Brigade Citadel - Phase 1
Brigade Enterprises Limited · Medchal-Malkajgiri · RERA P02200002237
BRIGADE CITADEL - PHASE 1 is a residential apartment project in Erragadda, Balanagar mandal, Medchal-Malkajgiri district, developed by registered promoter Brigade Enterprises Limited. The site area is 51,596.35 sq. m, and the development comprises eight residential blocks and one amenity block, with residential blocks ranging from Ground + 5 upper floors to Cellar + Ground + 15 upper floors. The TG-RERA filing records 370 homes: 172 2BHK and 198 3BHK. Registered under TG-RERA number P02200002237, the promoter’s Form B undertaking gives a proposed completion date of 30.9.2025.
More from Brigade Enterprises Ltd · 8 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
11 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered project name | BRIGADE CITADEL - PHASE 1 RERA record |
| Project type | Residential apartment project RERA record RERA filing |
| Phase / registered portion | Phase 1; the registration certificate is for this registered phase |
| TG-RERA registration number | P02200002237 |
| Registration validity | 30/10/2020–30/09/2025; the supplied certificate records four years. Registration validity is separate from the construction deadline and occupancy-certificate status. |
| Registered promoter | Brigade Enterprises Limited, Company RERA record Corporate record |
| TG-RERA status in supplied record | New Project RERA filing. The certificate records registration through 30/09/2025; no extension is recorded in the supplied certificate. |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality / address description | Erragadda; the building-permit record identifies Erragadda, and the RERA certificate gives PIN 500018. RERA record |
| Revenue village | Erragadda in the project header and building-permit record; the RERA certificate text also contains “YERRAGADDA.” The supplied records do not establish whether these are separate revenue villages or a spelling variation. RERA record |
| Mandal | Balanagar RERA record |
| District | Medchal-Malkajgiri in the project header; the RERA certificate states Hyderabad. RERA record |
| PIN | 500018 RERA record |
| Project survey numbers / subdivisions | 78/AA and 79/AA RERA record Land records |
| Site extent | Total site area 51,596.35 sq. m; net area 47,564.55 sq. m; road-affected area 4,031.8 sq. m. Building-permit record states nala-affected area 0 sq. m. Land records |
| Boundaries in RERA filing | East: ROAD; West: EXISTING BUILDING; North: OPEN LAND; South: ROAD. RERA filing |
Development identity
| Item | Project record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC) Approvals record |
| Principal building approval | GHMC Building Permit Order 1/C19/08901/2020, approved 24 August 2020; file number 1/C19/21198/2019. Approvals record |
| Layout / subdivision reference | 1/C19/15128/2019, shown in the permit record. |
| Approved built-up area | 181,352.59 sq. m as recorded in the RERA filing. RERA filing |
| Building arrangement in GHMC permit | One amenity block, AMENITIES-1, and eight residential blocks: BLOCK-1 (A1), (A2), (B), (C), (D), (E), (F) and (G). The permit lists floor configurations and heights below. |
| Sanctioned floors and heights | AMENITIES-1: Ground + 4 upper floors, height 20.1 m; BLOCK-1 (G) and (F): Ground + 5 upper floors, each 18.45 m; BLOCK-1 (E), (D), (C), (A2) and (B): Ground + 15 upper floors, each 47.95 m; BLOCK-1 (A1): Cellar + Ground + 15 upper floors, height 47.95 m. |
| Parking levels | Permit conditions identify cellar and stilts approved for parking; the supplied extract does not give a parking-space count. |
| Approved versus RERA-declared units | RERA filing records three building units; the supplied permit extract does not provide a total dwelling-unit count for direct comparison. The RERA unit table lists 370 homes: 172 2BHK and 198 3BHK. RERA filing RERA unit table |
Offering and status
| Item | Project record |
|---|---|
| RERA-filed configurations | 2BHK and 3BHK RERA unit table |
| RERA-filed saleable areas | 2BHK: 29.46 sq. m; 3BHK: 43.44 sq. m RERA unit table |
| RERA portal inventory | 370 total homes: 312 booked and 58 available (172 2BHK: 140 booked / 32 available; 198 3BHK: 172 booked / 26 available). Portal counts have no supplied as-of date and are indicative. RERA unit table |
