Sign in

Grc Residency

JP INFRA · Karimnagar · RERA P02700005500

GRC RESIDENCY is a residential apartment project in Vidya Nagar(Part)_W49, Karimnagar district; the mandal is not disclosed in the supplied project record. The registered promoter is JP INFRA, a partnership. The project has a registered site extent of 397.47 sq.m and one building, sanctioned as 1 Stilt + 5 upper floors, with ten apartments: five 2BHK and five 3BHK homes. It is registered with TG-RERA under P02700005500, and the promoter declares completion by 25th JANUARY, 2028.

More from Jp Infra · 2 projects →

01What we found

RegisteredTG-RERA - valid till 25 Jan 2028
11documents on file - each fact links to its page
0court cases on this project's land in the court records searched
9items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

9 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemRecord
Registered project nameGRC RESIDENCY RERA record
Project typeResidential apartment project RERA record RERA filing
Phase / registered portionPhase not separately identified in the supplied record; registration is for GRC RESIDENCY RERA record
TG-RERA registrationP02700005500 RERA record
Registration validity07/12/2022 to 25/01/2028, as stated on the registration certificate
RERA statusRegistered; the record does not show an extension
Registered promoterJP INFRA, a partnership RERA record RERA filing Corporate record

Land and geographic identity

ItemRecord
LocalityVidya Nagar(Part)_W49; the building permit identifies Vidya Nagar (Part)_W49, Ward 49 RERA record RERA filing
Revenue villageNot separately disclosed in the RERA project fields. Title documents describe Vidyanagar (RTC Work Shop) locality of Karimnagar City; the permit identifies Ward 49 Land records
MandalNot disclosed in the supplied project record Land records
District / PINKarimnagar / 505001 RERA record
Project survey number(s)1275/1 RERA record Land records
Registered site extent397.47 sq.m; RERA land details state total area and net area as 397.47 sq.m, with affected area 0 RERA filing
Boundaries filed with RERAEast: vacant land; West: vacant land; North: vacant land; South: 9M road RERA filing

Development identity

ItemRecord
Sanctioning authorityKarimnagar Municipal Corporation Approvals record
Principal building-permit number / date3011/W49/2019/5779, approved 02 February, 2022 Approvals record
Approved built-up area1,169.85 m² for five upper floors; the permit also lists 221.97 m² for the stilt
Building countOne building / one block recorded in the RERA project information RERA filing RERA unit table
Sanctioned floor configuration1 Stilt + 5 upper floors; sanctioned height 14.95 m
Parking levelsStilt and cellar/stilt parking are referenced in the permit conditions; a separate cellar level or space count is not established in the supplied extracted parameters
Unit count1 in the supplied RERA land-details fields, while the RERA unit inventory records 10 apartments; the registered inventory is five 2BHK and five 3BHK units RERA filing RERA unit table

Offering and status

ItemRecord
RERA-filed configurations2BHK and 3BHK RERA unit table
RERA-filed saleable area2BHK: 71.8 sq.m; 3BHK: 125.75 sq.m RERA unit table
Booked / available2BHK: 0 booked / 5 available; 3BHK: 0 booked / 5 available. Portal counts are indicative because the supplied record has no as-of date RERA unit table
Construction stageThe supplied evidence does not state a current construction stage; no independent site-progress verification is provided Document index
Completion timelinePromoter’s Form B declares completion by 25th JANUARY, 2028. The registration certificate is valid through 25/01/2028
Occupancy / completion certificateNo occupancy or completion certificate is included in the supplied project documents. The building-permit conditions require completion documentation and an occupancy certificate before occupation Document index

2. The project story

GRC RESIDENCY is registered with TG-RERA as a residential apartment project on survey number 1275/1, in the Vidya Nagar(Part)_W49 locality of Karimnagar. The filed land area is 397.47 sq.m. The RERA record describes one building and lists ten apartments: five 2BHK homes and five 3BHK homes. RERA record Land records RERA unit table

The building permit sanctions a residential building of 1 Stilt + 5 upper floors, with a stated height of 14.95 m. The supplied records do not establish how many apartments are arranged on each floor, whether construction is currently underway or complete, or whether any portion has received an occupancy certificate. The promoter’s completion date is a declaration; it is not evidence of completed construction or possession readiness. Document index

3. Master plan, architecture & building design

The building permit identifies one residential building on a 397.47 m² site. It records 1,169.85 m² across five upper floors and a 221.97 m² stilt, with an approved height of 14.95 m. These are permit figures; no separate FSI-counted area, gross built-up area, or independently measured site coverage is supplied.

