Jayabheri The Nirvana
JAYABHERI PROPERTIES PRIVATE IMITED · Rangareddy · RERA P02400003566
JAYABHERI THE NIRVANA is a residential apartment project in Gowlidoddi locality, Gopanpally revenue village, Serilingampally Mandal, Ranga Reddy District. The registered promoter is JAYABHERI PROPERTIES PRIVATE IMITED. The project has a total land area of 29,845.72 sq m and five residential blocks: Block A-1 has 3 Cellar + Ground + 28 upper floors, and Blocks B-1, C-1, D-1 and E-1 each have 1 Ground + 28 upper floors; the RERA filing records 679 total units, including 678 3BHK units. It is registered under TG-RERA number P02400003566, with proposed completion by 20 August 2027.
More from Jayabheri Properties Private Imited · 4 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
7 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered name | JAYABHERI THE NIRVANA RERA record |
| Project type | Residential apartment project RERA record RERA filing |
| Phase / registered portion | The RERA record identifies the registered project; a separate phase name or phase-wise registration is not disclosed. RERA record |
| TG-RERA registration | P02400003566 |
| Registration validity | 20 November 2021 to 20 August 2027; this is the registration period, not the construction deadline or evidence of OC. |
| Registered promoter | JAYABHERI PROPERTIES PRIVATE IMITED (also written “Jayabheri Properties Private Limited” in filed documents) RERA record Corporate record |
| RERA status | Registered; the supplied certificate records a five-year validity period. |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality / revenue village | Gowlidoddi locality; Gopanpally revenue village (also rendered “GOPANPALLE” in the building permit). RERA record RERA filing |
| Mandal / district / PIN | Serilingampally Mandal, Ranga Reddy District, 500075. RERA record RERA filing |
| Survey numbers and subdivisions | 62/P, 63/P, 64/P, 65/P, 72 and 73/P. RERA record Land records |
| Site extent | Total area 29,845.72 sq m; net area 29,479.69 sq m. The RERA land record reports 366.03 sq m affected by road widening/FTL of tanks/Nala widening. RERA filing |
| Boundaries in RERA filing | East: land of Jayabheri Four Seasons; west: proposed 60 feet road; north: land in Sy. No. 71; south: road. RERA filing |
Development identity
| Item | Project record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC). Approvals record |
| Principal building permission | Approval 1/C20/09240/2021, dated 20 August 2021; permit file no. 1/C20/03636/2020. Approvals record |
| Approved built-up area | 201,642.99 sq m, as recorded in the RERA filing. RERA filing |
| Residential blocks and sanctioned floors | Five residential blocks: Block A-1, 3 Cellar + Ground + 28 upper floors; Blocks B-1, C-1, D-1 and E-1, each 1 Ground + 28 upper floors. The permit records a height of 89.05 m for each block. |
| Amenities building | AMENITIES -1, 1 Ground + 3 upper floors, height 14.99 m; the permit lists commercial area for this building. |
| Parking levels | Three parking floors are recorded for Block A-1. The permit requires approved cellar and stilt parking areas to be used exclusively for vehicle parking; project-wide parking-space counts are not established by the supplied records. |
| Unit count | RERA filing: 679 total units across five blocks; 678 are filed as 3BHK and one row is recorded as “E” rather than a home configuration. RERA unit table RERA unit details |
| RERA-filed versus sanctioned count | The filing reports 679 units; the supplied permit extraction requires that the number of sanctioned units not be increased without prior GHMC approval, but does not provide a total sanctioned-unit count in the extracted facts. RERA unit table |
Offering and status
| Item | Project record |
|---|---|
| Filed home configuration and saleable area | 3BHK: 678 units, 201.13 sq m each as filed saleable area. A separate one-unit “E” row is not identified as a home configuration. RERA unit table RERA unit details |
| Booked / available counts | Portal-derived figures, with no as-of date in the supplied record: 3BHK—369 booked / 309 available; “E”—1 booked / 0 available. Treat these counts as indicative. RERA unit table RERA unit details |
| Completion deadline | Promoter’s Form B declaration undertakes completion by 20 August 2027; the permit also states construction is to be completed before that date. |
