Sign in

Vishnuni Towers

SIRIGINENI SANDEEP · Hanamkonda · RERA P00300004897

VISHNUNI TOWERS is a residential apartment project in Nakkalagutta, Hanamkonda, Warangal Urban; the mandal is not disclosed. The registered promoter is SIRIGINENI SANDEEP. The project covers 504.09 sq. m and comprises one building with 1 Stilt + 5 upper floors and 10 homes: 5 2BHK and 5 3BHK. It is registered under TG-RERA number P00300004897, with proposed completion on 12/10/2025.

01What we found

Period endedTG-RERA registration ran to 12 Oct 2025 - check its extension on TG-RERA
10documents on file - each fact links to its page
0court cases on this project's land in the court records searched
7items to check - 5 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

7 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

FieldRecord
Registered project nameVISHNUNI TOWERS RERA record
Project typeResidential apartment project RERA record RERA filing
Phase / registered portionPhase not separately identified; the RERA record describes one residential building RERA filing
TG-RERA registrationP00300004897 RERA record
Registration validity29 August 2022 to 12 October 2025; certificate states three years unless extended by the Authority. No extension is recorded in the supplied certificate data. This is registration validity, not the building-permit validity or occupancy status. Approvals record
Registered promoterSIRIGINENI SANDEEP RERA record
RERA statusThe supplied registration certificate records registration under section 5. It does not establish current registration status after 12 October 2025.

Land and geographic identity

FieldRecord
LocalityNAKKALAGUTTA_W48; the filed building permit identifies Nakkalagutta, Hanamkonda. RERA record RERA filing
Revenue villageNot disclosed in the project identity record. The permit identifies Ward 48, not a revenue village. Land records
MandalNot disclosed. Land records
DistrictWarangal Urban; the permit also states “WARANGAL (DIST).” RERA record
PIN506001 RERA record
All filed survey / property identifiersH NO 2-5-355 & 2-5-355/1; the registration certificate separately lists H NO 2-5-355 and 2-5-355/1. RERA filing
Registered site extent504.09 sq. m / m² in the filed land and permit records. RERA filing
Total / net areaTotal area 504.09 sq. m; net area 504.09 sq. m. Road-affected area is recorded as 0. RERA filing
Boundaries as filedNorth: ROAD WIDTH - 12; South: EXISTING BUILDING; East: EXISTING BUILDING; West: OTHERS - 2 44M PRIVATE LANE. RERA filing

Development identity

FieldRecord
Sanctioning authorityGreater Warangal Municipal Corporation (GWMC), as named on the building permit. Approvals record
Principal building-permit number / date3006/33288/W48/2021, approved 12 October 2021. Approvals record
Approved built-up area1,376.97 sq. m in the RERA filing. The permit lists 5 upper floors residential area 1,139.05 m² and Stilt 1 area 201.55 m². RERA filing
Buildings / towers / blocksOne building; the RERA filing records one building unit and one proposed building unit. RERA filing RERA unit table
Sanctioned floor configuration1 Stilt + 5 upper floors; the permit states height 14.7 m.
Approved parking levels / countsParking levels and car/two-wheeler space counts are not specified in the supplied record.
Approved versus RERA-declared homesThe filing records 10 units across 2BHK and 3BHK configurations. A separate approved home-count figure is not identified in the supplied record. RERA unit table RERA filing

Offering and status

FieldRecord
Configurations2BHK: 5 units; 3BHK: 5 units. RERA unit table
RERA-filed saleable areas2BHK: 115.7 sq. m; 3BHK: 112.44 sq. m. RERA unit table
Booked / availablePortal snapshot records 0 booked and 5 available in each configuration; no as-of date is supplied, so these counts are indicative. RERA unit table
Construction stageNo independently verified construction-stage or site-progress report is supplied. The permit records an area handed over as “SECOND FLOOR, Area (m2) 136.10”; this is not, by itself, a project-wide construction-progress assessment or an occupancy certificate.
Completion datesPromoter’s Form B declares completion by 12-10-2025; the project record also gives proposed completion as 12/10/2025. No revised completion date is supplied. RERA record
Occupancy / completion certificateNo occupancy or completion certificate is included in the supplied project documents. The permit says an occupancy certificate is compulsory before occupation. Document index