The permit’s extracted conditions and parameters identify four rain-water-harvesting structures, a transformer space, a garbage house, and parking use for the cellar/stilt provision. The supplied drawing record does not provide reliably reviewable information on flat placement by floor, lifts, staircases, circulation, landscaping layout, or common-area distribution. The layout-plan document is not extracted as readable evidence.

4. Homes, configurations & floor plans

The TG-RERA inventory lists ten apartments across two configurations. Carpet areas below are software-measured from the approved floor-plan drawing geometry, not RERA-filed measurements; the filing supplies saleable areas. Saleable area includes the home’s share of common areas, so it should not be treated as carpet area. RERA unit table Floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK50571.8 sq.m67.2 sq.m (software-measured)Not supplied
3BHK505125.75 sq.m112.9 sq.m (software-measured; drawing measurement needs review)Not supplied

The measured 2BHK drawing shows bedrooms, a living room, dining/kitchen, a toilet and a balcony. The measured 3BHK drawing shows three bedrooms, a drawing room, hall, kitchen, three toilets and a balcony. The listed balcony areas are excluded from the software-measured carpet figures: 2.07 m² for the 2BHK and 1.09 m² for the 3BHK. These are measurements from drawing geometry, not RERA disclosures, and should be checked against the approved drawing. RERA unit details Floor plans

5. Parking & vehicle circulation

The permit refers to cellar/stilt parking and requires those areas to be used exclusively for vehicle parking, without partition walls or rolling shutters. Its extracted parameters list a stilt area of 221.97 m², but the supplied evidence does not establish a sanctioned parking-space count, parking allocation by apartment, visitor or accessible parking, or the number of two-wheeler spaces.

No evidence supplied establishes the parking arrangement’s detailed circulation, ramps, vehicle entry and exit, pedestrian separation, or EV charging. A parking area shown or described in a permit does not by itself establish exclusive allocation or ownership of a particular bay. Promoter website

6. Amenities, recreation & open spaces

The RERA-filed amenities record marks water supply, sewerage, rain-water harvesting and an electrical meter room/sub-station/receiving station as available, but records 0% progress against every listed item. The building permit separately requires specified site provisions. No independently verified completion evidence is supplied. RERA amenities

Water supply
Description / sizeListed as available; source and capacity not stated in the RERA amenity record
Evidence sourceRERA amenities
Declared progress / verified status0% recorded; completion not independently verified
Sewerage
Description / size“Sewerage (Chamber, Lines, Septic Tank, STP)” listed as available; specific system not established
Evidence sourceRERA amenities
Declared progress / verified status0% recorded; completion not independently verified
Rain-water harvesting
Description / sizePermit lists four rain-water-harvesting structures; RERA amenities also lists water conservation/rain-water harvesting
Evidence sourceRERA amenities
Declared progress / verified status0% recorded in RERA amenities; completion not independently verified
Transformer space / electrical room
Description / sizePermit requires transformer space; RERA amenities lists electrical meter room, sub-station and receiving station as available
Evidence sourceRERA amenities
Declared progress / verified status0% recorded in RERA amenities; completion not independently verified
Garbage house
Description / sizeRequired by the building permit
Declared progress / verified statusNo progress or completion evidence supplied
Tot-lot / greenery
Description / sizePermit conditions refer to a fenced tot-lot and greenery strip/periphery
Declared progress / verified statusNo progress or completion evidence supplied
Other RERA-listed infrastructure
Description / sizeInternal roads and footpaths; storm-water drains; street lighting; community buildings; sewage treatment/disposal; solid-waste management; energy management; fire protection; recreational open space
Evidence sourceRERA amenities
Declared progress / verified statusEach listed at 0%; completion not independently verified

