Sign in

Gangidis Royal Abode

SRI VYSHNAVI ABODE LLP · Rangareddy

Gangidis Royal Abode is a residential apartment project in Gopanpally, Serilingampally Mandal, Ranga Reddy District. The registered promoter is SRI VYSHNAVI ABODE LLP. The project has a land area of 7,883.39 sq. m. and one residential building with 2 Cellar + Ground + 14 upper floors, comprising 3,087 apartments: 3,078 3BHK and 9 2BHK units. Its TG-RERA registration number is 1-c20-06038-2019 (as filed), and its proposed completion date is 17/04/2025.

More from Sri Vyshnavi Abode LLP · 2 projects →

01What we found

RegisteredTG-RERA
10documents on file - each fact links to its page
0court cases on this project's land in the court records searched
7items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

7 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Project at a glance

Project identity

FieldProject record
Registered project nameGangidis Royal Abode RERA record
Project typeResidential apartment project RERA record
Phase / registered portionNot separately identified in the supplied record RERA filing
TG-RERA registration number1-c20-06038-2019 (as filed) Approvals record
Registration validityNot available in the supplied evidence; the proposed completion date is not itself the registration-validity record RERA record
Registered promoterSRI VYSHNAVI ABODE LLP, an LLP RERA record Corporate record
TG-RERA status“New Project” in the filing RERA filing. Current registration status is not independently established in the supplied record.

Land and geographic identity

FieldProject record
Locality / revenue villageGopanpally; the title report also uses “Gopannapally” RERA record Land records
Mandal / district / PINSerilingampally / Ranga Reddy / 500046 RERA record
Project survey number(s)Sy.No.21; no subdivision is stated in the supplied project identity RERA record Land records
Registered site extent7,883.39 sq. m. RERA filing
Total / net land areaTotal area: 7,883.39 sq. m.; net area: 7,883.39 sq. m. RERA filing
Boundaries as filedEast: part of Sy.No.21 and Devuni Kunta; West: 100 feet road; North: 30 feet road; South: part of Sy.No.21 RERA filing

Development identity

FieldProject record
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC) Approvals record
Principal building approvalBuilding Permit Order 1/C20/06038/2019, approved 17 April 2019 Approvals record
Related file number1/C11/04363/2018 Approvals record
Approved built-up areaNot provided as a single total. The permit lists residential ground floor: 2,028.38 m²; 14 upper floors: 29,874.09 m²; and two cellar floors: 10,457.28 m²
Building count / arrangementOne residential building is identified in the filed record RERA filing
Sanctioned floor configuration2 Cellar + Ground + 14 upper floors; stated height: 44.85 m
Parking levelsCellars and stilts are identified for parking in the permit conditions; the supplied evidence does not state a parking-space count
Unit countsApproved plan count: 1 building unit in the RERA land fields; the filed unit schedule lists 3,087 apartments: 3,078 3BHK and 9 2BHK RERA filing RERA unit table

Offering and status

FieldProject record
RERA-filed configurations2BHK: 9 units; 3BHK: 3,078 units RERA unit table
RERA-filed saleable area2BHK: 12.78 sq. m.; 3BHK: 11.62 sq. m., as recorded in the filing RERA unit table
Booked / available0 booked and 9 available 2BHK; 0 booked and 3,078 available 3BHK. Portal figures have no supplied as-of date and are indicative RERA unit table
Construction stageNo independently verified site-progress information is supplied. The RERA-filed record gives completion dates but does not establish actual construction progress RERA record
Completion dates in supplied recordsProject fields: proposed completion 17/04/2025 RERA record. Form B declaration: completion undertaking of 01/02/2024. These are recorded here as separate filed statements, not as verified completion status.
Occupancy / completion certificateNo OC or completion certificate is included in the supplied documents; status is not established Document index

The project story

Gangidis Royal Abode is filed as a residential apartment development on Sy.No.21 in Gopanpally, Serilingampally Mandal, Ranga Reddy District. The project record identifies one residential building, with a GHMC building permit describing two cellar floors, a ground floor and 14 upper floors. The RERA filing lists 3,087 apartments, comprising 3,078 3BHK and 9 2BHK units. RERA record Land records RERA unit table

