Manisha S Dharam Vatika
MANISHA CONSTRUCTIONS PRIVATE LIMITED · Hyderabad · RERA P02500002043
MANISHA S DHARAM VATIKA is a residential apartment project in MASABTANK, Golconda, Hyderabad. The registered promoter developing it is MANISHA CONSTRUCTIONS PRIVATE LIMITED. The project occupies 585.22 m² and comprises one residential building with 1 stilt + 5 upper floors and 10 3BHK units. It is registered under TG-RERA number P02500002043, with proposed completion on 16/01/2026.
More from Manisha Constructions Pvt Ltd · 3 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
7 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Project record |
|---|---|
| Registered project name | MANISHA S DHARAM VATIKA RERA record |
| Project type / registered portion | Residential apartment project; one registered project/building is identified in the supplied record. A separately numbered phase is not disclosed. RERA record RERA filing |
| TG-RERA registration | P02500002043; certificate issued 24/08/2020, valid from 24/08/2020 to 16/01/2026. The supplied record does not show an extension. RERA record Approvals record |
| Registered promoter | MANISHA CONSTRUCTIONS PRIVATE LIMITED RERA record RERA filing |
| RERA status | Certificate records registration under section 5. The registration end date shown is 16/01/2026; this is the registration-validity date, not the building’s occupancy-certificate status. |
Land and geographic identity
| Field | Project record |
|---|---|
| Locality / revenue village | Locality: MASABTANK. The RERA identity record gives village Masabtank; the GHMC building-permit record identifies MASABTANK -7. The occupancy-certificate extraction identifies village Asif Nagar. RERA record RERA filing |
| Mandal / district / PIN | Golconda, Hyderabad, 500028 RERA record RERA filing |
| Survey number and subdivision | 123 Part; the occupancy-certificate extraction renders it as 123 PART. RERA record Land records |
| Plot / site extent | Plot B/5; site and net area 585.22 m². GHMC’s building-permit extraction records road-affected area 0 m². RERA filing |
| Boundaries recorded in RERA filing | East: 60 FEET WIDE ROAD; west: PLOT NO B14; north: PLOT NO B4; south: PLOT NO B6. RERA filing |
Development identity
| Field | Project record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC) Approvals record |
| Principal building approval | Building permit 1/C12/00523/2020, approved 16 January, 2020; associated file number 1/C12/13758/2019. Approvals record |
| Approved built-up / floor area | 1,401.80 m² in the project record and GHMC building-permit extraction. RERA filing |
| Building count and configuration | One residential building, recorded as 1 stilt + 5 upper floors; the GHMC occupancy-certificate extraction also describes Cellar + Stilt Ground + Upper Floors 5. RERA filing |
| Height | 14.95 m in the GHMC building-permit and occupancy-certificate extractions. |
| Parking | Building-permit extraction records stilt parking of 266.31 m². The RERA filing records a mortgage area of 149.27 m²; a count of parking spaces is not supplied. RERA filing |
| Unit counts | RERA filing records 10 proposed building units; the approved-plan field records 1 building unit. The occupancy certificate is for the building, not a unit-by-unit count. RERA filing RERA unit table |
Offering and status
| Field | Project record |
|---|---|
| RERA-filed configuration | 3BHK, 10 units RERA unit table |
| Booking status | 10 booked; 0 available, as last read from the TG-RERA portal; the record does not provide an as-of date, so the counts are indicative. RERA unit table |
| RERA-filed saleable area | 160.16 m² for the 3BHK configuration. RERA unit table |
| Completion deadline | The TG-RERA certificate/project record gives 16/01/2026. The Form-B declaration dated 16th day of December 2019 separately records an undertaking to complete by 16th January 2021. RERA record |
| Occupancy certificate | A GHMC occupancy certificate is filed for the residential building at Survey No. 123 PART, issued 24 August, 2021, and states that the inspected building is fit for occupation. Its extraction records completion date 26 July, 2021. |
| Construction-stage evidence | Architect’s completion certificates filed in the RERA documents state completion and refer to GHMC occupancy certificate 001165/GHMC/0680/KH, dated 24/08/2021. |
2. The project story
- The RERA record describes a single-building residential apartment development on Plot B/5, Survey No. 123 Part, in the Masabtank area of Hyderabad. The site is recorded as 585.22 m², with a residential building configured as 1 stilt + 5 upper floors; the occupancy-certificate extraction also refers to a cellar. RERA record RERA filing
- The registered offering is ten 3BHK apartments. The TG-RERA unit record shows all ten as booked, with none available at the time that record was read; no as-of date is supplied. RERA unit table
- The GHMC occupancy certificate and architect’s completion certificates indicate a completed, occupancy-certified building. These are documentary records; no independent site inspection or current physical-condition assessment is included here.