| Occupancy certificate | The filed architect’s completion certificate identifies GHMC OC 002944/GHMC/01586/, dated 1 August 2025, for Jayabheri The Nirvana, Blocks A/B/C/D/E and Amenities-1. This is the scope stated in that certificate. |
| Construction stage | The RERA amenity/infrastructure progress entries report percentages for listed items, but are not independent site verification. No overall independently verified construction-progress percentage is supplied. RERA amenities |
2. The project story
Jayabheri The Nirvana is a RERA-registered residential apartment project on the listed parcels in Gopanpally village, Serilingampally Mandal, Ranga Reddy District. Its GHMC building permit provides for five residential blocks and a separate amenities building. The residential blocks are approved at ground plus 28 upper floors; Block A-1 also has three cellar levels. The amenities building is approved at ground plus three upper floors. RERA record Land records
The project’s RERA unit table records 678 3BHK units and a separate one-unit entry labelled “E”; that entry is not a filed home configuration. The RERA portal booking figures supplied here show 369 of the 3BHK units booked and 309 available, without an as-of date. RERA unit table RERA unit details
The project record includes an architect’s certificate dated 13 August 2025 identifying a GHMC occupancy certificate dated 1 August 2025 for Blocks A–E and Amenities-1. The RERA filing also contains progress percentages for infrastructure and facilities; those are reported filing values, not an independent site inspection. RERA amenities
3. Master plan, architecture & building design
The RERA land filing records a total site area of 29,845.72 sq m and net area of 29,479.69 sq m. The RERA filing separately reports approved built-up area of 201,642.99 sq m. These are different measures and should not be treated as interchangeable. RERA filing RERA filing
The GHMC permit identifies five residential blocks—A-1 through E-1—and an amenities building. Blocks B-1, C-1, D-1 and E-1 are each shown as 1 Ground + 28 upper floors; Block A-1 is shown as 3 Cellar + Ground + 28 upper floors. The amenities building is 1 Ground + 3 upper floors. The permit lists each residential block at 89.05 m in height and the amenities building at 14.99 m.
The supplied approval extraction does not establish flats per floor, detailed apartment layouts, lift or stair counts, building footprints, internal circulation geometry, or a phase-wise building arrangement. The permit lists a 3030.72 sq m tot-lot and 1490 trees, and requires peripheral greenery and tree planting; these are permit-record items, not confirmation of completed landscaping.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 678 | 369 | 309 | 201.13 sq m | Not available | Not supplied |
| “E” (configuration not identified as a home) | 1 | 1 | 0 | 178.37 sq m | Not available | Not supplied |
The 3BHK count, booking figures and saleable area are from the RERA filing; booking counts have no supplied as-of date. The “E” entry is a unit-table row, not a disclosed residential configuration, and is not presented as a home type. RERA unit table RERA unit details
The supplied floor-plan review records 14 drawings: none measured, two scans pending and 12 with no flats identified. Accordingly, no software-measured carpet area or room dimensions are available in this evidence. RERA saleable area is the filed measure; it is not a carpet-area figure, and no loading calculation is supplied. Floor plans RERA unit details
5. Parking & vehicle circulation
The building permit records three parking floors for Block A-1 and requires cellar and stilt areas approved for parking to be used exclusively for vehicle parking, without partition walls or rolling shutters. The supplied extracts do not establish the project-wide number of car or two-wheeler spaces, visitor or accessible bays, parking allocations to individual homes, or a complete parking-level schedule for all blocks.
No supplied evidence establishes mechanical parking, EV charging, parking-space ownership or unit-specific parking allotments. A drawn or approved parking provision alone does not establish exclusive ownership or allocation. Document index
6. Amenities, recreation & open spaces
The following progress percentages are RERA-filed amenity/infrastructure entries. They are not independently verified completion figures.
