SWATHI S SKYLINE is a residential apartment project in Gajula Ramaram-1, Qutballapur, Medchal-Malkajgiri. It is being developed by the registered promoter, Swathi Constructions & Developers, on a site of 7587.27 m2, with three buildings: Block A with 1 Cellar + Stilt + 5 upper floors, Block B with 1 Stilt + 5 upper floors, and the Amenities Block with 1 Ground + 4 upper floors. The RERA filing lists 95 2BHK and 50 3BHK homes, with saleable areas of 113.6 sqm and 142.48 sqm, respectively. Its TG-RERA registration is P02200002948, and the proposed completion date is 16 March, 2027.

More from Swathi Constructions & Developers · 2 projects →

01What we found

RegisteredTG-RERA - valid till 16 Mar 2027
11documents on file - each fact links to its page
0court cases on this project's land in the court records searched
8items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

8 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Project at a glance

Project identity

FieldRecord
Registered project nameSWATHI S SKYLINE
Project typeResidential apartment project in the TG-RERA filing RERA record
Phase / registered portionNot separately identified as a phase in the supplied registration record; the filing identifies three buildings RERA filing
TG-RERA registrationP02200002948; issued 17/05/2021, valid through 16/03/2027. The certificate records a five-year registration period and no extension
Registered promoterSwathi Constructions & Developers, identified in the filing as a partnership RERA filing
RERA statusNew Project; the certificate records registration under section 5 RERA record

Land and geographic identity

FieldRecord
Locality / revenue villageGajularamram / Gajula Ramaram-1; the building-permit and OC extracts identify the revenue village as GAJULARAMARAM RERA record
MandalQutballapur RERA record
DistrictMedchal-Malkajgiri RERA record
PIN500055 RERA record
Project survey numbers206P, 207, 207P, 208, 208P RERA record
Registered site extent7587.27 m2; the permit records site area and net area as 7587.27 m2, with road-affected area and nala-affected area each recorded as 0
Boundaries in RERA filingEast: ROAD; West: SURVEY NO 206 PART 207 208 210 AND 211; North: PART OF SURVEY NO 206 207 208; South: NEIGHBOURS LAND RERA filing

Development identity

FieldRecord
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC)
Principal building permit1/C26/04174/2021, dated 16 March, 2021; file no. 1/C26/06209/2020
Approved built-up areaRERA filing records 17214.95 sqmts as approved built-up area RERA filing
Sanctioned buildings and floorsBlock A: 1 Cellar + Stilt + 5 upper floors; Block B: 1 Stilt + 5 upper floors; Amenities Block: 1 Ground + 4 upper floors
Sanctioned heightBlock A 14.99 m; Block B 14.99 m; Amenities Block 14.85 m
Parking provision in approvalCellar and stilt are approved for parking; the permit directs that these areas be used exclusively for vehicle parking. The OC extract records sanctioned parking area as 1388.44 m2
Unit countsRERA unit record lists 150 total units across three buildings; 145 are filed as 2BHK or 3BHK homes, and five additional rows are floor labels rather than identified home configurations RERA unit table RERA unit details
RERA-declared building count3 RERA filing

Offering and status

FieldRecord
Home configurations2BHK and 3BHK RERA unit table
RERA-filed saleable areas2BHK: 113.6 sqm; 3BHK: 142.48 sqm RERA unit table
Booked / available2BHK: 56 booked / 39 available; 3BHK: 34 booked / 16 available. These are portal-record counts without an as-of date, so treat them as indicative RERA unit table
Construction stageThe supplied GHMC Occupancy Certificate records completion of Blocks A and B and the Amenities Block; the OC extract gives a completion date of 07 September, 2023
Completion deadline16 March, 2027 in the RERA registration and promoter’s Form B undertaking; this is distinct from registration validity and the OC record
Occupancy certificateGHMC OC 5680/GHMC/KPL/2024-OC, dated 21 February, 2024; it covers the Amenities Block, Block B and Block A

The project story

SWATHI S SKYLINE is registered as a residential apartment project on a 7587.27 m2 site in Gajula Ramaram-1, Qutballapur, Medchal-Malkajgiri, on survey numbers 206P, 207, 207P, 208 and 208P. GHMC’s permit describes two residential blocks and a separate amenities block. Block A has a cellar, stilt and five upper floors; Block B has a stilt and five upper floors; the Amenities Block has a ground floor and four upper floors. RERA record

The RERA filing records 95 2BHK and 50 3BHK homes. Its unit table also contains five rows labelled by floor, not by home configuration; those rows are not included as homes in the configuration counts. The recorded booked and available figures are portal snapshots without a supplied date. RERA unit table RERA unit details

GHMC’s Occupancy Certificate extract identifies all three buildings and records a completion date of 07 September, 2023, with the OC dated 21 February, 2024. The extract reports deviations from the sanctioned plan for each building; detailed approval matters are indexed below and assessed separately in the approvals review. The separate RERA completion deadline remains 16 March, 2027.

