Eastern Aavaasa
MOHAMMED SHAFIQ · Rangareddy · RERA P02400009485
Eastern Aavaasa is a new residential plotted layout in Batasingaram, Abdullapurmet mandal, Ranga Reddy district, developed by registered promoter MOHAMMED SHAFIQ. The project covers 17,649 sq. m and is an open residential layout; the record does not state a tower or block count, floor configuration, plot count or plot-size schedule. The registered offering is residential plots. It is registered under TG-RERA number P02400009485, with a proposed completion date of 01/08/2027.
📘 Project brochure from the promoter’s website ↗01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
9 items to check before you pay, 2 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Record |
|---|---|
| Registered project name | Eastern Aavaasa RERA record |
| Project type | New residential plotted layout RERA record RERA filing |
| Phase / registered portion | Phase not separately identified; registration is for the project recorded on Survey Nos. 169, 170 and 171 RERA record |
| TG-RERA registration | P02400009485 RERA record |
| Registration validity | 14/08/2024 to 01/08/2027, unless extended by the Authority RERA record |
| Registered promoter | MOHAMMED SHAFIQ in the project identity record; the certificate names Mohammed Shafiq Ahmed RERA record |
| RERA status | Registered; the record labels it “New Project” RERA record |
Land and geographic identity
| Field | Record |
|---|---|
| Locality | BATASINGARAM RERA record |
| Revenue village | Batasingaram RERA record |
| Mandal | Abdullapurmet RERA record |
| District / PIN | Ranga Reddy / 501512 RERA record |
| Project survey numbers | 169, 170, 171; the RERA filing does not specify project-held subdivisions RERA record Land records |
| Total site area | 17,649 sq. m RERA filing |
| Road-affected area | 1,496.91 sq. m RERA filing |
| Net layout area | 16,152.09 sq. m in the RERA land record; the layout drawing states 16,152.10 RERA filing |
| Boundaries recorded | East: VACANT LAND; West: ROADWIDTH 9; North: ROADWIDTH 9; South: VACANT LAND RERA filing |
Development identity
| Field | Record |
|---|---|
| Sanctioning authority | Hyderabad Metropolitan Development Authority (HMDA) Approvals record |
| Principal layout approval | HMDA approval No. 000036/LO/Plg/HMDA/2024, approved 14-08-2024; application/file reference 062345/GHT/LT/U6/HMDA/31012024 Approvals record |
| Development form | Open residential plotted layout; the approved plan labels the use Residential and the nature of development New |
| Approved built-up area | 16,152.09 sq. m is recorded as “Approved Built up Area” in the RERA filing; this is a plotted-development record, not a stated building floor-area schedule RERA filing |
| Buildings / floor configuration | Building count and building-floor configuration are not disclosed in the supplied project record. The layout approval concerns plots, not a building schedule |
| Layout roads | 4,357.89 sq. m; the layout record also identifies road widths including 30.00 and 9.14 Layout record |
| Open space / park / utility | 1,370.74 sq. m organized open space/park/utility area; separate park and utility components appear in the local-body record Layout record |
| Social infrastructure | 404.43 sq. m Layout record |
| Mortgaged plots to HMDA | Plot Nos. 37, 45–50, 57 and 58, totaling 1,513.14 sq. m, recorded as mortgage security pending completion of layout works and release Layout record |
| Parking | No project-wide parking count or parking arrangement is established in the supplied RERA record RERA amenities |
Offering and status
| Field | Record |
|---|---|
| RERA-filed offering | Plots within a residential open layout; plot count and plot-size schedule are not established by the supplied drawing-derived data RERA record Layout record |
| RERA-filed saleable size range | Not disclosed in the supplied structured project data |
| Booked / available counts | Not disclosed in the supplied data |
| Construction / development stage | The filing identifies a new project and the HMDA layout approval requires development works; no independently verified site-progress inspection is supplied RERA record |
| Proposed completion date | 01/08/2027 in the project record RERA record |
| Occupancy certificate | An architect’s Form 1A document lists HMDA OC No. 0700/HMDA/SWFL/2025, dated 29.09.2025, and states overall completion; the supplied evidence does not establish the precise plot/layout scope covered by that certificate |
2. The project story
- Eastern Aavaasa is registered as a residential plotted development in Batasingaram village, Abdullapurmet mandal, Ranga Reddy district. The registered land identity is Survey Nos. 169, 170 and 171. HMDA’s approval record describes an open layout, with residential plots, internal roads, park/open-space and social-infrastructure areas. The approved layout is identified by HMDA approval No. 000036/LO/Plg/HMDA/2024 RERA record.