3. Master plan, architecture & building design
- GHMC’s building-permit extraction records a 585.22 m² site, 1,401.80 m² of residential floor area, one stilt parking level, five upper floors and a building height of 14.95 m. It also records a 95.4 RM compound wall and 25 Trees. The supplied material does not provide a verified breakdown of floor-by-floor apartment layouts, lift or stair arrangements, internal circulation, or common-area distribution.
- The RERA filing lists one building and ten proposed units. No separate registered phase, multiple-tower arrangement, or residential/commercial mix is evidenced. The extracted occupancy-certificate record describes a cellar and stilt in addition to upper floors; it records the sanctioned and site floor area as 1401.8 m². RERA filing
- A floor-plan document is available as document 106899. Software measurement from its drawing geometry covers four 3BHK designs; one drawing has an identified second-floor-plan unit panel. The drawing-derived measurements are not RERA area disclosures and are noted as needing review. Floor plans
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 10 | 10 | 0 | 160.16 m² | Software-measured range: 106.8–110.2 m²; median 108.8 m² | 32% |
- The unit count, booking count and saleable area are from the TG-RERA filing; booking counts have no stated as-of date. Carpet-area figures are software measurements from approved floor-plan drawing geometry, not RERA-filed figures, and the supplied measurement record says they need review. The record describes the RERA area as saleable area; it is not interchangeable with carpet area, which excludes the identified balcony and utility in the measured drawing. RERA unit table RERA unit details Floor plans
- One measured unit panel identifies three bedrooms, a kitchen, living/dining space, three toilets, a utility and a balcony. The utility and balcony are marked as excluded from the measured carpet area. Individual room dimensions are drawing-derived measurements, not RERA disclosures. RERA unit details
5. Parking & vehicle circulation
The GHMC building-permit extraction records 266.31 m² of stilt parking and requires the approved cellar and stilt parking areas to be used exclusively for vehicle parking. The RERA filing separately records a mortgage area of 149.27 m². No count of car or two-wheeler spaces, visitor or accessible spaces, parking-allocation schedule, ramp arrangement, or EV-charging provision is supplied. A recorded parking area does not by itself establish exclusive allocation to a particular apartment. RERA filing
6. Amenities, recreation & open spaces
| Description / size | GHMC permit requires a fenced tot-lot and maintained greenery; permit extraction records tot-lot area 0 m² and 25 Trees. |
|---|---|
| Declared progress / verified status | Permit condition; the supplied records do not independently verify delivery. |
| Description / size | GHMC permit requires a rainwater-harvesting percolation pit. |
|---|---|
| Declared progress / verified status | Permit condition. The occupancy-certificate extraction records RWH as 0; delivery is not independently verified here. |
| Description / size | No size or facility detail supplied; the RERA amenity record reports 0%. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA-reported progress: 0%. |
| Description / size | No size supplied; the RERA amenity record reports 0%. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA-reported progress: 0%. |
| Description / size | No internal-road detail supplied; the RERA amenity record reports 0%. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA-reported progress: 0%. |
7. Utilities, building services & safety
- The RERA amenity record marks water supply, sewerage, water conservation/rainwater harvesting, and an electrical meter room/sub-station/receiving station as available at 100%. The same record gives 0% for storm-water drains, street lighting, treatment and disposal of sewage and sullage water, solid-waste management, energy management, and fire-protection/fire-safety requirements. These are portal-recorded progress entries, not an independent operational inspection. RERA amenities
- GHMC’s building-permit conditions require a rainwater-harvesting percolation pit, transformer space and a garbage house, and specify that fire-safety installations and means-of-escape safety are to be provided; the permit also states that an occupancy fire NOC is to be obtained before issue of the occupancy certificate. The supplied evidence does not detail water source or storage, STP capacity or reuse, backup power, lift count or capacity, CCTV, access control, accessible routes, or utility-system operating status.
