Mahalakshmi Nivasam is a residential apartment project in Sapthagiri Enclave, Secunderabad mandal, Hyderabad district. The registered promoter is Mahalakshmi Infra, recorded as a partnership. The project has a land area of 473.45 sq. m, one building with 1 Stilt + 5 upper floors, and 10 three-bedroom flats, each with a RERA-filed saleable area of 133.55 sq. m. It is registered with TG-RERA under P02500002060, with proposed completion before 24 March, 2026.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
8 items to check before you pay, 2 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered project name | Mahalakshmi Nivasam RERA record |
| Project type | Residential apartment project RERA record |
| Phase / registered portion | Phase not separately identified in the supplied record; the registration is for the project associated with Survey No. 16/6 |
| TG-RERA registration | P02500002060 |
| Registration validity | 24/08/2020 to 12/03/2026; the registration certificate says five years, unless extended by the Authority. The supplied certificate records no extension |
| Registered promoter | Mahalakshmi Infra; entity type recorded as Partnership Corporate record RERA filing |
| RERA project status | The project pack identifies the registration and its stated validity. The certificate’s recorded end date has passed; current registration status is not established by the supplied record |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality | Sapthagiri Enclave RERA record |
| Revenue village | Ammuguda (also rendered as Ammuguda Village in the filed title material) |
| Mandal | Secunderabad on the TG-RERA registration certificate; project land record does not disclose a mandal Land records |
| District / PIN | Hyderabad / 500056 RERA record |
| Survey number / subdivision | Sy. No. 16/6; no subdivision is stated Land records |
| Plot numbers | 52 and 53 RERA filing |
| Registered site extent | 567.0 Sq. Yards, as declared in Form B for the land covered by the development agreement |
| Land area in project fields / permit | Total area 473.45 sq. m; net area 473.45 sq. m. The permit also records 473.45 m² RERA filing |
| Boundaries | East: Plot Nos. 70 and 71; West: Road; North: Plot No. 51; South: Plot No. 54 RERA filing |
Development identity
| Item | Project record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC) |
| Principal building approval | Building Permit Order / approval no. 1/C1/03727/2020, dated 12 March, 2020; file no. 1/C1/00374/2020 |
| Approved built-up area | The project fields record approved built-up area of 1349.50 sq. m RERA filing. The permit extraction separately records “Residential upper-floor area: 1,335.50 m2” |
| Building count and height | One building; proposed building identified as “PROPOSED-1 (BUILDING),” height 14.75 m |
| Sanctioned floor configuration | 1 Stilt + 5 upper floors |
| Parking | Stilt parking area recorded as 253.48 m²; the permit says approved stilt parking is to be used exclusively for vehicle parking. A bay count is not supplied |
| Unit count | 10 units in the RERA unit record; the project fields record one building unit, while the permit condition states sanctioned unit numbers must not be increased without GHMC approval RERA unit table RERA filing |
Offering and status
| Item | Project record |
|---|---|
| RERA-filed configuration | 3 BED ROOM FLAT; 10 units RERA unit table |
| RERA-filed saleable area | 133.55 sq. m per unit RERA unit table |
| Booked / available | 0 booked / 10 available in the TG-RERA portal reading; no as-of date is supplied, so these counts are indicative RERA unit table |
| Construction stage | The supplied architect’s Form–1A states the project was complete in all respects and records a GHMC occupancy certificate dated 23/09/2021. This is a filed certificate, not a current independent site inspection |
| Promoter-declared completion undertaking | Form B states completion before 24 March, 2026 |
| Occupancy certificate | GHMC OC 0371/GHMC/LBN/2021 -OC, dated 23/09/2021; the architect’s certificate describes the registered project as completed in all respects. The certificate refers to the project at Sapthagiri Enclave, Ammuguda; separate tower/phase scope is not stated |
2. The project story
Mahalakshmi Nivasam is recorded as a residential apartment project on Plot Nos. 52 and 53, Sy. No. 16/6, at Sapthagiri Enclave in Ammuguda village, Hyderabad district. The GHMC permit describes a single proposed residential building with a stilt and five upper floors. The RERA unit record lists ten three-bedroom flats RERA record Land records RERA unit table.