- The RERA record gives a proposed completion date of 01/08/2027. The layout approval requires development works and provides for specified plots to remain mortgaged to HMDA until the prescribed works are completed and the mortgage is released. No site inspection or independently verified construction-progress report is included here, so the available material establishes the registered proposal and approval conditions, not the physical completion of individual works RERA record.
- A Form 1A architect’s certificate in the RERA file states that the project is complete and lists an HMDA occupancy certificate dated 29.09.2025. The supplied extract does not identify which specific layout works or project portion the certificate covers. Registration validity through 01/08/2027 is a separate matter from the proposed completion date and the certificate’s stated completion/OC information.
3. Master plan, architecture & building design
- The approved drawing describes a residential open layout over a total site area of 17,649.00 sq. m, with 16,152.10 sq. m shown as net plot area after 1,496.91 sq. m of road-widening area. The drawing’s area schedule allocates 10,018.52 sq. m to plotted area, 4,357.89 sq. m to layout roads, 1,370.74 sq. m to organized open space/park/utility area, and 404.43 sq. m to social infrastructure.
- The HMDA plan identifies the mortgage area as 1,513.14 sq. m in Plot Nos. 37, 45–50, 57 and 58. The approval states that these plots are not to be sold while mortgaged and links release to completion of development works and the required local-body process.
- This is a plotted layout, not an apartment-building plan. Building count, building footprint, floor configuration, tower height, lifts, stairs and plot-by-plot dimensions are not established by the supplied approval extraction. Layout sheets were supplied, but plot-count and plot-size measurements were not completed in the available drawing-derived data; verify the stamped plan for those particulars Layout record.
4. Homes, configurations & floor plans
- The registered offering is a plotted layout. The supplied RERA data does not provide a verified plot count, plot-size bands, booked/available inventory or a plot-wise saleable-area schedule. The layout drawing’s text extraction is incomplete for plot-by-plot measurements, so no plot count or size range is stated here RERA record Layout record.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Residential plots | Not established | Not disclosed | Not disclosed | Not disclosed | Not applicable | Not supplied |
- The available floor-plan review records two layout sheets and no apartment floor plans. Carpet-area and room measurements therefore do not apply to the supplied plotted-layout evidence Floor plans Layout record.
5. Parking & vehicle circulation
- The supplied project record does not establish a sanctioned parking-space count, visitor or accessible parking, plot-specific parking allocation, or a separate parking facility. The HMDA drawing identifies layout roads, including road widths of 30.00 and 9.14, but does not provide evidence here of vehicle-entry arrangements, internal driveway dimensions beyond the area schedule, or pedestrian/vehicle separation RERA amenities.
6. Amenities, recreation & open spaces
- The HMDA layout record allocates areas for roads, park/open space/utility and social infrastructure. These are approved or recorded land-use areas; the supplied evidence does not independently verify that the corresponding facilities have been constructed or handed over.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Layout roads | 4,357.89 sq. m | HMDA layout plan | Area shown in approved layout; completion not independently verified |
| Organized open space / park / utility | 1,370.74 sq. m | HMDA layout plan | Area shown in approved layout; development and handover not independently verified |
| Social infrastructure | 404.43 sq. m | HMDA layout plan | Area shown in approved layout; facility type and completion not independently verified |
| Amenity area | 0.00 sq. m in the layout area schedule | HMDA layout plan | No separate amenity-area allocation shown in that schedule |
- The layout record also identifies park and utility components in the local-body communication, but the supplied extract does not establish completed facilities or their operating status. Brochure amenities are not treated as approved or delivered facilities in this overview.