8. Location, access & connectivity
- The registered project location is MASABTANK, Golconda Mandal, Hyderabad District, PIN 500028; the RERA filing identifies Survey No. 123 Part, Plot B/5. The recorded eastern boundary is a 60 FEET WIDE ROAD. RERA record RERA filing
- The supplied location record gives the Financial District (Nanakramguda) at 1.2 km as a connectivity anchor. No public-transport details, additional measured distances, or travel-time estimates are supplied. Location record
9. Developer & development status
- The registered promoter is MANISHA CONSTRUCTIONS PRIVATE LIMITED, a company. Its GSTIN is 36AADCM8356R1ZM. The project record lists its address as VALLEY VIEW APARTMENTS, ROAD NO.13A, SHANTHI NAGAR, MASABTANK, Golconda, Hyderabad, 500028 and gives the website https://www.manishaconstructions.in. RERA record Corporate record Parties record
- The Form-B declaration was made by authorized signatory Puskoor Raghu Kumar on 16th day of December 2019. It records a promoter undertaking to complete by 16th January 2021. The RERA certificate states validity ending 16/01/2026, and the filed GHMC occupancy certificate records the building as fit for occupation, issued 24 August, 2021. These dates describe distinct records: promoter undertaking, registration validity and building occupancy certification.
10. Approvals, official records & documents
| Identifier / date | P02500002043; issued 24/08/2020; valid to 16/01/2026 |
|---|---|
| Evidence and scope | Form ‘C’ certificate for MANISHA S DHARAM VATIKA, Survey No. 123 Part. |
| Identifier / date | 1/C12/00523/2020; approved 16 January, 2020; file 1/C12/13758/2019 |
|---|---|
| Evidence and scope | Building permit for a residential building at Masabtank, Survey No. 123 Part. |
| Identifier / date | 001165/GHMC/0680/KHB1/2021-OC; issued 24 August, 2021 |
|---|---|
| Evidence and scope | Extraction identifies the residential building at Survey No. 123 PART and states it is fit for occupation. |
| Identifier / date | 001165/GHMC/0680/KH; completion recorded as 24/08/2021 |
|---|---|
| Evidence and scope | Architect’s certificates filed with the project record. |
| Identifier / date | Document 106899 |
|---|---|
| Evidence and scope | Floor-plan drawing used for software measurement; the supplied record says one of two drawings was measured and one remains pending scan review. Floor plans |
| Identifier / date | Dated 16th day of December 2019 |
|---|---|
| Evidence and scope | Promoter declaration concerning land title, encumbrances and project obligations. |
1. Project at a glance
Project identity
Registered project name: MANISHA S DHARAM VATIKA
Project type / registered portion: Residential apartment project; one registered project/building is identified in the supplied record. A separately numbered phase is not disclosed.
TG-RERA registration: P02500002043; certificate issued 24/08/2020, valid from 24/08/2020 to 16/01/2026. The supplied record does not show an extension.
Registered promoter: MANISHA CONSTRUCTIONS PRIVATE LIMITED
RERA status: Certificate records registration under section 5. The registration end date shown is 16/01/2026; this is the registration-validity date, not the building’s occupancy-certificate status.
Land and geographic identity
Locality / revenue village: Locality: MASABTANK. The RERA identity record gives village Masabtank; the GHMC building-permit record identifies MASABTANK -7. The occupancy-certificate extraction identifies village Asif Nagar.
Mandal / district / PIN: Golconda, Hyderabad, 500028
Survey number and subdivision: 123 Part; the occupancy-certificate extraction renders it as 123 PART.
Plot / site extent: Plot B/5; site and net area 585.22 m². GHMC’s building-permit extraction records road-affected area 0 m².
Boundaries recorded in RERA filing: East: 60 FEET WIDE ROAD; west: PLOT NO B14; north: PLOT NO B4; south: PLOT NO B6.
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC)
Principal building approval: Building permit 1/C12/00523/2020, approved 16 January, 2020; associated file number 1/C12/13758/2019.
Approved built-up / floor area: 1,401.80 m² in the project record and GHMC building-permit extraction.
Building count and configuration: One residential building, recorded as 1 stilt + 5 upper floors; the GHMC occupancy-certificate extraction also describes Cellar + Stilt Ground + Upper Floors 5.
Height: 14.95 m in the GHMC building-permit and occupancy-certificate extractions.
Parking: Building-permit extraction records stilt parking of 266.31 m². The RERA filing records a mortgage area of 149.27 m²; a count of parking spaces is not supplied.
