Maphars Saba Residency
MAPHAR CONSTRUCTIONS PVT LTD · Hyderabad · RERA P02500001807
MAPHARS SABA RESIDENCY is a residential apartment project in Redhills, Nampally mandal, Hyderabad district, developed by registered promoter Maphar Constructions Pvt Ltd. The project filing records a total area of 2068 sqmts, and the GHMC permit extracts describe Building A and Building A-1, each with 1 Cellar + Stilt + 5 upper floors. The RERA configuration data lists 30 apartments: 5 2BHK and 25 3BHK. Its TG-RERA registration is P02500001807, and the Form B declaration dated 26th August 2019 undertakes completion by 14th June 2025.
More from Maphar Constructions Pvt Ltd · 6 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
8 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Record |
|---|---|
| Registered project name | MAPHARS SABA RESIDENCY RERA record |
| Project type | Residential apartment project RERA record |
| Phase / registered portion | A registered phase or portion is not separately identified in the supplied record; the building permits name Building A and Building A-1. Approvals record |
| TG-RERA registration | P02500001807 |
| Registration validity | 20/03/2020 to 14/06/2025; certificate records a five-year validity and no extension. This is the registration period, not a statement of construction completion or occupancy. |
| Registered promoter | Maphar Constructions Pvt Ltd Corporate record |
| RERA status | Registration certificate issued under section 5. The supplied certificate records validity ending 14/06/2025 and no extension; a current registration-status confirmation is not included. |
Land and geographic identity
| Field | Record |
|---|---|
| Locality / address references | Redhills / Red Hills; the project documents also identify 11-4-654 AND (OLD NO F1 - 339). RERA record RERA filing |
| Revenue village | Redhills is the village name in the project header and land record. The supplied records do not establish a distinct revenue-village identity. RERA record Land records |
| Mandal | Nampally in the TG-RERA registration certificate; the project land record does not disclose a mandal. Land records |
| District / PIN | Hyderabad / 500028 RERA record |
| Survey number / subdivision | Not disclosed in the supplied project identity and land records. Land records |
| Registered site extent | The supplied certificate identifies the plot/address but does not state a site extent. |
| Land area figures in project records | Project filing: total area 2068 sqmts, area affected in road widening/FTL/Nala widening 123 sqmts, and net area 1945.00 sqmts. The supplied land parcel record separately lists total/net area 1739.12 and affected area 0.0; those parcel figures do not specify a unit. RERA filing Land records |
| Boundaries in project filing | East: 40 FT ROAD; West: KHUSRO MANZIL; North: 11-4-653; South: 20 FT COMMON ROAD AND NEIGHBORS LAND. RERA filing |
| Boundaries in land parcel record | North: C C TO RED HILLS; South: NEIGHBOURS HOUSE; East: PUBLIC ROAD AND RED HILLS GARDEN; West: NEIGHBOURS HOUSE KAMAL VILLA. Land records |
Development identity
| Field | Record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC) Approvals record |
| Principal building-permit references | GHMC Building Permit Order 1/C12/09166/2019, approved 14 June, 2019; later Building Permit Order 1/C12/03154/2020, approved 03 March, 2020. The related file numbers are 1/C7/11980/2017 and 1/C12/23104/2019, respectively. Approvals record |
| Approved built-up area | The filing states 5367 sqmts as approved built-up area. The supplied permit extracts separately list Residential upper floors: 5; area 5,367.05 m2 for Building A. RERA filing |
| Building count / names in supplied permits | Building A (CAPT EL) and Building A-1 are each named in a GHMC permit extract. The supplied records do not establish how these permit labels map to the RERA filing’s building/unit summary. |
| Sanctioned floor configuration | Each permit extract describes 1 Cellar + Stilt + 5 upper floors. |
| Parking levels / sanctioned counts | Cellar and stilt are identified for parking in the Building A permit; the Building A-1 permit also says cellar and stilt approved for parking. A sanctioned total parking-space count is not supplied. |
| Unit counts | Project filing: 1 total building unit and 1 proposed building unit. The RERA unit configuration records separately list 30 apartments (5 2BHK and 25 3BHK). The supplied data does not explain the differing unit-count fields. RERA filing RERA unit table |
Offering and status
| Field | Record |
|---|---|
| RERA-filed configurations | 2BHK and 3BHK apartments RERA unit table |
| RERA-filed saleable-area range | 2BHK: 94.32 sqm; 3BHK: 103.84 sqm RERA unit table |
