THE ELEGANCE PEARL is a residential apartment project in Jyothi Nagar, Karimnagar, Karimnagar district, developed by the registered promoter Sri Sai Infra. The project covers 557.27 m² and comprises one building, Building - A (B), with 1 Stilt + 5 upper floors and 10 3BHK units, each with a RERA-filed saleable area of 58.36 m². It is registered under TG-RERA registration P02700003372, and the promoter’s Form B declares completion by 10/10/2025.
More from Sri Sai Infra · 4 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
9 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
Project at a glance
Project identity
| Field | Record |
|---|---|
| Registered project name | THE ELEGANCE PEARL RERA record |
| Project type | Residential apartment project RERA record RERA filing |
| Phase / registered portion | Not identified as a separate phase in the supplied record; registration covers the project on survey numbers 1259, 1260 and 1261. |
| TG-RERA registration | P02700003372 Approvals record |
| Registration validity | 30 August 2021 to 10 October 2025; the supplied certificate records no extension. This is the registration period, not the building-permit validity or a statement of completion. Approvals record |
| Registered promoter | Sri Sai Infra (also styled SRI SAI INFRA in project records); partnership. RERA record Parties record RERA filing |
| RERA status | The project is listed as “New Project.” The supplied registration certificate’s stated validity ended on 10 October 2025; current registration status is not established by the supplied material. RERA record |
Land and geographic identity
| Field | Record |
|---|---|
| Locality | Jyothi Nagar / JYOTHINAGAR RERA record RERA filing |
| Revenue village | The RERA filing identifies Jyothi Nagar. The building-permit extraction identifies the site as Karimnagar Municipal Corporation; an exact revenue-village name beyond the locality is not established in the supplied records. RERA record Land records |
| Mandal | Not disclosed. Land records |
| District / PIN | Karimnagar / 505001 RERA record |
| Project survey numbers | 1259, 1260 and 1261; no subdivisions are specified in the supplied project identity. RERA record Land records |
| Registered site extent | 557.27 m² in the project filing and building-permit extraction. RERA filing |
| Total / net area | Total area 557.27 m²; net area 557.27 m². The permit records road-affected area as 0 m². RERA filing |
| Boundaries in RERA filing | East: existing building; west: road width; north: existing building; south: existing building. RERA filing |
Development identity
| Field | Record |
|---|---|
| Sanctioning authority | Satavahana Urban Development Authority (Karimnagar), as named in the extracted building permit. The project filing lists DTCP as the authority. Approvals record |
| Principal building approval | Building Permit Order 3145/Karimnagar Muni/2020/0182, dated 10 October 2020. Approvals record |
| Approved built-up area | 1,615.43 m² in the project information filing. The permit separately states 1,339.55 m² for five residential upper floors and 253.54 m² for the stilt; these are the permit’s listed floor areas. RERA filing |
| Building count | One building: “Building - A (B).” RERA filing |
| Sanctioned configuration | 1 Stilt + 5 upper floors; stated building height 14.25 m. |
| Parking levels / provision | The permit requires the approved stilt and any cellar approved for parking to be used exclusively for parking. The extracted permit configuration lists a stilt; no parking-space count is provided. |
| Units | 10 units recorded in the RERA filing; the permit requires that the sanctioned unit count not be increased without prior approval. A separate approved unit total is not stated in the extracted permit data. RERA unit table RERA unit details |
Offering and status
| Field | Record |
|---|---|
| Configuration | 3BHK; 10 units recorded by TG-RERA. RERA unit details RERA unit table |
| RERA-filed saleable area | 58.36 m² per recorded configuration. RERA unit details RERA unit table |
| Booked / available | 0 booked / 10 available in the portal data supplied; no as-of date is recorded, so these counts are indicative rather than a current inventory confirmation. RERA unit table RERA unit details |
| Construction stage | Not established by the supplied evidence. The permit is not proof that construction began or is complete; no independently verified site progress is supplied. |
| Completion dates | Promoter’s Form B declares completion by 10/10/2025. The building-permit extraction also records completion before 10 October 2026. These are distinct records; neither establishes actual completion. |
| Occupancy / completion certificate | No completion or occupancy certificate is supplied; the permit extraction records completion_certified: false and requires an occupancy certificate before occupation. |
The project story
