Aparna Vasudha

Aparna Farms and Estates LLP · Rangareddy · RERA P02400005961

APARNA VASUDHA is a plotted development in Kesaram, Chevella Mandal, Ranga Reddy District, developed by registered promoter Aparna Farms and Estates LLP. The project has a total site area of 148155.91 sq.m and comprises 412 plots; plot configurations are not disclosed. It is registered with TG-RERA under registration number P02400005961, with proposed completion on 11/01/2026.

More from Aparna Farms and Estates LLP · 4 projects →

01What we found

Period endedTG-RERA registration ran to 11 Jan 2026 - check its extension on TG-RERA
53documents on file - each fact links to its page
1court case on this project's land (survey 121, Kesaram)
8items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

8 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemProject record
Registered nameAPARNA VASUDHA RERA record
Project typePlotted development / open-plot layout RERA record
Phase or registered portionRERA identifies the registered project as APARNA VASUDHA. A separate phase name is not disclosed. RERA record
TG-RERA registrationP02400005961; registration certificate issued 01/04/2023, valid through 11/01/2026; no extension is recorded in the supplied certificate. Registration validity is distinct from the completion deadline. RERA record
Registered promoterAparna Farms and Estates LLP RERA record Corporate record
RERA status in the supplied recordNew Project; registration certificate on file. The registration’s stated validity ended 11/01/2026. The supplied evidence does not establish a later extension or current registration status. RERA record

Land and geographic identity

ItemProject record
Locality / revenue villageKesaram; the supplied records also spell the village “Kesavaram” and “Keesaram.” The HMDA draft permission names Kesavaram (Chevella); the final-layout record names Kesaram Village. RERA record
Mandal / district / PINChevella Mandal, Ranga Reddy District, 501503 RERA record
Project survey numbers and subdivisions, as filed114, 114/E, 115, 115/A, 115/AA, 115/E, 116, 116/1, 116/2, 116/8, 117, 120/P, 120/C-J, 120/K, 120/L, 120/M, 120/N, 120/O, 121, 121/1, 121/A, 121/E/2, 121/A/3/1, 122, 122/A RERA record
Total site area148155.91 sq.m in the RERA land details. RERA filing
Net site area146588.20 sq.m in the RERA land details. RERA filing
Area affected by road widening / FTL of tanks / nala widening1567.71 sq.m in the RERA land details. RERA filing
BoundariesNorth: Road Chevella–Hyderabad; South: land in Sy. Nos. 115P and 116P; East: land in Sy. No. 121P; West: land in Sy. Nos. 117P, 120P and 119. RERA filing

Development identity

ItemProject record
Sanctioning authorityHyderabad Metropolitan Development Authority (HMDA) Approvals record
Draft layout approval000014/LO/Plg/HMDA/2023, approved 12 January 2023; the draft permission records the net site area as 146588.2 sq.m. Approvals record
Final layout permission007994/FLT/HMDA/1962/SKP/2024, dated 04 April 2025. Approvals record
Approved built-up area0 in the final-layout permission; the permission states total built-up area: 0. This is a plotted layout, not a building scheme in the supplied approval record.
Plot count412 plots stated in the HMDA final-layout permission.
Building / tower and floor configurationNot disclosed for this plotted development; no towers, apartment floors or building count are identified in the supplied project record.
ParkingThe supplied project evidence does not establish a sanctioned parking count or plot-level parking allocation.

Offering and status

ItemProject record
Purchasable offeringOpen plots; the RERA record identifies a plotted development. A RERA-filed plot-size schedule is not available in the supplied evidence. RERA record RERA filing
Booked / available plotsNot disclosed in the supplied evidence. RERA record
Construction stageRERA header records 80% completeness; this is a filed progress figure, not independent site verification. RERA record
Completion deadlineRERA header states proposed completion 11/01/2026. Form B records the promoter’s undertaking that the project would be completed within 3 Years. RERA record
Registration validityThrough 11/01/2026, unless extended; the supplied registration certificate records no extension.
Occupancy / completion certificateAn apartment-style OC is not identified in the supplied record. The project is a plotted layout; the supplied HMDA document is a final layout permission, not an occupancy certificate. RERA record

