Jubilee Landmark
JUBILEE CONSTRUCTIONS AND DEVELOPERS · Hanamkonda · RERA P00300000108
JUBILEE LANDMARK is a residential apartment project in HANMAKONDA, Warangal Urban district; the mandal is not disclosed in the project identity fields. The registered promoter is JUBILEE CONSTRUCTIONS AND DEVELOPERS. The project record identifies a land area of 1024.92 sq. m, one building, and 20 homes in a 3BHK configuration with a saleable area of 137.73 sq. m. It is registered under TG-RERA registration P00300000108, with a promoter-declared completion undertaking of 28.07.2024.
More from Jubilee Constructions And Developers · 5 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
12 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
Project at a glance
Project identity
| Field | Record |
|---|---|
| Registered project name | JUBILEE LANDMARK RERA record |
| Project type | Residential apartment project RERA record |
| Phase / registered portion | Not separately identified in the supplied record; the registration is for JUBILEE LANDMARK RERA record |
| TG-RERA registration | P00300000108 RERA record |
| Registration validity | 31 December 2018 to 28 July 2024; no extension is recorded in the supplied certificate RERA record |
| Registered promoter | JUBILEE CONSTRUCTIONS AND DEVELOPERS RERA record |
| RERA status | The project is registered. The supplied registration certificate’s validity ended on 28 July 2024; that is distinct from the completion undertaking and occupancy-certificate status below. |
Land and geographic identity
| Field | Record |
|---|---|
| Locality | HANMAKONDA RERA record |
| Revenue village | Hanmakonda in the project record; the building-permit and occupancy documents also identify Waddepally / Hanamkonda. RERA record Land records |
| Mandal | Not disclosed in the project identity fields; the occupancy-certificate extraction identifies HANAMKONDA. Land records |
| District | Warangal Urban RERA record |
| PIN | 506001 RERA record |
| Project survey numbers | 361/A and 362/A RERA record Land records |
| Subdivision / old survey references in the permit | SY.NO. 361/A [OLD 160/A] and 362/A [OLD 161/A in the occupancy-certificate extraction] |
| Registered site extent | RERA land record: total and net area 1024.92 sq. m. Building permit: site and net area 990.44 m². Land records |
| Boundaries in RERA filing | East: 30 FEET ROAD; West: 30 FEET ROAD; North: PLOT NO 48; South: PLOT OF A PADMANABHAR AND K LAXMINARAYANA Land records |
Development identity
| Field | Record |
|---|---|
| Sanctioning authority | Greater Warangal Municipal Corporation (GWMC) |
| Principal building permit | 3006/12858/W50/2018, dated 28 July, 2018 Approvals record |
| Approved building use / configuration | Residential building; permit describes Stilt + 5 |
| Approved built-up area | The project record lists 2315.06 sq. m as approved built-up area. The permit extraction separately lists 2,273.20 m² as “Area”; these are retained as separately labelled records. RERA filing |
| Building count | One building / one tower in the project record RERA filing RERA unit table |
| Sanctioned height and parking levels | Permit lists height 14.9 m, Cellar 0.00, Stilt 500.18 m², and U.Floors 0.00. The supplied permit extraction does not specify a complete floor-by-floor schedule. |
| RERA units | 20 units in the filed configuration; the RERA filing records 4 booked and 16 available. RERA unit table |
| Sanctioned unit count | Permit extraction does not provide a unit count; the permit states that sanctioned units must not be increased without prior approval. |
Offering and status
| Field | Record |
|---|---|
| RERA-filed configuration | 3BHK; saleable area 137.73 sq. m RERA unit table |
| Booked / available | 4 booked; 16 available, as last read from the TG-RERA portal. The portal record has no as-of date, so counts are indicative. RERA unit table |
| Promoter-declared completion undertaking | 28.07.2024 in the Form B declaration |
| Occupancy certificate | GWMC occupancy certificate 3006/28934/W50/2020, dated 21 November, 2020, for the building identified at Plot Nos. 46 and 49; the certificate states the building was inspected and declared fit for occupation. |
| Construction stage | An architect’s certificate dated 22.02.2024 certifies project completion; this is a filed certification, not an independent site inspection for this report. |
The project story
JUBILEE LANDMARK is recorded with TG-RERA as a residential apartment project on Survey Nos. 361/A and 362/A, in Hanmakonda, Warangal Urban. The filed project comprises one residential building and one 3BHK configuration. The TG-RERA unit record lists 20 units, with 4 booked and 16 available; the portal record does not specify an as-of date for those counts. RERA record Land records RERA unit table
The project documents show a GWMC building permit for a Stilt + 5 residential building dated 28 July, 2018. A GWMC occupancy certificate dated 21 November, 2020 identifies the building at Plot Nos. 46 and 49 and says it was inspected and declared fit for occupation. An architect’s certificate dated 22.02.2024 states that the project was completed in all aspects. These are documentary certifications; no independent site inspection is supplied.