THE ELEGANCE PEARL is a single-building residential apartment project in Jyothi Nagar, Karimnagar, on survey numbers 1259, 1260 and 1261. The filed site area is 557.27 m². The building permit describes one residential building, Building - A (B), with a stilt and five upper floors, at a stated height of 14.25 m. RERA record Land records
The RERA filing records ten 3BHK units, each with a filed saleable area of 58.36 m². The portal data supplied reports none booked and ten available, but has no inventory as-of date. No construction-stage evidence or verified completion progress is provided. The promoter’s declared completion date and the permit’s completion-before date are not evidence that construction has been completed. No occupancy or completion certificate is included. RERA unit details RERA unit table
Master plan, architecture & building design
- The extracted building permit describes a single residential block on a 557.27 m² site: one stilt level and five residential upper floors, with a stated height of 14.25 m. It lists 1,339.55 m² for the residential upper floors and 253.54 m² for the stilt. The RERA filing separately reports approved built-up area of 1,615.43 m²; the supplied records do not label these figures as carpet area or saleable area. RERA filing
- The permit lists front setback 3.58 m, rear setback 3.5 m, and side I setback 3.5 m. It requires periphery tree planting and a maintained greenery strip, a fenced tot-lot, a rainwater-harvesting percolation pit, space for a transformer and a garbage house. The permit extraction states “Tot-lot (m²) NA,” so no tot-lot area is established.
- No approved drawing-derived information is supplied on flats per floor, lifts, stairs, building footprint, entries, exits, internal circulation, landscaped area dimensions or residential/common-area distribution. The available floor-plan data contains no measured 3BHK design. Floor plans
Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 10 | 0 | 10 | 58.36 m² | Not measured in the supplied drawing data | Not supplied |
The 3BHK configuration, unit count, booking figures and saleable area are from the RERA filing/portal data. The supplied floor-plan review reports no measured flat design for this configuration; therefore, no software-measured carpet area or room dimensions can be reported. Saleable area is the filed figure and should not be read as a measured carpet-area figure. RERA unit details RERA unit table Floor plans
Parking & vehicle circulation
- The building permit requires the approved stilt—and any cellar approved for parking—to be used exclusively for vehicle parking, without partitions or rolling shutters, and not converted to another use. The extracted building configuration specifies one stilt and does not identify a cellar level. No sanctioned parking-space count, resident/visitor allocation, accessible bays, two-wheeler provision, ramp arrangement or unit-specific parking allocation is supplied.
- The RERA unit record marks the configuration as mortgaged, but does not identify an individual parking space or establish an allotment. RERA unit table
Amenities, recreation & open spaces
The amenity schedule is a RERA-filed project record with percentages shown as 0 for the listed works. This is not independent verification of site condition or completion. The building permit separately imposes specific conditions noted below. RERA amenities
| Description / size | Listed in the amenity schedule; no size stated. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | Progress shown as 0; completion not independently verified. |
| Description / size | Listed in the amenity schedule. Permit requires periphery planting/greenery and a fenced tot-lot; tot-lot area is recorded as NA. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | Amenity-schedule progress shown as 0; permit conditions do not establish delivery. |
| Description / size | Listed; no area stated. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | Progress shown as 0; no completed facility verified. |
No clubhouse or indoor recreation facility, sports facility, or convenience/community facility beyond the listed community-building entry is evidenced in the supplied data. RERA amenities
Utilities, building services & safety
- The RERA-filed amenity schedule lists water supply and sewerage (chambers, lines, septic tank/STP) as available “YES,” and also lists storm-water drains, sewage and sullage treatment/disposal, solid-waste management, water conservation/rainwater harvesting, energy management, fire protection, street lighting and electrical meter room/sub-station/receiving station. The schedule shows progress of 0 for the listed works; it does not establish that these services are operating or complete. RERA amenities
- The building permit specifically requires construction of a rainwater-harvesting percolation pit, provision of transformer space, and a garbage house within the premises. It also requires an occupancy certificate before occupation and states that public water and electricity connections will be provided only on production of that certificate. These are permit conditions, not confirmation of installed or commissioned services.