The project’s Form B declaration states that Mahalakshmi Infra entered into a Development Agreement-Cum-General Power of Attorney with four landowners for the described land and undertook to complete the project before 24 March, 2026. Separately, an architect’s Form–1A filed for the registered project states it was complete in all respects and records a GHMC occupancy certificate dated 23/09/2021. This is documentary completion evidence; the supplied pack does not include an independent inspection confirming present physical condition or occupancy.
3. Master plan, architecture & building design
The GHMC permit describes one residential building, “PROPOSED-1 (BUILDING),” at 14.75 m in height, with 1 Stilt + 5 upper floors. It records 473.45 m² site area and a 1,335.50 m² residential upper-floor area; project fields separately state approved built-up area of 1349.50 sq. m. These are distinct recorded area figures, not interchangeable area measures RERA filing.
The supplied drawing record identifies a typical plan for floors 1, 3, 4 and 5 and a separate second-floor plan. The software measurement record covers two three-bedroom flat designs and one four-bedroom design from the filed drawing, but does not establish that the four-bedroom design is part of the RERA-registered offering Floor plans RERA unit details.
The permit records 253.48 m² of stilt parking, 78.41 RM of compound wall, four rainwater-harvesting pits, 20 trees, and a transformer space and garbage house within the premises. Its extracted tot-lot figure is 0 m². The supplied record does not establish building footprint, flats per floor, lift or stair arrangements, or a complete residential/common-area schedule.
4. Homes, configurations & floor plans
The RERA filing lists ten “3 BED ROOM FLAT” units, each with saleable area of 133.55 sq. m. The portal reading shows none booked and all ten available, but has no as-of date RERA unit table RERA unit table.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK (filed as “3 BED ROOM FLAT”) | 10 | 0 | 10 | 133.55 sq. m | 95.3–98.6 sq. m; median 96.9 sq. m (software-measured) | 27% |
The carpet-area figures are software measurements from the supplied floor-plan drawing, not RERA-filed disclosures; they are marked as needing review. The drawing measurement identifies a kitchen, hall, three bedrooms, two toilets, a balcony and a utility area in the measured three-bedroom example. The balcony and utility are excluded from the measured carpet area RERA unit details Floor plans.
Carpet area, balcony/utility areas and saleable area are different measures. The supplied record does not provide a verified unit-by-unit allocation of common-area loading or an executed allotment identifying a particular flat.
5. Parking & vehicle circulation
The GHMC permit records 253.48 m² of stilt parking area and requires the sanctioned stilt parking to be used exclusively for vehicle parking, without partition walls or rolling shutters or conversion to another use. The supplied records do not state the number of parking bays, visitor or accessible spaces, two-wheeler provision, parking allocation to individual units, or whether any parking is mechanically provided. A drawn or sanctioned parking area does not itself establish exclusive ownership or allotment.
6. Amenities, recreation & open spaces
The following items are recorded in the GHMC permit or the RERA amenity fields. A 0% progress entry is a record value, not independent confirmation of absence or completion.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Tot-lot / green strip | Permit extraction records tot-lot 0 m²; permit conditions also require a tot-lot to be fenced and maintained as greenery | No completion verification supplied | |
| Trees / peripheral greenery | 20 trees recorded; permit conditions call for planting along the site periphery and in front of the premises | No completion verification supplied | |
| Internal roads and footpaths | Listed in the RERA amenity record | RERA amenities | 0% recorded; not independently verified |
| Community buildings | Listed in the RERA amenity record | RERA amenities | 0% recorded; not independently verified |
| Aggregate recreational open space | Listed in the RERA amenity record; no area supplied | RERA amenities | 0% recorded; not independently verified |
7. Utilities, building services & safety
The RERA amenity record marks water supply, sewerage and an electrical meter room/substation/receiving station “YES”; it does not provide capacities or establish present operation. Other listed items—including storm-water drains, sewage and sullage treatment/disposal, solid-waste management, water conservation/rainwater harvesting, energy management and fire protection—show 0% in the supplied amenity record, with no completion verification RERA amenities.
The GHMC permit requires rainwater-harvesting structures (percolation pits) and records four pits. It also requires transformer space and a garbage house within the premises, and states that sanitation, plumbing, fire-safety requirements, lifts and electrical installations are to be executed under qualified technical supervision. The permit requires an occupancy certificate before occupation and an Occupancy Fire NOC before issue of the occupancy certificate. The supplied material does not specify water source or storage, STP capacity, power backup, lift count or capacity, fire-system equipment, or accessibility arrangements.
