AASHRITHA PRIDE is a residential apartment project in Gayatri Nagar, Quthbullapur, Hyderabad. It is being developed by registered promoter TANMAY CONSTRUCTIONS on a site of 589.63 sq. m., with one building and 1 Stilt + 5 upper floors. The RERA-listed offering comprises 15 apartments: 10 2BHK and five 3BHK. Its TG-RERA registration is P02500002013, and its proposed completion date is 03/04/2025.

01What we found

Period endedTG-RERA registration ran to 3 Apr 2025 - check its extension on TG-RERA
14documents on file - each fact links to its page
1court case on this project's land (survey 123, Gayatri Nagar)
7items to check - 5 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

7 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemRecord
Registered project nameAASHRITHA PRIDE RERA record
Project typeResidential apartment project RERA record RERA filing
Phase / registered portionPhase not separately identified in the supplied record. The registration is for the project; the building permit identifies Building A. RERA record
TG-RERA registrationP02500002013 RERA record
Registration validity06/07/2020 to 03/04/2025; the supplied certificate states four years and is not marked extended. This is registration validity, not an occupancy certificate or a completion confirmation. RERA record
Registered promoterTANMAY CONSTRUCTIONS, partnership RERA record RERA filing
RERA statusListed as On-Going Project in the project information. The record gives a proposed/revised completion date of 03/04/2025; it does not establish current construction status. RERA filing RERA record

Land and geographic identity

ItemRecord
LocalityGayatri Nagar RERA record
Revenue villageJeedimetla is stated in the building permit and title documents; the RERA identity fields separately state Gayatri Nagar as the village. The supplied information does not resolve whether these labels refer to the same revenue-village identity. Land records
MandalQuthbullapur in the building permit; not disclosed in the project’s land identity fields. Land records
DistrictHyderabad in the RERA project identity; Medchal-Malkajgiri in the building permit. RERA record
PIN500097 RERA record
Survey number(s)Survey No. 123; no subdivision is supplied. RERA record Land records
Registered site extent589.63 sq. m. RERA filing
Total / net areaTotal area 589.63 sq. m.; net area 589.63 sq. m. RERA filing
Recorded road-affected / nala areaProject fields record 0 sq. m. affected in road widening/FTL/nala widening; the permit records road-affected area 0 sq. m. and nala-affected area 0 sq. m. RERA filing
BoundariesEast: “ROAD WIDTH 12”; west, north and south: “NEIGHBOURS LAND.” RERA filing

Development identity

ItemRecord
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC) Approvals record
Principal approvalBuilding Permit Order 2/C23/05551/2019, approved 03 April 2019. The permit also records file no. 2/KP/17905/2018. Approvals record
Approved built-up areaThe RERA project fields state approved built-up area 1,611.33 sq. m. The permit separately lists residential upper-floors area 1,342.75 m² and stilt area 256.72 m²; these are distinct figures as recorded. RERA filing
Building countOne building; the permit names Building A (Residential Flats). RERA filing
Sanctioned floor configuration1 Stilt + 5 upper floors; permit-stated height 14.99 m. No basement or podium is recorded.
Parking levelsThe permit says the approved cellar and stilts are for vehicle parking, but the extracted floor configuration records one stilt and does not establish a parking-space count or a cellar level.
Unit countGHMC permit: sanctioned unit total not stated in the supplied extraction. RERA project fields: one “building unit” and one “proposed building unit” (these fields do not give the apartment count). The RERA unit record lists 15 apartments. RERA filing RERA unit table

Offering and status

ItemRecord
RERA-listed configurations2BHK: 10 units; 3BHK: 5 units. RERA unit table
RERA-filed saleable area2BHK: 86.44–86.48 sq. m.; 3BHK: 95.77 sq. m. RERA unit table
Booked / availablePortal-derived unit record shows 0 booked and 15 available (2BHK: 0/10 booked, 10 available; 3BHK: 0/5 booked, 5 available). The record has no as-of date, so treat these counts as indicative. RERA unit table
Construction stageNo verified current stage or site-progress measurement is supplied. The permit is an approval record; it does not establish construction completion. RERA amenities
Completion datesProject fields show proposed and revised proposed completion as 03/04/2025. Form B separately records the promoter’s completion undertaking as 04/03/2025. RERA filing
Occupancy / completion certificateNo occupancy or completion certificate is included in the supplied project documents. The permit requires a completion notice and occupancy certificate before occupation.

