Kamala Apartments
GAK ESTATES AND PROJECTS · Karimnagar · RERA P02700004228
KAMALA APARTMENTS is a residential apartments project in Seetharampur, Karimnagar District; the mandal is not disclosed in the project filing data. The registered promoter is GAK ESTATES AND PROJECTS, partnership. The project is on 727.75 sq m of land and comprises one residential building with 1 stilt + 5 upper floors and 20 2BHK units. Its TG-RERA registration is P02700004228, and the project header records a proposed completion date of 25/03/2028.
More from Gak Estates And Projects · 5 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
9 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Record |
|---|---|
| Registered project name | KAMALA APARTMENTS RERA record |
| Project type | Residential apartments RERA record RERA filing |
| Phase / registered portion | Phase not separately identified; registration is for the project recorded under this name RERA record |
| TG-RERA registration | P02700004228 RERA record |
| Registration validity | 14 March 2022 to 25 November 2027; the certificate says five years. This is the registration period, not the project completion deadline. RERA record |
| Registered promoter | GAK ESTATES AND PROJECTS, partnership RERA record Corporate record |
| RERA status | Recorded as a new project; Form ‘C’ registration granted under section 5 RERA record |
Land and geographic identity
| Field | Record |
|---|---|
| Locality | Seetharampur / SEETHARAMPUR RERA record RERA filing |
| Revenue village | Seetharampur RERA record Land records |
| Mandal | Not disclosed in the project filing data Land records |
| District / PIN | Karimnagar / 505001 RERA record RERA filing |
| Project survey number(s) | Survey No. 16; no project subdivision is stated in the RERA identity fields. RERA record RERA filing |
| Site extent | 727.75 sq m, recorded as both total and net area; road-affected area is recorded as 0. RERA filing |
| Boundaries | North: ROAD WIDTH - 9; South: ROAD WIDTH - 9; East: VACANT LAND -; West: VACANT LAND -. RERA filing |
Development identity
| Field | Record |
|---|---|
| Sanctioning authority | Satavahana Urban Development Authority (Karimnagar) Approvals record |
| Principal building approval | Building Permit Order 3145/Karimnagar Muni/2021/0631, approved 25 November 2021 Approvals record |
| Approved built-up area | 1,822.70 m² residential upper floors and 388.89 m² stilt; the approval extraction also records a total of 2,232.67 m² as the approved built-up area. RERA filing |
| Building count / arrangement | One residential building, identified in the permit as “Building - AJAY KUMAR (G)” |
| Sanctioned floors | 1 stilt + 5 upper floors; stated building height: 14.95 m |
| Parking levels / provision | Stilt approved for parking; the supplied record does not give a sanctioned parking-space count. |
| Unit count | 20 units in the TG-RERA filing; the approval extraction does not provide a separate sanctioned unit count. RERA unit table RERA unit details |
Offering and status
| Field | Record |
|---|---|
| RERA-filed configuration | 2BHK RERA unit table RERA unit details |
| RERA-filed saleable area | 23.36 m², as recorded in the TG-RERA unit data RERA unit table RERA unit details |
| Booked / available | 0 booked and 20 available in the portal data; the booking record has no as-of date and should be treated as indicative. RERA unit table |
| Construction stage | No construction-progress percentage or independently verified site-progress record is supplied. RERA record RERA amenities |
| Completion deadline | Promoter-declared completion date: 25 November 2027 in Form B; the project header separately records a proposed completion date of 25/03/2028. RERA record |
| Occupancy / completion certificate | No OC or completion certificate is included in the supplied project documents. The building permit requires an occupancy certificate before occupation. |
2. The project story
KAMALA APARTMENTS is recorded with TG-RERA as a residential apartment project in Seetharampur, Karimnagar District, on Survey No. 16. The registered site area is 727.75 m². RERA record RERA filing
The building permit describes one residential building, “Building - AJAY KUMAR (G),” with one stilt level and five upper floors, and a height of 14.95 m. The RERA unit record lists 20 2BHK units. No supplied evidence establishes the current construction stage or verifies progress at the site; the portal’s amenity progress entries are recorded at 0%. RERA unit table RERA amenities
The RERA registration is valid through 25 November 2027. The promoter’s Form B declares completion by that date, while the project header gives a proposed completion date of 25/03/2028. No occupancy certificate is provided, and the approval requires one before occupation. RERA record
3. Master plan, architecture & building design
The supplied building permit is for one residential building on a 727.75 m² site, with a sanctioned configuration of 1 stilt + 5 upper floors. It records 1,822.70 m² of residential upper-floor area and 388.89 m² of stilt area, alongside a total approved built-up figure of 2,232.67 m². These are approval-record figures; the supplied material does not separately identify FSI-counted area, gross floor area or carpet area. RERA filing
The permit extraction records an open-space contribution of 14%, but the supplied document does not provide a corresponding dimensioned layout or a detailed allocation of open areas. It also lists setbacks as Front 4.1, Rear 3.5, Side I 2.69 and Side II 3.5; units are not stated in the extraction.
