities |
| Water supply | No source, capacity or storage details supplied | RERA infrastructure-status data | 100% reported; not independently verified RERA amenities |
| Sewerage (chambers, lines, septic tank, STP) | No capacity supplied | RERA infrastructure-status data | 50% reported; not independently verified RERA amenities |
| Water conservation / rainwater harvesting | HMDA approval identifies a rainwater-harvesting structure (percolation pit) | RERA status data; HMDA approval | 50% reported in RERA data; not independently verified RERA amenities |
| Electrical meter room / sub-station / receiving station | No capacity supplied | RERA infrastructure-status data | 70% reported; not independently verified RERA amenities |
| Storm-water drains | No size or layout supplied | RERA infrastructure-status data | 0% reported RERA amenities |
| Green strip / tot lot / park | No area supplied | RERA infrastructure-status data | 0% reported RERA amenities |
| Street lighting | No extent supplied | RERA infrastructure-status data | 0% reported RERA amenities |
| Community buildings | No description or size supplied | RERA infrastructure-status data | 0% reported RERA amenities |
| Treatment and disposal of sewage and sullage water | No capacity supplied | RERA infrastructure-status data | 0% reported RERA amenities |
| Solid-waste management and disposal | No system or capacity supplied | RERA infrastructure-status data | 0% reported RERA amenities |
| Energy management | No system specified | RERA infrastructure-status data | 0% reported RERA amenities |
| Fire protection and fire-safety requirements | No systems specified | RERA infrastructure-status data | 0% reported RERA amenities |
| Transformer | No capacity supplied | HMDA technical-approval extraction | Listed in approval extraction; completion status not established |
| Garbage house | No size supplied | HMDA technical-approval extraction | Listed in approval extraction; completion status not established |
| ETP | No capacity supplied | HMDA technical-approval conditions and listed amenities/utilities | Required/listed in the approval record; completion status not established |
| Recreational open space | No area supplied | RERA infrastructure-status data | 0% reported RERA amenities |
The supplied TG-RERA amenity data does not establish a clubhouse, swimming pool, gym, children’s play area or other indoor recreational facility.
7. Utilities, building services & safety
- Water and drainage: RERA status data reports water supply at 100% and sewerage infrastructure at 50%. The HMDA approval extraction lists an ETP and rainwater-harvesting percolation pit. No water source, storage capacity, treatment capacity, reuse arrangement or storm-water-drainage design is supplied; storm-water drains are reported at 0%. RERA amenities
- Electrical services: The RERA record reports electrical meter room/sub-station/receiving-station works at 70%. The HMDA approval extraction lists a transformer but does not specify its capacity or completion status. The supplied project documents do not establish backup-power capacity or EV-charging provision. RERA amenities
- Fire, access and safety: The infrastructure-status data reports fire-protection and fire-safety requirements at 0%. The HMDA approval includes a condition concerning safety of construction workers and refers to applicable technical standards, but the supplied evidence does not establish completed fire systems, fire-clearance documentation, escape-stair details, lift provision or accessibility arrangements. RERA amenities
- Waste: RERA status data reports solid-waste management and disposal at 0%. The HMDA approval extraction lists a garbage house, without capacity or evidence of completion. RERA amenities
8. Location, access & connectivity
The registered project location is Chowdariguda locality, Korremula revenue village, Ghatkesar Mandal, Medchal-Malkajgiri district, Telangana 500088. The RERA land record identifies the east boundary as a 30 feet wide road. RERA record RERA filing RERA filing
A sampled location record gives the nearest sampled Outer Ring Road interchange as approximately 4.0 km away. The supplied data does not identify a public-transport route or provide verified distances to transit stops or other landmarks. Location record
9. Developer & development status
The registered promoter is STAR INFRA DEVELOPERS, recorded as a partnership, with GSTIN 36AEKFS4981E1ZN. The project record gives the promoter address as Flat No. 104, Matrubhiumi Pearl, Mahadevpuram, Chowdariguda, Ghatkesar, Medchal-Malkajgiri, 500088. The TG-RERA registration certificate lists the promoter office separately as Village Gajula Ramaram-1, Mandal Qutballapur, Medchal-Malkajgiri, PIN 500055. No official website or contact details are supplied. Corporate record RERA filing RERA filing
Project development status is reported through RERA infrastructure entries, including 100% for internal roads and footpaths and water supply, 50% for sewerage and rainwater harvesting, and 70% for the electrical meter room/sub-station/receiving station. These are filed status figures and do not independently verify construction progress. RERA amenities
The project record gives a proposed and revised completion date of 18/03/2029. Separately, the promoter’s Form B declaration states completion by 18th Nov 2028. The supplied evidence does not establish an occupancy certificate or completion certificate for the building. RERA record
10. Approvals, official records & documents
| Identifier / date | P02200006934; issued 11/09/2023; valid through 18/11/2028 |
|---|---|
| What the supplied record establishes | Registration of Infocity Elite under section 5; certificate includes conditions concerning the agreement for sale, conveyance and separate account. |
| Identifier / date | 056072/GHT/R1/U6/HMDA/01082022; 18/11/2022 |
|---|---|
| What the supplied record establishes | Technical approval for a residential building on 3,992.45 sq. m, with the stated floor configuration and approval conditions. The document directs that building plans be sanctioned by the Executive Authority in conformity with the technically approved plans. |
| Identifier / date | GPC/887/2022; 14.02.2023 |
|---|---|
| What the supplied record establishes | Permission for a residential building described as Stilt + 5 Upper Floors, subject to conditions; the document requires an occupancy certificate after construction and does not certify completion. |
| Identifier / date | 10 August 2023 |
|---|---|
| What the supplied record establishes | Promoter declaration concerning title, encumbrances, project-account obligations, pending approvals and a stated completion undertaking. |
| Identifier / date | Not supplied |
|---|---|
| What the supplied record establishes | No project or building occupancy/completion certificate is included in the supplied evidence. |
The HMDA approval extraction lists Transformer, Garbage House, Rain Water Harvesting Structure (percolation pit) and ETP among amenities/utilities, and records the HMDA mortgage of 1,039.37 sq. m.
