Sm Sapphire

S M BUILDERS · Hyderabad · RERA P02500004214

SM SAPPHIRE is a Mixed Development (Residential & Commercial) in Chandanagar, Serilingampally Mandal, Hyderabad. The registered promoter is S M BUILDERS, a partnership. The project has a 3,000 m² site and one building, with 1 Cellar + Ground + 5 upper floors and 31 units: 16 2BHK, 14 3BHK and 1 commercial unit. Its TG-RERA registration number is P02500004214, and the project header records a proposed completion date of 16/11/2027.

More from S M Builders · 2 projects →

01What we found

RegisteredTG-RERA - valid till 16 Jul 2027
13documents on file - each fact links to its page
2court cases on this project's land (survey 205, Chandanagar)
6items to check - 2 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

6 items to check before you pay, 2 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemProject record
Registered nameSM SAPPHIRE RERA record
Project typeMixed Development (Residential & Commercial); the filing’s unit schedule includes residential and one commercial unit. RERA record RERA filing RERA unit table
Phase / registered portionPhase not disclosed. Registration is for the project identified in the certificate; phase scope is not separately stated. RERA record
TG-RERA registrationP02500004214; Form C records registration from 14/03/2022 to 16/07/2027, subject to the Act and rules. Registration validity is distinct from the completion deadline and occupancy status. RERA record
Registered promoterS M BUILDERS (also styled S M Builders in the certificate); partnership according to the RERA promoter record. RERA record Parties record Corporate record
RERA statusRegistered; the supplied record classifies it as a “New Project.” The portal snapshot reports 31 units and 31 available, but gives no booking-count as-of date. RERA record RERA filing RERA unit table

Land and geographic identity

ItemProject record
LocalityChandanagar / CHANDANAGAR RERA record Land records
Revenue villageChandanagar; the building-permit extraction also records CHANDANAGAR. RERA record Land records
MandalSerilingampally Mandal, as recorded in the building-permit extraction; the project identity record does not disclose a mandal. Land records
DistrictHyderabad in the project/RERA identity record. RERA record Land records
PIN500050 RERA record
Survey number(s) / subdivision(s)Survey No. 205. No project subdivision is stated in the supplied project identity; a title-report extraction separately references Sy No. 205/1 in connection with a mortgage. RERA record Land records
Site extent3,000 m² total site area in the building-permit and occupancy-certificate extracts. The permit extract records 2,715.93 m² net area, 284.07 m² nala-affected area, and 136.17 m² tot-lot.
Boundaries in RERA filingEast: “150 - WIDE ROAD INTERNAL ROAD LEADING TO AMEENPUR”; west: “NALA AMEENPUR ROAD STREET”; north: land in Survey No. 208; south: nala. Land records
Parcel location referenceA software-recorded cadastral parcel centroid is 17.41528, 78.35459; this is a location reference, not a surveyed boundary. Location record

Development identity

ItemProject record
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC) Approvals record
Principal building approvalBuilding Permit Order 1/C21/08605/2021, dated 16 July, 2021; file number 1/C21/08633/2019. Approvals record
Approved built-up areaThe project record lists 5350.76 m² as approved built-up area. The occupancy-certificate extraction separately records floor area of 3911.53 m² as per sanctioned plan and 3939.65 m² as per site building plan; these are separately labelled measures in that record. RERA filing
Building count and formOne building is recorded in the project filing; the building permit identifies Building - A-1 (RESI BLD). RERA filing
Sanctioned floors and height1 Cellar + Ground + 5 upper floors; building-permit height 17.99 m.
Parking levelCellar and stilt are designated for parking in the permit conditions. No stilt floor configuration or sanctioned parking-space count is supplied in the extracted record.
Approved versus RERA-filed unit countsRERA filing: 31 units—16 2BHK, 14 3BHK and 1 commercial unit. The permit condition says sanctioned unit numbers must not be increased without GHMC approval, but the supplied permit extraction does not state a total sanctioned unit count for comparison. RERA unit table