The Form B declaration undertakes completion by 28.07.2024. That completion undertaking, the registration validity ending 28 July 2024, and the earlier occupancy certificate are separate record items and should not be treated as interchangeable.
Master plan, architecture & building design
The project record identifies a site of 1024.92 sq. m and one building. The GWMC permit extraction records a site/net area of 990.44 m², a Stilt + 5 residential building, a height of 14.9 m, a stilt area of 500.18 m², and an “Area” of 2,273.20 m². The project record separately lists approved built-up area as 2315.06 sq. m. The supplied extracts do not provide a drawing-derived footprint, floor-by-floor unit arrangement, flats per floor, lift or stair details, or a complete schedule distinguishing gross built-up, FSI-counted, carpet and saleable area. Land records RERA filing
The permit lists 51.18 m² for the tot-lot and 3 rainwater-harvesting structures. It also requires a transformer space and garbage house within the premises and describes a periphery greenery requirement. These are permit-record items; the supplied data does not establish their completed condition.
Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 20 | 4 | 16 | 137.73 sq. m | Not available: no flat design was measured from the supplied floor-plan drawings | Not supplied |
The configuration, unit count, booking count and saleable area above are TG-RERA filing data. Booked and available counts have no as-of date in the portal extract. The floor-plan dataset records two drawings reviewed but zero measured 3BHK flat designs, so it provides no software-measured carpet area or room dimensions. Saleable area is not a carpet-area measurement; the supplied record does not provide a project-specific loading figure. RERA unit table RERA unit details Floor plans
Parking & vehicle circulation
The occupancy-certificate extraction records Parking Area (m2) 2804.51 as per both the sanctioned plan and the site building plan. The permit extraction lists a stilt area of 500.18 m² and Cellar 0.00; it does not provide a car- or two-wheeler-space count, visitor or accessible-space allocation, parking-level arrangement, ramp or driveway details, or unit-specific parking allocation.
The RERA unit record marks the 3BHK configuration as mortgaged but does not identify individual parking spaces or establish exclusive parking rights for any unit. A space count or spaces-per-home ratio cannot be determined from the supplied evidence. RERA unit table RERA unit table
Amenities, recreation & open spaces
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Tot-lot / green strip | Permit lists 51.18 m²; occupancy-certificate extraction lists 500.2 m² as per sanctioned plan and 51.18 m² as per site building plan | Permit condition / certificate record; no independent verification of current condition supplied | |
| Water supply | RERA amenity entry marked “YES” | RERA amenities | Progress shown as 20%; no independent verification supplied |
| Sewerage (Chamber, Lines, Septic Tank, STP) | RERA amenity entry marked “YES” | RERA amenities | Progress shown as 0%; no independent verification supplied |
| Internal roads & footpaths | No size or specification supplied | RERA amenities | Progress shown as 0% |
| Storm-water drains | No size or specification supplied | RERA amenities | Progress shown as 0% |
| Street lighting | No specification supplied | RERA amenities | Progress shown as 0% |
| Community buildings | No specification supplied | RERA amenities | Progress shown as 0% |
| Sewage and sullage treatment/disposal | No capacity or system details supplied | RERA amenities | Progress shown as 0% |
| Solid-waste management and disposal | No system details supplied | RERA amenities | Progress shown as 0% |
| Water conservation / rainwater harvesting | Permit requires rainwater-harvesting structures and lists 3; no capacity supplied | RERA amenities | Permit requirement; RERA progress shown as 0% |
| Energy management | No system details supplied | RERA amenities | Progress shown as 0% |
| Fire protection and fire safety | No system details supplied | RERA amenities | Progress shown as 0% |
| Electrical meter room / sub-station / receiving station | Permit requires space for a transformer; no equipment or capacity details supplied | RERA amenities | Permit requirement; RERA progress shown as 0% |
| Recreational open space | No area stated in the RERA amenity record | RERA amenities | Progress shown as 0% |
Utilities, building services & safety
The permit requires a rainwater-harvesting percolation pit, transformer space, a garbage house, tree planting along the site periphery, and a fenced tot-lot maintained as greenery. It also states that public water-supply and electricity connections will be provided only on production of an occupancy certificate. These are approval conditions, not evidence that the systems or facilities have been installed or are operating.
