RNR s RAGHAVA RESIDENCY
RNR INFRA DEVELOPERS · Hyderabad · RERA P02500003218
RNR s RAGHAVA RESIDENCY is a residential apartment project in Kowkoor, Hyderabad district; the mandal is not disclosed in the supplied project record. The registered promoter is RNR INFRA DEVELOPERS, a partnership. The project has a registered site extent of 891 sq.m. and one building with 1 Cellar + Stilt + 5 upper floors and 20 homes: 14 2BHK, 5 3BHK and 1 “BHK” unit recorded without a specified bedroom count. Its TG-RERA registration is P02500003218, and the registration records a proposed completion date of 17/12/2026.
More from Rnr Infra Developers · 3 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
5 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Project record |
|---|---|
| Registered name | RNR s RAGHAVA RESIDENCY RERA record |
| Project type | Residential apartment project RERA record |
| Phase / registered portion | The supplied record describes one registered project and one building; a separate phase designation is not disclosed. RERA record |
| TG-RERA registration | P02500003218; granted under section 5. Approvals record |
| Registration validity | 06/08/2021–17/08/2026; the certificate states five years, unless extended by the Authority. It records no extension. This is registration validity, not the construction deadline or an occupancy certificate. Approvals record |
| Registered promoter | RNR INFRA DEVELOPERS; partnership. RERA filing Corporate record |
| RERA status | The project is registered. The registration certificate is the supplied status evidence; no later extension is recorded in the supplied certificate. |
Land and geographic identity
| Field | Project record |
|---|---|
| Locality | Kowkoor RERA record RERA filing |
| Revenue village | Kowkoor Village Land records |
| Mandal | Not disclosed in the supplied project record Land records |
| District / PIN | Hyderabad / 500010 in the project header and RERA filing. RERA record RERA filing |
| Project survey numbers | 231, 232, 233, 234, 236, 237, 240, 249, 250, 251 and 265 Land records |
| Plot identifiers | 13, 14, 27 and 28 RERA filing |
| Registered site extent | 891 sq.m. in the RERA filing RERA filing. The GHMC building permit records Site Area 891.7 m² and Net Area 879.02 m². |
| Boundaries | East: ROAD WIDTH - 10; West: ROAD WIDTH - 10; North: ROAD WIDTH - 15; South: PLOT NO - 15 26 RERA filing |
Development identity
| Field | Project record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC) Approvals record |
| Principal building approval | 2/C27/08658/2020, approved 17 August, 2020; GHMC building permit order. The filed record also identifies file no. 2/C27/07670/2020. Approvals record |
| Approved built-up area | The project filing lists 3033.09 sq.m. RERA filing. The permit extraction separately records floor-area figures; the supplied material does not identify the 3033.09 sq.m. figure as carpet or saleable area. |
| Building count | One building: BUILDING-1 (RESI) |
| Sanctioned floor configuration | 1 Cellar + Stilt + 5 upper floors; the permit lists five proposed residential floors. Building height is 14.95 m. |
| Parking levels | One cellar parking floor and one stilt parking floor are shown in the permit. A space count and unit-by-unit parking allocation are not available in the supplied records. |
| Units | The RERA filing records 20 units in total, and the GHMC permit condition states that the sanctioned unit count must not be increased without prior approval. RERA unit table |
Offering and status
| Field | Project record |
|---|---|
| RERA-filed configurations | 14 2BHK, 5 3BHK, and 1 “BHK” unit recorded without a specified bedroom count. RERA unit table RERA unit details |
| RERA-filed saleable area | 2BHK: 75.82 sq.m.; 3BHK: 103.77 sq.m.; “BHK”: 110.76 sq.m. RERA unit table RERA unit details |
| Booked / available | Portal figures show 0 booked and 20 available across the listed configurations. The portal record has no as-of date, so these counts are indicative, not a current inventory confirmation. RERA unit table RERA unit details |
| Construction stage | No independently verified site-progress assessment is supplied. A third-party vendor record describes the project as “ready-to-move”; that is not a TG-RERA progress or OC record. Promoter website |
