Sign in

Balaji Nilayam

KK CONSTRUCTIONS AND DEVELOPERS · Medchal-Malkajgiri · RERA P02200010807

BALAJI NILAYAM is a residential apartment project in Gajularamaram, Qutballapur mandal, Medchal-Malkajgiri district. The registered promoter is KK CONSTRUCTIONS AND DEVELOPERS. The project has a site extent of 668.50 sq.m and one residential building with 1 Stilt + 5 upper floors, comprising 15 apartments: 10 2BHK and 5 3BHK. It is registered under TG-RERA number P02200010807, with proposed completion 18/10/2028.

01What we found

RegisteredTG-RERA - valid till 18 Jun 2028
22documents on file - each fact links to its page
0court cases on this project's land in the court records searched
9items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

9 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemRecord
Registered project nameBALAJI NILAYAM RERA record
Project type / phaseResidential apartment project; registered phase or separate phase name is not disclosed. RERA filing
TG-RERA registrationP02200010807 RERA record
Registration validity18/06/2025 to 18/06/2028; registration validity is distinct from the stated completion deadline. RERA record
Registered promoterKK CONSTRUCTIONS AND DEVELOPERS RERA record
RERA statusRegistered; the captured record identifies the project as New Project. RERA record RERA filing

Land and geographic identity

ItemRecord
Revenue villageGajula Ramaram-1; the building-permit material also names GAJULARAMARAM. RERA record
LocalityGajularamaram; the building-permit drawing identifies Balaji Lay Out. RERA record
Mandal / district / PINQutballapur / Medchal-Malkajgiri / 500055 RERA record
Survey numbers and subdivisions96, 108, 117/A, 119, 136, 138, 139, 140 and 141. These are the survey identifiers supplied in the project registration and building-permit records. RERA record
Site / plot identifiersPlot Nos. 740, 741, 778 and 779. RERA filing
Site extent668.50 sq.m; RERA records total area and net area as 668.50 sq.m, with affected road-widening/FTL/Nala area stated as 0. RERA filing
BoundariesEast: neighbours’ land; west: 30 Feet road; north: Plot Nos. 739 and 780; south: Plot Nos. 742 and 777. RERA filing

Development identity

ItemRecord
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC) Approvals record
Principal building-permit number / date5356/GHMC/KPL/2025-BP, approved 18 June, 2025. Approvals record
Approved buildingOne residential building, identified in the permit as A (RAMANA REDDY); 1 Stilt + 5 upper floors.
HeightThe permit records building height 14.50; the filed plan also lists Total Ht. 20.36mt. and 17.85 mt. from GL.
Approved built-up areaThe filed plan lists TOTAL BUA: 1896.39, TOTAL PROPOSED BUILT UP AREA EXCLUDING PARKING: 1529.50, TOTAL PROPOSED BUILT UP AREA INCLUDING PARKING: 1868.69, and PARKING AREA: 339.19. The permit separately states residential upper floors of 1,557.20 and total parking area 339.2. Units are not specified for all these extracted figures; see the filed drawing/permit for the applicable area labels.
Parking levelsPermit record: Parking floors: Cellar 0; Stilt 1. Stilt is designated exclusively for parking.
Unit countGHMC plan: 15 sanctioned units; RERA unit record: 15 proposed units (10 2BHK and 5 3BHK). RERA unit table

Offering and status

ItemRecord
Configurations2BHK and 3BHK apartments. RERA unit table
RERA-filed saleable area2BHK: 114.5 sq.m; 3BHK: 155.14 sq.m. RERA unit table
Portal booking / availability2BHK: 0 booked / 10 available; 3BHK: 0 booked / 5 available. These are portal figures with no stated as-of date and should be treated as indicative. RERA unit table
Construction stageThe project is recorded as a New Project; the supplied evidence gives no verified construction-progress percentage or independently verified site-stage assessment. RERA filing RERA amenities
Completion datesGHMC permit says construction is to commence before 18 December, 2025 and be completed before 18 June, 2028. The RERA Form B declaration undertakes completion by 18.06.2028; the project header separately records proposed completion 18/10/2028. RERA record
Occupancy / completion certificateNo occupancy or completion certificate is supplied. GHMC permit conditions require an occupancy certificate before occupation.