2. The project story

  • AASHRITHA PRIDE is recorded with TG-RERA as a residential apartment project in Gayatri Nagar, Hyderabad, on Survey No. 123. Its RERA-listed offering comprises 15 apartments—10 two-bedroom units and five three-bedroom units—in a single building. The GHMC building-permit extraction identifies that building as Building A, with one stilt and five upper floors. RERA record Land records RERA unit table
  • The project record does not establish how much construction has been completed, whether any apartments have been handed over, or whether the building has an occupancy certificate. The portal-derived booking figures show all 15 units as available and none as booked, but they have no as-of date and should be treated as indicative rather than a current sales statement. RERA unit table Document index
  • The permit contains design and site conditions, including rainwater-harvesting structures, transformer space, a garbage house and an ETP. These are approval requirements or recorded provisions, not evidence that the facilities have been installed or commissioned.

3. Master plan, architecture & building design

  • The project’s RERA land record identifies a single site of 589.63 sq. m. in Survey No. 123, with recorded net area also 589.63 sq. m. The GHMC permit extraction identifies one residential building, Building A, with 1 stilt + 5 upper floors and a stated height of 14.99 m. No basement, podium, multi-building arrangement or separate phase organization is established in the supplied material. RERA filing
  • The RERA fields state an approved built-up area of 1,611.33 sq. m. The permit’s extracted parameters separately report 1,342.75 m² for residential upper floors and 256.72 m² for the stilt. These figures are presented as recorded; the available extraction does not provide a drawing-based area schedule explaining their relationship. RERA filing
  • The permit records 10 rainwater-harvesting structures and 25 trees, and requires a periphery strip of greenery. The supplied drawing and permit extracts do not establish flats per floor, lift or stair configuration, entrances, exits, internal circulation, open-space dimensions, or the residential/common-area distribution.

4. Homes, configurations & floor plans

  • The RERA unit record lists 10 2BHK apartments and five 3BHK apartments. It reports saleable areas separately from drawing-measured carpet areas. The carpet figures below are software measurements from the approved floor-plan drawing record, not RERA-filed area disclosures; they need drawing review. Saleable area includes the home’s share of common areas, while carpet area is a different measurement. RERA unit table RERA unit details Floor plans
ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK1001086.44–86.48 sq. m.58.1–68.0 sq. m.; median 63.1 sq. m. (software-measured)27%
3BHK50595.77 sq. m.Not supplied for this RERA-listed configurationNot supplied
  • For one measured 2BHK drawing, the room schedule identifies a living room, dining area, kitchen, two bedrooms and a toilet, as well as two balconies. The drawing extraction gives dimensions for the listed enclosed rooms; balconies are excluded from the measured carpet area. These room details describe one measured drawing, not every unit. RERA unit details
  • The drawing-measurement data also contains a 6BHK configuration, but the RERA unit record does not list it as a project offering; it is therefore not included as a purchasable RERA-listed configuration here. RERA unit details Floor plans

5. Parking & vehicle circulation

  • The GHMC permit states that the cellar and stilt approved for parking are to be used exclusively for vehicle parking, without partition walls or rolling shutters. The extracted building configuration identifies one stilt; it does not establish a cellar level, the number or type of parking spaces, visitor or accessible spaces, parking allocation to individual units, or EV provision.
  • Although the permit describes parking use, the supplied records do not establish actual construction or a buyer’s exclusive entitlement to a particular bay. Obtain the sanctioned parking plan and the relevant sale/allotment documents to confirm any unit-specific arrangement. Document index

6. Amenities, recreation & open spaces

  • The RERA amenities record names project infrastructure and safety-related items, with recorded progress percentages. A percentage of 0 or 30 is a portal entry, not independent confirmation of construction or operation. The GHMC permit records certain site provisions and requirements; neither source establishes independently verified completion. RERA amenities
FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Internal roads and footpathsNo size statedRERA amenities recordListed “YES”; 0%. Not independently verified. RERA amenities
Green strip / tot-lot / parkNo area stated; the permit also requires a periphery greenery stripRERA amenities record; GHMC permitListed “YES”; 0%. Not independently verified. RERA amenities
Community buildingsNo description or size statedRERA amenities recordProgress 0%; not independently verified. RERA amenities
Street lightingNo quantity statedRERA amenities recordListed “YES”; 0%. Not independently verified. RERA amenities
  • The promoter-vendor material mentions facilities such as a swimming pool, clubhouse, gym, landscaped gardens and indoor play areas, but these are not established in the supplied RERA amenity record or permit extraction as sanctioned or delivered project facilities. They are not treated here as confirmed project provisions. Promoter website RERA amenities