7. Utilities, building services & safety
- The HMDA draft-layout letter lists proposed layout infrastructure including a common septic tank/STP, internal water-supply pipelines, an overhead tank, a transformer, avenue plantation, park development, rainwater-harvesting pits, potable-water supply, solid-waste and bio-compost provisions, cycling tracks and LED lighting. These are listed in the approval-plan extraction; the supplied evidence does not independently confirm installation, capacity, commissioning or present operation.
- The RERA amenity-status extract marks Internal Roads & Footpaths, Water Supply, Sewerage (Chamber, Lines, Septic Tank, STP), Green Strip/TOT LOT/Park, and Water Conservation, Rain water Harvesting as available at 100%. The same extract records 0% for storm-water drains, street lighting, community buildings, sewage/sullage treatment and disposal, solid-waste management, energy management, fire protection/fire-safety requirements, electrical meter room/sub-station/receiving station, and aggregate recreational open-space progress. These are recorded amenity-status entries, not independent site verification RERA amenities.
- No capacities, fire clearances, emergency-access details, security systems, accessibility provisions or commissioning evidence are supplied.
8. Location, access & connectivity
- The official project location is Batasingaram village, Abdullapurmet mandal, Ranga Reddy district, Telangana, PIN 501512. The RERA filing identifies the site boundaries as vacant land to the east and south, and roads recorded as “ROADWIDTH 9” to the west and north RERA record RERA filing.
- The layout record refers to an approach-road context and identifies roads within the layout; the supplied evidence does not establish public-transport services or verified distances from the site to landmarks. A cadastral parcel-centroid coordinate is available at 17.41528, 78.35459. No verified travel times or distance measurements to external destinations are supplied Location record.
9. Developer & development status
- The RERA project identity names MOHAMMED SHAFIQ as promoter; the Form ‘C’ registration certificate names Mohammed Shafiq Ahmed. The project filing also records five landowners—MD Ishaq Ahmed, MD Iqbal Ahmed, MD Althaf Ahmed, MD Mushathaq Ahmed and MD Riaz Ahmed—as area-share parties. The supplied evidence does not identify a corporate entity type for the registered promoter RERA record Corporate record.
- The RERA certificate states validity from 14/08/2024 through 01/08/2027, unless extended. The project record separately states a proposed completion date of 01/08/2027. The Form 1A architect’s certificate states overall completion and lists HMDA OC No. 0700/HMDA/SWFL/2025, dated 29.09.2025; the supplied extract does not specify the exact scope of that certificate or OC RERA record.
10. Approvals, official records & documents
| Identifier / date | P02400009485; issued from 14/08/2024, valid through 01/08/2027 unless extended |
|---|---|
| What the supplied record establishes | Form ‘C’ certificate for Eastern Aavaasa; names the promoter and identifies the project location and survey numbers |
| Identifier / date | 000036/LO/Plg/HMDA/2024; 14-08-2024 |
|---|---|
| What the supplied record establishes | Approval-plan record for a residential open layout; application/file reference 062345/GHT/LT/U6/HMDA/31012024 |
| Identifier / date | 000036/LO/Plg/HMDA/2024; 14 August, 2024 |
|---|---|
| What the supplied record establishes | Records layout area schedule and conditions, including development works, local-body handover and HMDA mortgage plots |
| Identifier / date | Gift Deed No. 4366/2024, dated 15.07.2024 |
|---|---|
| What the supplied record establishes | Panchayat Secretary confirmation concerning 1,496.91 sq. m of road-affected area for the proposed 100-foot road |
| Identifier / date | 06.03.2025 |
|---|---|
| What the supplied record establishes | Acknowledges receipt of the HMDA draft-layout permit and records public-purpose road and other area components |
| Identifier / date | Proceedings Nos. 2400007099, 2400006981, 2400004763, 2400006985, 2400044659 and 2400044648 |
|---|---|
| What the supplied record establishes | Conversion permissions for agricultural land to non-agricultural use; the extracted orders state that conversion permission does not itself confer title or ownership |
| Identifier / date | Form 1A; HMDA OC No. 0700/HMDA/SWFL/2025, dated 29.09.2025 |
|---|---|
| What the supplied record establishes | Architect’s certificate states project completion and lists the HMDA OC reference; the supplied extract does not identify the precise certificate/OC scope |
| Identifier / date | Form B verification dated 06.11.2024 |
|---|---|
| What the supplied record establishes | Extract records undertakings concerning project-account withdrawals, audits, pending approvals and non-discrimination; the supplied text is a continuation and does not itself identify the project in its extracted content |
- The public HMDA DPMS approved-layout lookup was unavailable in the supplied record; this overview therefore relies on the filed approval-plan material and its document extraction HMDA.
