Suvela Projects
SUVELA PROJECTS · Rangareddy · RERA P02400004683
SUVELA PROJECTS is a residential apartment project in BUDVEL, Rajendranagar mandal, Ranga Reddy district. The registered promoter developing it is SUVELA PROJECTS, recorded as a partnership. The project is on 794.2 sq. m of land and comprises one residential building with 1 Cellar + 1 Stilt + 5 upper floors, with 10 3 BED ROOM homes, each with a saleable area of 213.26 sq. m. It is registered under TG-RERA number P02400004683, and the promoter’s Form-B declaration undertakes completion by February, 2025.
More from Suvela Projects · 3 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
7 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Record |
|---|---|
| Registered project name | SUVELA PROJECTS RERA record |
| Project type / phase | Residential apartment project; phase or separately registered portion is not disclosed. RERA record RERA filing |
| TG-RERA registration | P02400004683, granted under section 5; valid 27/06/2022 to 05/02/2025. The certificate records no extension. Registration validity is separate from the project’s completion deadline. |
| Registered promoter | SUVELA PROJECTS; entity type recorded in the project filing as partnership. RERA filing Corporate record |
| RERA status | The supplied certificate establishes registration for the stated period; current registration status after 05/02/2025 is not established by the supplied record. |
Land and geographic identity
| Item | Record |
|---|---|
| Locality | BUDVEL; the building-plan record also identifies MANASA HILLS. RERA filing |
| Revenue village | Rajendra nagar in the project identity fields; the building permit identifies BUDVEL village. RERA filing |
| Mandal / district / PIN | Rajendranagar / Ranga Reddy / 500030. RERA filing |
| Project survey number | 308/PART; the filed title and plan records also use Sy.No. 308/Part. RERA filing |
| Plot and extent | Plot 14. RERA land fields record total and net area as 794.2 sq. m; the building permit records plot area 794.2 sq. m, road-affected area 0.0 sq. m, nala-affected area 0.0 sq. m, and net plot area 789.98 sq. m. RERA filing |
| Boundaries in the RERA filing | North: Plot No. 15; South: 50 FEET WIDE ROAD; East: 40 FEET WIDE ROAD; West: Plot No. 21. RERA filing |
Development identity
| Item | Record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC). |
| Principal building permit | 2080/GHMC/CHR/2022-BP, approved 05 February, 2022. Approvals record |
| Building / floors | One residential building, 1 Cellar + 1 Stilt + 5 upper floors. The permit records building height 14.95 and total height 20.35mt. |
| Area figures in the building-plan extract | Residential net BUA 1739.95; built-up area 1916.61; total built-up area 2754.01. The permit separately records residential upper floors area 1,739.95, cellar area 500.39, and stilt area 253.61. These are distinct plan-record figures; the supplied extract does not define them as carpet or saleable area. |
| Units | The RERA filing records 10 units, all in the 3 BED ROOM configuration. The building-plan extract separately states No. of units as sanctioned shall not be increased but does not supply a clear sanctioned unit count. RERA unit table |
Offering and status
| Item | Record |
|---|---|
| Configuration and RERA saleable area | 3 BED ROOM; 10 units; 213.26 sq. m saleable area per unit. RERA unit table RERA unit details |
| Booked / available | 0 booked / 10 available, as read from the TG-RERA record; the supplied unit record has no as-of date, so counts are indicative. RERA unit table |
| Completion deadline | Promoter’s Form-B declaration undertakes completion by February, 2025; the RERA certificate validity ended 05/02/2025. |
| Construction stage | The supplied RERA amenities record reports Water Supply at 20% and Sewerage at 0%; it does not provide a general construction-completion percentage or independently verified site progress. RERA amenities |
| Occupancy / completion certificate | The supplied records do not establish that an occupancy or completion certificate has been issued. |
2. The project story
SUVELA PROJECTS is registered as a residential apartment project on Plot 14 in Survey No. 308/PART at Budvel, in the Rajendranagar area of Ranga Reddy district. The RERA-filed development is organized as a single building, with one cellar, a stilt level and five upper floors. RERA record RERA filing
The RERA unit record describes ten three-bedroom homes, each with a filed saleable area of 213.26 sq. m. The building-plan extract identifies parking in the cellar and stilt, and names a tot-lot, transformer space, STP, percolation pit and garbage house among plan-related provisions. These are plan provisions, not evidence that the facilities have been completed. RERA unit details
The promoter’s Form-B affidavit declares a February 2025 completion target. The supplied material does not verify construction completion or issuance of an occupancy certificate; the RERA amenity progress record gives limited item-specific progress rather than an overall construction-stage assessment. RERA amenities
3. Master plan, architecture & building design
The GHMC building permit describes one residential building with 1 Cellar + 1 Stilt + 5 upper floors. It records plot area 794.2 sq. m, net plot area 789.98 sq. m, residential upper floors area 1,739.95, cellar area 500.39, stilt area 253.61, and total parking area 837.4. The separate building-plan extract records proposed coverage area 367.17 (46.23 %), vacant plot area 422.81, and built-up figures of 1916.61 and 2754.01. The supplied extract does not provide a full area-definition schedule explaining how these separate figures are calculated.