The permit records a 44.85 m building height and specifies a tot-lot, rainwater-harvesting structures, transformer space, a garbage house and an ETP. Those are permit-recorded provisions, not evidence that the facilities have since been installed or completed. No independently verified construction progress or occupancy certification is supplied. Document index

Master plan, architecture & building design

  • The GHMC permit identifies one residential building on a net site area of 7,883.39 m². Its stated configuration is 2 Cellar + Ground + 14 upper floors, with a height of 44.85 m. The permit’s area schedule separately lists 2,028.38 m² for the ground floor, 29,874.09 m² for the 14 upper floors and 10,457.28 m² for the two cellar floors; the supplied extraction does not provide a consolidated approved built-up-area figure. RERA filing
  • The permit also records 802.77 m² for a tot-lot, 18 RWHPs and 390 trees, and lists a compound wall of 122.26 RM. It does not provide an extracted floor-by-floor apartment arrangement, building footprint, lift and stair details, internal circulation plan or phase-wise organization.
  • The RERA filing records a mortgage area of 3,207.39 m²; the supplied material does not describe its detailed location within the building. RERA filing

Homes, configurations & floor plans

The RERA-filed unit schedule is the available basis for unit counts and saleable areas. The listed areas are reproduced as recorded and have not been independently validated. No usable software-measured carpet-area figure or room-dimension schedule is available: the floor-plan review reports zero measured flat designs for the matched RERA configurations and notes that some extracted measurements were held back as implausible. RERA unit table Floor plans RERA unit details

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK90912.78 sq. m.Not availableNot supplied
3BHK3,07803,07811.62 sq. m.Not availableNot supplied

The booking and availability figures are portal figures without a supplied as-of date and should be treated as indicative. Carpet area, balcony or utility space, and a home’s proportionate share of common areas are distinct measures; the supplied evidence does not provide measured carpet areas or a loading calculation for these configurations. RERA unit table Floor plans

Parking & vehicle circulation

  • The permit states that cellar and stilt areas approved for parking must be used exclusively for vehicle parking, without partition walls or rolling shutters. It does not state the number of sanctioned car or two-wheeler spaces, visitor or accessible spaces, or an allocation of parking to individual apartments.
  • The RERA-filed land details give a mortgage area of 3,207.39 m², but do not identify its parking-space count or unit allocation. Although the permit refers to parking, the supplied evidence does not establish the exact parking layout, ramp arrangements, vehicle entries and exits, pedestrian separation or EV charging provision. A drawn or sanctioned parking provision does not, by itself, establish exclusive ownership of a bay. RERA filing

Amenities, recreation & open spaces

The GHMC permit records specific site provisions; TG-RERA amenity fields also mark several infrastructure categories as “YES” while showing 0% progress. The evidence does not establish that any listed facility is complete or independently verified. RERA amenities

Landscape / open space
FacilityTot-lot
Description / size802.77 m²
Evidence sourceGHMC permit
Declared progress / verified statusRequired by permit; completion not verified
Landscape / open space
FacilityGreen strip / tot-lot / park
Description / sizeSize not stated in this RERA amenity entry
Evidence sourceRERA amenity record RERA amenities
Declared progress / verified statusAvailable: YES; progress shown as 0%
Landscape / open space
FacilityAggregate recreational open space
Description / sizeSize not stated in this RERA amenity entry
Evidence sourceRERA amenity record RERA amenities
Declared progress / verified statusAvailable: YES; progress shown as 0%
Sports / recreation
FacilityNo other project-specific facility established in the supplied RERA amenity record
Description / size—
Evidence sourceRERA amenities
Declared progress / verified statusNot established
Clubhouse / indoor
FacilityNo project-specific clubhouse or indoor facility established in the supplied RERA amenity record
Description / size—
Evidence sourceRERA amenities
Declared progress / verified statusNot established
Convenience / community
FacilityCommunity buildings
Description / sizeNo size or facility detail stated
Evidence sourceRERA amenity record RERA amenities
Declared progress / verified statusProgress shown as 0%; completion not verified