| Booked / available | As last read from the TG-RERA portal, 0 booked and 5 available 2BHKs; 0 booked and 25 available 3BHKs. The portal record has no as-of date, so counts are indicative. RERA unit table |
| Construction stage | No independently verified site-progress evidence or current construction-stage report is included. The RERA amenity entries show 0% progress for the listed items. RERA amenities |
| Completion dates in supplied records | RERA registration certificate valid through 14/06/2025; Form B declaration dated 26th August 2019 undertakes completion by 14th June 2025. Another Form B in the record declares 03-09-2022. |
| Occupancy / completion certificate | No occupancy certificate or completion certificate is included in the supplied records. The GHMC permit extracts state that an occupancy certificate is required before occupation. |
2. The project story
MAPHARS SABA RESIDENCY is recorded as a residential apartment project in Redhills, Hyderabad. The TG-RERA registration certificate identifies the site by house/plot reference 11-4-654 AND (OLD NO F1 - 339). The record does not disclose survey numbers or subdivisions. RERA record Land records
The supplied RERA configuration data lists 30 apartments: 25 3BHK and 5 2BHK. The portal-derived booking snapshot shows none booked and all 30 available, but is undated and should be treated as indicative rather than a current inventory confirmation. RERA unit table
GHMC permit extracts describe residential buildings with a cellar, stilt and five upper floors. No supplied evidence establishes construction progress or completion for either permit-labelled building; the RERA amenity-progress entries are recorded as 0%. No occupancy or completion certificate is included. RERA amenities
3. Master plan, architecture & building design
The GHMC permit extract for Building A records a site area of 2068.41 m2, net area of 1945.21, road-affected area of 123.21 m2, residential upper-floor area of 5,367.05 m2, cellar area of 1,140.39 m2, and stilt area of 973.34 m2. It specifies 1 Cellar + Stilt + 5 upper floors and a building height of 14.99 m.
The separate Building A-1 permit extract records a site and net area of 1739.12 m2, residential area of 4,376.20, cellar area of 934.44, stilt area of 848.31, and 1 Cellar + Stilt + 5 upper floors. Its stated height is 14.79 m.
The RERA filing’s approved built-up-area field is 5367 sqmts. The permit-extract figures above are retained as stated and are not treated as interchangeable with the filing’s approved built-up-area field. No FSI-counted area, detailed building footprint, flats-per-floor schedule, lift count, stair count, circulation plan, or phase-by-phase building organization is available in the supplied structured records. RERA filing
The Building A permit lists a 99.63 m2 tot-lot, 4 rainwater-harvesting pits, and space for a transformer and garbage house. The Building A-1 permit lists a 86.96 m2 tot-lot, a rainwater-harvesting percolation pit, and transformer and garbage-house requirements. These are permit-extract provisions; they do not establish that the facilities have been completed.
4. Homes, configurations & floor plans
RERA-filed saleable areas and counts are shown below. Carpet areas are software measurements from approved floor-plan drawing geometry, not RERA-filed areas; the measurement record says review is needed. Saleable area includes the home’s share of common areas, while carpet area is a separate interior-area measure. The supplied records do not provide a balcony-area or loading schedule for every configuration. RERA unit table Floor plans RERA unit details
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 5 | 0 | 5 | 94.32 sqm | 74.0–82.2 sqm; median 81.6 sqm (software-measured from 6 flat designs) | Not supplied |
| 3BHK | 25 | 0 | 25 | 103.84 sqm | 95.9–103.7 sqm; median 96.5 sqm (software-measured from 9 flat designs) | Not supplied |
The measured 2BHK drawing example includes a bedroom, hall, dining area, kitchen and toilets. The measured 3BHK example includes three bedrooms, living/dining, kitchen, toilets, a dress room, utility and balcony; the utility and balcony are excluded from the reported carpet measurement. Example room dimensions are drawing-derived software measurements, not RERA disclosures. RERA unit details
5. Parking & vehicle circulation
GHMC’s Building A permit states that the cellar and stilt approved in the plan are to be used exclusively for vehicle parking. The Building A-1 permit likewise identifies cellar and stilt for parking. The supplied permit extracts do not state a sanctioned parking-space count, resident/visitor allocation, accessible spaces, EV charging provision, ramp arrangement or unit-wise parking allotment.