| Facility | Green strip / tot-lot / park |
|---|---|
| Description / size | Permit records a tot-lot of 3030.72 sq m and 1490 trees; the permit also requires peripheral greenery and planting. |
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA filing reports 70% for Green Strip/TOT LOT/Park; not independently verified. |
| Facility | Aggregate recreational open space |
|---|---|
| Description / size | Area not supplied. |
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA filing reports 0%; not independently verified. |
| Facility | Community buildings |
|---|---|
| Description / size | Size and detailed facilities not supplied in the RERA progress entry. |
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA filing reports 75%; not independently verified. |
No project-specific RERA amenity schedule in the supplied data identifies clubhouse rooms, sports facilities or indoor recreation areas with approved dimensions or completion status. The permit identifies an amenities building, but the extracted permit facts do not specify its internal amenity schedule. RERA amenities
7. Utilities, building services & safety
| Evidence in the project record | GHMC permit makes public water connections conditional on production of an Occupancy Certificate. The RERA progress table lists Water Supply. RERA amenities |
|---|---|
| Declared progress / status | RERA filing reports 85%; not independently verified. Water source, storage and treatment capacity are not supplied. |
| Evidence in the project record | RERA progress entries list sewerage, treatment/disposal of sewage and sullage water, and storm-water drains. RERA amenities |
|---|---|
| Declared progress / status | 95%, 70% and 90%, respectively, as filed; not independently verified. STP capacity and reuse arrangements are not supplied. |
| Evidence in the project record | Permit requires a rain-water harvesting structure (percolation pit); the RERA progress table lists water conservation/rainwater harvesting. RERA amenities |
|---|---|
| Declared progress / status | RERA filing reports 90%; not independently verified. |
| Evidence in the project record | Permit requires space for a transformer and conditions public electricity connections on production of an Occupancy Certificate. The RERA progress table lists an electrical meter room, sub-station and receiving station. RERA amenities |
|---|---|
| Declared progress / status | Electrical meter room/sub-station/receiving station: 85% as filed; not independently verified. Supply capacity and backup details are not supplied. |
| Evidence in the project record | The RERA progress table lists fire protection and fire-safety requirements. The permit requires services, including fire-safety requirements, to be executed under qualified technical supervision. RERA amenities |
|---|---|
| Declared progress / status | RERA filing reports 100%; this is a filed progress figure, not an independent compliance verification. |
| Evidence in the project record | Permit requires a garbage house within the premises; the RERA progress table lists solid-waste management and disposal. RERA amenities |
|---|---|
| Declared progress / status | RERA filing reports 85%; not independently verified. |
| Evidence in the project record | Listed in the RERA progress table. RERA amenities |
|---|---|
| Declared progress / status | 85% and 90%, respectively, as filed; not independently verified. |
| Evidence in the project record | Permit requires lifts and other services to be executed under qualified technical supervision. Specific lift counts/capacities, accessible circulation details and ramp specifications are not supplied. |
|---|---|
| Declared progress / status | Not established in the supplied evidence. |
8. Location, access & connectivity
The registered project location is Gopanpally village, Serilingampally Mandal, Ranga Reddy District, PIN 500075; the GHMC permit describes the locality as Gowlidoddi. The RERA filing records a proposed 60 feet road on the western boundary and a road on the southern boundary. RERA record RERA filing RERA filing
The supplied location record lists the Financial District (Nanakramguda) at 1.2 km, a bus station at 2.2 km (unnamed), Manuu Polytechnic Hyderabad at 1.6 km, Sankaraya Eye Hospital at 1.6 km, South India Shopping Mall at 2.6 km, Nanakramguda Government Primary School at 0.5 km, and an unnamed park at 1.2 km. These are listed distances; no travel times or route measurements are supplied. Location record
9. Developer & development status
The TG-RERA registered promoter is JAYABHERI PROPERTIES PRIVATE IMITED. The registration certificate and project filing identify the project promoter as Jayabheri Properties Private Limited; the supplied corporate record identifies the entity type as a company and GSTIN 36AAACM5296R1ZO. RERA record Corporate record
The RERA promoter address is Jayabheri Corporate Office, Jayabheri Enclave, GOPANAPALLI ROAD, GOPANAPALLY, Serilingampally, Ranga Reddy, PIN 500075. The supplied record lists Kishore Duggirala as authorized signatory and director and Ram Mohan Maganti as a director. No additional verified contact details are provided here. Parties record RERA filing
The promoter’s Form B affidavit, dated 16 September 2021, declares completion by 20 August 2027 and includes the promoter’s separate-account, audit and pending-approval undertakings. These are promoter declarations. The project record also contains an architect’s certificate identifying an OC dated 1 August 2025 for Blocks A–E and Amenities-1.
10. Approvals, official records & documents
| Record | What the supplied document establishes |
|---|---|
| TG-RERA registration certificate, Form C | Registration of JAYABHERI THE NIRVANA as P02400003566, issued 20 November 2021, with validity through 20 August 2027. |
| GHMC Building Permit Order | Approval 1/C20/09240/2021, file 1/C20/03636/2020, dated 20 August 2021; specifies the five residential blocks, amenities building, floor configurations and conditions. |
| Form B affidavit-cum-declaration | Promoter declaration by Kishore Duggirala, dated 16 September 2021, including a completion undertaking of 20 August 2027. |
| Architect’s completion certificate / OC record | Architect’s certificate dated 13 August 2025 identifies GHMC occupancy certificate 002944/GHMC/01586/ dated 1 August 2025 for Blocks A/B/C/D/E and Amenities-1. |
| Approved-plan drawing record | Drawing stamp is recorded as approval 1/C20/09240/2021; the supplied record says the drawing text-layer reading needs review. Approvals record |
| RERA-filed unit and progress records | Unit counts, booking figures, saleable areas and infrastructure progress entries are available in the supplied RERA-derived records; booking counts have no as-of date, and progress entries are not independent verification. RERA unit table RERA amenities |
1. Project at a glance
Project identity
Registered name: JAYABHERI THE NIRVANA
Project type: Residential apartment project
Phase / registered portion: The RERA record identifies the registered project; a separate phase name or phase-wise registration is not disclosed.