- No capacities or technical details are supplied for water sources/storage, STP, drainage or reuse, electrical supply or backup, lifts, fire systems, security, accessibility or waste handling. The permit requires worker safety and a tot-lot but does not provide a detailed fire, access or building-services specification in the extracted material. RERA amenities
Location, access & connectivity
- The project is identified in the RERA record as Jyothi Nagar, Karimnagar, Telangana, PIN 505001; the project land is recorded in survey numbers 1259, 1260 and 1261. The RERA filing gives the west boundary as “ROAD WIDTH” and the other three boundaries as existing buildings. RERA record Land records
- A location record lists Financial District (Nanakramguda) at 1.2 km from a cadastral parcel centroid. The supplied material does not establish that this location point corresponds to the Karimnagar project site, so it is not used here as a project connectivity distance. No verified project approach-road, public-transport, landmark-distance or travel-time information is supplied. Location record
Developer & development status
- The registered promoter is Sri Sai Infra, identified in the RERA records as a partnership. The project filing gives GSTIN 36ADDFS2386K1ZO. The supplied promoter address is recorded as Elegance Prestige, Jyothi Nagar, Karimnagar, PIN 505001; no official contact details or website are supplied. Parties record RERA filing Corporate record
- The promoter’s Form B, signed by G. Santosh Reddy, declares a project completion date of 10/10/2025 and gives separate-account and other project undertakings. These are promoter declarations, not independent confirmation of construction progress or completion. The supplied record does not provide a verified construction-stage update, revised completion date, or occupancy certificate. Document index
Approvals, official records & documents
| Record | Supplied evidence |
|---|---|
| TG-RERA registration | Form C for THE ELEGANCE PEARL, registration P02700003372, for survey numbers 1259, 1260 and 1261; recorded validity 30 August 2021–10 October 2025. |
| Building permit | Building Permit Order 3145/Karimnagar Muni/2020/0182, dated 10 October 2020, issued by Satavahana Urban Development Authority (Karimnagar); one 1 Stilt + 5 upper-floor residential building. |
| Layout / approved plan material | A layout-plan document is listed in the filing, but the supplied record says it was not extracted. The building-permit order and its stated conditions are available in extracted form. Document index |
| Title and land records | RERA-filed title scrutiny report dated 2 July 2021 (doc 175826); development agreement cum GPA dated 17 June 2021 (doc 175885); additional title-related filings include docs 175825, 175886 and 175887. These are listed here as document-index items; detailed title analysis belongs in the Land & Title section. Document index |
| Project agreement form | A partially completed agreement-for-sale form is filed; the supplied extraction says key project, unit, allottee, consideration and date fields are unfilled. |
| Completion / occupancy certificate | No such certificate is included in the supplied records. The building-permit extraction records completion as not certified and requires an occupancy certificate before occupation. |
Project at a glance
Project identity
Registered project name: THE ELEGANCE PEARL
Project type: Residential apartment project
Phase / registered portion: Not identified as a separate phase in the supplied record; registration covers the project on survey numbers 1259, 1260 and 1261.
TG-RERA registration: P02700003372
Registration validity: 30 August 2021 to 10 October 2025; the supplied certificate records no extension. This is the registration period, not the building-permit validity or a statement of completion.
Registered promoter: Sri Sai Infra (also styled SRI SAI INFRA in project records); partnership.
RERA status: The project is listed as “New Project.” The supplied registration certificate’s stated validity ended on 10 October 2025; current registration status is not established by the supplied material.
Land and geographic identity
Locality: Jyothi Nagar / JYOTHINAGAR
Revenue village: The RERA filing identifies Jyothi Nagar. The building-permit extraction identifies the site as Karimnagar Municipal Corporation; an exact revenue-village name beyond the locality is not established in the supplied records.
Mandal: Not disclosed.
District / PIN: Karimnagar / 505001
Project survey numbers: 1259, 1260 and 1261; no subdivisions are specified in the supplied project identity.
Registered site extent: 557.27 m² in the project filing and building-permit extraction.
Total / net area: Total area 557.27 m²; net area 557.27 m². The permit records road-affected area as 0 m².
Boundaries in RERA filing: East: existing building; west: road width; north: existing building; south: existing building.
Development identity
Sanctioning authority: Satavahana Urban Development Authority (Karimnagar), as named in the extracted building permit. The project filing lists DTCP as the authority.
Principal building approval: Building Permit Order 3145/Karimnagar Muni/2020/0182, dated 10 October 2020.