2. The project story

VISHNUNI TOWERS is registered with TG-RERA as a residential apartment project at the filed property identifiers H NO 2-5-355 and 2-5-355/1 in Nakkalagutta, Hanamkonda, Warangal Urban. The filed site extent is 504.09 sq. m, and the building permit describes one residential building with a stilt and five upper floors. RERA record Land records

The RERA filing lists ten apartments: five 2BHK and five 3BHK. It reports all ten as available and none as booked in the portal data supplied, but that snapshot has no stated date and should be treated as indicative. RERA unit table

The promoter declared a completion date of 12-10-2025. The supplied material does not establish current construction progress or provide an occupancy/completion certificate. The permit’s reference to a second-floor area handed over is a permit-record entry, not independent confirmation that the project or any phase is complete or occupied. Document index

3. Master plan, architecture & building design

The filed building permit authorizes one residential building on a 504.09 m² site, with 1 Stilt + 5 upper floors and a stated height of 14.7 m. The permit lists 5 upper floors residential area 1,139.05 m² and Stilt 1 area 201.55 m². Separately, the RERA filing reports approved built-up area of 1,376.97 sq. m; these figures are retained as the distinct values stated in their respective records. RERA filing

The permit records setbacks as Front 3.05, Rear 3.5, Side I 3.5 and Side II 3.5, without units in the supplied extraction. It also records road-affected area as 0 and net site area as 504.09 m². The supplied records do not establish a building footprint, flats per floor, lift or stair arrangement, internal circulation, or a separate phase organization.

The filed land-boundary descriptions are North: ROAD WIDTH - 12; South and East: EXISTING BUILDING; West: OTHERS - 2 44M PRIVATE LANE. No approved landscape or open-space area is quantified in the supplied project data. RERA filing

4. Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK505115.7 sq. mNot availableNot supplied
3BHK505112.44 sq. mNot availableNot supplied

Unit counts, booking/availability and saleable areas are from the TG-RERA filing; the booking snapshot has no supplied as-of date. RERA unit table

The supplied drawing-measurement record does not provide usable carpet-area measurements for the RERA-listed 2BHK or 3BHK configurations. It reports a measured-drawing category of 5BHK that does not match the RERA configurations and was held back as implausible; it is therefore not used as a home-area figure here. Floor plans RERA unit details

The listed areas are RERA-filed saleable areas, not carpet areas. No supplied record gives carpet area, balcony or utility area, or a loading figure for these configurations. RERA unit table Floor plans

5. Parking & vehicle circulation

The supplied project records do not state sanctioned car or two-wheeler parking counts, visitor or accessible spaces, parking allocation by apartment, or a parking layout. The building permit identifies a stilt floor but does not establish how it is used for parking or how many spaces it accommodates. RERA unit table

The permit specifies a 12-wide road on the north boundary and records an 18M road width in its extracted parameters; the supplied data does not explain the locations or function of the latter reference. No ramp, internal driveway, vehicle-entry arrangement, pedestrian separation or EV-charging provision is documented. RERA filing

6. Amenities, recreation & open spaces

The permit lists a space for a transformer, a garbage house and a rain-water-harvesting structure (percolation pit); it records the tot-lot area as “NA.”

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Tot-lot“NA” for areaBuilding permitPermit entry; no delivered facility or size established.
Green strip / tot lot / parkArea not suppliedTG-RERA amenity recordRecorded at 0%; completion not independently verified. RERA amenities
Community buildingsSize not suppliedTG-RERA amenity recordRecorded at 0%; completion not independently verified. RERA amenities
Aggregate recreational open spaceArea not suppliedTG-RERA amenity recordRecorded at 0%; completion not independently verified. RERA amenities

No clubhouse, indoor recreation or sports facility is identified in the supplied evidence. The permit and amenity entries are not evidence that an amenity has been completed or independently inspected. RERA amenities