The building plan identifies the cellar and stilt as parking levels and records a tot-lot and transformer space. Its conditions also refer to periphery greenery, a fenced tot-lot, rainwater harvesting, a garbage house and STP. The permit and plan record identify a single building; no multi-tower or phase-wise arrangement is evidenced.
The supplied floor-plan review is based on drawings in document 229498; it is not a separate RERA disclosure of measured carpet area. The supplied record does not give a verified floor-by-floor unit schedule, lift count, stair configuration, or detailed circulation/landscape plan. Floor plans
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3 BED ROOM / 3BHK | 10 | 0 | 10 | 213.26 sq. m | Software-measured: 150.5–161.6 sq. m; median 155.7 sq. m | 27% |
Unit count, booking/availability and saleable area are from the TG-RERA filing. The carpet-area range and loading are software measurements from approved floor-plan drawing geometry in document 229498, not RERA-filed measurements; the source notes that the drawing-based measurement needs review. RERA unit details RERA unit table Floor plans
The measured second-floor flat drawing shows a sitout, drawing room, living/dining area, three bedrooms, kitchen, three toilets, balcony and utility. For the illustrated flat, the drawing-based room measurements include living/dining 3.97 × 9.98 m, kitchen 2.93 × 3.16 m, and balcony 1.82 × 1.37 m. These are software-measured drawing dimensions, not RERA-filed room specifications. RERA unit details
Carpet area is a drawing-based measure of the home’s internal space; the filed saleable area is a separate RERA figure and the supplied floor-plan note says it also counts the home’s share of common areas. The filing’s unit record does not establish that its area is carpet area. Floor plans RERA unit details
5. Parking & vehicle circulation
The GHMC permit records a cellar and stilt intended for vehicle parking, and a Total Parking Area of 837.4. The building-plan extract states PROPOSED NUMBER OF PARKINGS 1; the supplied extracts do not explain this count or provide a clear sanctioned total of individual car or two-wheeler spaces.
The permit conditions state that the cellar and stilt approved for parking are to be used exclusively for vehicle parking and not partitioned or converted to another use. The available records do not establish visitor or accessible parking, parking allocations to individual homes, EV charging, ramp arrangement, or a verified spaces-per-home figure. A plan provision does not by itself establish an exclusive parking right for a buyer.