| Completion dates | The registration records a proposed completion date of 17/12/2026. The promoter’s Form B undertaking states 17/08/2026. RERA record |
| Occupancy / completion certificate | No occupancy or completion certificate is supplied. The GHMC permit says an occupancy certificate is compulsory before occupation and requires a completion notice. |
2. The project story
RNR s RAGHAVA RESIDENCY is a single-building residential apartment development in Kowkoor Village, Hyderabad district. The RERA filing identifies the project land as plots 13, 14, 27 and 28 and lists survey numbers 231, 232, 233, 234, 236, 237, 240, 249, 250, 251 and 265. The GHMC permit describes one residential building with a cellar, stilt and five upper floors. RERA record RERA filing
The RERA unit schedule contains 20 homes: 14 2BHK units, five 3BHK units and one unit recorded only as “BHK.” It reports none booked and all 20 available, but the portal extract is undated. The supplied evidence does not establish construction progress or an issued occupancy certificate; therefore, the third-party “ready-to-move” description is not treated as verified completion or permission to occupy. RERA unit table RERA unit details Promoter website
The filing gives 17/12/2026 as the proposed completion date, while the Form B declaration states a completion undertaking of 17/08/2026. These are reported as separate record entries here; the supplied evidence does not establish a revised completion date. RERA record
3. Master plan, architecture & building design
The GHMC building permit describes one residential block, BUILDING-1 (RESI), with 1 Cellar + Stilt + 5 upper floors and a building height of 14.95 m. The permit extraction records a Site Area of 891.7 m², Net Area of 879.02 m², a 44.59 m² tot-lot, and no road- or nala-affected area in its listed measurements. It also lists 1,891.55 for residential upper floors, 534.09 for cellar parking and 349.13 for stilt parking; the supplied extraction does not specify a separate unit for these floor-area entries.
The RERA project filing records an approved built-up area of 3033.09 sq.m. That figure is kept distinct from the permit’s extracted floor-area entries and from the RERA-filed saleable areas in the home schedule. No carpet-area measurements were successfully produced from the supplied drawings: the two drawing records are reported as having no flats measured. RERA filing Floor plans RERA unit table
The permit specifies 4.04 m for each of the side I, side II, front and rear setbacks. Its conditions require the tot-lot to be fenced and maintained as greenery, tree planting along the periphery and front, a rainwater-harvesting percolation pit, transformer space and a garbage house. A project-specific drawing description of internal circulation, lifts, stairs, entrances, landscaping beyond these conditions, or the residential/common-area distribution is not supplied.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 14 | 0 | 14 | 75.82 sq.m. | Not available | Not supplied |
| 3BHK | 5 | 0 | 5 | 103.77 sq.m. | Not available | Not supplied |
| Unspecified (“BHK” in filing) | 1 | 0 | 1 | 110.76 sq.m. | Not available | Not supplied |
Unit counts, booking figures and saleable areas are from the RERA unit record; booked/available figures have no as-of date in the supplied extract. RERA unit table RERA unit details
Carpet area is not available: the supplied floor-plan review records two drawings, with no flats measured. The RERA-filed saleable area is therefore the only area figure available here. No RERA-filed room dimensions, balcony or utility measurements, orientation, or typical-floor arrangement are provided. Floor plans RERA unit table
5. Parking & vehicle circulation
The GHMC-approved plan identifies one cellar parking floor and one stilt parking floor and requires both areas to be used exclusively for vehicle parking, without partition walls or rolling shutters, and not converted to another use. The permit extraction gives the cellar and stilt parking floor-area figures as 534.09 and 349.13, respectively, without specifying a unit for those entries.