Approved built-up area: 1,615.43 m² in the project information filing. The permit separately states 1,339.55 m² for five residential upper floors and 253.54 m² for the stilt; these are the permit’s listed floor areas.
Building count: One building: “Building - A (B).”
Sanctioned configuration: 1 Stilt + 5 upper floors; stated building height 14.25 m.
Parking levels / provision: The permit requires the approved stilt and any cellar approved for parking to be used exclusively for parking. The extracted permit configuration lists a stilt; no parking-space count is provided.
Units: 10 units recorded in the RERA filing; the permit requires that the sanctioned unit count not be increased without prior approval. A separate approved unit total is not stated in the extracted permit data.
Offering and status
Configuration: 3BHK; 10 units recorded by TG-RERA.
RERA-filed saleable area: 58.36 m² per recorded configuration.
Booked / available: 0 booked / 10 available in the portal data supplied; no as-of date is recorded, so these counts are indicative rather than a current inventory confirmation.
Construction stage: Not established by the supplied evidence. The permit is not proof that construction began or is complete; no independently verified site progress is supplied.
Completion dates: Promoter’s Form B declares completion by 10/10/2025. The building-permit extraction also records completion before 10 October 2026. These are distinct records; neither establishes actual completion.
Occupancy / completion certificate: No completion or occupancy certificate is supplied; the permit extraction records completion_certified: false and requires an occupancy certificate before occupation.
The project story
THE ELEGANCE PEARL is a single-building residential apartment project in Jyothi Nagar, Karimnagar, on survey numbers 1259, 1260 and 1261. The filed site area is 557.27 m². The building permit describes one residential building, Building - A (B), with a stilt and five upper floors, at a stated height of 14.25 m.
The RERA filing records ten 3BHK units, each with a filed saleable area of 58.36 m². The portal data supplied reports none booked and ten available, but has no inventory as-of date. No construction-stage evidence or verified completion progress is provided. The promoter’s declared completion date and the permit’s completion-before date are not evidence that construction has been completed. No occupancy or completion certificate is included.
Master plan, architecture & building design
- The extracted building permit describes a single residential block on a 557.27 m² site: one stilt level and five residential upper floors, with a stated height of 14.25 m. It lists 1,339.55 m² for the residential upper floors and 253.54 m² for the stilt. The RERA filing separately reports approved built-up area of 1,615.43 m²; the supplied records do not label these figures as carpet area or saleable area.
- The permit lists front setback 3.58 m, rear setback 3.5 m, and side I setback 3.5 m. It requires periphery tree planting and a maintained greenery strip, a fenced tot-lot, a rainwater-harvesting percolation pit, space for a transformer and a garbage house. The permit extraction states “Tot-lot (m²) NA,” so no tot-lot area is established.
- No approved drawing-derived information is supplied on flats per floor, lifts, stairs, building footprint, entries, exits, internal circulation, landscaped area dimensions or residential/common-area distribution. The available floor-plan data contains no measured 3BHK design.
Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 10 | 0 | 10 | 58.36 m² | Not measured in the supplied drawing data | Not supplied |
The 3BHK configuration, unit count, booking figures and saleable area are from the RERA filing/portal data. The supplied floor-plan review reports no measured flat design for this configuration; therefore, no software-measured carpet area or room dimensions can be reported. Saleable area is the filed figure and should not be read as a measured carpet-area figure.
Parking & vehicle circulation
- The building permit requires the approved stilt—and any cellar approved for parking—to be used exclusively for vehicle parking, without partitions or rolling shutters, and not converted to another use. The extracted building configuration specifies one stilt and does not identify a cellar level. No sanctioned parking-space count, resident/visitor allocation, accessible bays, two-wheeler provision, ramp arrangement or unit-specific parking allocation is supplied.
- The RERA unit record marks the configuration as mortgaged, but does not identify an individual parking space or establish an allotment.
Amenities, recreation & open spaces
The amenity schedule is a RERA-filed project record with percentages shown as 0 for the listed works. This is not independent verification of site condition or completion. The building permit separately imposes specific conditions noted below.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Community buildings | Listed in the amenity schedule; no size stated. | Progress shown as 0; completion not independently verified. | |
| Green strip / tot-lot / park | Listed in the amenity schedule. Permit requires periphery planting/greenery and a fenced tot-lot; tot-lot area is recorded as NA. | Amenity-schedule progress shown as 0; permit conditions do not establish delivery. | |
| Aggregate recreational open space | Listed; no area stated. | Progress shown as 0; no completed facility verified. |
No clubhouse or indoor recreation facility, sports facility, or convenience/community facility beyond the listed community-building entry is evidenced in the supplied data.