6. Amenities, recreation & open spaces
| Description / size | Permit extract records Tot Lot 39.96; the plan condition calls for fencing and maintaining it as greenery. |
|---|---|
| Evidence source | GHMC permit and building-plan extract |
| Declared progress / verified status | RERA amenities record lists Green Strip/TOT LOT/Park at 0%; no independent completion verification supplied. RERA amenities |
| Description / size | No facility detail supplied. |
|---|---|
| Evidence source | RERA amenities record RERA amenities |
| Declared progress / verified status | 0% recorded. |
| Description / size | No layout or specification detail supplied for this apartment project. |
|---|---|
| Evidence source | RERA amenities record RERA amenities |
| Declared progress / verified status | 0% recorded. |
| Description / size | No separate aggregate area detail supplied in the RERA amenities record. |
|---|---|
| Evidence source | RERA amenities record RERA amenities |
| Declared progress / verified status | 0% recorded. |
No clubhouse or indoor recreation facility, sports facility, or other convenience/community facility is identified in the supplied amenity details. The plan’s tot-lot provision is a drawing/permit record, not evidence of delivery. RERA amenities
7. Utilities, building services & safety
| Supplied evidence | The RERA amenities record lists Water Supply as available “YES”; the building-plan conditions state public water supply connections are provided only on production of an occupancy certificate. |
|---|---|
| Status shown | RERA-recorded progress 20%; no source, storage capacity or completed connection is established. RERA amenities |
| Supplied evidence | The RERA amenities record lists sewerage, including chamber, lines, septic tank and STP, as available “YES”; the plan extract lists STP. |
|---|---|
| Status shown | RERA-recorded progress 0%; no capacity or operational status supplied. RERA amenities |
| Supplied evidence | The RERA amenities record lists storm-water drains at 0% and water conservation/rainwater harvesting as “YES” at 0%. The permit conditions call for a rainwater-harvesting percolation pit; the permit extract records “No.of Rain Water Harvesting Pits NA.” |
|---|---|
| Status shown | Proposed/recorded provisions only; completed status is not established. RERA amenities |
| Supplied evidence | The plan conditions require space for a transformer; the RERA amenities record lists an electrical meter room, sub-station or receiving station at 0%. |
|---|---|
| Status shown | No supply capacity, backup provision or completed installation established. RERA amenities |
| Supplied evidence | The plan conditions require a garbage house within the premises; the RERA amenities record lists solid-waste management and disposal at 0%. |
|---|---|
| Status shown | No operating arrangements or completion verification supplied. RERA amenities |
| Supplied evidence | The RERA amenities record lists fire protection and fire safety requirements at 0%. The building permit states that an Occupancy Fire NOC is to be obtained from the Director (EV&DM) before issue of an occupancy certificate. |
|---|---|
| Status shown | No Fire NOC or completed fire-system evidence supplied. RERA amenities |
| Supplied evidence | The building-plan conditions refer to lifts and technical supervision of services; no lift count, capacity, accessible circulation details, CCTV or access-control system is supplied. |
|---|---|
| Status shown | Not established by the supplied records. |
8. Location, access & connectivity
The project is identified in the RERA filing at BUDVEL, Rajendranagar mandal, Ranga Reddy district, PIN 500030; the building-plan record places Plot 14 in Manasa Hills, Budvel Village. The supplied location record identifies Rajiv Gandhi Intl Airport at 10.6 km; no travel time is provided. RERA filing Location record
The RERA land filing gives boundaries of a 40 FEET WIDE ROAD on the east and a 50 FEET WIDE ROAD on the south. The building-plan records also reference 15.24M and 12M road widths, while the building permit refers to an 18 mt. road condition. These are plan-record references; the supplied materials do not establish public-transport options or additional nearby landmarks. RERA filing
9. Developer & development status
The registered promoter is SUVELA PROJECTS, identified in the project filing as a partnership. The supplied corporate record gives GSTIN 36AECFS5629B1Z6. The RERA filing lists SANIKOMMU RAJA SEKHAR and SANIKOMMU PUSHPA SEKHAR as partners and SANIKOMMU RAJA SEKHAR as authorised signatory. Corporate record RERA filing Parties record
The project’s building permit names the landowners as applicants and Suvela Projects, represented by its managing partner, in the project development role. The promoter’s Form-B affidavit declares a February 2025 completion target. The supplied material does not establish a revised completion date or an overall independently verified construction-progress percentage. RERA amenities
10. Approvals, official records & documents
| Identifier / date | P02400004683; issued 27/06/2022; valid to 05/02/2025 |
|---|---|
| What the supplied material establishes | Form C registration for SUVELA PROJECTS, with the stated validity and conditions. |
| Identifier / date | 2080/GHMC/CHR/2022-BP; approved 05 February, 2022; file 004694/GHMC/2582/CHR2/2021-BP |
|---|---|
| What the supplied material establishes | Conditional permit for one residential building at Budvel, described as one cellar, one stilt and five upper floors. |
| Identifier / date | Application TS/023799/2021 |
|---|---|
| What the supplied material establishes | Proposed residential flats on Plot 14, Survey No. 308/Part; the extract contains plan areas and conditions. |
| Identifier / date | Dated 12/02/2022 |
|---|---|
| What the supplied material establishes | Advocate’s title opinion concerning Plot 14, Sy. No. 308/Part, Budwel Village; full title-chain review belongs in the Land & Title section. |
| Identifier / date | Dated 11 day of April 11, 2022 |
|---|---|
| What the supplied material establishes | Promoter declaration including a February 2025 completion undertaking and project-related disclosures. |
| Identifier / date | Document 229496, p. 1 |
|---|---|
| What the supplied material establishes | Drawing extract showing a land-use analysis and 60'-00' road; it does not identify an approval, parties or location in the supplied extraction. |
| Identifier / date | Not supplied |
|---|---|
| What the supplied material establishes | The supplied material does not establish issuance of an occupancy or completion certificate. |
1. Project at a glance
Project identity
Registered project name: SUVELA PROJECTS
Project type / phase: Residential apartment project; phase or separately registered portion is not disclosed.