The vendor record lists 35 Covered Parking and “dedicated parking spaces”; this is a marketing-source claim, not a confirmed sanctioned count or legal allocation. Promoter website
6. Amenities, recreation & open spaces
The RERA amenity record marks the listed items at 0% progress. Permit-listed tot-lots and other provisions are not evidence of completion. RERA amenities
| Description / size | RERA amenity listed; Building A permit extract specifies 99.63 m2 tot-lot; Building A-1 extract specifies 86.96 m2 tot-lot. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA entry: 0%; completion not independently verified. |
| Description / size | RERA amenity listed; Building A permit extract lists 4 rainwater-harvesting pits; Building A-1 permit requires a rainwater-harvesting percolation pit. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA entry: 0%; completion not independently verified. |
| Description / size | Listed in the RERA amenity record; no description or size supplied. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | 0%; completion not independently verified. |
| Description / size | Listed in the RERA amenity record; no dimensions or further detail supplied. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | 0%; completion not independently verified. |
| Description / size | Listed in the RERA amenity record; no system details supplied. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | 0%; completion not independently verified. |
No supported evidence is supplied for a clubhouse or indoor recreation facilities.
7. Utilities, building services & safety
The RERA amenity record lists water supply, sewerage and sewage/sullage treatment, storm-water drains, solid-waste management, rainwater harvesting, fire protection, and an electrical meter room/sub-station/receiving station; each corresponding listed item shows 0% progress. The record does not provide capacities, system specifications or completed-status verification. RERA amenities
GHMC’s Building A permit requires transformer space, a garbage house, rainwater harvesting, and services—including sanitation, plumbing, fire safety, lifts and electrical installations—under qualified technical supervision. The Building A-1 permit includes conditions for emergency lighting, fire extinguishers, manual alarm, hose reel/down corner, separate underground and terrace fire-water tanks of 25,000 lts. each, generator provision, and fire-safety requirements. These are permit conditions, not evidence that installations are complete or that statutory clearances have been obtained.
The Building A permit also states that an occupancy fire NOC is to be obtained before an occupancy certificate. The supplied record does not include a fire NOC, occupancy certificate, lift count or capacity, water-storage capacity for general supply, STP capacity, backup capacity, CCTV or access-control verification, or accessibility details. RERA amenities
8. Location, access & connectivity
The official project location is recorded as Redhills, Hyderabad, PIN 500028, with site reference 11-4-654 AND (OLD NO F1 - 339). The registration certificate identifies mandal Nampally; the land record does not disclose a mandal or survey number. RERA record Land records
The project filing gives site boundaries of 40 FT ROAD to the east, KHUSRO MANZIL to the west, 11-4-653 to the north, and 20 FT COMMON ROAD AND NEIGHBORS LAND to the south. A location record gives the Financial District (Nanakramguda) at 1.2 km. RERA filing Location record
No public-transport or further approach-road details are supplied. The vendor brochure contains other distance claims, but they are not used here as official project-location evidence. Location record Promoter website
9. Developer & development status
The registered legal promoter is Maphar Constructions Pvt Ltd, a company. Its supplied corporate identifier is GSTIN 36AAJCM5061F1ZH. The promoter address in the project record is MAPHAR CASTLE, MASAB TANK, REDHILLS, REDHILLS, Hyderabad, 500028. No official contact details or company website are established by the supplied project records. Corporate record Parties record
The Form B declaration dated 26th August 2019 records a promoter undertaking to complete by 14th June 2025; a separate Form B dated 03d Day of March 2020 states completion by 03-09-2022. These are promoter declarations. No current construction-progress certification or occupancy/completion certificate is supplied.
10. Approvals, official records & documents
| Reference and scope | P02500001807, MAPHARS SABA RESIDENCY; certificate valid 20/03/2020–14/06/2025 and records no extension. |
|---|---|
| Evidence available | Registration certificate, Form C |
| Reference and scope | 1/C12/09166/2019, approved 14 June, 2019; Building A (CAPT EL), file 1/C7/11980/2017. |
|---|---|
| Evidence available | Permit extract |
| Reference and scope | 1/C12/03154/2020, approved 03 March, 2020; Building A-1, file 1/C12/23104/2019. |
|---|---|
| Evidence available | Permit extract |
| Reference and scope | Drawing text layer identifies 1/C12/09166/2019; stamp is recorded as needing review. |
|---|---|
| Evidence available | Drawing record |
| Reference and scope | Permit extracts are supplied under the commencement-certificate document category. No occupancy or completion certificate is included. |
|---|---|
| Evidence available | Document index |
| Reference and scope | Form B declarations dated 26th August 2019 and 03d Day of March 2020. |
|---|
| Reference and scope | No approved-layout document or accessible public layout lookup result is supplied. |
|---|---|
| Evidence available | HMDA Document index |
Survey number/subdivision and a verified revenue-village identity are not disclosed in the supplied project records. The land-record site-area figures, permit-extract areas and RERA filing area fields are reported in their respective sections as recorded; the supplied evidence does not provide a reconciled site-area statement. Land records RERA filing
1. Project at a glance
Project identity
Registered project name: MAPHARS SABA RESIDENCY
Project type: Residential apartment project
Phase / registered portion: A registered phase or portion is not separately identified in the supplied record; the building permits name Building A and Building A-1.