Offering and status

ItemProject record
RERA-filed configurations2BHK: 16 units; 3BHK: 14 units; commercial: 1 unit. RERA unit table
RERA-filed saleable area2BHK: 163.15 m²; 3BHK: 139.35 m²; commercial: 410.0 m². RERA unit table
Booked / availablePortal data as supplied shows 0 booked and all 31 available (16 2BHK, 14 3BHK, 1 commercial). The record has no as-of date; figures are indicative. RERA unit table
Construction stageNo independently verified current construction-stage assessment is supplied. RERA filing labels the project “New Project”; a third-party listing describes it as under construction, but that is not a RERA-filed progress certification. RERA filing Promoter website
Completion datesRERA Form B declares completion by 16/07/2027; the project header records a proposed completion date of 16/11/2027. These are recorded as separate dates; the supplied evidence does not explain the difference. RERA record
Occupancy certificateGHMC occupancy certificate 5666/GHMC/SLP/2024-OC, dated 19 February, 2024, for the building identified as SM at Survey No. 205, Chandanagar. The certificate records completion date 16 October, 2023 and completion certified.

2. The project story

SM SAPPHIRE is registered as a mixed residential and commercial development at Chandanagar, on Survey No. 205. The RERA filing records a 3,000 m² site and one building; GHMC’s permit extract identifies the building as A-1, a residential building with a cellar, ground floor and five upper floors. The RERA unit schedule lists 30 homes and one commercial unit. RERA record Land records RERA unit table

GHMC issued an occupancy certificate for the building identified as SM at Survey No. 205. The certificate records that the building was inspected and declared fit for occupation, and gives a completion date of 16 October, 2023. The supplied material does not establish the current on-site condition, whether all listed units are occupied, or the present status of the project’s common facilities.

The promoter’s RERA Form B declares completion by 16/07/2027, while the project header records a proposed completion date of 16/11/2027. The supplied documents do not explain the difference between these recorded dates; neither should be confused with TG-RERA registration validity, which runs to 16/07/2027. RERA record

3. Master plan, architecture & building design

The GHMC building permit identifies one residential building, Building - A-1, with 1 Cellar + Ground + 5 upper floors and a height of 17.99 m. The project record lists an approved built-up area of 5350.76 m². The occupancy-certificate extract gives a separate sanctioned-plan floor-area figure of 3911.53 m² and site-plan floor-area figure of 3939.65 m²; these figures are reported as labelled in their respective records, not treated as interchangeable area measures. RERA filing

The permit extract records a 3,000 m² site, 2,715.93 m² net area, 284.07 m² nala-affected area and a 136.17 m² tot-lot. The RERA land record also identifies an affected area, but the boundary and land-area particulars should be checked against the filed plans and title materials; this overview reports the permit-extract values as recorded. Land records

Approved-plan drawing material is referenced as document 218424. The available drawing-derived measurements cover two floor-plan drawings; the supplied information does not establish a full architectural schedule of floor-by-floor uses, building footprint, flats per floor, lift or stair counts, or detailed circulation and landscape layout. Floor plans

GHMC permit conditions identify the cellar and stilts as parking areas, require a fenced and maintained tot-lot, periphery greenery, rainwater harvesting and transformer space, and prohibit occupation before an occupancy certificate. These are approval conditions, not confirmation that each feature is currently complete.

4. Homes, configurations & floor plans

The following unit counts and saleable areas are from the TG-RERA unit record. Carpet-area figures are software-measured from the approved floor-plan drawings and are not RERA disclosures; the drawing geometry is marked as needing review. RERA unit table RERA unit details Floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK16016163.15 m²72.8–98.9 m²; median 84.4 m²48%
3BHK14014139.35 m²102.0–135.7 m²; median 109.4 m²21%
Commercial101410.0 m²Not suppliedNot supplied

The RERA-listed figures are saleable areas. The measured carpet areas are drawing-based software measurements, not RERA-filed values, and should be checked against the drawings. Saleable area and carpet area are different measures; no independently verified unit-by-unit area schedule is supplied. RERA unit table Floor plans