Utilities, building services & safety
- The RERA-filed amenity schedule lists water supply and sewerage (chambers, lines, septic tank/STP) as available “YES,” and also lists storm-water drains, sewage and sullage treatment/disposal, solid-waste management, water conservation/rainwater harvesting, energy management, fire protection, street lighting and electrical meter room/sub-station/receiving station. The schedule shows progress of 0 for the listed works; it does not establish that these services are operating or complete.
- The building permit specifically requires construction of a rainwater-harvesting percolation pit, provision of transformer space, and a garbage house within the premises. It also requires an occupancy certificate before occupation and states that public water and electricity connections will be provided only on production of that certificate. These are permit conditions, not confirmation of installed or commissioned services.
- No capacities or technical details are supplied for water sources/storage, STP, drainage or reuse, electrical supply or backup, lifts, fire systems, security, accessibility or waste handling. The permit requires worker safety and a tot-lot but does not provide a detailed fire, access or building-services specification in the extracted material.
Location, access & connectivity
- The project is identified in the RERA record as Jyothi Nagar, Karimnagar, Telangana, PIN 505001; the project land is recorded in survey numbers 1259, 1260 and 1261. The RERA filing gives the west boundary as “ROAD WIDTH” and the other three boundaries as existing buildings.
- A location record lists Financial District (Nanakramguda) at 1.2 km from a cadastral parcel centroid. The supplied material does not establish that this location point corresponds to the Karimnagar project site, so it is not used here as a project connectivity distance. No verified project approach-road, public-transport, landmark-distance or travel-time information is supplied.
Developer & development status
- The registered promoter is Sri Sai Infra, identified in the RERA records as a partnership. The project filing gives GSTIN 36ADDFS2386K1ZO. The supplied promoter address is recorded as Elegance Prestige, Jyothi Nagar, Karimnagar, PIN 505001; no official contact details or website are supplied.
- The promoter’s Form B, signed by G. Santosh Reddy, declares a project completion date of 10/10/2025 and gives separate-account and other project undertakings. These are promoter declarations, not independent confirmation of construction progress or completion. The supplied record does not provide a verified construction-stage update, revised completion date, or occupancy certificate.
Approvals, official records & documents
TG-RERA registration: Form C for THE ELEGANCE PEARL, registration P02700003372, for survey numbers 1259, 1260 and 1261; recorded validity 30 August 2021–10 October 2025.
Building permit: Building Permit Order 3145/Karimnagar Muni/2020/0182, dated 10 October 2020, issued by Satavahana Urban Development Authority (Karimnagar); one 1 Stilt + 5 upper-floor residential building.
Layout / approved plan material: A layout-plan document is listed in the filing, but the supplied record says it was not extracted. The building-permit order and its stated conditions are available in extracted form.
Title and land records: RERA-filed title scrutiny report dated 2 July 2021 (doc 175826); development agreement cum GPA dated 17 June 2021 (doc 175885); additional title-related filings include docs 175825, 175886 and 175887. These are listed here as document-index items; detailed title analysis belongs in the Land & Title section.
Project agreement form: A partially completed agreement-for-sale form is filed; the supplied extraction says key project, unit, allottee, consideration and date fields are unfilled.
Completion / occupancy certificate: No such certificate is included in the supplied records. The building-permit extraction records completion as not certified and requires an occupancy certificate before occupation.
Frequently asked questions
Is THE ELEGANCE PEARL registered with Telangana RERA?
Yes. THE ELEGANCE PEARL is registered with the Telangana Real Estate Regulatory Authority as P02700003372; the registration status is New Project.
Who is the developer of THE ELEGANCE PEARL?
The promoter named in the RERA registration is SRI SAI INFRA.
Where is THE ELEGANCE PEARL located?
THE ELEGANCE PEARL is in JYOTHI NAGAR, Karimnagar, Telangana (505001).
When will THE ELEGANCE PEARL be completed?
The promoter's proposed date of completion filed with RERA is 10/10/2025. This is the promoter's declaration, not a guarantee.