TG-RERA registration: P02500001807
Registration validity: 20/03/2020 to 14/06/2025; certificate records a five-year validity and no extension. This is the registration period, not a statement of construction completion or occupancy.
Registered promoter: Maphar Constructions Pvt Ltd
RERA status: Registration certificate issued under section 5. The supplied certificate records validity ending 14/06/2025 and no extension; a current registration-status confirmation is not included.
Land and geographic identity
Locality / address references: Redhills / Red Hills; the project documents also identify 11-4-654 AND (OLD NO F1 - 339).
Revenue village: Redhills is the village name in the project header and land record. The supplied records do not establish a distinct revenue-village identity.
Mandal: Nampally in the TG-RERA registration certificate; the project land record does not disclose a mandal.
District / PIN: Hyderabad / 500028
Survey number / subdivision: Not disclosed in the supplied project identity and land records.
Registered site extent: The supplied certificate identifies the plot/address but does not state a site extent.
Land area figures in project records: Project filing: total area 2068 sqmts, area affected in road widening/FTL/Nala widening 123 sqmts, and net area 1945.00 sqmts. The supplied land parcel record separately lists total/net area 1739.12 and affected area 0.0; those parcel figures do not specify a unit.
Boundaries in project filing: East: 40 FT ROAD; West: KHUSRO MANZIL; North: 11-4-653; South: 20 FT COMMON ROAD AND NEIGHBORS LAND.
Boundaries in land parcel record: North: C C TO RED HILLS; South: NEIGHBOURS HOUSE; East: PUBLIC ROAD AND RED HILLS GARDEN; West: NEIGHBOURS HOUSE KAMAL VILLA.
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC)
Principal building-permit references: GHMC Building Permit Order 1/C12/09166/2019, approved 14 June, 2019; later Building Permit Order 1/C12/03154/2020, approved 03 March, 2020. The related file numbers are 1/C7/11980/2017 and 1/C12/23104/2019, respectively.
Approved built-up area: The filing states 5367 sqmts as approved built-up area. The supplied permit extracts separately list Residential upper floors: 5; area 5,367.05 m2 for Building A.
Building count / names in supplied permits: Building A (CAPT EL) and Building A-1 are each named in a GHMC permit extract. The supplied records do not establish how these permit labels map to the RERA filing’s building/unit summary.
Sanctioned floor configuration: Each permit extract describes 1 Cellar + Stilt + 5 upper floors.
Parking levels / sanctioned counts: Cellar and stilt are identified for parking in the Building A permit; the Building A-1 permit also says cellar and stilt approved for parking. A sanctioned total parking-space count is not supplied.
Unit counts: Project filing: 1 total building unit and 1 proposed building unit. The RERA unit configuration records separately list 30 apartments (5 2BHK and 25 3BHK). The supplied data does not explain the differing unit-count fields.
Offering and status
RERA-filed configurations: 2BHK and 3BHK apartments
RERA-filed saleable-area range: 2BHK: 94.32 sqm; 3BHK: 103.84 sqm
Booked / available: As last read from the TG-RERA portal, 0 booked and 5 available 2BHKs; 0 booked and 25 available 3BHKs. The portal record has no as-of date, so counts are indicative.
Construction stage: No independently verified site-progress evidence or current construction-stage report is included. The RERA amenity entries show 0% progress for the listed items.
Completion dates in supplied records: RERA registration certificate valid through 14/06/2025; Form B declaration dated 26th August 2019 undertakes completion by 14th June 2025. Another Form B in the record declares 03-09-2022.
Occupancy / completion certificate: No occupancy certificate or completion certificate is included in the supplied records. The GHMC permit extracts state that an occupancy certificate is required before occupation.
2. The project story
MAPHARS SABA RESIDENCY is recorded as a residential apartment project in Redhills, Hyderabad. The TG-RERA registration certificate identifies the site by house/plot reference 11-4-654 AND (OLD NO F1 - 339). The record does not disclose survey numbers or subdivisions.