The measured 2BHK drawing set contains six designs. One example, flat 02 on the first-floor plan, labels a hall, kitchen, two bedrooms, two toilets, foyer and sit-out. The measured 3BHK set also contains six designs. One example, flat 03 on the first-floor plan, labels three bedrooms, dining, kitchen, two toilets, pooja, balcony and utility. The room labels and dimensions come from drawing measurement, not from a unit-specific RERA disclosure. RERA unit details

Booked and available figures are a portal snapshot without an as-of date, so they are indicative rather than a current inventory confirmation. RERA unit table

5. Parking & vehicle circulation

GHMC’s permit conditions state that the cellar and stilts approved for parking are to be used exclusively for vehicle parking, without partition walls or rolling shutters. The occupancy-certificate extract records a Parking Area (m2): 1250.54. The supplied records do not establish the number of car or two-wheeler spaces, visitor or accessible parking provision, mechanical parking, EV charging, ramp configuration, or unit-specific parking allocations.

A parking area shown or recorded at project level does not by itself establish exclusive ownership or allocation to a particular unit. The supplied evidence does not provide an allotment schedule.

6. Amenities, recreation & open spaces

Clubhouse / indoor

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
ClubhouseListed in third-party vendor data; no size suppliedPromoter websiteVendor listing only; not established as sanctioned or delivered
GymListed in third-party vendor data; no size suppliedPromoter websiteVendor listing only; not established as sanctioned or delivered

Sports / recreation

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Tot-lot136.17 m² in the building-permit and occupancy-certificate extractsPermit requires it to be fenced and maintained as greenery; current completion is not independently verified
Swimming poolListed in third-party vendor data; no size suppliedPromoter websiteVendor listing only; not established as sanctioned or delivered
Children’s play areaListed in third-party vendor data; no size suppliedPromoter websiteVendor listing only; not established as sanctioned or delivered

Landscape / open space

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Periphery greenery / green stripGHMC permit requires periphery greenery; no area suppliedApproval condition; current status not verified
Aggregate recreational open spaceProject amenity record shows 0%RERA amenitiesRecord does not establish a delivered facility

Convenience / community

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Community buildingsProject amenity record shows 0%RERA amenitiesNo progress recorded
Street lightingProject amenity record shows 0%RERA amenitiesNo progress recorded
Internal roads and footpathsProject amenity record shows 0%RERA amenitiesNo progress recorded
Waste management and disposalProject amenity record shows 0%RERA amenitiesNo progress recorded

The vendor listing also names security, maintenance staff and visitor parking, among other facilities; the supplied evidence does not establish their sanctioned scope or delivery. Promoter website

7. Utilities, building services & safety

Water supply
Evidence in the supplied recordRERA amenity record marks water supply “YES” at 100%. RERA amenities
Status limitationThis is a recorded status; independent current verification is not supplied.
Sewerage and drainage
Evidence in the supplied recordRERA amenity record marks sewerage and storm-water drains “YES” at 100%. Treatment and disposal of sewage and sullage water is recorded at 0%. RERA amenities
Status limitationNo treatment capacity, reuse details or current operating evidence is supplied.
Rainwater harvesting
Evidence in the supplied recordRERA amenity record marks water conservation/rainwater harvesting “YES” at 100%; GHMC permit requires a percolation pit. The occupancy-certificate extract records RWH(Rain Water Harvesting): 2. RERA amenities
Status limitationThe number in the certificate is reported as recorded; system capacity and current operation are not supplied.
Electricity
Evidence in the supplied recordRERA amenity record marks an electrical meter room/sub-station/receiving station “YES” at 100%. GHMC permit requires space for a transformer. RERA amenities
Status limitationSupply capacity and backup arrangements are not supplied by project documents here.
Fire and life safety
Evidence in the supplied recordGHMC permit conditions require fire NOC before issue of occupancy certificate and assign responsibility for structural safety and means of escape. The RERA amenity record shows fire protection and fire-safety requirements at 0%. RERA amenities
Status limitationThe permit condition alone does not establish the details or current status of fire systems.
Waste
Evidence in the supplied recordGHMC permit requires a garbage house within the premises; the amenity record shows solid-waste management and disposal at 0%. RERA amenities
Status limitationFacility capacity and current operation are not supplied.
Lifts, accessibility and security
Evidence in the supplied recordThe permit refers to lifts and services being executed under qualified technical supervision and contains an accessibility condition for public and semi-public buildings above 300 m². No lift schedule, lift capacity, project accessibility plan or project-specific security system details are supplied.
Status limitationNo installed-equipment or accessibility-completion verification is supplied.