Unit counts: RERA filing records 10 proposed building units; the approved-plan field records 1 building unit. The occupancy certificate is for the building, not a unit-by-unit count.
Offering and status
RERA-filed configuration: 3BHK, 10 units
Booking status: 10 booked; 0 available, as last read from the TG-RERA portal; the record does not provide an as-of date, so the counts are indicative.
RERA-filed saleable area: 160.16 m² for the 3BHK configuration.
Completion deadline: The TG-RERA certificate/project record gives 16/01/2026. The Form-B declaration dated 16th day of December 2019 separately records an undertaking to complete by 16th January 2021.
Occupancy certificate: A GHMC occupancy certificate is filed for the residential building at Survey No. 123 PART, issued 24 August, 2021, and states that the inspected building is fit for occupation. Its extraction records completion date 26 July, 2021.
Construction-stage evidence: Architect’s completion certificates filed in the RERA documents state completion and refer to GHMC occupancy certificate 001165/GHMC/0680/KH, dated 24/08/2021.
2. The project story
- The RERA record describes a single-building residential apartment development on Plot B/5, Survey No. 123 Part, in the Masabtank area of Hyderabad. The site is recorded as 585.22 m², with a residential building configured as 1 stilt + 5 upper floors; the occupancy-certificate extraction also refers to a cellar.
- The registered offering is ten 3BHK apartments. The TG-RERA unit record shows all ten as booked, with none available at the time that record was read; no as-of date is supplied.
- The GHMC occupancy certificate and architect’s completion certificates indicate a completed, occupancy-certified building. These are documentary records; no independent site inspection or current physical-condition assessment is included here.
3. Master plan, architecture & building design
- GHMC’s building-permit extraction records a 585.22 m² site, 1,401.80 m² of residential floor area, one stilt parking level, five upper floors and a building height of 14.95 m. It also records a 95.4 RM compound wall and 25 Trees. The supplied material does not provide a verified breakdown of floor-by-floor apartment layouts, lift or stair arrangements, internal circulation, or common-area distribution.
- The RERA filing lists one building and ten proposed units. No separate registered phase, multiple-tower arrangement, or residential/commercial mix is evidenced. The extracted occupancy-certificate record describes a cellar and stilt in addition to upper floors; it records the sanctioned and site floor area as 1401.8 m².
- A floor-plan document is available as document 106899. Software measurement from its drawing geometry covers four 3BHK designs; one drawing has an identified second-floor-plan unit panel. The drawing-derived measurements are not RERA area disclosures and are noted as needing review.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 10 | 10 | 0 | 160.16 m² | Software-measured range: 106.8–110.2 m²; median 108.8 m² | 32% |
- The unit count, booking count and saleable area are from the TG-RERA filing; booking counts have no stated as-of date. Carpet-area figures are software measurements from approved floor-plan drawing geometry, not RERA-filed figures, and the supplied measurement record says they need review. The record describes the RERA area as saleable area; it is not interchangeable with carpet area, which excludes the identified balcony and utility in the measured drawing.
- One measured unit panel identifies three bedrooms, a kitchen, living/dining space, three toilets, a utility and a balcony. The utility and balcony are marked as excluded from the measured carpet area. Individual room dimensions are drawing-derived measurements, not RERA disclosures.
5. Parking & vehicle circulation
The GHMC building-permit extraction records 266.31 m² of stilt parking and requires the approved cellar and stilt parking areas to be used exclusively for vehicle parking. The RERA filing separately records a mortgage area of 149.27 m². No count of car or two-wheeler spaces, visitor or accessible spaces, parking-allocation schedule, ramp arrangement, or EV-charging provision is supplied. A recorded parking area does not by itself establish exclusive allocation to a particular apartment.