1. Project at a glance
Project identity
Registered project name: Infocity Elite
Project type: Residential apartment project
Phase / registered portion: No phase name or phase number disclosed. The registration covers the land identified as Survey Nos. 793/A/1A and 793/A/1A/1.
TG-RERA registration: P02200006934; issued 11/09/2023; certificate states validity from 11/09/2023 to 18/11/2028. Registration validity is separate from the project’s completion deadline.
Registered promoter: STAR INFRA DEVELOPERS, recorded as a partnership.
RERA status: “On-Going Project” in the project record.
Land and geographic identity
Locality: Chowdariguda
Revenue village: Korremula (also rendered “Korremul” in approval-document text)
Mandal / district / PIN: Ghatkesar / Medchal-Malkajgiri / 500088
Project survey numbers and subdivisions: 793/A/1A and 793/A/1A/1
Registered site extent: 3,992.45 sq. m in the HMDA technical approval and RERA land record
Net / total area: Total area 3,992.45 sq. m; net area 3,992.45 sq. m; area reported affected by road widening/FTL/nala widening: 0 sq. m.
Boundaries: East: 30 feet wide road; West: neighbours’ land; North: land of Star Infra Developers; South: neighbours’ land of existing layout.
Development identity
Sanctioning authority / principal approval: HMDA technical approval 056072/GHT/R1/U6/HMDA/01082022, dated 18/11/2022. The approval directs that building plans be sanctioned by the Executive Authority in conformity with HMDA’s technically approved plans.
Additional permission on file: Gram Panchayath construction permission GPC/887/2022, dated 14.02.2023; the document describes a residential building of Stilt + 5 Upper Floors.
Approved built-up area: 12,578.54 sq. m is listed as proposed built-up area in the HMDA approval extraction. The same extraction separately lists 10,131.55 as “Built up Area”; the supplied record does not specify a unit for that separate figure.
Building / tower count: The RERA record lists 1 building unit; the HMDA technical approval describes one residential building.
Sanctioned floor configuration: HMDA technical approval: 1Cellar + 1Stilt + 5 floors. Gram Panchayath permission: Stilt + 5 Upper Floors.
Parking levels / provision: A cellar and stilt are identified in the HMDA approval; no parking-space count or allocation is established in the supplied evidence.
Unit counts: RERA filing lists 24,680 units in total: 9,375 2BHK and 15,305 3BHK.
Approved versus RERA-declared counts: The supplied approval extraction does not state a unit count. The RERA filing provides the counts above.
Offering and status
Unit types: 2BHK and 3BHK, as filed with TG-RERA.
Filed saleable area: 2BHK: 0.36 sq. m; 3BHK: 0.51 sq. m. These are the values recorded in the RERA unit data; they are not independently measured here.
Booked / available: 2BHK: 2,810 booked / 6,565 available; 3BHK: 1,834 booked / 13,471 available. Portal counts are indicative: the record gives no as-of date.
Construction stage: RERA infrastructure-status data reports internal roads and footpaths and water supply at 100%; sewerage and rainwater harvesting at 50%; electrical meter room/sub-station/receiving station at 70%. These are filed status figures, not independent site verification.
Completion timeline: Proposed and revised proposed completion date: 18/03/2029 in the project record. A Form B declaration states an undertaking to complete by 18th Nov 2028.
Occupancy / completion certificate: The supplied evidence does not include an occupancy certificate or completion certificate for the project or building. The Gram Panchayath permission requires an occupancy certificate after construction and states that it does not certify completion.