TG-RERA registration: P02400004683, granted under section 5; valid 27/06/2022 to 05/02/2025. The certificate records no extension. Registration validity is separate from the project’s completion deadline.
Registered promoter: SUVELA PROJECTS; entity type recorded in the project filing as partnership.
RERA status: The supplied certificate establishes registration for the stated period; current registration status after 05/02/2025 is not established by the supplied record.
Land and geographic identity
Locality: BUDVEL; the building-plan record also identifies MANASA HILLS.
Revenue village: Rajendra nagar in the project identity fields; the building permit identifies BUDVEL village.
Mandal / district / PIN: Rajendranagar / Ranga Reddy / 500030.
Project survey number: 308/PART; the filed title and plan records also use Sy.No. 308/Part.
Plot and extent: Plot 14. RERA land fields record total and net area as 794.2 sq. m; the building permit records plot area 794.2 sq. m, road-affected area 0.0 sq. m, nala-affected area 0.0 sq. m, and net plot area 789.98 sq. m.
Boundaries in the RERA filing: North: Plot No. 15; South: 50 FEET WIDE ROAD; East: 40 FEET WIDE ROAD; West: Plot No. 21.
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC).
Principal building permit: 2080/GHMC/CHR/2022-BP, approved 05 February, 2022.
Building / floors: One residential building, 1 Cellar + 1 Stilt + 5 upper floors. The permit records building height 14.95 and total height 20.35mt.
Area figures in the building-plan extract: Residential net BUA 1739.95; built-up area 1916.61; total built-up area 2754.01. The permit separately records residential upper floors area 1,739.95, cellar area 500.39, and stilt area 253.61. These are distinct plan-record figures; the supplied extract does not define them as carpet or saleable area.
Units: The RERA filing records 10 units, all in the 3 BED ROOM configuration. The building-plan extract separately states No. of units as sanctioned shall not be increased but does not supply a clear sanctioned unit count.
Offering and status
Configuration and RERA saleable area: 3 BED ROOM; 10 units; 213.26 sq. m saleable area per unit.
Booked / available: 0 booked / 10 available, as read from the TG-RERA record; the supplied unit record has no as-of date, so counts are indicative.
Completion deadline: Promoter’s Form-B declaration undertakes completion by February, 2025; the RERA certificate validity ended 05/02/2025.
Construction stage: The supplied RERA amenities record reports Water Supply at 20% and Sewerage at 0%; it does not provide a general construction-completion percentage or independently verified site progress.
Occupancy / completion certificate: The supplied records do not establish that an occupancy or completion certificate has been issued.
2. The project story
SUVELA PROJECTS is registered as a residential apartment project on Plot 14 in Survey No. 308/PART at Budvel, in the Rajendranagar area of Ranga Reddy district. The RERA-filed development is organized as a single building, with one cellar, a stilt level and five upper floors.
The RERA unit record describes ten three-bedroom homes, each with a filed saleable area of 213.26 sq. m. The building-plan extract identifies parking in the cellar and stilt, and names a tot-lot, transformer space, STP, percolation pit and garbage house among plan-related provisions. These are plan provisions, not evidence that the facilities have been completed.
The promoter’s Form-B affidavit declares a February 2025 completion target. The supplied material does not verify construction completion or issuance of an occupancy certificate; the RERA amenity progress record gives limited item-specific progress rather than an overall construction-stage assessment.
3. Master plan, architecture & building design
The GHMC building permit describes one residential building with 1 Cellar + 1 Stilt + 5 upper floors. It records plot area 794.2 sq. m, net plot area 789.98 sq. m, residential upper floors area 1,739.95, cellar area 500.39, stilt area 253.61, and total parking area 837.4. The separate building-plan extract records proposed coverage area 367.17 (46.23 %), vacant plot area 422.81, and built-up figures of 1916.61 and 2754.01. The supplied extract does not provide a full area-definition schedule explaining how these separate figures are calculated.