No supported plan-derived information is supplied on floor-by-floor unit arrangement, building footprint, lifts, stairs, entrances, internal circulation or the residential/common-area distribution. The approval conditions require a sanctioned plan to be followed and displayed at the site, and require prior approval for modifications.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 20 | 0 | 20 | 23.36 m² | Not established from the supplied measurements | Not supplied |
The unit count, booking figures and saleable area above are from the TG-RERA unit record; bookings are undated portal data and indicative. The supplied floor-plan review reports two drawings measured but no measured flat designs for the RERA-matched 2BHK configuration. It therefore provides no drawing-based carpet-area or room-dimension figure to report. RERA unit table RERA unit details Floor plans
Saleable area and carpet area are different measures: the supplied floor-plan notes state that carpet area measured from drawings would be a software measurement and that RERA saleable area also counts the home’s share of common areas. No measured carpet area or loading figure is established here. Floor plans
5. Parking & vehicle circulation
The building permit records the stilt level as approved for parking and requires the stilt/cellar areas shown for parking to be used exclusively for vehicle parking, without partition walls or rolling shutters. The supplied record does not give a number of parking spaces, distinguish resident or visitor spaces, or provide an allocation of spaces to individual units.
No evidence is supplied about ramps, driveway layout, pedestrian separation, accessible parking, mechanical parking or EV charging. A parking provision in the sanction does not by itself establish an exclusive parking entitlement for a particular apartment.
6. Amenities, recreation & open spaces
The following are listed in the project’s RERA amenity data. The supplied progress fields show 0% for the listed items; this is a record entry, not an independent site inspection. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Green Strip / Tot Lot / Park | No size supplied | RERA amenities | 0%; not independently verified. The permit requires a fenced tot lot maintained as greenery and tree planting. |
| Community Buildings | No size or facility detail supplied | RERA amenities | 0%; not independently verified |
| Aggregate area of recreational open space | No area supplied in the amenity record | RERA amenities | 0%; not independently verified. Permit extraction records open-space contribution of 14%. |
No project-specific clubhouse, indoor recreation, sports facility or facility capacity is detailed in the supplied TG-RERA records. The approval additionally calls for a garbage house, but that is a site utility and is covered below.
7. Utilities, building services & safety
| Service | Supplied project evidence |
|---|---|
| Water | RERA amenity data marks Water Supply “YES,” with 0% progress recorded. No source, storage capacity or treatment details are supplied. RERA amenities |
| Sewerage / drainage | Sewerage (chamber, lines, septic tank, STP) is marked “YES,” with 0% progress recorded. Storm-water drains and treatment/disposal of sewage and sullage water are also listed with 0% progress. No capacities or system specifications are supplied. RERA amenities |
| Rainwater harvesting | Marked “YES” in the RERA amenity data, with 0% progress. The permit requires a rainwater-harvesting structure (percolation pit) and records 8 RWHPs. RERA amenities |
| Electrical | The amenity record marks an electrical meter room/sub-station/receiving station “YES,” with 0% progress. The permit requires space for a transformer; no capacity or backup-power details are supplied. RERA amenities |
| Fire and life safety | Fire protection and fire-safety requirements are listed with 0% progress in the amenity record. The permit assigns responsibility for required firefighting installations to the owner/builder and other named technical parties; no installed-system details or completion evidence are supplied. RERA amenities |
| Waste | Solid-waste management and disposal are listed with 0% progress. The permit requires a garbage house within the premises. RERA amenities |
| Energy management / lighting | Energy management and street lighting are listed with 0% progress. No equipment or capacity details are supplied. RERA amenities |
| Lifts, accessibility and security | The permit refers to lifts and other services being executed under qualified technical supervision, but the supplied records do not specify lift numbers or capacities, accessibility provisions, CCTV or access-control systems. |
These are approval conditions and RERA-filed amenity entries; the supplied evidence does not verify completion or operational status. The permit states that an occupancy certificate is compulsory before occupation and that public water and electricity connections will be provided only on production of that certificate.