2. The project story

APARNA VASUDHA is registered with TG-RERA as a plotted development in the Kesaram area of Chevella Mandal, Ranga Reddy District. The project site is identified by the survey numbers and subdivisions listed above, and the RERA filing states a total site area of 148155.91 sq.m, including an affected area of 1567.71 sq.m and net area of 146588.20 sq.m. RERA record RERA filing

The HMDA file records a draft layout permission in January 2023 and a final layout permission dated 04 April 2025 for 412 plots. The final permission records roads, open spaces, social infrastructure and utilities as handed over to the local authority by registered gift deed; it also records a relinquishment deed concerning mortgaged plots. These are documentary statements in the HMDA permission record.

The RERA header reports 80% completeness, while the promoter’s Form B declares a three-year completion period. The supplied materials do not provide independently verified site progress, plot-by-plot inventory, or an occupancy/completion certificate. RERA record

3. Master plan, architecture & building design

The approved scheme is a plotted layout rather than a multi-storey residential building project. The HMDA draft permission records 148155.91 sq.m total site area, 1567.71 sq.m affected area and 146588.2 sq.m net site area. It lists 85405.15 sq.m as plotted area, 45400.54 sq.m as layout road area, 12113.32 sq.m as park area, 3669.15 sq.m as open space and 3669.15 sq.m as social infrastructure area. The permission also specifies a 60.0mts road width.

The final-layout permission records 412 plots, total built-up area 0, 84825.04 sq.m plotted area, 45709.21 sq.m layout road area, 11171.36 sq.m open space/park area, 3669.15 sq.m social infrastructure area and 1213.31 sq.m utilities area. It states that the roads, open spaces, social infrastructure and utilities were taken over by the local authority by registered gift deed No. 4116/2024, dated 12 April 2024.

No plot-by-plot layout drawing, plot-size schedule, building footprint, floor configuration, or detailed circulation drawing is available in the supplied evidence.

4. Homes, configurations & floor plans

This project offers plots, not apartments. The final HMDA layout permission states 412 plots, but the supplied evidence does not give a plot-size schedule, booked/available inventory, or individual plot measurements. RERA record

A marketing/vendor record describes plots of 200 Sq. Yds. with East and West orientations available; this is a vendor statement, not a RERA-filed plot schedule. Promoter website

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
Open plots412 (HMDA final-layout permission)Not disclosedNot disclosedNot disclosedNot applicableNot disclosed

The supplied floor-plan material contains no measured drawings: two drawings are listed as scans pending, with zero measured. Apartment carpet-area measurements therefore do not apply here. Floor plans

5. Parking & vehicle circulation

The supplied RERA and HMDA materials do not establish a parking-space count, visitor or accessible parking provision, parking allocation to individual plots, or dedicated parking facilities. The HMDA draft permission specifies 60.0mts roads and requires roads to remain open for access to neighbouring sites; the final permission states that roads are open for free access to the general public.

6. Amenities, recreation & open spaces

The following facilities appear in the project’s RERA amenity record and HMDA permission documents. The amenity record shows 0% progress for each listed item; this is a filed progress status, not independent verification. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Clubhouse / indoor
Community buildingsListed; no size or description supplied.RERA amenitiesRERA amenity progress: 0%; not independently verified.
Sports / recreation
Cycling tracksHMDA draft permission requires cycling tracks within the layout.Required by the draft permission; completion not established.
Landscape / open space
Green strip / tot lot / parkRERA amenity entry; HMDA draft permission lists park 12113.32 sq.m and open space 3669.15 sq.m. Final-layout permission records park/open space 11171.36 sq.m.RERA amenitiesRERA amenity progress: 0%; no independent completion verification supplied.
Avenue plantationListed in HMDA draft permission.Required in the permission; completion not established.
Aggregate recreational open spaceListed in the RERA amenity record.RERA amenitiesRERA amenity progress: 0%; not independently verified.
Convenience / community
Social infrastructureHMDA records 3669.15 sq.m; the final-layout permission says this area was handed over to the local authority by registered gift deed No. 4116/2024, dated 12 April 2024.Handover is stated in the final-layout permission; the supplied evidence does not independently verify current condition or use.