1. Project at a glance
Project identity
Registered project name: Eastern Aavaasa
Project type: New residential plotted layout
Phase / registered portion: Phase not separately identified; registration is for the project recorded on Survey Nos. 169, 170 and 171
TG-RERA registration: P02400009485
Registration validity: 14/08/2024 to 01/08/2027, unless extended by the Authority
Registered promoter: MOHAMMED SHAFIQ in the project identity record; the certificate names Mohammed Shafiq Ahmed
RERA status: Registered; the record labels it “New Project”
Land and geographic identity
Locality: BATASINGARAM
Revenue village: Batasingaram
Mandal: Abdullapurmet
District / PIN: Ranga Reddy / 501512
Project survey numbers: 169, 170, 171; the RERA filing does not specify project-held subdivisions
Total site area: 17,649 sq. m
Road-affected area: 1,496.91 sq. m
Net layout area: 16,152.09 sq. m in the RERA land record; the layout drawing states 16,152.10
Boundaries recorded: East: VACANT LAND; West: ROADWIDTH 9; North: ROADWIDTH 9; South: VACANT LAND
Development identity
Sanctioning authority: Hyderabad Metropolitan Development Authority (HMDA)
Principal layout approval: HMDA approval No. 000036/LO/Plg/HMDA/2024, approved 14-08-2024; application/file reference 062345/GHT/LT/U6/HMDA/31012024
Development form: Open residential plotted layout; the approved plan labels the use Residential and the nature of development New
Approved built-up area: 16,152.09 sq. m is recorded as “Approved Built up Area” in the RERA filing; this is a plotted-development record, not a stated building floor-area schedule
Buildings / floor configuration: Building count and building-floor configuration are not disclosed in the supplied project record. The layout approval concerns plots, not a building schedule
Layout roads: 4,357.89 sq. m; the layout record also identifies road widths including 30.00 and 9.14
Open space / park / utility: 1,370.74 sq. m organized open space/park/utility area; separate park and utility components appear in the local-body record
Social infrastructure: 404.43 sq. m
Mortgaged plots to HMDA: Plot Nos. 37, 45–50, 57 and 58, totaling 1,513.14 sq. m, recorded as mortgage security pending completion of layout works and release
Parking: No project-wide parking count or parking arrangement is established in the supplied RERA record
Offering and status
RERA-filed offering: Plots within a residential open layout; plot count and plot-size schedule are not established by the supplied drawing-derived data
RERA-filed saleable size range: Not disclosed in the supplied structured project data
Booked / available counts: Not disclosed in the supplied data
Construction / development stage: The filing identifies a new project and the HMDA layout approval requires development works; no independently verified site-progress inspection is supplied
Proposed completion date: 01/08/2027 in the project record
Occupancy certificate: An architect’s Form 1A document lists HMDA OC No. 0700/HMDA/SWFL/2025, dated 29.09.2025, and states overall completion; the supplied evidence does not establish the precise plot/layout scope covered by that certificate
2. The project story
- Eastern Aavaasa is registered as a residential plotted development in Batasingaram village, Abdullapurmet mandal, Ranga Reddy district. The registered land identity is Survey Nos. 169, 170 and 171. HMDA’s approval record describes an open layout, with residential plots, internal roads, park/open-space and social-infrastructure areas. The approved layout is identified by HMDA approval No. 000036/LO/Plg/HMDA/2024.
- The RERA record gives a proposed completion date of 01/08/2027. The layout approval requires development works and provides for specified plots to remain mortgaged to HMDA until the prescribed works are completed and the mortgage is released. No site inspection or independently verified construction-progress report is included here, so the available material establishes the registered proposal and approval conditions, not the physical completion of individual works.