TG-RERA registration: P02400003566
Registration validity: 20 November 2021 to 20 August 2027; this is the registration period, not the construction deadline or evidence of OC.
Registered promoter: JAYABHERI PROPERTIES PRIVATE IMITED (also written “Jayabheri Properties Private Limited” in filed documents)
RERA status: Registered; the supplied certificate records a five-year validity period.
Land and geographic identity
Locality / revenue village: Gowlidoddi locality; Gopanpally revenue village (also rendered “GOPANPALLE” in the building permit).
Mandal / district / PIN: Serilingampally Mandal, Ranga Reddy District, 500075.
Survey numbers and subdivisions: 62/P, 63/P, 64/P, 65/P, 72 and 73/P.
Site extent: Total area 29,845.72 sq m; net area 29,479.69 sq m. The RERA land record reports 366.03 sq m affected by road widening/FTL of tanks/Nala widening.
Boundaries in RERA filing: East: land of Jayabheri Four Seasons; west: proposed 60 feet road; north: land in Sy. No. 71; south: road.
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC).
Principal building permission: Approval 1/C20/09240/2021, dated 20 August 2021; permit file no. 1/C20/03636/2020.
Approved built-up area: 201,642.99 sq m, as recorded in the RERA filing.
Residential blocks and sanctioned floors: Five residential blocks: Block A-1, 3 Cellar + Ground + 28 upper floors; Blocks B-1, C-1, D-1 and E-1, each 1 Ground + 28 upper floors. The permit records a height of 89.05 m for each block.
Amenities building: AMENITIES -1, 1 Ground + 3 upper floors, height 14.99 m; the permit lists commercial area for this building.
Parking levels: Three parking floors are recorded for Block A-1. The permit requires approved cellar and stilt parking areas to be used exclusively for vehicle parking; project-wide parking-space counts are not established by the supplied records.
Unit count: RERA filing: 679 total units across five blocks; 678 are filed as 3BHK and one row is recorded as “E” rather than a home configuration.
RERA-filed versus sanctioned count: The filing reports 679 units; the supplied permit extraction requires that the number of sanctioned units not be increased without prior GHMC approval, but does not provide a total sanctioned-unit count in the extracted facts.
Offering and status
Filed home configuration and saleable area: 3BHK: 678 units, 201.13 sq m each as filed saleable area. A separate one-unit “E” row is not identified as a home configuration.
Booked / available counts: Portal-derived figures, with no as-of date in the supplied record: 3BHK—369 booked / 309 available; “E”—1 booked / 0 available. Treat these counts as indicative.
Completion deadline: Promoter’s Form B declaration undertakes completion by 20 August 2027; the permit also states construction is to be completed before that date.
Occupancy certificate: The filed architect’s completion certificate identifies GHMC OC 002944/GHMC/01586/, dated 1 August 2025, for Jayabheri The Nirvana, Blocks A/B/C/D/E and Amenities-1. This is the scope stated in that certificate.
Construction stage: The RERA amenity/infrastructure progress entries report percentages for listed items, but are not independent site verification. No overall independently verified construction-progress percentage is supplied.
2. The project story
Jayabheri The Nirvana is a RERA-registered residential apartment project on the listed parcels in Gopanpally village, Serilingampally Mandal, Ranga Reddy District. Its GHMC building permit provides for five residential blocks and a separate amenities building. The residential blocks are approved at ground plus 28 upper floors; Block A-1 also has three cellar levels. The amenities building is approved at ground plus three upper floors.
The project’s RERA unit table records 678 3BHK units and a separate one-unit entry labelled “E”; that entry is not a filed home configuration. The RERA portal booking figures supplied here show 369 of the 3BHK units booked and 309 available, without an as-of date.