7. Utilities, building services & safety

The HMDA draft permission identifies the following planned layout infrastructure: potable/drinking-water supply connection and internal water-supply pipelines, an overhead tank, underground drainage and storm-water drainage, a common septic tank/STP, rainwater-harvesting pits, electrical supply lines, a transformer yard in the utilities area, LED street lighting, solid-waste disposal and dumping space, and a bio-compost unit. It also requires underground ducting of utilities.

The RERA amenity record lists water supply, sewerage, storm-water drains, sewage treatment, solid-waste management, water conservation/rainwater harvesting, energy management, and an electrical meter room/sub-station/receiving station. Each entry shows 0% progress; capacities, operating status and independent verification are not supplied. RERA amenities

The final-layout permission refers to water supply, sewerage, drainage disposal, street lighting and rainwater-harvesting structures as civic systems for local-authority maintenance. It also specifies a minimum 3m (10’0”) safety distance between buildings and high-tension electricity lines. The supplied documents do not establish fire-system details, lifts, backup power, CCTV, access-control arrangements or accessibility features.

8. Location, access & connectivity

The registered location is Kesaram, Chevella Mandal, Ranga Reddy District, PIN 501503. The project boundary description identifies the Chevella–Hyderabad road to the north. RERA record RERA filing

The supplied location record gives an approximate distance of 107.9 km to the nearest sampled Outer Ring Road interchange. This is a measured location-record distance; no travel time or public-transport information is supplied. Location record

9. Developer & development status

The registered promoter is Aparna Farms and Estates LLP, an LLP, with GSTIN 36ABSFA2904Q1ZV. The supplied RERA registration certificate lists the promoter office as “Village: Mandal: District: Hyderabad, Pin: 500034”; a more complete registered-office address is not supplied. Corporate record RERA filing

The RERA header reports 80% completeness and a proposed completion date of 11/01/2026. The registration certificate records validity through that same date and no extension. Form B, signed by Designated Partner Sannareddy Subramanyam Reddy, records the promoter’s three-year completion undertaking and fund-management declarations. These are promoter filings; the supplied evidence does not independently verify physical progress or the completion of layout works. RERA record

10. Approvals, official records & documents

RecordSupplied evidence
TG-RERA registrationCertificate for APARNA VASUDHA, registration P02400005961, issued 01/04/2023 and valid through 11/01/2026.
HMDA draft layout permission000014/LO/Plg/HMDA/2023, approved 12 January 2023; draft layout letter for the stated project land and survey numbers.
HMDA final layout permission007994/FLT/HMDA/1962/SKP/2024, dated 04 April 2025; final layout permission records 412 plots.
Layout-area handover documents referenced in the final permissionRegistered gift deed 4116/2024, dated 12 April 2024; relinquishment deed 1625/2025, dated 27 March 2025.
Promoter declarationForm B affidavit-cum-declaration dated 28 February 2023, including the promoter’s title, encumbrance, fund-management and completion declarations.
Site lookup limitationThe supplied HMDA layout-status information says the public DPMS lookup was not reachable; no public-channel layout lookup result is supplied. HMDA

The HMDA permission documents contain the stated layout conditions and handover details; the supplied evidence does not include an occupancy certificate or building completion certificate for this plotted development.

Other registrations of Aparna Vasudha

Frequently asked questions

Is APARNA VASUDHA registered with Telangana RERA?

Yes. APARNA VASUDHA is registered with the Telangana Real Estate Regulatory Authority as P02400005961; the registration status is New Project.

Who is the developer of APARNA VASUDHA?

The promoter named in the RERA registration is Aparna Farms and Estates LLP.

Where is APARNA VASUDHA located?

APARNA VASUDHA is in Kesaram, Chevella, Rangareddy, Telangana (501503).

When will APARNA VASUDHA be completed?

The promoter's proposed date of completion filed with RERA is 11/01/2026. This is the promoter's declaration, not a guarantee.