- A Form 1A architect’s certificate in the RERA file states that the project is complete and lists an HMDA occupancy certificate dated 29.09.2025. The supplied extract does not identify which specific layout works or project portion the certificate covers. Registration validity through 01/08/2027 is a separate matter from the proposed completion date and the certificate’s stated completion/OC information.
3. Master plan, architecture & building design
- The approved drawing describes a residential open layout over a total site area of 17,649.00 sq. m, with 16,152.10 sq. m shown as net plot area after 1,496.91 sq. m of road-widening area. The drawing’s area schedule allocates 10,018.52 sq. m to plotted area, 4,357.89 sq. m to layout roads, 1,370.74 sq. m to organized open space/park/utility area, and 404.43 sq. m to social infrastructure.
- The HMDA plan identifies the mortgage area as 1,513.14 sq. m in Plot Nos. 37, 45–50, 57 and 58. The approval states that these plots are not to be sold while mortgaged and links release to completion of development works and the required local-body process.
- This is a plotted layout, not an apartment-building plan. Building count, building footprint, floor configuration, tower height, lifts, stairs and plot-by-plot dimensions are not established by the supplied approval extraction. Layout sheets were supplied, but plot-count and plot-size measurements were not completed in the available drawing-derived data; verify the stamped plan for those particulars.
4. Homes, configurations & floor plans
- The registered offering is a plotted layout. The supplied RERA data does not provide a verified plot count, plot-size bands, booked/available inventory or a plot-wise saleable-area schedule. The layout drawing’s text extraction is incomplete for plot-by-plot measurements, so no plot count or size range is stated here.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Residential plots | Not established | Not disclosed | Not disclosed | Not disclosed | Not applicable | Not supplied |
- The available floor-plan review records two layout sheets and no apartment floor plans. Carpet-area and room measurements therefore do not apply to the supplied plotted-layout evidence.
5. Parking & vehicle circulation
- The supplied project record does not establish a sanctioned parking-space count, visitor or accessible parking, plot-specific parking allocation, or a separate parking facility. The HMDA drawing identifies layout roads, including road widths of 30.00 and 9.14, but does not provide evidence here of vehicle-entry arrangements, internal driveway dimensions beyond the area schedule, or pedestrian/vehicle separation.
6. Amenities, recreation & open spaces
- The HMDA layout record allocates areas for roads, park/open space/utility and social infrastructure. These are approved or recorded land-use areas; the supplied evidence does not independently verify that the corresponding facilities have been constructed or handed over.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Layout roads | 4,357.89 sq. m | HMDA layout plan | Area shown in approved layout; completion not independently verified |
| Organized open space / park / utility | 1,370.74 sq. m | HMDA layout plan | Area shown in approved layout; development and handover not independently verified |
| Social infrastructure | 404.43 sq. m | HMDA layout plan | Area shown in approved layout; facility type and completion not independently verified |
| Amenity area | 0.00 sq. m in the layout area schedule | HMDA layout plan | No separate amenity-area allocation shown in that schedule |
- The layout record also identifies park and utility components in the local-body communication, but the supplied extract does not establish completed facilities or their operating status. Brochure amenities are not treated as approved or delivered facilities in this overview.
7. Utilities, building services & safety
- The HMDA draft-layout letter lists proposed layout infrastructure including a common septic tank/STP, internal water-supply pipelines, an overhead tank, a transformer, avenue plantation, park development, rainwater-harvesting pits, potable-water supply, solid-waste and bio-compost provisions, cycling tracks and LED lighting. These are listed in the approval-plan extraction; the supplied evidence does not independently confirm installation, capacity, commissioning or present operation.
- The RERA amenity-status extract marks Internal Roads & Footpaths, Water Supply, Sewerage (Chamber, Lines, Septic Tank, STP), Green Strip/TOT LOT/Park, and Water Conservation, Rain water Harvesting as available at 100%. The same extract records 0% for storm-water drains, street lighting, community buildings, sewage/sullage treatment and disposal, solid-waste management, energy management, fire protection/fire-safety requirements, electrical meter room/sub-station/receiving station, and aggregate recreational open-space progress. These are recorded amenity-status entries, not independent site verification.
- No capacities, fire clearances, emergency-access details, security systems, accessibility provisions or commissioning evidence are supplied.