| Construction stage | The supplied RERA amenity/infrastructure table reports percentage figures for selected items, but no overall construction-progress percentage or independently verified current site inspection is provided. RERA amenities |
| Completion dates | Promoter’s Form B undertaking: 30.9.2025. The GHMC building permit states construction was to be completed before 24 August 2026. These are different record items; the supplied evidence does not identify a RERA-approved revised completion date. |
| Occupancy certificate | GHMC OC 3897/GHMC/SLP/2023-OC, dated 16-10-2023, is recorded for Buildings A1 and A2. The supplied OC material does not establish OC coverage for every block listed in the building permit. |
2. The project story
Brigade Citadel - Phase 1 is a residential apartment project registered with TG-RERA on survey numbers 78/AA and 79/AA in Erragadda, Balanagar mandal. The GHMC permit describes a multi-block development: eight residential blocks alongside a separate amenity block. The permit’s block schedule includes two lower residential blocks at Ground + 5 upper floors, five at Ground + 15 upper floors, and one at Cellar + Ground + 15 upper floors. RERA record
The RERA filing records 370 homes across 2BHK and 3BHK configurations, with 312 booked and 58 shown as available in the portal data supplied; no inventory as-of date is given. RERA’s infrastructure/amenity table reports selected work categories at percentages ranging from 60% to 100%, but does not give an overall construction-completion percentage. These are filed progress figures, not an independent site verification. RERA unit table RERA amenities
GHMC occupancy-certificate material records OC 3897/GHMC/SLP/2023-OC for Buildings A1 and A2. The permit schedule names additional residential blocks and an amenity block; the supplied OC evidence does not establish the certificate scope for those other blocks.
3. Master plan, architecture & building design
The RERA filing gives a total site area of 51,596.35 sq. m and approved built-up area of 181,352.59 sq. m. The building-permit extract separately identifies 47,564.55 sq. m net area, 4,031.8 sq. m road-affected area and nala-affected area of 0 sq. m. These figures are reported as recorded; no FSI-counted area or carpet-area total is supplied. RERA filing RERA filing Land records
The GHMC permit lists eight residential blocks and AMENITIES-1, with the block-by-block floor configurations and heights shown in the development identity table. It also records a 7.00 m setback and 18 mt. road widths. The supplied plan material does not provide a reliable, complete description of flats per floor, lift and stair counts, internal circulation, or detailed landscaping arrangements.
The permit lists a 4,823.3 sq. m tot-lot, 33 rainwater-harvesting pits, 2,575 trees, space for a transformer and a garbage house. These are permit-record provisions; the supplied evidence does not independently verify their present condition or completion.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 172 | 140 | 32 | 29.46 sq. m | Not measured in supplied floor-plan records | Not supplied |
| 3BHK | 198 | 172 | 26 | 43.44 sq. m | Not measured in supplied floor-plan records | Not supplied |
RERA unit counts, bookings, available counts and saleable areas come from the TG-RERA filing/portal data; the portal counts have no stated as-of date. RERA unit table
The supplied drawing-measurement data contains one 1BHK design measured from the floor-plan drawing: software-measured carpet area 31.5 sq. m (339 sq. ft), with one drawing design measured. This configuration is not listed in the supplied RERA unit table, so it is not presented as a RERA-filed offering or counted among the 370 homes. The drawing measurement needs review. RERA unit details Floor plans
Carpet area measured from a drawing is not the same as RERA-filed saleable area: the supplied measurement note says saleable area also includes a home’s share of common areas. The available data does not provide measured carpet areas for the RERA-filed 2BHK or 3BHK configurations, nor a verified loading figure. Floor plans RERA unit table
5. Parking & vehicle circulation
The GHMC permit states that cellar and stilt areas approved for parking are to be used exclusively for vehicle parking, without partition walls or rolling shutters. It does not state the sanctioned number of parking spaces in the supplied extract.