The project record includes an architect’s certificate dated 13 August 2025 identifying a GHMC occupancy certificate dated 1 August 2025 for Blocks A–E and Amenities-1. The RERA filing also contains progress percentages for infrastructure and facilities; those are reported filing values, not an independent site inspection.
3. Master plan, architecture & building design
The RERA land filing records a total site area of 29,845.72 sq m and net area of 29,479.69 sq m. The RERA filing separately reports approved built-up area of 201,642.99 sq m. These are different measures and should not be treated as interchangeable.
The GHMC permit identifies five residential blocks—A-1 through E-1—and an amenities building. Blocks B-1, C-1, D-1 and E-1 are each shown as 1 Ground + 28 upper floors; Block A-1 is shown as 3 Cellar + Ground + 28 upper floors. The amenities building is 1 Ground + 3 upper floors. The permit lists each residential block at 89.05 m in height and the amenities building at 14.99 m.
The supplied approval extraction does not establish flats per floor, detailed apartment layouts, lift or stair counts, building footprints, internal circulation geometry, or a phase-wise building arrangement. The permit lists a 3030.72 sq m tot-lot and 1490 trees, and requires peripheral greenery and tree planting; these are permit-record items, not confirmation of completed landscaping.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 678 | 369 | 309 | 201.13 sq m | Not available | Not supplied |
| “E” (configuration not identified as a home) | 1 | 1 | 0 | 178.37 sq m | Not available | Not supplied |
The 3BHK count, booking figures and saleable area are from the RERA filing; booking counts have no supplied as-of date. The “E” entry is a unit-table row, not a disclosed residential configuration, and is not presented as a home type.
The supplied floor-plan review records 14 drawings: none measured, two scans pending and 12 with no flats identified. Accordingly, no software-measured carpet area or room dimensions are available in this evidence. RERA saleable area is the filed measure; it is not a carpet-area figure, and no loading calculation is supplied.
5. Parking & vehicle circulation
The building permit records three parking floors for Block A-1 and requires cellar and stilt areas approved for parking to be used exclusively for vehicle parking, without partition walls or rolling shutters. The supplied extracts do not establish the project-wide number of car or two-wheeler spaces, visitor or accessible bays, parking allocations to individual homes, or a complete parking-level schedule for all blocks.
No supplied evidence establishes mechanical parking, EV charging, parking-space ownership or unit-specific parking allotments. A drawn or approved parking provision alone does not establish exclusive ownership or allocation.
6. Amenities, recreation & open spaces
The following progress percentages are RERA-filed amenity/infrastructure entries. They are not independently verified completion figures.
| Facility | Green strip / tot-lot / park |
|---|---|
| Description / size | Permit records a tot-lot of 3030.72 sq m and 1490 trees; the permit also requires peripheral greenery and planting. |
| Declared progress / verified status | RERA filing reports 70% for Green Strip/TOT LOT/Park; not independently verified. |
| Facility | Aggregate recreational open space |
|---|---|
| Description / size | Area not supplied. |
| Declared progress / verified status | RERA filing reports 0%; not independently verified. |
| Facility | Community buildings |
|---|---|
| Description / size | Size and detailed facilities not supplied in the RERA progress entry. |
| Declared progress / verified status | RERA filing reports 75%; not independently verified. |
No project-specific RERA amenity schedule in the supplied data identifies clubhouse rooms, sports facilities or indoor recreation areas with approved dimensions or completion status. The permit identifies an amenities building, but the extracted permit facts do not specify its internal amenity schedule.