2. The project story

BALAJI NILAYAM is a single-building residential apartment project registered under TG-RERA number P02200010807. It is located in Gajularamaram, Qutballapur mandal, Medchal-Malkajgiri district, on Plot Nos. 740, 741, 778 and 779, with the project records identifying Survey Nos. 96, 108, 117/A, 119, 136, 138, 139, 140 and 141. RERA record RERA filing

The GHMC building permit describes one residential building with 1 Stilt + 5 upper floors. The RERA unit record lists 15 apartments: ten 2BHK and five 3BHK. The available evidence does not establish construction progress through an independently verified site inspection, and no occupancy/completion certificate is included. The permit and RERA declaration set completion-related dates, but those dates do not establish that the building has been completed or occupied. RERA unit table

3. Master plan, architecture & building design

The GHMC-filed building-permit plan is for one residential building on a site recorded as 668.50 sq.m, with 1 Stilt + 5 upper floors. The approved plan identifies Plot Nos. 740, 741, 778 and 779 and the nine survey identifiers listed above. The extracted plan gives TOTAL BUA: 1896.39, NET BUA: 1529.50, PARKING AREA: 339.19, and TOTAL PROPOSED BUILT UP AREA EXCLUDING PARKING: 1529.50; the permit extraction also lists residential upper floors as 1,557.20. These are source-recorded area labels and are not interchangeable with RERA saleable area or software-measured carpet area.

The permit describes one entry and one exit, each with a minimum width of 4.5mts. and height clearance of 5mts. The filed plan lists a lift and staircase, and the building permit requires the stilt/cellar parking area to remain for parking use. The approved material also refers to a tot-lot, peripheral greenery, a transformer space and a garbage house; supplied records do not provide a detailed dimensioned landscape plan or a verified account of completed works.

The supplied material does not specify basement levels, podiums, flats per floor, lift count or capacity, staircase count, building footprint, floor-by-floor residential/common-area distribution, or a separate phase arrangement. The permit records Cellar 0; Stilt 1 for parking.

4. Homes, configurations & floor plans

RERA records 15 proposed apartments across two configurations. The saleable areas below are RERA-filed; carpet areas and loading are software measurements from the filed floor-plan drawing, not RERA disclosures. The software-measured areas are subject to drawing review. Saleable area and carpet area are different measures: saleable area includes the home’s share of common areas, while carpet area is measured from the dwelling’s floor-plan geometry. RERA unit table RERA unit details Floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK10010114.5 sq.m68.5–69.2 sq.m (median 68.5 sq.m; software-measured)40%
3BHK505155.14 sq.m98.6 sq.m (software-measured)36%

The measured 2BHK drawing shows a kitchen, living room, two bedrooms, two toilets and a utility area. The measured 3BHK drawing shows a living room, dining area, kitchen, three bedrooms, three toilets and a utility area. The utility areas are excluded from the software-measured carpet calculation. Measurements are drawn from the first- and second-floor plan panels in document 676191 and are not substitutes for checking the individual approved drawing or sale agreement. RERA unit details

5. Parking & vehicle circulation

The GHMC permit records one stilt parking level and no cellar parking level; the filed plan lists PARKING AREA: 339.19 and the permit lists Total Parking Area 339.2. The permit condition requires the stilt/cellar area designated for parking to be used exclusively for vehicle parking. It also describes one entry and one exit with minimum width 4.5mts. and height clearance 5mts.

The documents do not establish the number of individual car or two-wheeler bays, visitor or accessible bays, EV charger count, a spaces-per-home ratio, or exclusive parking allocation to any particular apartment. A parking drawing or common parking provision does not by itself establish exclusive ownership or allotment. The building-permit conditions require electric-vehicle charging infrastructure in parking areas, but the evidence does not show installed chargers or their capacity.

6. Amenities, recreation & open spaces

The following items appear in the RERA-filed material and permit conditions. The supplied amenity progress record shows 0% for listed items; this is a filed progress figure, not independent verification of site condition. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Tot-lot / green stripTot-lot and peripheral greenery are referred to in the plan conditions; no area or dimensions supplied.RERA amenity record RERA amenitiesRERA amenity record: 0%; completion not independently verified.
Internal roads and footpathsListed in the RERA amenity record; no dimensions supplied.RERA amenities0% recorded; completion not independently verified.
Street lightingListed in the RERA amenity record; no specification supplied.RERA amenities0% recorded; completion not independently verified.
Community buildingsListed in the RERA amenity record; no building or size details supplied.RERA amenities0% recorded; completion not independently verified.
Garbage houseRequired within the premises by the permit conditions.No completion evidence supplied.