The RERA filing records a mortgage area of 18,596.24 sq. m, and the building-permit extract identifies a 18,596.24 sq. m ground-and-first-floor area to be handed over. Neither figure establishes a parking count or an individual allottee’s exclusive parking rights. RERA filing
The supplied records do not establish resident/visitor/accessibility parking counts, EV charging, parking allocation arrangements, or details of ramps and internal vehicle circulation.
6. Amenities, recreation & open spaces
The table below summarizes facilities and infrastructure recorded in the RERA amenity table and GHMC permit. RERA-filed percentages are reported as supplied and are not independent verification of completion. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Community buildings / amenity block | GHMC permit identifies AMENITIES-1, Ground + 4 upper floors, height 20.1 m | RERA table reports Community Buildings: 80%; no independent completion verification supplied RERA amenities | |
| Green strip / tot-lot / park | Permit records tot-lot 4,823.3 sq. m | RERA table reports 70%; no independent completion verification supplied RERA amenities | |
| Trees | Permit records 2,575 Trees | No current planting/completion verification supplied | |
| Internal roads and footpaths | No size supplied | RERA amenity table RERA amenities | Reported 100% |
| Street lighting | No quantity or technical detail supplied | RERA amenity table RERA amenities | Reported 80% |
The supplied RERA table reports aggregate recreational open space at 0%. This is the filed table value; the materials supplied do not explain the entry. RERA amenities Promoter-brochure claims about clubhouse and recreation facilities are not treated here as RERA-declared or verified delivery.
7. Utilities, building services & safety
The RERA amenity table reports water supply at 90%, sewerage and sewage/sullage treatment and disposal at 100%, storm-water drains at 80%, solid-waste management and disposal at 100%, water conservation/rainwater harvesting at 60%, energy management at 80%, fire protection/fire-safety requirements at 100%, and electrical meter room/sub-station/receiving station at 90%. These are reported filing percentages; no independent verification of present operation or statutory compliance is supplied. RERA amenities
The GHMC permit records 33 No. of RWHPs, space for a transformer and a garbage house. It also requires a Fire NOC from the Director (EV&DM) before issue of an occupancy certificate and refers to Fire Services Department and Airports Authority of India NOC conditions. The supplied record does not establish the current status of those items for each block.
The supplied evidence does not specify water-source or storage capacity, STP capacity, storm-water system design, electrical load or backup capacity, lift numbers/capacities, accessible circulation, security systems, CCTV, or waste-segregation arrangements. No completion or operational status for those details is established by the materials provided.
8. Location, access & connectivity
The project is identified in the RERA filing at Erragadda, Balanagar mandal, Medchal-Malkajgiri district, PIN 500018, on survey numbers 78/AA and 79/AA. The GHMC permit likewise describes the site at Erragadda. The supplied registration certificate states “YERRAGADDA” and district Hyderabad; exact revenue-village and district nomenclature should be checked against the authoritative land and revenue records. RERA record
The GHMC permit records 18 mt. road widths and road boundaries on the east and south sides. The supplied location dataset provides a parcel-centroid coordinate of 17.415275719570207, 78.35458902767974 and nearby mapped points, including ADP at 0.0 km, an unnamed bus station at 2.2 km, and Sankaraya Eye Hospital at 1.6 km. These are mapped-point distances, not verified travel routes or times. Location record The materials do not provide a verified project approach-road description or public-transport service details.
9. Developer & development status
The registered promoter is Brigade Enterprises Limited, a Company; its GSTIN is 36AAACB7459F1ZN. The RERA project record lists its address as Marketing Office, Erragadda Road, Erragadda, Balanagar, Medchal-Malkajgiri, 500018. Corporate record Parties record The supplied evidence does not include a verified corporate registered-office address or official project contact details.