8. Location, access & connectivity
The registered project location is Seetharampur, Karimnagar District, Telangana, PIN 505001, on Survey No. 16. The RERA address fields also record Begumpet and Seetharampur; the supplied project record does not provide verified approach-road, public-transport or landmark distances for this site. RERA record RERA filing RERA filing
The building-permit extraction records a road width of 18M and site boundaries described as road width 9 to the north and south. No supplied location evidence establishes travel times, transit services or nearby facilities. RERA filing
9. Developer & development status
The registered promoter is GAK ESTATES AND PROJECTS, identified in the RERA filing as a partnership. Its GSTIN is 36AAOFG7882N1ZE. The RERA record names GUDIPALLI AJAY KUMAR as authorized signatory and GUDIPALLY PARAN JYOTI as partner. RERA record Corporate record Parties record
The registration certificate lists a promoter office as “Village: Mandal: District: Hyderabad, Pin: 500016.” The supplied data does not provide a complete registered-office address, official contact details or a promoter website.
The promoter’s Form B declares that the project would be completed by 25/11/2027 and includes declarations concerning title, encumbrances and the separate account. These are promoter declarations, not independent verification of title, funding or construction progress. No construction-progress percentage or OC is supplied. RERA amenities
10. Approvals, official records & documents
| Record | Supplied evidence |
|---|---|
| TG-RERA registration | Form ‘C’ certificate for KAMALA APARTMENTS, P02700004228, issued 14/03/2022; stated validity through 25/11/2027. |
| Building sanction | Building Permit Order 3145/Karimnagar Muni/2021/0631, issued by Satavahana Urban Development Authority (Karimnagar), approved 25 November 2021. |
| Commencement / building permit | The supplied commencement-certificate document is extracted as a building permit order for one stilt + five upper floors on Survey No. 16, with conditions including compliance with the sanctioned plan and obtaining an occupancy certificate before occupation. |
| Approved layout | No extracted, stamped layout approval or detailed layout drawing is supplied. The RERA filing includes a layout-plan document entry, but its contents were not extracted. Document index |
| Occupancy / completion certificate | No certificate is included in the supplied documents. Document index |
| Promoter declaration | Form B dated 27-12-2021, signed by authorized signatory G. Ajay Kumar, including a declared completion date of 25/11/2027. |
This index identifies the records available in the supplied evidence; it does not establish that unlisted approvals or certificates were obtained.
1. Project at a glance
Project identity
Registered project name: KAMALA APARTMENTS
Project type: Residential apartments
Phase / registered portion: Phase not separately identified; registration is for the project recorded under this name
TG-RERA registration: P02700004228
Registration validity: 14 March 2022 to 25 November 2027; the certificate says five years. This is the registration period, not the project completion deadline.
Registered promoter: GAK ESTATES AND PROJECTS, partnership
RERA status: Recorded as a new project; Form ‘C’ registration granted under section 5
Land and geographic identity
Locality: Seetharampur / SEETHARAMPUR
Revenue village: Seetharampur
Mandal: Not disclosed in the project filing data
District / PIN: Karimnagar / 505001
Project survey number(s): Survey No. 16; no project subdivision is stated in the RERA identity fields.
Site extent: 727.75 sq m, recorded as both total and net area; road-affected area is recorded as 0.
Boundaries: North: ROAD WIDTH - 9; South: ROAD WIDTH - 9; East: VACANT LAND -; West: VACANT LAND -.
Development identity
Sanctioning authority: Satavahana Urban Development Authority (Karimnagar)
Principal building approval: Building Permit Order 3145/Karimnagar Muni/2021/0631, approved 25 November 2021
Approved built-up area: 1,822.70 m² residential upper floors and 388.89 m² stilt; the approval extraction also records a total of 2,232.67 m² as the approved built-up area.
Building count / arrangement: One residential building, identified in the permit as “Building - AJAY KUMAR (G)”
Sanctioned floors: 1 stilt + 5 upper floors; stated building height: 14.95 m
Parking levels / provision: Stilt approved for parking; the supplied record does not give a sanctioned parking-space count.