8. Location, access & connectivity
The registered project location is Sapthagiri Enclave, Ammuguda village, Hyderabad district, PIN 500056; the project record does not disclose a mandal RERA record Land records. The supplied location record gives a cadastral parcel-centroid coordinate of 17.41528, 78.35459 and lists Financial District (Nanakramguda) at 1.2 km Location record. No approach-road, public-transport or other landmark distances are provided in the supplied project location data.
9. Developer & development status
The registered promoter is Mahalakshmi Infra, recorded as a partnership. The RERA record names Cheemalapati Srinivas Rao as partner and authorised signatory and Pothireddy Madhava Reddy as partner Corporate record Parties record. The registration certificate lists the promoter office as Village: not stated, Mandal: Secunderabad, District: Hyderabad, PIN 500080. A Form B declaration is signed through authorised partner Sri Cheemalapati Srinivas Rao and states the development agreement and project-completion undertaking.
No official contact details or promoter website are supplied. The project has one recorded building and a ten-unit RERA offering; see the construction stage and occupancy certificate above RERA unit table.
10. Approvals, official records & documents
| Identifier / date | P02500002060; issued 24/08/2020; stated validity to 12/03/2026 |
|---|---|
| What the supplied record establishes | Form C registration for Mahalakshmi Nivasam and its stated conditions, including the separate-account requirement |
| Identifier / date | Approval 1/C1/03727/2020; file 1/C1/00374/2020; 12 March, 2020 |
|---|---|
| What the supplied record establishes | Permit for a residential building at Sapthagiri Enclave, Ammuguda, Sy. No. 16/6 |
| Identifier / date | Document 115879 |
|---|---|
| What the supplied record establishes | Plan document supplied for drawing-based unit measurements; its extraction does not provide a separate approved-layout confirmation |
| Identifier / date | 22 July, 2020 |
|---|---|
| What the supplied record establishes | Promoter declaration concerning the development agreement, land, project funds and completion undertaking |
| Identifier / date | GHMC OC 0371/GHMC/LBN/2021 -OC; 23/09/2021 |
|---|---|
| What the supplied record establishes | Architect’s Form–1A states the project is complete in all respects and records the GHMC occupancy certificate |
The supplied extract of the GHMC permit states that the permission does not confer ownership rights, requires adherence to the sanctioned plan, and requires an occupancy certificate before occupation.
1. Project at a glance
Project identity
Registered project name: Mahalakshmi Nivasam
Project type: Residential apartment project
Phase / registered portion: Phase not separately identified in the supplied record; the registration is for the project associated with Survey No. 16/6
TG-RERA registration: P02500002060
Registration validity: 24/08/2020 to 12/03/2026; the registration certificate says five years, unless extended by the Authority. The supplied certificate records no extension
Registered promoter: Mahalakshmi Infra; entity type recorded as Partnership
RERA project status: The project pack identifies the registration and its stated validity. The certificate’s recorded end date has passed; current registration status is not established by the supplied record
Land and geographic identity
Locality: Sapthagiri Enclave
Revenue village: Ammuguda (also rendered as Ammuguda Village in the filed title material)
Mandal: Secunderabad on the TG-RERA registration certificate; project land record does not disclose a mandal
District / PIN: Hyderabad / 500056
Survey number / subdivision: Sy. No. 16/6; no subdivision is stated
Plot numbers: 52 and 53
Registered site extent: 567.0 Sq. Yards, as declared in Form B for the land covered by the development agreement
Land area in project fields / permit: Total area 473.45 sq. m; net area 473.45 sq. m. The permit also records 473.45 m²
Boundaries: East: Plot Nos. 70 and 71; West: Road; North: Plot No. 51; South: Plot No. 54
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC)
Principal building approval: Building Permit Order / approval no. 1/C1/03727/2020, dated 12 March, 2020; file no. 1/C1/00374/2020
Approved built-up area: The project fields record approved built-up area of 1349.50 sq. m. The permit extraction separately records “Residential upper-floor area: 1,335.50 m2”
Building count and height: One building; proposed building identified as “PROPOSED-1 (BUILDING),” height 14.75 m
Sanctioned floor configuration: 1 Stilt + 5 upper floors