A third-party vendor record lists facilities including a clubhouse, swimming pool, gym and children’s play area, but the supplied TG-RERA and permit evidence does not establish these as sanctioned or delivered project facilities. Promoter website

7. Utilities, building services & safety

The RERA amenities record lists water supply and sewerage as available, but does not identify the water source, storage or treatment capacity, or confirm whether sewerage includes an STP. The permit requires rain-water harvesting, a transformer space and a garbage house; it does not establish their construction or commissioning. RERA amenities

The permit conditions require fire-safety installations and services including sanitation, plumbing, lifts and electrical installations to be executed under qualified technical supervision. The supplied evidence does not specify lift number or capacity, backup-power capacity, fire-system design, emergency access or escape-stair details, CCTV, security arrangements, waste segregation, or accessible circulation. No statutory compliance or completed-service status can be confirmed from the supplied material. RERA amenities

8. Location, access & connectivity

The project is recorded in Karimnagar district, PIN 505001, at the Vidya Nagar(Part)_W49 locality; the permit refers to Ward 49 and Vidya Nagar (Part)_W49. The RERA-filed southern boundary is a 9M ROAD. The supplied location data lists the Financial District (Nanakramguda) at 1.2 km from the cadastral parcel centroid. No road route, travel time, public-transport service or additional landmark distance is supplied. RERA record RERA filing Location record

9. Developer & development status

The registered promoter is JP INFRA, recorded as a partnership, with GSTIN 36AARFJ8905E1Z1 and a Karimnagar address at 9-3-23(NEW), 9-3-18/1(OLD), GODHAMGADDA, VIDYA NAGAR, Vidya Nagar(Part)_W49, Karimnagar, 505001. The RERA filing lists Dinesh Goud Kothuri and Nishanth Goud Gurram as authorized signatories. RERA filing Corporate record Parties record

The promoter’s Form B declares that the project will be completed by 25th JANUARY, 2028. The supplied evidence does not include a current construction-progress report or independently verified site status. Registration validity through 25/01/2028 is a separate RERA registration period, not an occupancy certificate or proof of completion. Document index

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP02700005500; issued 07/12/2022
What the supplied evidence establishesRegisters GRC RESIDENCY under section 5; validity stated through 25/01/2028
Building permit order
Identifier / date3011/W49/2019/5779; 02 February, 2022
What the supplied evidence establishesKarimnagar Municipal Corporation permit for a residential building on survey 1275/1, with configuration and conditions described above
Form B promoter declaration
Identifier / dateDated 13.09-2022
What the supplied evidence establishesPromoter-declared title, encumbrance and completion disclosures, including completion by 25th JANUARY, 2028
Approved drawing / layout-plan filing
Identifier / dateDocument 264068
What the supplied evidence establishesListed as a layout-plan filing, but not extracted as readable text; drawing-based unit measurements are software measurements, not RERA disclosures Floor plans
Occupancy / completion certificate
Identifier / dateNot included in supplied project documents
What the supplied evidence establishesThe permit requires completion documentation and an occupancy certificate before occupation; no certificate status is established by the supplied record Document index

The supplied file also includes a RERA-filed agreement-for-sale template with the project and allottee particulars blank; it does not identify a completed buyer-specific agreement.

Frequently asked questions

Is GRC RESIDENCY registered with Telangana RERA?

Yes. GRC RESIDENCY is registered with the Telangana Real Estate Regulatory Authority as P02700005500; the registration status is New Project.

Who is the developer of GRC RESIDENCY?

The promoter named in the RERA registration is JP INFRA.

Where is GRC RESIDENCY located?

GRC RESIDENCY is in Vidya Nagar(Part)_W49, Karimnagar, Telangana (505001).

When will GRC RESIDENCY be completed?

The promoter's proposed date of completion filed with RERA is 25/05/2028. This is the promoter's declaration, not a guarantee.

More projects in Karimnagar