7. Utilities, building services & safety
| Evidence in the project record | GHMC permit makes public water connections conditional on production of an Occupancy Certificate. The RERA progress table lists Water Supply. |
|---|---|
| Declared progress / status | RERA filing reports 85%; not independently verified. Water source, storage and treatment capacity are not supplied. |
| Evidence in the project record | RERA progress entries list sewerage, treatment/disposal of sewage and sullage water, and storm-water drains. |
|---|---|
| Declared progress / status | 95%, 70% and 90%, respectively, as filed; not independently verified. STP capacity and reuse arrangements are not supplied. |
| Evidence in the project record | Permit requires a rain-water harvesting structure (percolation pit); the RERA progress table lists water conservation/rainwater harvesting. |
|---|---|
| Declared progress / status | RERA filing reports 90%; not independently verified. |
| Evidence in the project record | Permit requires space for a transformer and conditions public electricity connections on production of an Occupancy Certificate. The RERA progress table lists an electrical meter room, sub-station and receiving station. |
|---|---|
| Declared progress / status | Electrical meter room/sub-station/receiving station: 85% as filed; not independently verified. Supply capacity and backup details are not supplied. |
| Evidence in the project record | The RERA progress table lists fire protection and fire-safety requirements. The permit requires services, including fire-safety requirements, to be executed under qualified technical supervision. |
|---|---|
| Declared progress / status | RERA filing reports 100%; this is a filed progress figure, not an independent compliance verification. |
| Evidence in the project record | Permit requires a garbage house within the premises; the RERA progress table lists solid-waste management and disposal. |
|---|---|
| Declared progress / status | RERA filing reports 85%; not independently verified. |
| Evidence in the project record | Listed in the RERA progress table. |
|---|---|
| Declared progress / status | 85% and 90%, respectively, as filed; not independently verified. |
| Evidence in the project record | Permit requires lifts and other services to be executed under qualified technical supervision. Specific lift counts/capacities, accessible circulation details and ramp specifications are not supplied. |
|---|---|
| Declared progress / status | Not established in the supplied evidence. |
8. Location, access & connectivity
The registered project location is Gopanpally village, Serilingampally Mandal, Ranga Reddy District, PIN 500075; the GHMC permit describes the locality as Gowlidoddi. The RERA filing records a proposed 60 feet road on the western boundary and a road on the southern boundary.
The supplied location record lists the Financial District (Nanakramguda) at 1.2 km, a bus station at 2.2 km (unnamed), Manuu Polytechnic Hyderabad at 1.6 km, Sankaraya Eye Hospital at 1.6 km, South India Shopping Mall at 2.6 km, Nanakramguda Government Primary School at 0.5 km, and an unnamed park at 1.2 km. These are listed distances; no travel times or route measurements are supplied.
9. Developer & development status
The TG-RERA registered promoter is JAYABHERI PROPERTIES PRIVATE IMITED. The registration certificate and project filing identify the project promoter as Jayabheri Properties Private Limited; the supplied corporate record identifies the entity type as a company and GSTIN 36AAACM5296R1ZO.
The RERA promoter address is Jayabheri Corporate Office, Jayabheri Enclave, GOPANAPALLI ROAD, GOPANAPALLY, Serilingampally, Ranga Reddy, PIN 500075. The supplied record lists Kishore Duggirala as authorized signatory and director and Ram Mohan Maganti as a director. No additional verified contact details are provided here.
The promoter’s Form B affidavit, dated 16 September 2021, declares completion by 20 August 2027 and includes the promoter’s separate-account, audit and pending-approval undertakings. These are promoter declarations. The project record also contains an architect’s certificate identifying an OC dated 1 August 2025 for Blocks A–E and Amenities-1.
10. Approvals, official records & documents
TG-RERA registration certificate, Form C: Registration of JAYABHERI THE NIRVANA as P02400003566, issued 20 November 2021, with validity through 20 August 2027.
GHMC Building Permit Order: Approval 1/C20/09240/2021, file 1/C20/03636/2020, dated 20 August 2021; specifies the five residential blocks, amenities building, floor configurations and conditions.
Form B affidavit-cum-declaration: Promoter declaration by Kishore Duggirala, dated 16 September 2021, including a completion undertaking of 20 August 2027.
Architect’s completion certificate / OC record: Architect’s certificate dated 13 August 2025 identifies GHMC occupancy certificate 002944/GHMC/01586/ dated 1 August 2025 for Blocks A/B/C/D/E and Amenities-1.
Approved-plan drawing record: Drawing stamp is recorded as approval 1/C20/09240/2021; the supplied record says the drawing text-layer reading needs review.
RERA-filed unit and progress records: Unit counts, booking figures, saleable areas and infrastructure progress entries are available in the supplied RERA-derived records; booking counts have no as-of date, and progress entries are not independent verification.
Frequently asked questions
Is JAYABHERI THE NIRVANA registered with Telangana RERA?
Yes. JAYABHERI THE NIRVANA is registered with the Telangana Real Estate Regulatory Authority as P02400003566; the registration status is New Project.
Who is the developer of JAYABHERI THE NIRVANA?
The promoter named in the RERA registration is JAYABHERI PROPERTIES PRIVATE IMITED.
Where is JAYABHERI THE NIRVANA located?
JAYABHERI THE NIRVANA is in GOPANAPALLY, Serilingampally, Rangareddy, Telangana (500075).
When will JAYABHERI THE NIRVANA be completed?
The promoter's proposed date of completion filed with RERA is 20/08/2027. This is the promoter's declaration, not a guarantee.