The supplied evidence does not establish the number of parking spaces, separate resident or visitor provision, accessible spaces, two-wheeler provision, ramps or driveway arrangement, EV charging, or parking allocation to individual apartments. The existence of approved parking areas does not, by itself, establish an exclusive parking right for a particular unit. RERA unit table
6. Amenities, recreation & open spaces
The GHMC permit records a tot-lot and includes conditions for specified site features. The RERA amenity record gives status percentages, but does not provide facility dimensions or independent site verification.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Tot-lot / greenery | Permit extraction lists 44.59 m²; permit conditions require fencing and maintenance as greenery. | Required by permit; completion not independently verified. | |
| Peripheral greenery and trees | Tree planting along the site periphery and front; permit lists 40 Trees. | Required/listed in permit; delivered status not verified. | |
| Internal roads and footpaths | No description or size supplied. | RERA amenities | RERA amenity record: 0%. |
| Green strip / tot-lot / park | No additional size or description supplied. | RERA amenities | RERA amenity record: 0%. |
| Community buildings | No facility details supplied. | RERA amenities | RERA amenity record: 0%. |
The third-party vendor lists a “Common Garden,” but no size, sanctioned drawing detail or verified delivery status for it is supplied. Promoter website
7. Utilities, building services & safety
| Service | Supplied evidence |
|---|---|
| Water | The RERA amenity record marks water supply “YES” and 100%. The GHMC permit states public water supply connections are to be provided only on production of an occupancy certificate. Source, storage and treatment capacity are not supplied. RERA amenities |
| Sewerage / drainage | The RERA amenity record marks sewerage (including STP) and storm-water drains “YES” and 100%. It lists treatment and disposal of sewage and sullage water at 0%. No plant capacity, reuse arrangement or drainage design is supplied. RERA amenities |
| Rainwater harvesting | The permit requires a percolation-pit structure; the RERA amenity record marks water conservation/rainwater harvesting “YES” and 100%. Completion has not been independently verified. RERA amenities |
| Electrical | The RERA amenity record marks the electrical meter room/sub-station/receiving station “YES” and 100%; the permit requires transformer space. Supply capacity and backup arrangements are not supplied in the RERA evidence. RERA amenities |
| Lifts | The permit refers to lifts and requires services to be executed under qualified technical personnel. No lift count, capacity, service lift or independently verified installation details are supplied. |
| Fire and life safety | The permit makes structural safety and means-of-escape safety the responsibility of the owner, builder/developer and technical professionals, and requires fire-fighting installations stipulated in the National Building Code of India, 2016. It also requires an occupancy fire NOC before issue of an occupancy certificate. The RERA amenity record lists fire protection and fire safety at 0%; the vendor separately lists “Fire Safety.” No fire NOC or verified completion evidence is supplied. RERA amenities Promoter website |
| Waste | The permit requires a garbage house within the premises. The RERA amenity record lists solid-waste management and disposal at 0%; the vendor lists “Waste Management.” Detailed arrangements and verified status are not supplied. RERA amenities Promoter website |
| Security / CCTV | The vendor lists security and CCTV. These are third-party-listed features; no corresponding project-specific RERA progress or verification is supplied. Promoter website |
| Accessibility | The supplied records do not describe project-specific accessible routes or facilities. The permit’s physically-handicapped-access condition is stated for public and semi-public buildings above 300 sq.m.; it does not establish accessibility provision for this residential project. |
8. Location, access & connectivity
The registered project location is Kowkoor Village, Kowkoor locality, Hyderabad district, PIN 500010. The supplied location record identifies the cadastral parcel centroid as 17.41528, 78.35459. The GHMC permit describes road widths of 10 m to the east and west and 15 m to the north in the RERA land record; the building permit also refers to sites abutting 18 mt. road widths in a general condition, without establishing that this describes a specific project boundary. RERA record RERA filing Location record
The supplied location data records the Financial District (Nanakramguda) at 1.2 km as an anchor. No measured distances to public transport or other landmarks are provided. A third-party vendor describes schools, airports, restaurants, bus stops and railway stations as nearby, but supplies no distances; those claims are not independently verified here. Location record Promoter website
9. Developer & development status
The registered promoter is RNR INFRA DEVELOPERS, identified in the RERA filing as a partnership. Its supplied project address is B, BRUNDAVAN NAGAR, PRIYADARSHI ENCLAVE, KOWKOOR, Hyderabad, 500010; GSTIN 36ABAFR5508D1ZH is recorded. An official website, promoter contact details and a distinct marketing-brand relationship are not supplied. RERA filing RERA filing Corporate record
The project filing identifies one building and 20 RERA-filed units. The supplied records do not provide an independently verified construction-stage report or a TG-RERA-recorded occupancy certificate. The promoter’s Form B states a completion undertaking of 17/08/2026; the project header records 17/12/2026 as the proposed completion date. RERA record RERA unit table
10. Approvals, official records & documents
| Record | Supplied evidence |
|---|---|
| TG-RERA registration | Form C for RNR s RAGHAVA RESIDENCY, registration P02500003218, issued 06/08/2021, valid to 17/08/2026; no extension is recorded in the supplied certificate. |
| GHMC building permit | Building Permit Order dated 17 August, 2020, approval 2/C27/08658/2020, file 2/C27/07670/2020, for a residential building at Kowkoor. |
| Registered site identifiers | Survey numbers 231, 232, 233, 234, 236, 237, 240, 249, 250, 251 and 265 are listed in the project registration and permit. |
| Occupancy / completion record | No occupancy or completion certificate is included. The permit requires an occupancy certificate before occupation. |
| Promoter declaration | Form B records the promoter’s land, account, approval and completion declarations, including the stated completion undertaking of 17/08/2026. |
| Filed sale agreement | An Annexure A agreement-for-sale form is present, but the supplied extraction describes it as a blank template rather than an executed unit-specific agreement. |
| Other project-filed records | The registration pack includes a land-title search report, title documents, an encumbrance statement, and a partner resolution appointing an authorized signatory. |
| Drawing record | A floor-plan/layout record is listed as, but no usable flat measurements are available in the supplied drawing review. Floor plans |
The permit includes conditions relating to the sanctioned plan, commencement and completion notices, parking use, site greenery, rainwater harvesting, transformer space, garbage storage, service connections and occupancy certification. This index summarizes the supplied record; detailed approval conditions and other land/title matters are addressed in their respective report sections.