7. Utilities, building services & safety

ServiceSupplied record
WaterTG-RERA amenity record lists water supply as “YES” and 100%; no source, storage or treatment capacity is supplied. RERA amenities
Sewerage / drainageSewerage (chamber, lines, septic tank, STP) and storm-water drains are listed as “YES” and 100%; the record does not identify the specific sewerage system or capacities. RERA amenities
Sewage treatment / reuse“Treatment And Disposal Of Sewage And Sullage Water” is recorded at 0%; no reuse details are supplied. RERA amenities
Rain-water harvestingTG-RERA amenity record lists water conservation/rain-water harvesting as “YES” and 100%; the permit specifies a rain-water-harvesting structure (percolation pit). RERA amenities
ElectricalElectrical meter room/sub-station/receiving station is listed as “YES” and 100%; the permit requires space for a transformer. No power-backup or capacity details are supplied. RERA amenities
LiftsNo lift count, type or capacity is supplied. Document index
Fire and life safetyThe TG-RERA amenity record lists fire protection and fire-safety requirements at 0%. No fire-system details or completion evidence are supplied. RERA amenities
WasteThe permit lists a garbage house. Solid-waste management and disposal is recorded at 0%; no segregation or disposal details are supplied. RERA amenities
Accessibility / securityNo accessibility, CCTV or access-control provisions are described in the supplied records. Document index

The percentages and “YES” entries above are portal-recorded amenity statuses, not independent verification of installed or operational services. RERA amenities

8. Location, access & connectivity

The official project record identifies the site as NAKKALAGUTTA_W48, with the building permit describing Nakkalagutta, Hanamkonda, Ward 48, Warangal (Dist.). The RERA record gives Warangal Urban and PIN 506001; it does not disclose a revenue village or mandal. RERA record Land records

The project data supplies one connectivity reference: Financial District (Nanakramguda), 1.2 km. No approach-road description, public-transport information or additional measured landmark distances are supplied. Location record

9. Developer & development status

The TG-RERA registered promoter is SIRIGINENI SANDEEP. The filing identifies the organization type as “Others” and describes it as “OTHERS”; a more specific legal-entity type and corporate identifier are not supplied. The registration certificate gives the promoter office location only as Village/Mandal blank, District Warangal Urban, PIN 506001. RERA record RERA filing

The building permit names SIRIGINENI VENKAT RAO and SIRIGINENI SHARADA as owners/applicants acting through development-cum-GPA holders SIRIGINENI SANDEEP and SIRIGINENI SANTHOSH.

The promoter’s Form B declares that the project would be completed by 12-10-2025. No updated completion undertaking, independently verified progress report or occupancy/completion certificate is supplied. The permit itself states that an occupancy certificate is required before occupation.

10. Approvals, official records & documents

RecordSupplied evidence
TG-RERA registrationForm ‘C’ certificate for VISHNUNI TOWERS, registration P00300004897, issued 29 August 2022; stated validity through 12 October 2025 unless extended.
Building permitGreater Warangal Municipal Corporation Building Permit Order 3006/33288/W48/2021, dated 12 October 2021, for a residential building with 1 stilt and 5 upper floors. The permit states that an occupancy certificate is compulsory before occupation.
Permit conditions / periodPermit records a six-year duration from the order date, with validity through 12 October 2027 in the supplied extraction. It requires construction in accordance with the sanctioned plan, submission of completion notice and obtaining an occupancy certificate.
Permit-recorded site and parametersSite and net area 504.09 m²; road-affected area 0; height 14.7 m; 5 upper floors residential area 1,139.05 m²; stilt area 201.55 m².
RERA promoter declarationForm B by Sirigineni Sandeep declares title, no encumbrances and completion by 12-10-2025, and includes project-account and approval undertakings.
Occupancy / completion certificateNot present in the supplied documents. Document index
Other project documentsA registration certificate and the permit are available in the supplied record; no usable approved floor-plan drawing details or separate occupancy/completion document are supplied for this Overview. Document index Floor plans

Frequently asked questions

Is VISHNUNI TOWERS registered with Telangana RERA?

Yes. VISHNUNI TOWERS is registered with the Telangana Real Estate Regulatory Authority as P00300004897; the registration status is New Project.

Who is the developer of VISHNUNI TOWERS?

The promoter named in the RERA registration is SIRIGINENI SANDEEP.

Where is VISHNUNI TOWERS located?

VISHNUNI TOWERS is in NAKKALAGUTTA_W48, Hanamkonda, Telangana (506001).

When will VISHNUNI TOWERS be completed?

The promoter's proposed date of completion filed with RERA is 12/10/2025. This is the promoter's declaration, not a guarantee.

More projects in Hanamkonda