2. The project story
Infocity Elite is registered as a residential apartment project in Chowdariguda, in Korremula revenue village, Ghatkesar Mandal, Medchal-Malkajgiri district. Its registered land identity is Survey Nos. 793/A/1A and 793/A/1A/1, with a recorded site extent of 3,992.45 sq. m.
The project record describes one residential building. The HMDA technical approval specifies 1Cellar + 1Stilt + 5 floors, while the Gram Panchayath permission describes Stilt + 5 Upper Floors. These documents establish their respective stated approval descriptions; the supplied evidence does not establish completed construction or an issued occupancy certificate.
TG-RERA’s unit data records 2BHK and 3BHK configurations and portal booking/availability figures. The filed infrastructure updates report different completion percentages for certain site services; these are reported progress figures, not a site inspection or independent confirmation of construction progress.
3. Master plan, architecture & building design
The RERA land record gives a total and net site area of 3,992.45 sq. m. The HMDA technical approval describes one residential building and lists a proposed built-up area of 12,578.54 sq. m. It also separately lists 10,131.55 as “Built up Area,” without a unit specified in the supplied extraction; these figures are therefore reported as recorded rather than reconciled.
The HMDA approval describes the building as 1Cellar + 1Stilt + 5 floors. The Gram Panchayath permission describes Stilt + 5 Upper Floors. The supplied material does not include readable floor-plan drawings from which to establish footprint, flats per floor, circulation, entrances, lift or stair arrangements, open-space layout, or residential/common-area distribution.
The HMDA approval records a mortgage of 10.26% of built-up area, stated as 1,039.37 sq. m on the First floor, in favour of the Metropolitan Commissioner, HMDA.
4. Homes, configurations & floor plans
The following unit counts and saleable-area figures are from the TG-RERA filing. The portal counts have no stated as-of date and should be treated as indicative.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 9,375 | 2,810 | 6,565 | 0.36 sq. m | Not available | Not supplied |
| 3BHK | 15,305 | 1,834 | 13,471 | 0.51 sq. m | Not available | Not supplied |
Two floor-plan drawings are recorded, but neither has been measured; both are listed as scans pending. Accordingly, no software-measured carpet area, room dimensions, orientation, balcony or utility-area measurements, or typical-floor arrangement can be reported. Carpet area is distinct from RERA saleable area, which can include the home’s share of common areas; no loading figure is supplied.
5. Parking & vehicle circulation
The HMDA technical approval identifies a cellar and stilt, but the supplied evidence does not establish the number of parking spaces, whether spaces are resident, visitor or accessible, or how any spaces are allocated to individual units. The HMDA approval states that parking or construction must not be placed in setback areas.
The project record includes an internal-roads-and-footpaths status entry, but does not provide drawings or details sufficient to describe ramps, vehicle entries/exits, driveways, pedestrian separation, mechanical parking or EV charging.
6. Amenities, recreation & open spaces
RERA’s filed infrastructure-status data and the HMDA technical-approval extraction provide the following information. Percentages are reported status entries and are not independent verification of completion.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Internal roads and footpaths | No size supplied | RERA infrastructure-status data | 100% reported; not independently verified |
| Water supply | No source, capacity or storage details supplied | RERA infrastructure-status data | 100% reported; not independently verified |
| Sewerage (chambers, lines, septic tank, STP) | No capacity supplied | RERA infrastructure-status data | 50% reported; not independently verified |
| Water conservation / rainwater harvesting | HMDA approval identifies a rainwater-harvesting structure (percolation pit) | RERA status data; HMDA approval | 50% reported in RERA data; not independently verified |
| Electrical meter room / sub-station / receiving station | No capacity supplied | RERA infrastructure-status data | 70% reported; not independently verified |
| Storm-water drains | No size or layout supplied | RERA infrastructure-status data | 0% reported |
| Green strip / tot lot / park | No area supplied | RERA infrastructure-status data | 0% reported |
| Street lighting | No extent supplied | RERA infrastructure-status data | 0% reported |
| Community buildings | No description or size supplied | RERA infrastructure-status data | 0% reported |
| Treatment and disposal of sewage and sullage water | No capacity supplied | RERA infrastructure-status data | 0% reported |
| Solid-waste management and disposal | No system or capacity supplied | RERA infrastructure-status data | 0% reported |
| Energy management | No system specified | RERA infrastructure-status data | 0% reported |
| Fire protection and fire-safety requirements | No systems specified | RERA infrastructure-status data | 0% reported |
| Transformer | No capacity supplied | HMDA technical-approval extraction | Listed in approval extraction; completion status not established |
| Garbage house | No size supplied | HMDA technical-approval extraction | Listed in approval extraction; completion status not established |
| ETP | No capacity supplied | HMDA technical-approval conditions and listed amenities/utilities | Required/listed in the approval record; completion status not established |
| Recreational open space | No area supplied | RERA infrastructure-status data | 0% reported |
The supplied TG-RERA amenity data does not establish a clubhouse, swimming pool, gym, children’s play area or other indoor recreational facility.