1. Project at a glance
Project identity
Registered name: RNR s RAGHAVA RESIDENCY
Project type: Residential apartment project
Phase / registered portion: The supplied record describes one registered project and one building; a separate phase designation is not disclosed.
TG-RERA registration: P02500003218; granted under section 5.
Registration validity: 06/08/2021–17/08/2026; the certificate states five years, unless extended by the Authority. It records no extension. This is registration validity, not the construction deadline or an occupancy certificate.
Registered promoter: RNR INFRA DEVELOPERS; partnership.
RERA status: The project is registered. The registration certificate is the supplied status evidence; no later extension is recorded in the supplied certificate.
Land and geographic identity
Locality: Kowkoor
Revenue village: Kowkoor Village
Mandal: Not disclosed in the supplied project record
District / PIN: Hyderabad / 500010 in the project header and RERA filing.
Project survey numbers: 231, 232, 233, 234, 236, 237, 240, 249, 250, 251 and 265
Plot identifiers: 13, 14, 27 and 28
Registered site extent: 891 sq.m. in the RERA filing. The GHMC building permit records Site Area 891.7 m² and Net Area 879.02 m².
Boundaries: East: ROAD WIDTH - 10; West: ROAD WIDTH - 10; North: ROAD WIDTH - 15; South: PLOT NO - 15 26
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC)
Principal building approval: 2/C27/08658/2020, approved 17 August, 2020; GHMC building permit order. The filed record also identifies file no. 2/C27/07670/2020.
Approved built-up area: The project filing lists 3033.09 sq.m.. The permit extraction separately records floor-area figures; the supplied material does not identify the 3033.09 sq.m. figure as carpet or saleable area.
Building count: One building: BUILDING-1 (RESI)
Sanctioned floor configuration: 1 Cellar + Stilt + 5 upper floors; the permit lists five proposed residential floors. Building height is 14.95 m.
Parking levels: One cellar parking floor and one stilt parking floor are shown in the permit. A space count and unit-by-unit parking allocation are not available in the supplied records.
Units: The RERA filing records 20 units in total, and the GHMC permit condition states that the sanctioned unit count must not be increased without prior approval.
Offering and status
RERA-filed configurations: 14 2BHK, 5 3BHK, and 1 “BHK” unit recorded without a specified bedroom count.
RERA-filed saleable area: 2BHK: 75.82 sq.m.; 3BHK: 103.77 sq.m.; “BHK”: 110.76 sq.m.
Booked / available: Portal figures show 0 booked and 20 available across the listed configurations. The portal record has no as-of date, so these counts are indicative, not a current inventory confirmation.
Construction stage: No independently verified site-progress assessment is supplied. A third-party vendor record describes the project as “ready-to-move”; that is not a TG-RERA progress or OC record.
Completion dates: The registration records a proposed completion date of 17/12/2026. The promoter’s Form B undertaking states 17/08/2026.
Occupancy / completion certificate: No occupancy or completion certificate is supplied. The GHMC permit says an occupancy certificate is compulsory before occupation and requires a completion notice.
2. The project story
RNR s RAGHAVA RESIDENCY is a single-building residential apartment development in Kowkoor Village, Hyderabad district. The RERA filing identifies the project land as plots 13, 14, 27 and 28 and lists survey numbers 231, 232, 233, 234, 236, 237, 240, 249, 250, 251 and 265. The GHMC permit describes one residential building with a cellar, stilt and five upper floors.
The RERA unit schedule contains 20 homes: 14 2BHK units, five 3BHK units and one unit recorded only as “BHK.” It reports none booked and all 20 available, but the portal extract is undated. The supplied evidence does not establish construction progress or an issued occupancy certificate; therefore, the third-party “ready-to-move” description is not treated as verified completion or permission to occupy.
The filing gives 17/12/2026 as the proposed completion date, while the Form B declaration states a completion undertaking of 17/08/2026. These are reported as separate record entries here; the supplied evidence does not establish a revised completion date.