Master plan, architecture & building design

The GHMC building permit describes a multi-block development on a site area and net area of 7587.27 m2. Its building-specific sanctioned parameters are:

PROPOSED-1 (BLOCK A)
Use in permitResidential
Sanctioned floors1 Cellar + Stilt + 5 upper floors
Height14.99 m
Recorded area detailsResidential upper-floor area 8,049.20 m2; cellar 4,540.10 m2; stilt 1,722.60 m2
PROPOSED-1 (BLOCK B)
Use in permitResidential
Sanctioned floors1 Stilt + 5 upper floors
Height14.99 m
Recorded area detailsResidential upper-floor area 8,224.55 m2; stilt 1,729.70 m2
PROPOSED-1 (AMENITIES BLOCK)
Use in permitAmenities
Sanctioned floors1 Ground + 4 upper floors
Height14.85 m
Recorded area detailsCommercial ground area 188.24 m2; commercial upper-floor area 752.96 m2

The RERA filing separately reports approved built-up area as 17214.95 sqmts. This is the filed approved-built-up figure, distinct from the building-specific area entries in the permit. The supplied material does not provide a verified FSI-counted area, a floor-by-floor apartment schedule, a building footprint, or a detailed approved site-layout drawing for describing internal circulation and building placement. RERA filing

The OC extract records a sanctioned tot-lot area of 1388.44 m2 and a sanctioned parking area of 1388.44 m2. No detailed landscaping or internal-road layout measurements are available in the supplied drawing records.

Homes, configurations & floor plans

The RERA filing lists 145 homes in two configurations. Saleable areas below are RERA-filed; carpet areas and loading are software measurements taken from the approved floor-plan drawings, not RERA disclosures. The drawing-based measurements need review. RERA unit table RERA unit details

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK955639113.6 sqm55.6–92.8 sqm; median 71.6 sqm37%
3BHK503416142.48 sqm92.5–98.9 sqm; median 97.8 sqm31%

RERA unit table RERA unit details Floor plans

Carpet area describes the measured internal floor-plan area; the RERA saleable area is a separate filed measure and includes a share of common areas. The supplied floor-plan software record does not provide a RERA-filed carpet area. As one drawing example, the measured 2BHK plan shows drawing room, dining, two bedrooms, kitchen, two toilets, wash area and a balcony; the balcony is excluded from that drawing’s carpet-area measurement. A measured 3BHK example shows a living room, dining, three bedrooms, kitchen, two toilets, dress areas, wash area and a balcony, with the balcony excluded from measured carpet area. RERA unit details Floor plans

The drawing extraction also identifies five 1BHK designs, but the supplied TG-RERA configuration record does not file 1BHK homes; no RERA unit count or saleable area is therefore stated for that drawing-only configuration. RERA unit details

Parking & vehicle circulation

The GHMC permit approves a cellar in Block A and stilts in Blocks A and B for vehicle parking, and expressly requires approved cellar and stilt parking areas to remain exclusively for parking. The OC extract records 1388.44 m2 of parking area as per the sanctioned plan.

The supplied records do not establish the number of car or two-wheeler spaces, visitor or accessible-space provision, parking allocation to individual units, or a verified spaces-per-home ratio. The permit identifies an 18 mt. road width in its conditions but the supplied material does not detail ramps, internal driveways, pedestrian separation or vehicle entry/exit arrangements. A sanctioned parking area does not by itself establish exclusive allocation to a particular apartment.

Amenities, recreation & open spaces

The GHMC permit and OC extract identify a tot-lot and rainwater harvesting as project features. Other facilities listed in the RERA amenity schedule are promoter-declared items; the schedule reports stated availability and progress as shown below, not independent completion verification. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Tot-lot / green strip1388.44 m2 in the permit and OC sanctioned-parameter extractSanctioned; the permit requires the tot-lot to be fenced and maintained as greenery. No independent completion verification supplied
Water supplyNo source or capacity statedRERA amenitiesRERA schedule: available “YES”, 100%
Sewerage (chamber, lines, septic tank, STP)No capacity statedRERA amenitiesRERA schedule: available “YES”, 0%
Storm-water drainsNo size or route statedRERA amenitiesRERA schedule: available “YES”, 0%
Treatment and disposal of sewage and sullage waterNo system capacity statedRERA amenitiesRERA schedule: available “YES”, 0%
Solid-waste management and disposalNo system details statedRERA amenitiesRERA schedule: available “YES”, 0%
Rainwater harvestingPermit specifies a rainwater-harvesting structure (percolation pit); OC extract also lists rainwater harvestingRequired by permit; no independent completion verification supplied
Transformer spaceSpace required by permit; no capacity statedSanction condition; completion not independently verified
Garbage houseRequired within the premises by permitSanction condition; completion not independently verified
Internal roads and footpathsNo dimensions suppliedRERA amenitiesRERA schedule: 0%
Street lightingNo details suppliedRERA amenitiesRERA schedule: 0%
Community buildingsAmenities Block is separately identified in the permit and OC; specific facilities within it are not detailed in the supplied official extractsBuilding identified in the OC; individual facilities and their status not established
Energy managementNo details suppliedRERA amenitiesRERA schedule: 0%
Recreational open spaceNo aggregate area stated in the RERA amenity scheduleRERA amenitiesRERA schedule: 0%