The supplied RERA configuration data lists 30 apartments: 25 3BHK and 5 2BHK. The portal-derived booking snapshot shows none booked and all 30 available, but is undated and should be treated as indicative rather than a current inventory confirmation.
GHMC permit extracts describe residential buildings with a cellar, stilt and five upper floors. No supplied evidence establishes construction progress or completion for either permit-labelled building; the RERA amenity-progress entries are recorded as 0%. No occupancy or completion certificate is included.
3. Master plan, architecture & building design
The GHMC permit extract for Building A records a site area of 2068.41 m2, net area of 1945.21, road-affected area of 123.21 m2, residential upper-floor area of 5,367.05 m2, cellar area of 1,140.39 m2, and stilt area of 973.34 m2. It specifies 1 Cellar + Stilt + 5 upper floors and a building height of 14.99 m.
The separate Building A-1 permit extract records a site and net area of 1739.12 m2, residential area of 4,376.20, cellar area of 934.44, stilt area of 848.31, and 1 Cellar + Stilt + 5 upper floors. Its stated height is 14.79 m.
The RERA filing’s approved built-up-area field is 5367 sqmts. The permit-extract figures above are retained as stated and are not treated as interchangeable with the filing’s approved built-up-area field. No FSI-counted area, detailed building footprint, flats-per-floor schedule, lift count, stair count, circulation plan, or phase-by-phase building organization is available in the supplied structured records.
The Building A permit lists a 99.63 m2 tot-lot, 4 rainwater-harvesting pits, and space for a transformer and garbage house. The Building A-1 permit lists a 86.96 m2 tot-lot, a rainwater-harvesting percolation pit, and transformer and garbage-house requirements. These are permit-extract provisions; they do not establish that the facilities have been completed.
4. Homes, configurations & floor plans
RERA-filed saleable areas and counts are shown below. Carpet areas are software measurements from approved floor-plan drawing geometry, not RERA-filed areas; the measurement record says review is needed. Saleable area includes the home’s share of common areas, while carpet area is a separate interior-area measure. The supplied records do not provide a balcony-area or loading schedule for every configuration.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 5 | 0 | 5 | 94.32 sqm | 74.0–82.2 sqm; median 81.6 sqm (software-measured from 6 flat designs) | Not supplied |
| 3BHK | 25 | 0 | 25 | 103.84 sqm | 95.9–103.7 sqm; median 96.5 sqm (software-measured from 9 flat designs) | Not supplied |
The measured 2BHK drawing example includes a bedroom, hall, dining area, kitchen and toilets. The measured 3BHK example includes three bedrooms, living/dining, kitchen, toilets, a dress room, utility and balcony; the utility and balcony are excluded from the reported carpet measurement. Example room dimensions are drawing-derived software measurements, not RERA disclosures.
5. Parking & vehicle circulation
GHMC’s Building A permit states that the cellar and stilt approved in the plan are to be used exclusively for vehicle parking. The Building A-1 permit likewise identifies cellar and stilt for parking. The supplied permit extracts do not state a sanctioned parking-space count, resident/visitor allocation, accessible spaces, EV charging provision, ramp arrangement or unit-wise parking allotment.
The vendor record lists 35 Covered Parking and “dedicated parking spaces”; this is a marketing-source claim, not a confirmed sanctioned count or legal allocation.
6. Amenities, recreation & open spaces
The RERA amenity record marks the listed items at 0% progress. Permit-listed tot-lots and other provisions are not evidence of completion.
| Description / size | RERA amenity listed; Building A permit extract specifies 99.63 m2 tot-lot; Building A-1 extract specifies 86.96 m2 tot-lot. |
|---|---|
| Declared progress / verified status | RERA entry: 0%; completion not independently verified. |
| Description / size | RERA amenity listed; Building A permit extract lists 4 rainwater-harvesting pits; Building A-1 permit requires a rainwater-harvesting percolation pit. |
|---|---|
| Declared progress / verified status | RERA entry: 0%; completion not independently verified. |
| Description / size | Listed in the RERA amenity record; no description or size supplied. |
|---|---|
| Declared progress / verified status | 0%; completion not independently verified. |
| Description / size | Listed in the RERA amenity record; no dimensions or further detail supplied. |
|---|---|
| Declared progress / verified status | 0%; completion not independently verified. |
| Description / size | Listed in the RERA amenity record; no system details supplied. |
|---|---|
| Declared progress / verified status | 0%; completion not independently verified. |
No supported evidence is supplied for a clubhouse or indoor recreation facilities.