The RERA amenity record marks water supply and sewerage as available, but records 20% progress for water supply and 0% for sewerage. No water source or storage capacity, treatment or reuse capacity, storm-water design, power-supply or backup specification, lift details, fire-system specification, waste-segregation arrangements, security system, or accessibility features are supplied in the project evidence. RERA amenities
Location, access & connectivity
The registered project location is Hanmakonda, Warangal Urban, Telangana, PIN 506001; the RERA land record identifies Hanmakonda village and the building documents refer to Waddepally / Hanamkonda. The building permit describes the locality as “SRI NAGAR COLONY ROAD NO.3/A - N.G.O's COLONY ROAD - HANAMKONDA”; the occupancy-certificate extraction identifies “SRINAGAR COLONY_W50.” RERA record Land records
Supplied approximate distances from the cadastral parcel centroid are: Outer Ring Road (nearest sampled interchange) 71.0 km, MVS Degree College 3.2 km, Panchavati Hospital 1.7 km, and Zilla Parishath High School Bhuthpur 1.7 km. These are supplied distance records; no travel times or public-transport details are available. Location record
Developer & development status
The registered promoter is JUBILEE CONSTRUCTIONS AND DEVELOPERS, identified in the project record as a partnership. Its supplied corporate identifier is GSTIN 36AAOFJ1549D1ZC. The listed promoter address is CHANDRA COMPLEX, OLD BUS DEPOT ROAD, WADDEPALLY, HANMAKONDA, Warangal Urban, 506001. No official contact details are supplied. RERA record RERA filing Corporate record Parties record
The RERA filing records V.BRAHMANANDAM and SRINIVAS CHINTHAKUNTLA as landowners under AreaShare arrangements. The Form B declaration identifies the promoter and states a completion undertaking of 28.07.2024. The supplied project documents also include a GWMC occupancy certificate dated 21 November, 2020 and an architect’s completion certificate dated 22.02.2024. These are filed records and certifications; no independent construction-progress inspection is included. Parties record
Approvals, official records & documents
| Reference / date | P00300000108; issued 31/12/2018; valid to 28/07/2024 |
|---|---|
| What the supplied record identifies | Form C certificate for JUBILEE LANDMARK, registered under section 5 |
| Reference / date | 3006/12858/W50/2018; 28 July, 2018 |
|---|---|
| What the supplied record identifies | Conditional permission for a Stilt + 5 residential building; identifies Survey Nos. 361/A [old 160/A] and 362/A |
| Reference / date | 3006/28934/W50/2020; 21 November, 2020 |
|---|---|
| What the supplied record identifies | Identifies the building at Plot Nos. 46 and 49 and states it was inspected and declared fit for occupation |
| Reference / date | Dated 22.02.2024 |
|---|---|
| What the supplied record identifies | States JUBILEE LANDMARK is completed in all aspects and identifies the occupancy certificate |
| Reference / date | Declared in 2018; day and month blank |
|---|---|
| What the supplied record identifies | Contains the promoter’s title and encumbrance declarations, project-account undertakings, and completion undertaking of 28.07.2024 |
| Reference / date | 3006/12858/W50/2018 appears in the project record; drawing stamp extraction dated 30-06-2018 |
|---|---|
| What the supplied record identifies | The supplied drawing text is identified as needing review; no further layout-plan detail is established here Approvals record |
The supplied approval and document extracts do not include a complete architectural plan set or detailed service drawings.