Utilities, building services & safety

  • The RERA amenity record marks water supply, sewerage and sewage/sullage treatment and disposal, storm-water drains, solid-waste management, rainwater harvesting, energy management, fire protection, and an electrical meter room/sub-station/receiving station as “YES”; each entry shows 0% progress. The evidence does not provide capacities, designs, completion evidence or operating details for these services. RERA amenities
  • The GHMC permit separately requires a rainwater-harvesting structure (percolation pit), transformer space, a garbage house and an ETP, and requires the tot-lot to be fenced and maintained as greenery before an occupancy certificate is issued. The permit also states that an occupancy certificate is compulsory before occupation. These are recorded conditions; the supplied evidence does not establish implementation, clearance or OC issuance.
  • The supplied project record does not establish water sources or storage capacity, STP/ETP capacity or treated-water reuse, backup power, lift number or capacity, fire-system specifications, CCTV or access-control provision, or accessible routes and facilities. No statutory-compliance conclusion can be drawn from the listed provisions alone.

Location, access & connectivity

  • The registered location is Gopanpally, Serilingampally Mandal, Ranga Reddy District, Telangana, PIN 500046; the project’s stated boundaries include a 100 feet road to the west and a 30 feet road to the north. RERA record RERA filing
  • The project-location record lists the nearest sampled Outer Ring Road interchange at approximately 123.0 km. This is a supplied location measurement, not a travel-time estimate. No verified public-transport information or other measured connectivity distances are supplied. Location record

Developer & development status

The registered promoter is SRI VYSHNAVI ABODE LLP, an LLP. The RERA record lists an address at L B Stadium, Fathe Maidan Road, Gopanpally, Hyderabad, Serilingampally, Ranga Reddy, 500046. The supplied data does not provide a verified corporate registration number, official contact details, or official website. Corporate record Parties record

In a Form B declaration dated 15 October 2019, the LLP’s designated partners declared that the land was free from encumbrances and undertook project completion by 01/02/2024. This is a promoter declaration, not independent verification of title, construction progress or completion. The project fields separately state a proposed completion date of 17/04/2025. No completed construction stage or occupancy certificate is established in the supplied evidence. RERA record Document index

Approvals, official records & documents

TG-RERA registration
Supplied evidenceNumber 1-c20-06038-2019 as filed Approvals record
Scope / noteCurrent validity and status not established by the supplied record
GHMC building permit
Supplied evidenceBuilding Permit Order 1/C20/06038/2019, approved 17 April 2019; related File No. 1/C11/04363/2018
Scope / noteResidential building on Sy.No.21, Gopanpally; permit describes 2 Cellar + Ground + 14 upper floors
Title report
Supplied evidenceAdvocate’s title report
Scope / noteTitle report concerning the stated Gopanpally land; full title review belongs in the Land & Title section
Form B declaration
Supplied evidencePromoter declaration dated 15 October 2019
Scope / noteIncludes promoter statements on title, encumbrances and completion undertaking
Occupancy / completion certificate
Supplied evidenceNot supplied Document index
Scope / noteIssuance status is not established
Approved layout / drawing records
Supplied evidencePlan approval number is filed; the approved drawing stamp is recorded as 30-04-2019, read from the drawing text layer and requiring review Approvals record HMDA
Scope / noteThe supplied evidence does not provide a public, independently verified layout-approval lookup or detailed extracted floor plans

Frequently asked questions

Who is the developer of Gangidis Royal Abode?

The promoter named in the RERA registration is SRI VYSHNAVI ABODE LLP.

Where is Gangidis Royal Abode located?

Gangidis Royal Abode is in hyderabad, Gopanpally, Serilingampally, Rangareddy, Telangana (500046).

When will Gangidis Royal Abode be completed?

The promoter's proposed date of completion filed with RERA is 17/04/2025. This is the promoter's declaration, not a guarantee.

More projects in Gopanpally