The building plan identifies the cellar and stilt as parking levels and records a tot-lot and transformer space. Its conditions also refer to periphery greenery, a fenced tot-lot, rainwater harvesting, a garbage house and STP. The permit and plan record identify a single building; no multi-tower or phase-wise arrangement is evidenced.
The supplied floor-plan review is based on drawings in document 229498; it is not a separate RERA disclosure of measured carpet area. The supplied record does not give a verified floor-by-floor unit schedule, lift count, stair configuration, or detailed circulation/landscape plan.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3 BED ROOM / 3BHK | 10 | 0 | 10 | 213.26 sq. m | Software-measured: 150.5–161.6 sq. m; median 155.7 sq. m | 27% |
Unit count, booking/availability and saleable area are from the TG-RERA filing. The carpet-area range and loading are software measurements from approved floor-plan drawing geometry in document 229498, not RERA-filed measurements; the source notes that the drawing-based measurement needs review.
The measured second-floor flat drawing shows a sitout, drawing room, living/dining area, three bedrooms, kitchen, three toilets, balcony and utility. For the illustrated flat, the drawing-based room measurements include living/dining 3.97 × 9.98 m, kitchen 2.93 × 3.16 m, and balcony 1.82 × 1.37 m. These are software-measured drawing dimensions, not RERA-filed room specifications.
Carpet area is a drawing-based measure of the home’s internal space; the filed saleable area is a separate RERA figure and the supplied floor-plan note says it also counts the home’s share of common areas. The filing’s unit record does not establish that its area is carpet area.
5. Parking & vehicle circulation
The GHMC permit records a cellar and stilt intended for vehicle parking, and a Total Parking Area of 837.4. The building-plan extract states PROPOSED NUMBER OF PARKINGS 1; the supplied extracts do not explain this count or provide a clear sanctioned total of individual car or two-wheeler spaces.
The permit conditions state that the cellar and stilt approved for parking are to be used exclusively for vehicle parking and not partitioned or converted to another use. The available records do not establish visitor or accessible parking, parking allocations to individual homes, EV charging, ramp arrangement, or a verified spaces-per-home figure. A plan provision does not by itself establish an exclusive parking right for a buyer.
6. Amenities, recreation & open spaces
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Tot-lot / green space | Permit extract records Tot Lot 39.96; the plan condition calls for fencing and maintaining it as greenery. | GHMC permit and building-plan extract | RERA amenities record lists Green Strip/TOT LOT/Park at 0%; no independent completion verification supplied. |
| Community buildings | No facility detail supplied. | RERA amenities record | 0% recorded. |
| Internal roads and footpaths | No layout or specification detail supplied for this apartment project. | RERA amenities record | 0% recorded. |
| Recreation open space | No separate aggregate area detail supplied in the RERA amenities record. | RERA amenities record | 0% recorded. |
No clubhouse or indoor recreation facility, sports facility, or other convenience/community facility is identified in the supplied amenity details. The plan’s tot-lot provision is a drawing/permit record, not evidence of delivery.
7. Utilities, building services & safety
| Supplied evidence | The RERA amenities record lists Water Supply as available “YES”; the building-plan conditions state public water supply connections are provided only on production of an occupancy certificate. |
|---|---|
| Status shown | RERA-recorded progress 20%; no source, storage capacity or completed connection is established. |
| Supplied evidence | The RERA amenities record lists sewerage, including chamber, lines, septic tank and STP, as available “YES”; the plan extract lists STP. |
|---|---|
| Status shown | RERA-recorded progress 0%; no capacity or operational status supplied. |
| Supplied evidence | The RERA amenities record lists storm-water drains at 0% and water conservation/rainwater harvesting as “YES” at 0%. The permit conditions call for a rainwater-harvesting percolation pit; the permit extract records “No.of Rain Water Harvesting Pits NA.” |
|---|---|
| Status shown | Proposed/recorded provisions only; completed status is not established. |
| Supplied evidence | The plan conditions require space for a transformer; the RERA amenities record lists an electrical meter room, sub-station or receiving station at 0%. |
|---|---|
| Status shown | No supply capacity, backup provision or completed installation established. |
| Supplied evidence | The plan conditions require a garbage house within the premises; the RERA amenities record lists solid-waste management and disposal at 0%. |
|---|---|
| Status shown | No operating arrangements or completion verification supplied. |
| Supplied evidence | The RERA amenities record lists fire protection and fire safety requirements at 0%. The building permit states that an Occupancy Fire NOC is to be obtained from the Director (EV&DM) before issue of an occupancy certificate. |
|---|---|
| Status shown | No Fire NOC or completed fire-system evidence supplied. |
| Supplied evidence | The building-plan conditions refer to lifts and technical supervision of services; no lift count, capacity, accessible circulation details, CCTV or access-control system is supplied. |
|---|---|
| Status shown | Not established by the supplied records. |
8. Location, access & connectivity
The project is identified in the RERA filing at BUDVEL, Rajendranagar mandal, Ranga Reddy district, PIN 500030; the building-plan record places Plot 14 in Manasa Hills, Budvel Village. The supplied location record identifies Rajiv Gandhi Intl Airport at 10.6 km; no travel time is provided.