Project at a glance
Project identity
Registered project name: JUBILEE LANDMARK
Project type: Residential apartment project
Phase / registered portion: Not separately identified in the supplied record; the registration is for JUBILEE LANDMARK
TG-RERA registration: P00300000108
Registration validity: 31 December 2018 to 28 July 2024; no extension is recorded in the supplied certificate
Registered promoter: JUBILEE CONSTRUCTIONS AND DEVELOPERS
RERA status: The project is registered. The supplied registration certificate’s validity ended on 28 July 2024; that is distinct from the completion undertaking and occupancy-certificate status below.
Land and geographic identity
Locality: HANMAKONDA
Revenue village: Hanmakonda in the project record; the building-permit and occupancy documents also identify Waddepally / Hanamkonda.
Mandal: Not disclosed in the project identity fields; the occupancy-certificate extraction identifies HANAMKONDA.
District: Warangal Urban
PIN: 506001
Project survey numbers: 361/A and 362/A
Subdivision / old survey references in the permit: SY.NO. 361/A [OLD 160/A] and 362/A [OLD 161/A in the occupancy-certificate extraction]
Registered site extent: RERA land record: total and net area 1024.92 sq. m. Building permit: site and net area 990.44 m².
Boundaries in RERA filing: East: 30 FEET ROAD; West: 30 FEET ROAD; North: PLOT NO 48; South: PLOT OF A PADMANABHAR AND K LAXMINARAYANA
Development identity
Sanctioning authority: Greater Warangal Municipal Corporation (GWMC)
Principal building permit: 3006/12858/W50/2018, dated 28 July, 2018
Approved building use / configuration: Residential building; permit describes Stilt + 5
Approved built-up area: The project record lists 2315.06 sq. m as approved built-up area. The permit extraction separately lists 2,273.20 m² as “Area”; these are retained as separately labelled records.
Building count: One building / one tower in the project record
Sanctioned height and parking levels: Permit lists height 14.9 m, Cellar 0.00, Stilt 500.18 m², and U.Floors 0.00. The supplied permit extraction does not specify a complete floor-by-floor schedule.
RERA units: 20 units in the filed configuration; the RERA filing records 4 booked and 16 available.
Sanctioned unit count: Permit extraction does not provide a unit count; the permit states that sanctioned units must not be increased without prior approval.
Offering and status
RERA-filed configuration: 3BHK; saleable area 137.73 sq. m
Booked / available: 4 booked; 16 available, as last read from the TG-RERA portal. The portal record has no as-of date, so counts are indicative.
Promoter-declared completion undertaking: 28.07.2024 in the Form B declaration
Occupancy certificate: GWMC occupancy certificate 3006/28934/W50/2020, dated 21 November, 2020, for the building identified at Plot Nos. 46 and 49; the certificate states the building was inspected and declared fit for occupation.
Construction stage: An architect’s certificate dated 22.02.2024 certifies project completion; this is a filed certification, not an independent site inspection for this report.
The project story
JUBILEE LANDMARK is recorded with TG-RERA as a residential apartment project on Survey Nos. 361/A and 362/A, in Hanmakonda, Warangal Urban. The filed project comprises one residential building and one 3BHK configuration. The TG-RERA unit record lists 20 units, with 4 booked and 16 available; the portal record does not specify an as-of date for those counts.
The project documents show a GWMC building permit for a Stilt + 5 residential building dated 28 July, 2018. A GWMC occupancy certificate dated 21 November, 2020 identifies the building at Plot Nos. 46 and 49 and says it was inspected and declared fit for occupation. An architect’s certificate dated 22.02.2024 states that the project was completed in all aspects. These are documentary certifications; no independent site inspection is supplied.