7. Utilities, building services & safety

Water
What the records stateGHMC plan conditions refer to water supply and list a separate underground static storage tank of 25,000 lits. and separate terrace tank of 25,000lits capacity for residential buildings. The amenity record marks water supply “YES” and 0% progress.
Evidence / statusRERA amenities. No completed-system verification supplied.
Sewerage and drainage
What the records statePlan material lists a Septic Tank: 2.0 X 3.0 X 2.5 m and sump; the RERA amenity record marks sewerage and storm-water drains “YES” with 0% progress. No STP or reuse capacity is specified.
Evidence / statusRERA amenities.
Rainwater
What the records stateThe permit material requires rainwater harvesting and lists 8 rainwater harvesting pits.
Evidence / statusInstallation status not established.
Electrical
What the records stateThe plan lists space for a transformer; the RERA amenity record marks an electrical meter room/sub-station/receiving station “YES” and 0% progress.
Evidence / statusRERA amenities. Supply and backup capacities are not provided.
EV charging
What the records statePermit conditions require EV charging infrastructure in parking places. No installed charger count or capacity is documented.
Lifts and stairs
What the records stateA lift and staircase are listed in the filed plan. Lift number, capacity and service-lift provision are not stated.
Fire and life safety
What the records stateGHMC permit conditions require an occupancy fire NOC before occupancy certificate and state that fire-safety requirements and installations are the owner/developer’s responsibility. The amenity record lists fire protection and safety requirements at 0%.
Evidence / statusRERA amenities. No fire NOC or installed-system evidence is supplied.
Waste
What the records stateThe plan requires a garbage house and directs C&D waste to a designated collection point. The RERA amenity record lists solid-waste management and disposal at 0%.
Evidence / statusRERA amenities.
Accessibility
What the records stateThe supplied records do not describe project-specific accessible routes, ramps or accessible parking.
Evidence / statusNot disclosed in supplied project evidence.

8. Location, access & connectivity

The registered location is Gajula Ramaram-1, Qutballapur, Medchal-Malkajgiri, 500055. The permit drawing names Gajularamaram Village and Balaji Lay Out. Its road references include a 9.00 MT WIDE EXISTING ROAD, a 9.00 MT WIDE PROPOSED ROAD, and an 18 mt. road width; the site-boundary record identifies a 30 Feet road on the west. These are the supplied site/plan references, not a measured route assessment. RERA record RERA filing

The supplied location record gives the cadastral parcel centroid as (17.53439, 78.42756) and lists HITEC City — 11.4 km. No source-supported public-transport distances or project-specific travel times are provided. Location record

9. Developer & development status

The registered promoter is KK CONSTRUCTIONS AND DEVELOPERS, identified in the RERA record as a Partnership. The supplied corporate identifier is GSTIN 36ABBFK1086E1ZK. The listed partners are KRISTAIAH KOKA, Venkateshwarlu Kakarla and Nagarjuna Rao Challa; KRISTAIAH KOKA is also identified as an authorized signatory. RERA record Corporate record Parties record

The RERA certificate gives the promoter’s address as Village: Nizampet, Mandal: Bachupally, District: Medchal-Malkajgiri, Pin: 500090. The project evidence does not provide official contact details or a registered website.

The GHMC permit records completion before 18 June, 2028, and the promoter’s Form B declaration undertakes completion by 18.06.2028. No verified construction-progress assessment or occupancy certificate is supplied. The permit identifies AYUU BUUILDERS AND RR ASSOCIATES PVT LTD as developer/builder in its extracted record; the project’s registered RERA promoter remains KK CONSTRUCTIONS AND DEVELOPERS.

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / scopeBALAJI NILAYAM; P02200010807; validity 18/06/2025–18/06/2028.
GHMC building permit
Identifier / scope5356/GHMC/KPL/2025-BP, approved 18 June, 2025; one residential building, 1 Stilt + 5 upper floors.
Filed building/layout plan
Identifier / scopePlan for residential building on Plot Nos. 740, 741, 778 and 779, Survey Nos. 96, 108, 117/A, 119, 136, 138, 139, 140 and 141.
Commencement / occupancy records
Identifier / scopePermit conditions refer to commencement notice and require an occupancy certificate before occupation; no separate commencement certificate or issued occupancy/completion certificate is supplied.
Promoter Form B declaration
Identifier / scopeKK CONSTRUCTIONS AND DEVELOPERS; completion undertaking 18.06.2028; declaration dated 10" day of Nov 2025.
Filed unit and plan evidence
Identifier / scopeRERA unit record lists 10 2BHK and 5 3BHK apartments; floor-plan measurements are software-derived from the GHMC-filed plan.
EvidenceRERA unit table RERA unit details
Other project-specific approvals
Identifier / scopeNo separate utility connection approvals or issued fire NOC/occupancy certificate are included in the supplied evidence.
EvidenceDocument index

Frequently asked questions

Is BALAJI NILAYAM registered with Telangana RERA?

Yes. BALAJI NILAYAM is registered with the Telangana Real Estate Regulatory Authority as P02200010807; the registration status is New Project.

Who is the developer of BALAJI NILAYAM?

The promoter named in the RERA registration is KK CONSTRUCTIONS AND DEVELOPERS.

Where is BALAJI NILAYAM located?

BALAJI NILAYAM is in Gajularamaram, Gajula Ramaram-1, Qutballapur, Medchal-Malkajgiri, Telangana (500055).

When will BALAJI NILAYAM be completed?

The promoter's proposed date of completion filed with RERA is 18/10/2028. This is the promoter's declaration, not a guarantee.