The promoter’s Form B declaration, dated 15 September 2020, undertakes completion by 30.9.2025 and states that Sahil Enterprises holds legal title, with an agreement for development enclosed. These are promoter declarations in the RERA filing. The GHMC building permit separately states construction completion before 24 August 2026. No RERA extension is recorded in the supplied registration certificate, which states validity through 30/09/2025.
GHMC occupancy-certificate material identifies Buildings A1 and A2 as covered by OC 3897/GHMC/SLP/2023-OC dated 16-10-2023. The project evidence does not establish OC coverage for all blocks listed in the permit. The supplied RERA amenity table provides item-specific progress figures but no overall construction-progress percentage or independent site-verification report. RERA amenities
10. Approvals, official records & documents
| Record | Supplied evidence |
|---|---|
| TG-RERA registration | Form C registration certificate for BRIGADE CITADEL - PHASE 1, No. P02200002237, issued 30/10/2020; validity to 30/09/2025. |
| GHMC building permit | Building Permit Order 1/C19/08901/2020, approved 24 August 2020; file No. 1/C19/21198/2019; project survey numbers 78/AA and 79/AA. |
| Layout / subdivision reference | 1/C19/15128/2019 appears in the GHMC permit. A separate public layout-approval lookup was unavailable in the supplied HMDA material. HMDA |
| Occupancy certificate | GHMC OC 3897/GHMC/SLP/2023-OC, dated 16-10-2023, recorded for Buildings A1 and A2. |
| Architect’s completion certificates | Architect’s certificate records completion and the A1/A2 OC; documents 407011, 436989 and 445887 refer to this certificate/OC. |
| Engineer’s certificate | Document 245037 is an Engineer’s Certificate (F2), dated 11-04-2022, for Phase 1 and its development-cost information; it is not an approval or title-transfer instrument. |
| Promoter declaration | Form B affidavit-cum-declaration for Phase 1, dated 15 September 2020. |
| Layout-plan lookup | The supplied HMDA evidence says the approved-layout portal is not publicly reachable from the review environment; this is an availability limitation, not evidence of refusal. HMDA |
The supplied material does not include a complete set of detailed approved drawings or a public layout-approval lookup result. GHMC permit conditions include surrender of the road-affected portion to GHMC and requirements concerning commencement, completion notice, occupancy certificate, tot-lot and fire clearance; full condition assessment is outside this overview.
1. Project at a glance
Project identity
Registered project name: BRIGADE CITADEL - PHASE 1
Project type: Residential apartment project
Phase / registered portion: Phase 1; the registration certificate is for this registered phase
TG-RERA registration number: P02200002237
Registration validity: 30/10/2020–30/09/2025; the supplied certificate records four years. Registration validity is separate from the construction deadline and occupancy-certificate status.
Registered promoter: Brigade Enterprises Limited, Company
TG-RERA status in supplied record: New Project. The certificate records registration through 30/09/2025; no extension is recorded in the supplied certificate.
Land and geographic identity
Locality / address description: Erragadda; the building-permit record identifies Erragadda, and the RERA certificate gives PIN 500018.
Revenue village: Erragadda in the project header and building-permit record; the RERA certificate text also contains “YERRAGADDA.” The supplied records do not establish whether these are separate revenue villages or a spelling variation.
Mandal: Balanagar
District: Medchal-Malkajgiri in the project header; the RERA certificate states Hyderabad.
PIN: 500018
Project survey numbers / subdivisions: 78/AA and 79/AA
Site extent: Total site area 51,596.35 sq. m; net area 47,564.55 sq. m; road-affected area 4,031.8 sq. m. Building-permit record states nala-affected area 0 sq. m.
Boundaries in RERA filing: East: ROAD; West: EXISTING BUILDING; North: OPEN LAND; South: ROAD.
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC)
Principal building approval: GHMC Building Permit Order 1/C19/08901/2020, approved 24 August 2020; file number 1/C19/21198/2019.