The Form B declaration undertakes completion by 28.07.2024. That completion undertaking, the registration validity ending 28 July 2024, and the earlier occupancy certificate are separate record items and should not be treated as interchangeable.
Master plan, architecture & building design
The project record identifies a site of 1024.92 sq. m and one building. The GWMC permit extraction records a site/net area of 990.44 m², a Stilt + 5 residential building, a height of 14.9 m, a stilt area of 500.18 m², and an “Area” of 2,273.20 m². The project record separately lists approved built-up area as 2315.06 sq. m. The supplied extracts do not provide a drawing-derived footprint, floor-by-floor unit arrangement, flats per floor, lift or stair details, or a complete schedule distinguishing gross built-up, FSI-counted, carpet and saleable area.
The permit lists 51.18 m² for the tot-lot and 3 rainwater-harvesting structures. It also requires a transformer space and garbage house within the premises and describes a periphery greenery requirement. These are permit-record items; the supplied data does not establish their completed condition.
Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 20 | 4 | 16 | 137.73 sq. m | Not available: no flat design was measured from the supplied floor-plan drawings | Not supplied |
The configuration, unit count, booking count and saleable area above are TG-RERA filing data. Booked and available counts have no as-of date in the portal extract. The floor-plan dataset records two drawings reviewed but zero measured 3BHK flat designs, so it provides no software-measured carpet area or room dimensions. Saleable area is not a carpet-area measurement; the supplied record does not provide a project-specific loading figure.
Parking & vehicle circulation
The occupancy-certificate extraction records Parking Area (m2) 2804.51 as per both the sanctioned plan and the site building plan. The permit extraction lists a stilt area of 500.18 m² and Cellar 0.00; it does not provide a car- or two-wheeler-space count, visitor or accessible-space allocation, parking-level arrangement, ramp or driveway details, or unit-specific parking allocation.
The RERA unit record marks the 3BHK configuration as mortgaged but does not identify individual parking spaces or establish exclusive parking rights for any unit. A space count or spaces-per-home ratio cannot be determined from the supplied evidence.
Amenities, recreation & open spaces
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Tot-lot / green strip | Permit lists 51.18 m²; occupancy-certificate extraction lists 500.2 m² as per sanctioned plan and 51.18 m² as per site building plan | Permit condition / certificate record; no independent verification of current condition supplied | |
| Water supply | RERA amenity entry marked “YES” | Progress shown as 20%; no independent verification supplied | |
| Sewerage (Chamber, Lines, Septic Tank, STP) | RERA amenity entry marked “YES” | Progress shown as 0%; no independent verification supplied | |
| Internal roads & footpaths | No size or specification supplied | Progress shown as 0% | |
| Storm-water drains | No size or specification supplied | Progress shown as 0% | |
| Street lighting | No specification supplied | Progress shown as 0% | |
| Community buildings | No specification supplied | Progress shown as 0% | |
| Sewage and sullage treatment/disposal | No capacity or system details supplied | Progress shown as 0% | |
| Solid-waste management and disposal | No system details supplied | Progress shown as 0% | |
| Water conservation / rainwater harvesting | Permit requires rainwater-harvesting structures and lists 3; no capacity supplied | Permit requirement; RERA progress shown as 0% | |
| Energy management | No system details supplied | Progress shown as 0% | |
| Fire protection and fire safety | No system details supplied | Progress shown as 0% | |
| Electrical meter room / sub-station / receiving station | Permit requires space for a transformer; no equipment or capacity details supplied | Permit requirement; RERA progress shown as 0% | |
| Recreational open space | No area stated in the RERA amenity record | Progress shown as 0% |
Utilities, building services & safety
The permit requires a rainwater-harvesting percolation pit, transformer space, a garbage house, tree planting along the site periphery, and a fenced tot-lot maintained as greenery. It also states that public water-supply and electricity connections will be provided only on production of an occupancy certificate. These are approval conditions, not evidence that the systems or facilities have been installed or are operating.