Parking: Stilt parking area recorded as 253.48 m²; the permit says approved stilt parking is to be used exclusively for vehicle parking. A bay count is not supplied
Unit count: 10 units in the RERA unit record; the project fields record one building unit, while the permit condition states sanctioned unit numbers must not be increased without GHMC approval
Offering and status
RERA-filed configuration: 3 BED ROOM FLAT; 10 units
RERA-filed saleable area: 133.55 sq. m per unit
Booked / available: 0 booked / 10 available in the TG-RERA portal reading; no as-of date is supplied, so these counts are indicative
Construction stage: The supplied architect’s Form–1A states the project was complete in all respects and records a GHMC occupancy certificate dated 23/09/2021. This is a filed certificate, not a current independent site inspection
Promoter-declared completion undertaking: Form B states completion before 24 March, 2026
Occupancy certificate: GHMC OC 0371/GHMC/LBN/2021 -OC, dated 23/09/2021; the architect’s certificate describes the registered project as completed in all respects. The certificate refers to the project at Sapthagiri Enclave, Ammuguda; separate tower/phase scope is not stated
2. The project story
Mahalakshmi Nivasam is recorded as a residential apartment project on Plot Nos. 52 and 53, Sy. No. 16/6, at Sapthagiri Enclave in Ammuguda village, Hyderabad district. The GHMC permit describes a single proposed residential building with a stilt and five upper floors. The RERA unit record lists ten three-bedroom flats.
The project’s Form B declaration states that Mahalakshmi Infra entered into a Development Agreement-Cum-General Power of Attorney with four landowners for the described land and undertook to complete the project before 24 March, 2026. Separately, an architect’s Form–1A filed for the registered project states it was complete in all respects and records a GHMC occupancy certificate dated 23/09/2021. This is documentary completion evidence; the supplied pack does not include an independent inspection confirming present physical condition or occupancy.
3. Master plan, architecture & building design
The GHMC permit describes one residential building, “PROPOSED-1 (BUILDING),” at 14.75 m in height, with 1 Stilt + 5 upper floors. It records 473.45 m² site area and a 1,335.50 m² residential upper-floor area; project fields separately state approved built-up area of 1349.50 sq. m. These are distinct recorded area figures, not interchangeable area measures.
The supplied drawing record identifies a typical plan for floors 1, 3, 4 and 5 and a separate second-floor plan. The software measurement record covers two three-bedroom flat designs and one four-bedroom design from the filed drawing, but does not establish that the four-bedroom design is part of the RERA-registered offering.
The permit records 253.48 m² of stilt parking, 78.41 RM of compound wall, four rainwater-harvesting pits, 20 trees, and a transformer space and garbage house within the premises. Its extracted tot-lot figure is 0 m². The supplied record does not establish building footprint, flats per floor, lift or stair arrangements, or a complete residential/common-area schedule.
4. Homes, configurations & floor plans
The RERA filing lists ten “3 BED ROOM FLAT” units, each with saleable area of 133.55 sq. m. The portal reading shows none booked and all ten available, but has no as-of date.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK (filed as “3 BED ROOM FLAT”) | 10 | 0 | 10 | 133.55 sq. m | 95.3–98.6 sq. m; median 96.9 sq. m (software-measured) | 27% |
The carpet-area figures are software measurements from the supplied floor-plan drawing, not RERA-filed disclosures; they are marked as needing review. The drawing measurement identifies a kitchen, hall, three bedrooms, two toilets, a balcony and a utility area in the measured three-bedroom example. The balcony and utility are excluded from the measured carpet area.
Carpet area, balcony/utility areas and saleable area are different measures. The supplied record does not provide a verified unit-by-unit allocation of common-area loading or an executed allotment identifying a particular flat.
5. Parking & vehicle circulation
The GHMC permit records 253.48 m² of stilt parking area and requires the sanctioned stilt parking to be used exclusively for vehicle parking, without partition walls or rolling shutters or conversion to another use. The supplied records do not state the number of parking bays, visitor or accessible spaces, two-wheeler provision, parking allocation to individual units, or whether any parking is mechanically provided. A drawn or sanctioned parking area does not itself establish exclusive ownership or allotment.