7. Utilities, building services & safety
- Water and drainage: RERA status data reports water supply at 100% and sewerage infrastructure at 50%. The HMDA approval extraction lists an ETP and rainwater-harvesting percolation pit. No water source, storage capacity, treatment capacity, reuse arrangement or storm-water-drainage design is supplied; storm-water drains are reported at 0%.
- Electrical services: The RERA record reports electrical meter room/sub-station/receiving-station works at 70%. The HMDA approval extraction lists a transformer but does not specify its capacity or completion status. The supplied project documents do not establish backup-power capacity or EV-charging provision.
- Fire, access and safety: The infrastructure-status data reports fire-protection and fire-safety requirements at 0%. The HMDA approval includes a condition concerning safety of construction workers and refers to applicable technical standards, but the supplied evidence does not establish completed fire systems, fire-clearance documentation, escape-stair details, lift provision or accessibility arrangements.
- Waste: RERA status data reports solid-waste management and disposal at 0%. The HMDA approval extraction lists a garbage house, without capacity or evidence of completion.
8. Location, access & connectivity
The registered project location is Chowdariguda locality, Korremula revenue village, Ghatkesar Mandal, Medchal-Malkajgiri district, Telangana 500088. The RERA land record identifies the east boundary as a 30 feet wide road.
A sampled location record gives the nearest sampled Outer Ring Road interchange as approximately 4.0 km away. The supplied data does not identify a public-transport route or provide verified distances to transit stops or other landmarks.
9. Developer & development status
The registered promoter is STAR INFRA DEVELOPERS, recorded as a partnership, with GSTIN 36AEKFS4981E1ZN. The project record gives the promoter address as Flat No. 104, Matrubhiumi Pearl, Mahadevpuram, Chowdariguda, Ghatkesar, Medchal-Malkajgiri, 500088. The TG-RERA registration certificate lists the promoter office separately as Village Gajula Ramaram-1, Mandal Qutballapur, Medchal-Malkajgiri, PIN 500055. No official website or contact details are supplied.
Project development status is reported through RERA infrastructure entries, including 100% for internal roads and footpaths and water supply, 50% for sewerage and rainwater harvesting, and 70% for the electrical meter room/sub-station/receiving station. These are filed status figures and do not independently verify construction progress.
The project record gives a proposed and revised completion date of 18/03/2029. Separately, the promoter’s Form B declaration states completion by 18th Nov 2028. The supplied evidence does not establish an occupancy certificate or completion certificate for the building.
10. Approvals, official records & documents
| Identifier / date | P02200006934; issued 11/09/2023; valid through 18/11/2028 |
|---|---|
| What the supplied record establishes | Registration of Infocity Elite under section 5; certificate includes conditions concerning the agreement for sale, conveyance and separate account. |
| Identifier / date | 056072/GHT/R1/U6/HMDA/01082022; 18/11/2022 |
|---|---|
| What the supplied record establishes | Technical approval for a residential building on 3,992.45 sq. m, with the stated floor configuration and approval conditions. The document directs that building plans be sanctioned by the Executive Authority in conformity with the technically approved plans. |
| Identifier / date | GPC/887/2022; 14.02.2023 |
|---|---|
| What the supplied record establishes | Permission for a residential building described as Stilt + 5 Upper Floors, subject to conditions; the document requires an occupancy certificate after construction and does not certify completion. |
| Identifier / date | 10 August 2023 |
|---|---|
| What the supplied record establishes | Promoter declaration concerning title, encumbrances, project-account obligations, pending approvals and a stated completion undertaking. |
| Identifier / date | Not supplied |
|---|---|
| What the supplied record establishes | No project or building occupancy/completion certificate is included in the supplied evidence. |
The HMDA approval extraction lists Transformer, Garbage House, Rain Water Harvesting Structure (percolation pit) and ETP among amenities/utilities, and records the HMDA mortgage of 1,039.37 sq. m.
Frequently asked questions
Is Infocity Elite registered with Telangana RERA?
Yes. Infocity Elite is registered with the Telangana Real Estate Regulatory Authority as P02200006934; the registration status is On-Going Project.
Who is the developer of Infocity Elite?
The promoter named in the RERA registration is STAR INFRA DEVELOPERS.
Where is Infocity Elite located?
Infocity Elite is in Chowdariguda, Korremula, Ghatkesar, Medchal-Malkajgiri, Telangana (500088).
When will Infocity Elite be completed?
The promoter's proposed date of completion filed with RERA is 18/03/2029. This is the promoter's declaration, not a guarantee.