Layout / subdivision reference: 1/C19/15128/2019, shown in the permit record.
Approved built-up area: 181,352.59 sq. m as recorded in the RERA filing.
Building arrangement in GHMC permit: One amenity block, AMENITIES-1, and eight residential blocks: BLOCK-1 (A1), (A2), (B), (C), (D), (E), (F) and (G). The permit lists floor configurations and heights below.
Sanctioned floors and heights: AMENITIES-1: Ground + 4 upper floors, height 20.1 m; BLOCK-1 (G) and (F): Ground + 5 upper floors, each 18.45 m; BLOCK-1 (E), (D), (C), (A2) and (B): Ground + 15 upper floors, each 47.95 m; BLOCK-1 (A1): Cellar + Ground + 15 upper floors, height 47.95 m.
Parking levels: Permit conditions identify cellar and stilts approved for parking; the supplied extract does not give a parking-space count.
Approved versus RERA-declared units: RERA filing records three building units; the supplied permit extract does not provide a total dwelling-unit count for direct comparison. The RERA unit table lists 370 homes: 172 2BHK and 198 3BHK.
Offering and status
RERA-filed configurations: 2BHK and 3BHK
RERA-filed saleable areas: 2BHK: 29.46 sq. m; 3BHK: 43.44 sq. m
RERA portal inventory: 370 total homes: 312 booked and 58 available (172 2BHK: 140 booked / 32 available; 198 3BHK: 172 booked / 26 available). Portal counts have no supplied as-of date and are indicative.
Construction stage: The supplied RERA amenity/infrastructure table reports percentage figures for selected items, but no overall construction-progress percentage or independently verified current site inspection is provided.
Completion dates: Promoter’s Form B undertaking: 30.9.2025. The GHMC building permit states construction was to be completed before 24 August 2026. These are different record items; the supplied evidence does not identify a RERA-approved revised completion date.
Occupancy certificate: GHMC OC 3897/GHMC/SLP/2023-OC, dated 16-10-2023, is recorded for Buildings A1 and A2. The supplied OC material does not establish OC coverage for every block listed in the building permit.
2. The project story
Brigade Citadel - Phase 1 is a residential apartment project registered with TG-RERA on survey numbers 78/AA and 79/AA in Erragadda, Balanagar mandal. The GHMC permit describes a multi-block development: eight residential blocks alongside a separate amenity block. The permit’s block schedule includes two lower residential blocks at Ground + 5 upper floors, five at Ground + 15 upper floors, and one at Cellar + Ground + 15 upper floors.
The RERA filing records 370 homes across 2BHK and 3BHK configurations, with 312 booked and 58 shown as available in the portal data supplied; no inventory as-of date is given. RERA’s infrastructure/amenity table reports selected work categories at percentages ranging from 60% to 100%, but does not give an overall construction-completion percentage. These are filed progress figures, not an independent site verification.
GHMC occupancy-certificate material records OC 3897/GHMC/SLP/2023-OC for Buildings A1 and A2. The permit schedule names additional residential blocks and an amenity block; the supplied OC evidence does not establish the certificate scope for those other blocks.
3. Master plan, architecture & building design
The RERA filing gives a total site area of 51,596.35 sq. m and approved built-up area of 181,352.59 sq. m. The building-permit extract separately identifies 47,564.55 sq. m net area, 4,031.8 sq. m road-affected area and nala-affected area of 0 sq. m. These figures are reported as recorded; no FSI-counted area or carpet-area total is supplied.
The GHMC permit lists eight residential blocks and AMENITIES-1, with the block-by-block floor configurations and heights shown in the development identity table. It also records a 7.00 m setback and 18 mt. road widths. The supplied plan material does not provide a reliable, complete description of flats per floor, lift and stair counts, internal circulation, or detailed landscaping arrangements.