The RERA land filing gives boundaries of a 40 FEET WIDE ROAD on the east and a 50 FEET WIDE ROAD on the south. The building-plan records also reference 15.24M and 12M road widths, while the building permit refers to an 18 mt. road condition. These are plan-record references; the supplied materials do not establish public-transport options or additional nearby landmarks.
9. Developer & development status
The registered promoter is SUVELA PROJECTS, identified in the project filing as a partnership. The supplied corporate record gives GSTIN 36AECFS5629B1Z6. The RERA filing lists SANIKOMMU RAJA SEKHAR and SANIKOMMU PUSHPA SEKHAR as partners and SANIKOMMU RAJA SEKHAR as authorised signatory.
The project’s building permit names the landowners as applicants and Suvela Projects, represented by its managing partner, in the project development role. The promoter’s Form-B affidavit declares a February 2025 completion target. The supplied material does not establish a revised completion date or an overall independently verified construction-progress percentage.
10. Approvals, official records & documents
| Identifier / date | P02400004683; issued 27/06/2022; valid to 05/02/2025 |
|---|---|
| What the supplied material establishes | Form C registration for SUVELA PROJECTS, with the stated validity and conditions. |
| Identifier / date | 2080/GHMC/CHR/2022-BP; approved 05 February, 2022; file 004694/GHMC/2582/CHR2/2021-BP |
|---|---|
| What the supplied material establishes | Conditional permit for one residential building at Budvel, described as one cellar, one stilt and five upper floors. |
| Identifier / date | Application TS/023799/2021 |
|---|---|
| What the supplied material establishes | Proposed residential flats on Plot 14, Survey No. 308/Part; the extract contains plan areas and conditions. |
| Identifier / date | Dated 12/02/2022 |
|---|---|
| What the supplied material establishes | Advocate’s title opinion concerning Plot 14, Sy. No. 308/Part, Budwel Village; full title-chain review belongs in the Land & Title section. |
| Identifier / date | Dated 11 day of April 11, 2022 |
|---|---|
| What the supplied material establishes | Promoter declaration including a February 2025 completion undertaking and project-related disclosures. |
| Identifier / date | Document 229496, p. 1 |
|---|---|
| What the supplied material establishes | Drawing extract showing a land-use analysis and 60'-00' road; it does not identify an approval, parties or location in the supplied extraction. |
| Identifier / date | Not supplied |
|---|---|
| What the supplied material establishes | The supplied material does not establish issuance of an occupancy or completion certificate. |
Other registrations of Suvela Projects
Frequently asked questions
Is SUVELA PROJECTS registered with Telangana RERA?
Yes. SUVELA PROJECTS is registered with the Telangana Real Estate Regulatory Authority as P02400004683; the registration status is New Project.
Who is the developer of SUVELA PROJECTS?
The promoter named in the RERA registration is SUVELA PROJECTS.
Where is SUVELA PROJECTS located?
SUVELA PROJECTS is in BUDVEL, Rajendra nagar, Rajendranagar, Rangareddy, Telangana (500030).
When will SUVELA PROJECTS be completed?
The promoter's proposed date of completion filed with RERA is 05/02/2025. This is the promoter's declaration, not a guarantee.
More projects in Rajendra Nagar