3. Master plan, architecture & building design
The GHMC building permit describes one residential block, BUILDING-1 (RESI), with 1 Cellar + Stilt + 5 upper floors and a building height of 14.95 m. The permit extraction records a Site Area of 891.7 m², Net Area of 879.02 m², a 44.59 m² tot-lot, and no road- or nala-affected area in its listed measurements. It also lists 1,891.55 for residential upper floors, 534.09 for cellar parking and 349.13 for stilt parking; the supplied extraction does not specify a separate unit for these floor-area entries.
The RERA project filing records an approved built-up area of 3033.09 sq.m. That figure is kept distinct from the permit’s extracted floor-area entries and from the RERA-filed saleable areas in the home schedule. No carpet-area measurements were successfully produced from the supplied drawings: the two drawing records are reported as having no flats measured.
The permit specifies 4.04 m for each of the side I, side II, front and rear setbacks. Its conditions require the tot-lot to be fenced and maintained as greenery, tree planting along the periphery and front, a rainwater-harvesting percolation pit, transformer space and a garbage house. A project-specific drawing description of internal circulation, lifts, stairs, entrances, landscaping beyond these conditions, or the residential/common-area distribution is not supplied.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 14 | 0 | 14 | 75.82 sq.m. | Not available | Not supplied |
| 3BHK | 5 | 0 | 5 | 103.77 sq.m. | Not available | Not supplied |
| Unspecified (“BHK” in filing) | 1 | 0 | 1 | 110.76 sq.m. | Not available | Not supplied |
Unit counts, booking figures and saleable areas are from the RERA unit record; booked/available figures have no as-of date in the supplied extract.
Carpet area is not available: the supplied floor-plan review records two drawings, with no flats measured. The RERA-filed saleable area is therefore the only area figure available here. No RERA-filed room dimensions, balcony or utility measurements, orientation, or typical-floor arrangement are provided.
5. Parking & vehicle circulation
The GHMC-approved plan identifies one cellar parking floor and one stilt parking floor and requires both areas to be used exclusively for vehicle parking, without partition walls or rolling shutters, and not converted to another use. The permit extraction gives the cellar and stilt parking floor-area figures as 534.09 and 349.13, respectively, without specifying a unit for those entries.
The supplied evidence does not establish the number of parking spaces, separate resident or visitor provision, accessible spaces, two-wheeler provision, ramps or driveway arrangement, EV charging, or parking allocation to individual apartments. The existence of approved parking areas does not, by itself, establish an exclusive parking right for a particular unit.
6. Amenities, recreation & open spaces
The GHMC permit records a tot-lot and includes conditions for specified site features. The RERA amenity record gives status percentages, but does not provide facility dimensions or independent site verification.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Tot-lot / greenery | Permit extraction lists 44.59 m²; permit conditions require fencing and maintenance as greenery. | Required by permit; completion not independently verified. | |
| Peripheral greenery and trees | Tree planting along the site periphery and front; permit lists 40 Trees. | Required/listed in permit; delivered status not verified. | |
| Internal roads and footpaths | No description or size supplied. | RERA amenity record: 0%. | |
| Green strip / tot-lot / park | No additional size or description supplied. | RERA amenity record: 0%. | |
| Community buildings | No facility details supplied. | RERA amenity record: 0%. |
The third-party vendor lists a “Common Garden,” but no size, sanctioned drawing detail or verified delivery status for it is supplied.
7. Utilities, building services & safety
Water: The RERA amenity record marks water supply “YES” and 100%. The GHMC permit states public water supply connections are to be provided only on production of an occupancy certificate. Source, storage and treatment capacity are not supplied.
Sewerage / drainage: The RERA amenity record marks sewerage (including STP) and storm-water drains “YES” and 100%. It lists treatment and disposal of sewage and sullage water at 0%. No plant capacity, reuse arrangement or drainage design is supplied.
Rainwater harvesting: The permit requires a percolation-pit structure; the RERA amenity record marks water conservation/rainwater harvesting “YES” and 100%. Completion has not been independently verified.
Electrical: The RERA amenity record marks the electrical meter room/sub-station/receiving station “YES” and 100%; the permit requires transformer space. Supply capacity and backup arrangements are not supplied in the RERA evidence.
Lifts: The permit refers to lifts and requires services to be executed under qualified technical personnel. No lift count, capacity, service lift or independently verified installation details are supplied.