7. Utilities, building services & safety

  • The RERA amenities record lists water supply, sewerage, storm-water drains, sewage and sullage treatment/disposal, solid-waste management, rainwater harvesting, energy management, fire protection and safety, and electrical meter room/substation/receiving station. It records water supply at 30% and the other listed service-progress entries at 0%; these are declared portal figures, not independent verification of works or operational service. RERA amenities
  • The GHMC permit records 10 rainwater-harvesting structures, space for a transformer, a garbage house and an ETP. It also requires sanitation, plumbing, fire-safety requirements, lifts and electrical installations to be executed under qualified technical supervision. The supplied extracts do not state water source or storage capacity, treatment capacity, backup-power provision, lift count or capacity, detailed fire systems, CCTV, access control, or accessibility arrangements.
  • The permit requires an occupancy certificate before occupation and requires a completion notice after construction. No occupancy/completion certificate is supplied in the reviewed project documents; no completed or commissioned status is established here. Document index

8. Location, access & connectivity

  • The registered project location is Gayatri Nagar, Hyderabad, Telangana 500097. The permit describes the site as being in Jeedimetla, Quthbullapur, Medchal-Malkajgiri, at Survey No. 123; the project fields separately state village Gayatri Nagar and district Hyderabad. These are the location identifiers provided in the records. RERA record Land records
  • The RERA land record lists the eastern boundary as “ROAD WIDTH 12,” with neighbouring land to the north, south and west. The GHMC permit also references an 18-metre road condition. The supplied extracts do not identify a named approach road, public-transport service, or measured distances to local landmarks. RERA filing

9. Developer & development status

  • The registered legal promoter is TANMAY CONSTRUCTIONS, recorded as a partnership. The project record lists Chennupati Sarath Kumar, Gantu Srinivasa Rao and Punukollu Jaya Chandra as partners, and Mynani Ravi Kumar as authorized signatory. The supplied records do not provide a verified promoter registration number or official website/contact details. RERA filing Parties record
  • The Form B affidavit-cum-declaration was signed by Mynani Ravi Kumar as authorized signatory and dated 18/2/2020. It contains the promoter’s statements about title and encumbrances, the RERA separate-account arrangements and an undertaking to complete by 04/03/2025; these are promoter declarations, not independent verification of present title, account operation or construction status.
  • The RERA project fields show 03/04/2025 as both the proposed and revised proposed completion date, while the registration certificate states validity through 03/04/2025. The supplied record does not establish a subsequent extension, current construction progress or an occupancy certificate. RERA filing Document index

10. Approvals, official records & documents

RecordSupplied evidence
TG-RERA registrationForm C certificate for AASHRITHA PRIDE, registration P02500002013, issued 06/07/2020; stated validity 06/07/2020–03/04/2025. The certificate is not marked extended.
Principal building approvalGHMC Building Permit Order 2/C23/05551/2019, approved 03 April 2019; file no. 2/KP/17905/2018. The extraction identifies Building A, residential flats, at Survey No. 123. Approvals record
Building and commencement recordThe RERA document register includes “Commencement Certificates for each building in each phase”; the supplied extracted document is a GHMC Building Permit Order. No separate commencement notice or certificate is identified in the supplied material. Document index
Approved-plan evidenceA layout-plan item is listed in the RERA document register, but its contents were not extracted. The permit extraction supplies selected building and site parameters. Document index
Completion / occupancy evidenceNo completion or occupancy certificate is included in the supplied project documents. Document index
Promoter declarationForm B affidavit-cum-declaration by TANMAY CONSTRUCTIONS’ authorized signatory, dated 18/2/2020.
Title / development records in project fileThe RERA document list includes a title search report and title documents, including a 2018 sale deed and a 2019 development agreement-cum-GPA. Their detailed title implications are addressed in the Land & Title section. Document index
  • The available plan item is not extractable in the supplied record, and the reviewed material does not include a completion/occupancy certificate or a current site-progress verification. Those limits mean the overview can describe the registered offering and permit-recorded design, but cannot confirm present construction or facility completion. Document index

Frequently asked questions

Is AASHRITHA PRIDE registered with Telangana RERA?

Yes. AASHRITHA PRIDE is registered with the Telangana Real Estate Regulatory Authority as P02500002013; the registration status is On-Going Project.

Who is the developer of AASHRITHA PRIDE?

The promoter named in the RERA registration is TANMAY CONSTRUCTIONS.

Where is AASHRITHA PRIDE located?

AASHRITHA PRIDE is in GAYATRI NAGAR, Hyderabad, Telangana (500097).

When will AASHRITHA PRIDE be completed?

The promoter's proposed date of completion filed with RERA is 03/04/2025. This is the promoter's declaration, not a guarantee.