The RERA amenity record marks water supply and sewerage as available, but records 20% progress for water supply and 0% for sewerage. No water source or storage capacity, treatment or reuse capacity, storm-water design, power-supply or backup specification, lift details, fire-system specification, waste-segregation arrangements, security system, or accessibility features are supplied in the project evidence.
Location, access & connectivity
The registered project location is Hanmakonda, Warangal Urban, Telangana, PIN 506001; the RERA land record identifies Hanmakonda village and the building documents refer to Waddepally / Hanamkonda. The building permit describes the locality as “SRI NAGAR COLONY ROAD NO.3/A - N.G.O's COLONY ROAD - HANAMKONDA”; the occupancy-certificate extraction identifies “SRINAGAR COLONY_W50.”
Supplied approximate distances from the cadastral parcel centroid are: Outer Ring Road (nearest sampled interchange) 71.0 km, MVS Degree College 3.2 km, Panchavati Hospital 1.7 km, and Zilla Parishath High School Bhuthpur 1.7 km. These are supplied distance records; no travel times or public-transport details are available.
Developer & development status
The registered promoter is JUBILEE CONSTRUCTIONS AND DEVELOPERS, identified in the project record as a partnership. Its supplied corporate identifier is GSTIN 36AAOFJ1549D1ZC. The listed promoter address is CHANDRA COMPLEX, OLD BUS DEPOT ROAD, WADDEPALLY, HANMAKONDA, Warangal Urban, 506001. No official contact details are supplied.
The RERA filing records V.BRAHMANANDAM and SRINIVAS CHINTHAKUNTLA as landowners under AreaShare arrangements. The Form B declaration identifies the promoter and states a completion undertaking of 28.07.2024. The supplied project documents also include a GWMC occupancy certificate dated 21 November, 2020 and an architect’s completion certificate dated 22.02.2024. These are filed records and certifications; no independent construction-progress inspection is included.
Approvals, official records & documents
| Reference / date | P00300000108; issued 31/12/2018; valid to 28/07/2024 |
|---|---|
| What the supplied record identifies | Form C certificate for JUBILEE LANDMARK, registered under section 5 |
| Reference / date | 3006/12858/W50/2018; 28 July, 2018 |
|---|---|
| What the supplied record identifies | Conditional permission for a Stilt + 5 residential building; identifies Survey Nos. 361/A [old 160/A] and 362/A |
| Reference / date | 3006/28934/W50/2020; 21 November, 2020 |
|---|---|
| What the supplied record identifies | Identifies the building at Plot Nos. 46 and 49 and states it was inspected and declared fit for occupation |
| Reference / date | Dated 22.02.2024 |
|---|---|
| What the supplied record identifies | States JUBILEE LANDMARK is completed in all aspects and identifies the occupancy certificate |
| Reference / date | Declared in 2018; day and month blank |
|---|---|
| What the supplied record identifies | Contains the promoter’s title and encumbrance declarations, project-account undertakings, and completion undertaking of 28.07.2024 |
| Reference / date | 3006/12858/W50/2018 appears in the project record; drawing stamp extraction dated 30-06-2018 |
|---|---|
| What the supplied record identifies | The supplied drawing text is identified as needing review; no further layout-plan detail is established here |
The supplied approval and document extracts do not include a complete architectural plan set or detailed service drawings.
Frequently asked questions
Is JUBILEE LANDMARK registered with Telangana RERA?
Yes. JUBILEE LANDMARK is registered with the Telangana Real Estate Regulatory Authority as P00300000108; the registration status is New Project.
Who is the developer of JUBILEE LANDMARK?
The promoter named in the RERA registration is JUBILEE CONSTRUCTIONS AND DEVELOPERS.
Where is JUBILEE LANDMARK located?
JUBILEE LANDMARK is in HANMAKONDA, Hanamkonda, Telangana (506001).
When will JUBILEE LANDMARK be completed?
The promoter's proposed date of completion filed with RERA is 28/07/2024. This is the promoter's declaration, not a guarantee.
More projects in Hanamkonda