6. Amenities, recreation & open spaces
The following items are recorded in the GHMC permit or the RERA amenity fields. A 0% progress entry is a record value, not independent confirmation of absence or completion.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Tot-lot / green strip | Permit extraction records tot-lot 0 m²; permit conditions also require a tot-lot to be fenced and maintained as greenery | No completion verification supplied | |
| Trees / peripheral greenery | 20 trees recorded; permit conditions call for planting along the site periphery and in front of the premises | No completion verification supplied | |
| Internal roads and footpaths | Listed in the RERA amenity record | 0% recorded; not independently verified | |
| Community buildings | Listed in the RERA amenity record | 0% recorded; not independently verified | |
| Aggregate recreational open space | Listed in the RERA amenity record; no area supplied | 0% recorded; not independently verified |
7. Utilities, building services & safety
The RERA amenity record marks water supply, sewerage and an electrical meter room/substation/receiving station “YES”; it does not provide capacities or establish present operation. Other listed items—including storm-water drains, sewage and sullage treatment/disposal, solid-waste management, water conservation/rainwater harvesting, energy management and fire protection—show 0% in the supplied amenity record, with no completion verification.
The GHMC permit requires rainwater-harvesting structures (percolation pits) and records four pits. It also requires transformer space and a garbage house within the premises, and states that sanitation, plumbing, fire-safety requirements, lifts and electrical installations are to be executed under qualified technical supervision. The permit requires an occupancy certificate before occupation and an Occupancy Fire NOC before issue of the occupancy certificate. The supplied material does not specify water source or storage, STP capacity, power backup, lift count or capacity, fire-system equipment, or accessibility arrangements.
8. Location, access & connectivity
The registered project location is Sapthagiri Enclave, Ammuguda village, Hyderabad district, PIN 500056; the project record does not disclose a mandal. The supplied location record gives a cadastral parcel-centroid coordinate of 17.41528, 78.35459 and lists Financial District (Nanakramguda) at 1.2 km. No approach-road, public-transport or other landmark distances are provided in the supplied project location data.
9. Developer & development status
The registered promoter is Mahalakshmi Infra, recorded as a partnership. The RERA record names Cheemalapati Srinivas Rao as partner and authorised signatory and Pothireddy Madhava Reddy as partner. The registration certificate lists the promoter office as Village: not stated, Mandal: Secunderabad, District: Hyderabad, PIN 500080. A Form B declaration is signed through authorised partner Sri Cheemalapati Srinivas Rao and states the development agreement and project-completion undertaking.
No official contact details or promoter website are supplied. The project has one recorded building and a ten-unit RERA offering; see the construction stage and occupancy certificate above.
10. Approvals, official records & documents
| Identifier / date | P02500002060; issued 24/08/2020; stated validity to 12/03/2026 |
|---|---|
| What the supplied record establishes | Form C registration for Mahalakshmi Nivasam and its stated conditions, including the separate-account requirement |
| Identifier / date | Approval 1/C1/03727/2020; file 1/C1/00374/2020; 12 March, 2020 |
|---|---|
| What the supplied record establishes | Permit for a residential building at Sapthagiri Enclave, Ammuguda, Sy. No. 16/6 |
| Identifier / date | Document 115879 |
|---|---|
| What the supplied record establishes | Plan document supplied for drawing-based unit measurements; its extraction does not provide a separate approved-layout confirmation |
| Identifier / date | 22 July, 2020 |
|---|---|
| What the supplied record establishes | Promoter declaration concerning the development agreement, land, project funds and completion undertaking |
| Identifier / date | GHMC OC 0371/GHMC/LBN/2021 -OC; 23/09/2021 |
|---|---|
| What the supplied record establishes | Architect’s Form–1A states the project is complete in all respects and records the GHMC occupancy certificate |
The supplied extract of the GHMC permit states that the permission does not confer ownership rights, requires adherence to the sanctioned plan, and requires an occupancy certificate before occupation.
Frequently asked questions
Is Mahalakshmi Nivasam registered with Telangana RERA?
Yes. Mahalakshmi Nivasam is registered with the Telangana Real Estate Regulatory Authority as P02500002060; the registration status is New Project.
Who is the developer of Mahalakshmi Nivasam?
The promoter named in the RERA registration is Mahalakshmi Infra.
Where is Mahalakshmi Nivasam located?
Mahalakshmi Nivasam is in Sapthagiri Enclave, Hyderabad, Telangana (500056).
When will Mahalakshmi Nivasam be completed?
The promoter's proposed date of completion filed with RERA is 12/03/2026. This is the promoter's declaration, not a guarantee.