Fire and life safety: The permit makes structural safety and means-of-escape safety the responsibility of the owner, builder/developer and technical professionals, and requires fire-fighting installations stipulated in the National Building Code of India, 2016. It also requires an occupancy fire NOC before issue of an occupancy certificate. The RERA amenity record lists fire protection and fire safety at 0%; the vendor separately lists “Fire Safety.” No fire NOC or verified completion evidence is supplied.
Waste: The permit requires a garbage house within the premises. The RERA amenity record lists solid-waste management and disposal at 0%; the vendor lists “Waste Management.” Detailed arrangements and verified status are not supplied.
Security / CCTV: The vendor lists security and CCTV. These are third-party-listed features; no corresponding project-specific RERA progress or verification is supplied.
Accessibility: The supplied records do not describe project-specific accessible routes or facilities. The permit’s physically-handicapped-access condition is stated for public and semi-public buildings above 300 sq.m.; it does not establish accessibility provision for this residential project.
8. Location, access & connectivity
The registered project location is Kowkoor Village, Kowkoor locality, Hyderabad district, PIN 500010. The supplied location record identifies the cadastral parcel centroid as 17.41528, 78.35459. The GHMC permit describes road widths of 10 m to the east and west and 15 m to the north in the RERA land record; the building permit also refers to sites abutting 18 mt. road widths in a general condition, without establishing that this describes a specific project boundary.
The supplied location data records the Financial District (Nanakramguda) at 1.2 km as an anchor. No measured distances to public transport or other landmarks are provided. A third-party vendor describes schools, airports, restaurants, bus stops and railway stations as nearby, but supplies no distances; those claims are not independently verified here.
9. Developer & development status
The registered promoter is RNR INFRA DEVELOPERS, identified in the RERA filing as a partnership. Its supplied project address is B, BRUNDAVAN NAGAR, PRIYADARSHI ENCLAVE, KOWKOOR, Hyderabad, 500010; GSTIN 36ABAFR5508D1ZH is recorded. An official website, promoter contact details and a distinct marketing-brand relationship are not supplied.
The project filing identifies one building and 20 RERA-filed units. The supplied records do not provide an independently verified construction-stage report or a TG-RERA-recorded occupancy certificate. The promoter’s Form B states a completion undertaking of 17/08/2026; the project header records 17/12/2026 as the proposed completion date.
10. Approvals, official records & documents
TG-RERA registration: Form C for RNR s RAGHAVA RESIDENCY, registration P02500003218, issued 06/08/2021, valid to 17/08/2026; no extension is recorded in the supplied certificate.
GHMC building permit: Building Permit Order dated 17 August, 2020, approval 2/C27/08658/2020, file 2/C27/07670/2020, for a residential building at Kowkoor.
Registered site identifiers: Survey numbers 231, 232, 233, 234, 236, 237, 240, 249, 250, 251 and 265 are listed in the project registration and permit.
Occupancy / completion record: No occupancy or completion certificate is included. The permit requires an occupancy certificate before occupation.
Promoter declaration: Form B records the promoter’s land, account, approval and completion declarations, including the stated completion undertaking of 17/08/2026.
Filed sale agreement: An Annexure A agreement-for-sale form is present, but the supplied extraction describes it as a blank template rather than an executed unit-specific agreement.
Other project-filed records: The registration pack includes a land-title search report, title documents, an encumbrance statement, and a partner resolution appointing an authorized signatory.
Drawing record: A floor-plan/layout record is listed as, but no usable flat measurements are available in the supplied drawing review.
The permit includes conditions relating to the sanctioned plan, commencement and completion notices, parking use, site greenery, rainwater harvesting, transformer space, garbage storage, service connections and occupancy certification. This index summarizes the supplied record; detailed approval conditions and other land/title matters are addressed in their respective report sections.
Frequently asked questions
Is RNR s RAGHAVA RESIDENCY registered with Telangana RERA?
Yes. RNR s RAGHAVA RESIDENCY is registered with the Telangana Real Estate Regulatory Authority as P02500003218; the registration status is New Project.
Who is the developer of RNR s RAGHAVA RESIDENCY?
The promoter named in the RERA registration is RNR INFRA DEVELOPERS.
Where is RNR s RAGHAVA RESIDENCY located?
RNR s RAGHAVA RESIDENCY is in KOWKOOR, Hyderabad, Telangana (500010).
When will RNR s RAGHAVA RESIDENCY be completed?
The promoter's proposed date of completion filed with RERA is 17/12/2026. This is the promoter's declaration, not a guarantee.
More projects in Hyderabad