Unit count: 20 units in the TG-RERA filing; the approval extraction does not provide a separate sanctioned unit count.
Offering and status
RERA-filed configuration: 2BHK
RERA-filed saleable area: 23.36 m², as recorded in the TG-RERA unit data
Booked / available: 0 booked and 20 available in the portal data; the booking record has no as-of date and should be treated as indicative.
Construction stage: No construction-progress percentage or independently verified site-progress record is supplied.
Completion deadline: Promoter-declared completion date: 25 November 2027 in Form B; the project header separately records a proposed completion date of 25/03/2028.
Occupancy / completion certificate: No OC or completion certificate is included in the supplied project documents. The building permit requires an occupancy certificate before occupation.
2. The project story
KAMALA APARTMENTS is recorded with TG-RERA as a residential apartment project in Seetharampur, Karimnagar District, on Survey No. 16. The registered site area is 727.75 m².
The building permit describes one residential building, “Building - AJAY KUMAR (G),” with one stilt level and five upper floors, and a height of 14.95 m. The RERA unit record lists 20 2BHK units. No supplied evidence establishes the current construction stage or verifies progress at the site; the portal’s amenity progress entries are recorded at 0%.
The RERA registration is valid through 25 November 2027. The promoter’s Form B declares completion by that date, while the project header gives a proposed completion date of 25/03/2028. No occupancy certificate is provided, and the approval requires one before occupation.
3. Master plan, architecture & building design
The supplied building permit is for one residential building on a 727.75 m² site, with a sanctioned configuration of 1 stilt + 5 upper floors. It records 1,822.70 m² of residential upper-floor area and 388.89 m² of stilt area, alongside a total approved built-up figure of 2,232.67 m². These are approval-record figures; the supplied material does not separately identify FSI-counted area, gross floor area or carpet area.
The permit extraction records an open-space contribution of 14%, but the supplied document does not provide a corresponding dimensioned layout or a detailed allocation of open areas. It also lists setbacks as Front 4.1, Rear 3.5, Side I 2.69 and Side II 3.5; units are not stated in the extraction.
No supported plan-derived information is supplied on floor-by-floor unit arrangement, building footprint, lifts, stairs, entrances, internal circulation or the residential/common-area distribution. The approval conditions require a sanctioned plan to be followed and displayed at the site, and require prior approval for modifications.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 20 | 0 | 20 | 23.36 m² | Not established from the supplied measurements | Not supplied |
The unit count, booking figures and saleable area above are from the TG-RERA unit record; bookings are undated portal data and indicative. The supplied floor-plan review reports two drawings measured but no measured flat designs for the RERA-matched 2BHK configuration. It therefore provides no drawing-based carpet-area or room-dimension figure to report.
Saleable area and carpet area are different measures: the supplied floor-plan notes state that carpet area measured from drawings would be a software measurement and that RERA saleable area also counts the home’s share of common areas. No measured carpet area or loading figure is established here.
5. Parking & vehicle circulation
The building permit records the stilt level as approved for parking and requires the stilt/cellar areas shown for parking to be used exclusively for vehicle parking, without partition walls or rolling shutters. The supplied record does not give a number of parking spaces, distinguish resident or visitor spaces, or provide an allocation of spaces to individual units.
No evidence is supplied about ramps, driveway layout, pedestrian separation, accessible parking, mechanical parking or EV charging. A parking provision in the sanction does not by itself establish an exclusive parking entitlement for a particular apartment.
6. Amenities, recreation & open spaces
The following are listed in the project’s RERA amenity data. The supplied progress fields show 0% for the listed items; this is a record entry, not an independent site inspection.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Green Strip / Tot Lot / Park | No size supplied | 0%; not independently verified. The permit requires a fenced tot lot maintained as greenery and tree planting. | |
| Community Buildings | No size or facility detail supplied | 0%; not independently verified | |
| Aggregate area of recreational open space | No area supplied in the amenity record | 0%; not independently verified. Permit extraction records open-space contribution of 14%. |
No project-specific clubhouse, indoor recreation, sports facility or facility capacity is detailed in the supplied TG-RERA records. The approval additionally calls for a garbage house, but that is a site utility and is covered below.
7. Utilities, building services & safety
Water: RERA amenity data marks Water Supply “YES,” with 0% progress recorded. No source, storage capacity or treatment details are supplied.