7. Utilities, building services & safety
The RERA amenity record lists water supply, sewerage and sewage/sullage treatment, storm-water drains, solid-waste management, rainwater harvesting, fire protection, and an electrical meter room/sub-station/receiving station; each corresponding listed item shows 0% progress. The record does not provide capacities, system specifications or completed-status verification.
GHMC’s Building A permit requires transformer space, a garbage house, rainwater harvesting, and services—including sanitation, plumbing, fire safety, lifts and electrical installations—under qualified technical supervision. The Building A-1 permit includes conditions for emergency lighting, fire extinguishers, manual alarm, hose reel/down corner, separate underground and terrace fire-water tanks of 25,000 lts. each, generator provision, and fire-safety requirements. These are permit conditions, not evidence that installations are complete or that statutory clearances have been obtained.
The Building A permit also states that an occupancy fire NOC is to be obtained before an occupancy certificate. The supplied record does not include a fire NOC, occupancy certificate, lift count or capacity, water-storage capacity for general supply, STP capacity, backup capacity, CCTV or access-control verification, or accessibility details.
8. Location, access & connectivity
The official project location is recorded as Redhills, Hyderabad, PIN 500028, with site reference 11-4-654 AND (OLD NO F1 - 339). The registration certificate identifies mandal Nampally; the land record does not disclose a mandal or survey number.
The project filing gives site boundaries of 40 FT ROAD to the east, KHUSRO MANZIL to the west, 11-4-653 to the north, and 20 FT COMMON ROAD AND NEIGHBORS LAND to the south. A location record gives the Financial District (Nanakramguda) at 1.2 km.
No public-transport or further approach-road details are supplied. The vendor brochure contains other distance claims, but they are not used here as official project-location evidence.
9. Developer & development status
The registered legal promoter is Maphar Constructions Pvt Ltd, a company. Its supplied corporate identifier is GSTIN 36AAJCM5061F1ZH. The promoter address in the project record is MAPHAR CASTLE, MASAB TANK, REDHILLS, REDHILLS, Hyderabad, 500028. No official contact details or company website are established by the supplied project records.
The Form B declaration dated 26th August 2019 records a promoter undertaking to complete by 14th June 2025; a separate Form B dated 03d Day of March 2020 states completion by 03-09-2022. These are promoter declarations. No current construction-progress certification or occupancy/completion certificate is supplied.
10. Approvals, official records & documents
| Reference and scope | P02500001807, MAPHARS SABA RESIDENCY; certificate valid 20/03/2020–14/06/2025 and records no extension. |
|---|---|
| Evidence available | Registration certificate, Form C |
| Reference and scope | 1/C12/09166/2019, approved 14 June, 2019; Building A (CAPT EL), file 1/C7/11980/2017. |
|---|---|
| Evidence available | Permit extract |
| Reference and scope | 1/C12/03154/2020, approved 03 March, 2020; Building A-1, file 1/C12/23104/2019. |
|---|---|
| Evidence available | Permit extract |
| Reference and scope | Drawing text layer identifies 1/C12/09166/2019; stamp is recorded as needing review. |
|---|---|
| Evidence available | Drawing record |
| Reference and scope | Permit extracts are supplied under the commencement-certificate document category. No occupancy or completion certificate is included. |
|---|
| Reference and scope | Form B declarations dated 26th August 2019 and 03d Day of March 2020. |
|---|
| Reference and scope | No approved-layout document or accessible public layout lookup result is supplied. |
|---|
Survey number/subdivision and a verified revenue-village identity are not disclosed in the supplied project records. The land-record site-area figures, permit-extract areas and RERA filing area fields are reported in their respective sections as recorded; the supplied evidence does not provide a reconciled site-area statement.
Frequently asked questions
Is MAPHARS SABA RESIDENCY registered with Telangana RERA?
Yes. MAPHARS SABA RESIDENCY is registered with the Telangana Real Estate Regulatory Authority as P02500001807; the registration status is New Project.
Who is the developer of MAPHARS SABA RESIDENCY?
The promoter named in the RERA registration is MAPHAR CONSTRUCTIONS PVT LTD.
Where is MAPHARS SABA RESIDENCY located?
MAPHARS SABA RESIDENCY is in REDHILLS, Hyderabad, Telangana (500028).
When will MAPHARS SABA RESIDENCY be completed?
The promoter's proposed date of completion filed with RERA is 14/06/2025. This is the promoter's declaration, not a guarantee.
More projects in Hyderabad