6. Amenities, recreation & open spaces
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Green strip / tot-lot | GHMC permit requires a fenced tot-lot and maintained greenery; permit extraction records tot-lot area 0 m² and 25 Trees. | Permit condition; the supplied records do not independently verify delivery. | |
| Water conservation / rainwater harvesting | GHMC permit requires a rainwater-harvesting percolation pit. | Permit condition. The occupancy-certificate extraction records RWH as 0; delivery is not independently verified here. | |
| Community buildings | No size or facility detail supplied; the RERA amenity record reports 0%. | RERA-reported progress: 0%. | |
| Aggregate recreational open space | No size supplied; the RERA amenity record reports 0%. | RERA-reported progress: 0%. | |
| Internal roads and footpaths | No internal-road detail supplied; the RERA amenity record reports 0%. | RERA-reported progress: 0%. |
7. Utilities, building services & safety
- The RERA amenity record marks water supply, sewerage, water conservation/rainwater harvesting, and an electrical meter room/sub-station/receiving station as available at 100%. The same record gives 0% for storm-water drains, street lighting, treatment and disposal of sewage and sullage water, solid-waste management, energy management, and fire-protection/fire-safety requirements. These are portal-recorded progress entries, not an independent operational inspection.
- GHMC’s building-permit conditions require a rainwater-harvesting percolation pit, transformer space and a garbage house, and specify that fire-safety installations and means-of-escape safety are to be provided; the permit also states that an occupancy fire NOC is to be obtained before issue of the occupancy certificate. The supplied evidence does not detail water source or storage, STP capacity or reuse, backup power, lift count or capacity, CCTV, access control, accessible routes, or utility-system operating status.
8. Location, access & connectivity
- The registered project location is MASABTANK, Golconda Mandal, Hyderabad District, PIN 500028; the RERA filing identifies Survey No. 123 Part, Plot B/5. The recorded eastern boundary is a 60 FEET WIDE ROAD.
- The supplied location record gives the Financial District (Nanakramguda) at 1.2 km as a connectivity anchor. No public-transport details, additional measured distances, or travel-time estimates are supplied.
9. Developer & development status
- The registered promoter is MANISHA CONSTRUCTIONS PRIVATE LIMITED, a company. Its GSTIN is 36AADCM8356R1ZM. The project record lists its address as VALLEY VIEW APARTMENTS, ROAD NO.13A, SHANTHI NAGAR, MASABTANK, Golconda, Hyderabad, 500028 and gives the website https://www.manishaconstructions.in.
- The Form-B declaration was made by authorized signatory Puskoor Raghu Kumar on 16th day of December 2019. It records a promoter undertaking to complete by 16th January 2021. The RERA certificate states validity ending 16/01/2026, and the filed GHMC occupancy certificate records the building as fit for occupation, issued 24 August, 2021. These dates describe distinct records: promoter undertaking, registration validity and building occupancy certification.
10. Approvals, official records & documents
| Identifier / date | P02500002043; issued 24/08/2020; valid to 16/01/2026 |
|---|---|
| Evidence and scope | Form ‘C’ certificate for MANISHA S DHARAM VATIKA, Survey No. 123 Part. |
| Identifier / date | 1/C12/00523/2020; approved 16 January, 2020; file 1/C12/13758/2019 |
|---|---|
| Evidence and scope | Building permit for a residential building at Masabtank, Survey No. 123 Part. |
| Identifier / date | 001165/GHMC/0680/KHB1/2021-OC; issued 24 August, 2021 |
|---|---|
| Evidence and scope | Extraction identifies the residential building at Survey No. 123 PART and states it is fit for occupation. |
| Identifier / date | 001165/GHMC/0680/KH; completion recorded as 24/08/2021 |
|---|---|
| Evidence and scope | Architect’s certificates filed with the project record. |
| Identifier / date | Document 106899 |
|---|---|
| Evidence and scope | Floor-plan drawing used for software measurement; the supplied record says one of two drawings was measured and one remains pending scan review. |
| Identifier / date | Dated 16th day of December 2019 |
|---|---|
| Evidence and scope | Promoter declaration concerning land title, encumbrances and project obligations. |
Frequently asked questions
Is MANISHA S DHARAM VATIKA registered with Telangana RERA?
Yes. MANISHA S DHARAM VATIKA is registered with the Telangana Real Estate Regulatory Authority as P02500002043; the registration status is New Project.
Who is the developer of MANISHA S DHARAM VATIKA?
The promoter named in the RERA registration is MANISHA CONSTRUCTIONS PRIVATE LIMITED.
Where is MANISHA S DHARAM VATIKA located?
MANISHA S DHARAM VATIKA is in MASABTANK, Golconda, Hyderabad, Telangana (500028).
When will MANISHA S DHARAM VATIKA be completed?
The promoter's proposed date of completion filed with RERA is 16/01/2026. This is the promoter's declaration, not a guarantee.
More projects in Golconda