Sewerage / drainage: Sewerage (chamber, lines, septic tank, STP) is marked “YES,” with 0% progress recorded. Storm-water drains and treatment/disposal of sewage and sullage water are also listed with 0% progress. No capacities or system specifications are supplied.
Rainwater harvesting: Marked “YES” in the RERA amenity data, with 0% progress. The permit requires a rainwater-harvesting structure (percolation pit) and records 8 RWHPs.
Electrical: The amenity record marks an electrical meter room/sub-station/receiving station “YES,” with 0% progress. The permit requires space for a transformer; no capacity or backup-power details are supplied.
Fire and life safety: Fire protection and fire-safety requirements are listed with 0% progress in the amenity record. The permit assigns responsibility for required firefighting installations to the owner/builder and other named technical parties; no installed-system details or completion evidence are supplied.
Waste: Solid-waste management and disposal are listed with 0% progress. The permit requires a garbage house within the premises.
Energy management / lighting: Energy management and street lighting are listed with 0% progress. No equipment or capacity details are supplied.
Lifts, accessibility and security: The permit refers to lifts and other services being executed under qualified technical supervision, but the supplied records do not specify lift numbers or capacities, accessibility provisions, CCTV or access-control systems.
These are approval conditions and RERA-filed amenity entries; the supplied evidence does not verify completion or operational status. The permit states that an occupancy certificate is compulsory before occupation and that public water and electricity connections will be provided only on production of that certificate.
8. Location, access & connectivity
The registered project location is Seetharampur, Karimnagar District, Telangana, PIN 505001, on Survey No. 16. The RERA address fields also record Begumpet and Seetharampur; the supplied project record does not provide verified approach-road, public-transport or landmark distances for this site.
The building-permit extraction records a road width of 18M and site boundaries described as road width 9 to the north and south. No supplied location evidence establishes travel times, transit services or nearby facilities.
9. Developer & development status
The registered promoter is GAK ESTATES AND PROJECTS, identified in the RERA filing as a partnership. Its GSTIN is 36AAOFG7882N1ZE. The RERA record names GUDIPALLI AJAY KUMAR as authorized signatory and GUDIPALLY PARAN JYOTI as partner.
The registration certificate lists a promoter office as “Village: Mandal: District: Hyderabad, Pin: 500016.” The supplied data does not provide a complete registered-office address, official contact details or a promoter website.
The promoter’s Form B declares that the project would be completed by 25/11/2027 and includes declarations concerning title, encumbrances and the separate account. These are promoter declarations, not independent verification of title, funding or construction progress. No construction-progress percentage or OC is supplied.
10. Approvals, official records & documents
TG-RERA registration: Form ‘C’ certificate for KAMALA APARTMENTS, P02700004228, issued 14/03/2022; stated validity through 25/11/2027.
Building sanction: Building Permit Order 3145/Karimnagar Muni/2021/0631, issued by Satavahana Urban Development Authority (Karimnagar), approved 25 November 2021.
Commencement / building permit: The supplied commencement-certificate document is extracted as a building permit order for one stilt + five upper floors on Survey No. 16, with conditions including compliance with the sanctioned plan and obtaining an occupancy certificate before occupation.
Approved layout: No extracted, stamped layout approval or detailed layout drawing is supplied. The RERA filing includes a layout-plan document entry, but its contents were not extracted.
Occupancy / completion certificate: No certificate is included in the supplied documents.
Promoter declaration: Form B dated 27-12-2021, signed by authorized signatory G. Ajay Kumar, including a declared completion date of 25/11/2027.
This index identifies the records available in the supplied evidence; it does not establish that unlisted approvals or certificates were obtained.
Frequently asked questions
Is KAMALA APARTMENTS registered with Telangana RERA?
Yes. KAMALA APARTMENTS is registered with the Telangana Real Estate Regulatory Authority as P02700004228; the registration status is New Project.
Who is the developer of KAMALA APARTMENTS?
The promoter named in the RERA registration is GAK ESTATES AND PROJECTS.
Where is KAMALA APARTMENTS located?
KAMALA APARTMENTS is in SEETHARAMPUR, Karimnagar, Telangana (505001).
When will KAMALA APARTMENTS be completed?
The promoter's proposed date of completion filed with RERA is 25/03/2028. This is the promoter's declaration, not a guarantee.
More projects in Karimnagar