8. Location, access & connectivity
- The official project location is Batasingaram village, Abdullapurmet mandal, Ranga Reddy district, Telangana, PIN 501512. The RERA filing identifies the site boundaries as vacant land to the east and south, and roads recorded as “ROADWIDTH 9” to the west and north.
- The layout record refers to an approach-road context and identifies roads within the layout; the supplied evidence does not establish public-transport services or verified distances from the site to landmarks. A cadastral parcel-centroid coordinate is available at 17.41528, 78.35459. No verified travel times or distance measurements to external destinations are supplied.
9. Developer & development status
- The RERA project identity names MOHAMMED SHAFIQ as promoter; the Form ‘C’ registration certificate names Mohammed Shafiq Ahmed. The project filing also records five landowners—MD Ishaq Ahmed, MD Iqbal Ahmed, MD Althaf Ahmed, MD Mushathaq Ahmed and MD Riaz Ahmed—as area-share parties. The supplied evidence does not identify a corporate entity type for the registered promoter.
- The RERA certificate states validity from 14/08/2024 through 01/08/2027, unless extended. The project record separately states a proposed completion date of 01/08/2027. The Form 1A architect’s certificate states overall completion and lists HMDA OC No. 0700/HMDA/SWFL/2025, dated 29.09.2025; the supplied extract does not specify the exact scope of that certificate or OC.
10. Approvals, official records & documents
| Identifier / date | P02400009485; issued from 14/08/2024, valid through 01/08/2027 unless extended |
|---|---|
| What the supplied record establishes | Form ‘C’ certificate for Eastern Aavaasa; names the promoter and identifies the project location and survey numbers |
| Identifier / date | 000036/LO/Plg/HMDA/2024; 14-08-2024 |
|---|---|
| What the supplied record establishes | Approval-plan record for a residential open layout; application/file reference 062345/GHT/LT/U6/HMDA/31012024 |
| Identifier / date | 000036/LO/Plg/HMDA/2024; 14 August, 2024 |
|---|---|
| What the supplied record establishes | Records layout area schedule and conditions, including development works, local-body handover and HMDA mortgage plots |
| Identifier / date | Gift Deed No. 4366/2024, dated 15.07.2024 |
|---|---|
| What the supplied record establishes | Panchayat Secretary confirmation concerning 1,496.91 sq. m of road-affected area for the proposed 100-foot road |
| Identifier / date | 06.03.2025 |
|---|---|
| What the supplied record establishes | Acknowledges receipt of the HMDA draft-layout permit and records public-purpose road and other area components |
| Identifier / date | Proceedings Nos. 2400007099, 2400006981, 2400004763, 2400006985, 2400044659 and 2400044648 |
|---|---|
| What the supplied record establishes | Conversion permissions for agricultural land to non-agricultural use; the extracted orders state that conversion permission does not itself confer title or ownership |
| Identifier / date | Form 1A; HMDA OC No. 0700/HMDA/SWFL/2025, dated 29.09.2025 |
|---|---|
| What the supplied record establishes | Architect’s certificate states project completion and lists the HMDA OC reference; the supplied extract does not identify the precise certificate/OC scope |
| Identifier / date | Form B verification dated 06.11.2024 |
|---|---|
| What the supplied record establishes | Extract records undertakings concerning project-account withdrawals, audits, pending approvals and non-discrimination; the supplied text is a continuation and does not itself identify the project in its extracted content |
- The public HMDA DPMS approved-layout lookup was unavailable in the supplied record; this overview therefore relies on the filed approval-plan material and its document extraction.
Frequently asked questions
Is Eastern Aavaasa registered with Telangana RERA?
Yes. Eastern Aavaasa is registered with the Telangana Real Estate Regulatory Authority as P02400009485; the registration status is New Project.
Who is the developer of Eastern Aavaasa?
The promoter named in the RERA registration is MOHAMMED SHAFIQ.
Where is Eastern Aavaasa located?
Eastern Aavaasa is in BATASINGARAM, Abdullapurmet, Rangareddy, Telangana (501512).
When will Eastern Aavaasa be completed?
The promoter's proposed date of completion filed with RERA is 01/08/2027. This is the promoter's declaration, not a guarantee.