Utilities, building services & safety

The permit identifies a rainwater-harvesting percolation pit, transformer space, a garbage house and an effluent-treatment plant (ETP). It also lists water supply and sanitation-related facilities in the RERA amenity schedule, but does not provide water-source or storage details, ETP/STP capacity, wastewater-reuse arrangements, storm-water design, or electrical-supply and backup capacities. RERA amenities

The building permit requires automatic sprinklers in the cellar and other fire-safety systems as specified in its conditions, calls for an occupancy Fire NOC before issue of an Occupancy Certificate, and requires services including sanitation, plumbing, fire safety, lifts and electrical installations to be executed under qualified technical supervision. These are approval requirements; the supplied records do not include the Fire NOC itself or detailed fire-system specifications.

The supplied RERA-filed amenity record marks fire protection and fire-safety progress at 0%. No official extract supplied here establishes lift count or capacity, backup-power capacity, CCTV coverage, access control, waste-segregation arrangements, or accessibility features. RERA amenities

Location, access & connectivity

The registered location is Gajula Ramaram-1, Qutballapur, Medchal-Malkajgiri, Telangana, PIN 500055. The location record supplies a cadastral parcel-centroid coordinate of 17.52909, 78.42234. RERA record Location record

Supplied nearby-location distances are:

Nearby placeRecorded distance
New Era The Lead School0.2 km
(unnamed park)0.5 km
Store World1.1 km
Usha Mullapudi Cardiac Centre1.2 km
Union Bank of India1.6 km
Auto Stand2.0 km
Sri Chaitanya Junior College2.9 km
Nearest Metro: KPHB Colony4.5 km

Location record

The GHMC permit refers to an 18 mt. road in a condition concerning the site boundary, but the supplied records do not provide a complete approach-road description or verified public-transport routes.

Developer & development status

The registered promoter is SWATHI CONSTRUCTIONS & DEVELOPERS, identified in the RERA filing as a partnership. The filing names BADARINATH PADARTHI as authorized signatory and SUJATHA PADARTI and VAMSI KRISHNA PADARTHI as partners. RERA filing Parties record

The registration certificate gives a promoter-office entry of “Village: Mandal: District: Hyderabad, Pin: 500016.” The supplied record does not provide a verified corporate registration number, official website or contact details.

In Form B, the promoter’s authorized signatory declares that the land owner is Sri. HARI KRISHNA VIDIYALA, that the development arrangement is Development Agreement-cum-General Power of Attorney No. 28387/2018, and that the project is to be completed by 16 March 2027. These are promoter declarations in the filed affidavit.

The GHMC OC extract identifies Blocks A and B and the Amenities Block as covered by the occupancy certificate. The available unit-booking figures have no supplied as-of date and should be treated as indicative portal counts, not as independently verified sales information. RERA unit table

Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP02200002948; issued 17/05/2021; valid through 16/03/2027
What it establishesRegistration of SWATHI S SKYLINE; certificate includes project conditions
GHMC building permit order
Identifier / date1/C26/04174/2021, dated 16 March, 2021; file no. 1/C26/06209/2020
What it establishesSanctioned building parameters and conditions for Blocks A and B and the Amenities Block
GHMC Occupancy Certificate
Identifier / date5680/GHMC/KPL/2024-OC, dated 21 February, 2024; application no. 010116/GHMC/5017/KPL1/2023-OC
What it establishesOC extract identifies the Amenities Block, Block B and Block A; records completion date 07 September, 2023
Form B affidavit-cum-declaration
Identifier / dateDated 24 MAR 2021
What it establishesPromoter declaration identifying land owner, development arrangement, project completion undertaking and other RERA undertakings
Legal title report
Identifier / dateDated 02/03/2021
What it establishesFiled title opinion concerning the project land
Encumbrance statement
Identifier / dateStatement no. 32657630
What it establishesFiled record of listed transactions; the extract notes that transaction document numbers require verification
Layout-plan document entry
Identifier / dateDocument ID 158712
What it establishesThe RERA document list identifies a layout-plan requirement, but the supplied record does not contain an extracted layout drawing

The supplied material does not include an independently verified public contact record or a detailed extracted layout plan. The approval conditions and title matters are addressed in their dedicated report sections.

Frequently asked questions

Is SWATHI S SKYLINE registered with Telangana RERA?

Yes. SWATHI S SKYLINE is registered with the Telangana Real Estate Regulatory Authority as P02200002948; the registration status is New Project.

Who is the developer of SWATHI S SKYLINE?

The promoter named in the RERA registration is SWATHI CONSTRUCTIONS & DEVELOPERS.

Where is SWATHI S SKYLINE located?

SWATHI S SKYLINE is in Gajularamram, Gajula Ramaram-1, Qutballapur, Medchal-Malkajgiri, Telangana (500055).

When will SWATHI S SKYLINE be completed?

The promoter's proposed date of completion filed with RERA is 16/03/2027. This is the promoter's declaration, not a guarantee.