The permit lists a 4,823.3 sq. m tot-lot, 33 rainwater-harvesting pits, 2,575 trees, space for a transformer and a garbage house. These are permit-record provisions; the supplied evidence does not independently verify their present condition or completion.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 172 | 140 | 32 | 29.46 sq. m | Not measured in supplied floor-plan records | Not supplied |
| 3BHK | 198 | 172 | 26 | 43.44 sq. m | Not measured in supplied floor-plan records | Not supplied |
RERA unit counts, bookings, available counts and saleable areas come from the TG-RERA filing/portal data; the portal counts have no stated as-of date.
The supplied drawing-measurement data contains one 1BHK design measured from the floor-plan drawing: software-measured carpet area 31.5 sq. m (339 sq. ft), with one drawing design measured. This configuration is not listed in the supplied RERA unit table, so it is not presented as a RERA-filed offering or counted among the 370 homes. The drawing measurement needs review.
Carpet area measured from a drawing is not the same as RERA-filed saleable area: the supplied measurement note says saleable area also includes a home’s share of common areas. The available data does not provide measured carpet areas for the RERA-filed 2BHK or 3BHK configurations, nor a verified loading figure.
5. Parking & vehicle circulation
The GHMC permit states that cellar and stilt areas approved for parking are to be used exclusively for vehicle parking, without partition walls or rolling shutters. It does not state the sanctioned number of parking spaces in the supplied extract.
The RERA filing records a mortgage area of 18,596.24 sq. m, and the building-permit extract identifies a 18,596.24 sq. m ground-and-first-floor area to be handed over. Neither figure establishes a parking count or an individual allottee’s exclusive parking rights.
The supplied records do not establish resident/visitor/accessibility parking counts, EV charging, parking allocation arrangements, or details of ramps and internal vehicle circulation.
6. Amenities, recreation & open spaces
The table below summarizes facilities and infrastructure recorded in the RERA amenity table and GHMC permit. RERA-filed percentages are reported as supplied and are not independent verification of completion.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Community buildings / amenity block | GHMC permit identifies AMENITIES-1, Ground + 4 upper floors, height 20.1 m | RERA table reports Community Buildings: 80%; no independent completion verification supplied | |
| Green strip / tot-lot / park | Permit records tot-lot 4,823.3 sq. m | RERA table reports 70%; no independent completion verification supplied | |
| Trees | Permit records 2,575 Trees | No current planting/completion verification supplied | |
| Internal roads and footpaths | No size supplied | RERA amenity table | Reported 100% |
| Street lighting | No quantity or technical detail supplied | RERA amenity table | Reported 80% |
The supplied RERA table reports aggregate recreational open space at 0%. This is the filed table value; the materials supplied do not explain the entry. Promoter-brochure claims about clubhouse and recreation facilities are not treated here as RERA-declared or verified delivery.
7. Utilities, building services & safety
The RERA amenity table reports water supply at 90%, sewerage and sewage/sullage treatment and disposal at 100%, storm-water drains at 80%, solid-waste management and disposal at 100%, water conservation/rainwater harvesting at 60%, energy management at 80%, fire protection/fire-safety requirements at 100%, and electrical meter room/sub-station/receiving station at 90%. These are reported filing percentages; no independent verification of present operation or statutory compliance is supplied.
The GHMC permit records 33 No. of RWHPs, space for a transformer and a garbage house. It also requires a Fire NOC from the Director (EV&DM) before issue of an occupancy certificate and refers to Fire Services Department and Airports Authority of India NOC conditions. The supplied record does not establish the current status of those items for each block.
The supplied evidence does not specify water-source or storage capacity, STP capacity, storm-water system design, electrical load or backup capacity, lift numbers/capacities, accessible circulation, security systems, CCTV, or waste-segregation arrangements. No completion or operational status for those details is established by the materials provided.
8. Location, access & connectivity
The project is identified in the RERA filing at Erragadda, Balanagar mandal, Medchal-Malkajgiri district, PIN 500018, on survey numbers 78/AA and 79/AA. The GHMC permit likewise describes the site at Erragadda. The supplied registration certificate states “YERRAGADDA” and district Hyderabad; exact revenue-village and district nomenclature should be checked against the authoritative land and revenue records.