8. Location, access & connectivity

The registered project location is Chandanagar, Hyderabad, Telangana 500050, on Survey No. 205. The RERA filing describes the eastern boundary as an internal road leading to Ameenpur, the western boundary as “NALA AMEENPUR ROAD STREET,” the northern boundary as land in Survey No. 208, and the southern boundary as nala. RERA record Land records

The project record gives a cadastral parcel-centroid coordinate of 17.41528, 78.35459. A location record lists the Financial District (Nanakramguda) at 1.2 km; this is a recorded distance, not a travel-time estimate. Location record

The vendor record separately lists “150 Feet Ameenpur Mainroad” as connectivity, but this is third-party listing information rather than a RERA-filed road-access description. Promoter website

9. Developer & development status

The registered promoter is S M BUILDERS, recorded as a partnership. Its GSTIN is 36ADJFS6957J1ZB. The supplied corporate record does not provide a company registration number or official website/contact details. Parties record Corporate record

The RERA party record identifies Raavi Vasu as authorized signatory and Raavi Madhavi as partner. RERA records two landowners—Muppalla Aditya Kumar and Teegela Padma Rao—under an area-share arrangement. Parties record

The promoter’s Form B is a declaration by Raavi Vasu as authorized signatory; it declares the project land free from encumbrances and undertakes completion by 16/07/2027. The project header separately records 16/11/2027 as proposed completion. The supplied evidence does not provide a current independently verified construction-progress percentage or explain the difference between the two recorded completion dates. RERA record

10. Approvals, official records & documents

TG-RERA registration certificate
Reference and scopeForm C; P02500004214; project SM SAPPHIRE; validity 14/03/2022–16/07/2027.
GHMC building permit
Reference and scopeBuilding Permit Order 1/C21/08605/2021, dated 16 July, 2021; file number 1/C21/08633/2019; Building A-1, Survey No. 205, Chandanagar.
GHMC occupancy certificate
Reference and scope5666/GHMC/SLP/2024-OC, dated 19 February, 2024; application 011605/GHMC/5713/SLP1/2023-OC; building identified as SM, Survey No. 205, Chandanagar; completion date 16 October, 2023.
RERA Form B declaration
Reference and scopePromoter declaration by Raavi Vasu for SM SAPPHIRE, including declared encumbrance position and completion undertaking.
Approved drawing record
Reference and scopeDrawing document 218424, referenced for floor-plan software measurements; the supplied record does not include a complete drawing-by-drawing approval index.
Title-report materials filed with RERA
Reference and scopeDocuments include government conveyance/auction records, release-deed material, development-agreement/GPA material and advocate title search report.
Layout approval lookup
Reference and scopeThe HMDA DPMS layout lookup is recorded as unavailable through the public route in the supplied record; this is not evidence of refusal. HMDA

The permit’s conditions include requirements concerning sanctioned-plan adherence, road-affected land, parking use, tot-lot maintenance, rainwater harvesting, transformer space, garbage facilities and occupancy certification. This overview lists selected conditions relevant to the project profile; the full conditions remain in the permit record.

Frequently asked questions

Is SM SAPPHIRE registered with Telangana RERA?

Yes. SM SAPPHIRE is registered with the Telangana Real Estate Regulatory Authority as P02500004214; the registration status is New Project.

Who is the developer of SM SAPPHIRE?

The promoter named in the RERA registration is S M BUILDERS.

Where is SM SAPPHIRE located?

SM SAPPHIRE is in CHANDANAGAR, Hyderabad, Telangana (500050).

When will SM SAPPHIRE be completed?

The promoter's proposed date of completion filed with RERA is 16/11/2027. This is the promoter's declaration, not a guarantee.