The GHMC permit records 18 mt. road widths and road boundaries on the east and south sides. The supplied location dataset provides a parcel-centroid coordinate of 17.415275719570207, 78.35458902767974 and nearby mapped points, including ADP at 0.0 km, an unnamed bus station at 2.2 km, and Sankaraya Eye Hospital at 1.6 km. These are mapped-point distances, not verified travel routes or times. The materials do not provide a verified project approach-road description or public-transport service details.
9. Developer & development status
The registered promoter is Brigade Enterprises Limited, a Company; its GSTIN is 36AAACB7459F1ZN. The RERA project record lists its address as Marketing Office, Erragadda Road, Erragadda, Balanagar, Medchal-Malkajgiri, 500018. The supplied evidence does not include a verified corporate registered-office address or official project contact details.
The promoter’s Form B declaration, dated 15 September 2020, undertakes completion by 30.9.2025 and states that Sahil Enterprises holds legal title, with an agreement for development enclosed. These are promoter declarations in the RERA filing. The GHMC building permit separately states construction completion before 24 August 2026. No RERA extension is recorded in the supplied registration certificate, which states validity through 30/09/2025.
GHMC occupancy-certificate material identifies Buildings A1 and A2 as covered by OC 3897/GHMC/SLP/2023-OC dated 16-10-2023. The project evidence does not establish OC coverage for all blocks listed in the permit. The supplied RERA amenity table provides item-specific progress figures but no overall construction-progress percentage or independent site-verification report.
10. Approvals, official records & documents
TG-RERA registration: Form C registration certificate for BRIGADE CITADEL - PHASE 1, No. P02200002237, issued 30/10/2020; validity to 30/09/2025.
GHMC building permit: Building Permit Order 1/C19/08901/2020, approved 24 August 2020; file No. 1/C19/21198/2019; project survey numbers 78/AA and 79/AA.
Layout / subdivision reference: 1/C19/15128/2019 appears in the GHMC permit. A separate public layout-approval lookup was unavailable in the supplied HMDA material.
Occupancy certificate: GHMC OC 3897/GHMC/SLP/2023-OC, dated 16-10-2023, recorded for Buildings A1 and A2.
Architect’s completion certificates: Architect’s certificate records completion and the A1/A2 OC; documents 407011, 436989 and 445887 refer to this certificate/OC.
Engineer’s certificate: Document 245037 is an Engineer’s Certificate (F2), dated 11-04-2022, for Phase 1 and its development-cost information; it is not an approval or title-transfer instrument.
Promoter declaration: Form B affidavit-cum-declaration for Phase 1, dated 15 September 2020.
Layout-plan lookup: The supplied HMDA evidence says the approved-layout portal is not publicly reachable from the review environment; this is an availability limitation, not evidence of refusal.
The supplied material does not include a complete set of detailed approved drawings or a public layout-approval lookup result. GHMC permit conditions include surrender of the road-affected portion to GHMC and requirements concerning commencement, completion notice, occupancy certificate, tot-lot and fire clearance; full condition assessment is outside this overview.
Other registrations of Brigade Citadel
Frequently asked questions
Is BRIGADE CITADEL - PHASE 1 registered with Telangana RERA?
Yes. BRIGADE CITADEL - PHASE 1 is registered with the Telangana Real Estate Regulatory Authority as P02200002237; the registration status is New Project.
Who is the developer of BRIGADE CITADEL - PHASE 1?
The promoter named in the RERA registration is Brigade Enterprises Limited.
Where is BRIGADE CITADEL - PHASE 1 located?
BRIGADE CITADEL - PHASE 1 is in ERRAGADDA, Balanagar, Medchal-Malkajgiri, Telangana (500018).
When will BRIGADE CITADEL - PHASE 1 be completed?
The promoter's proposed date of completion filed with RERA is 30/09/2025. This is the promoter's declaration, not a guarantee.