Arcadian Arena
SRI SAI BALAJI DEVELOPERS · Rangareddy · RERA P02400008971
ARCADIAN ARENA is a plotted development in MAHESHWARAM & RANCHANDRAGUDA VILLAGE, Maheshwaram Mandal, Ranga Reddy District. It is being developed by the registered promoter, SRI SAI BALAJI DEVELOPERS, a partnership. The registered site extent is 21,172 sq.m, and the project is an open-plot layout; the supplied record does not disclose a plot count or plot-size schedule. The project is registered under TG-RERA number P02400008971, with a completion undertaking of 25/09/2027.
More from Sri Sai Balaji Developers · 2 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
11 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Record |
|---|---|
| Registered project name | ARCADIAN ARENA RERA record |
| Project type | Plotted development / open layout RERA record RERA filing |
| Phase / registered portion | Phase not separately identified; registration is for the project as a whole RERA record |
| TG-RERA registration | P02400008971; registered from 27/09/2024 RERA record |
| Registration validity | Certificate states 27/09/2024 to 25/09/2027, unless extended by the Authority |
| Registered promoter | SRI SAI BALAJI DEVELOPERS, partnership RERA filing Parties record |
| RERA status | Registered; project header classifies it as “New Project” RERA record |
Land and geographic identity
| Field | Record |
|---|---|
| Locality | MAHESHWARAM & RANCHANDRAGUDA VILLAGE RERA record RERA filing |
| Revenue villages | Maheshwaram Village and Pendyal Village |
| Mandal / district / PIN | Maheshwaram / Ranga Reddy / 501359 RERA record RERA filing |
| Project survey identity | 290/P and 291/P of Maheshwaram Village; Sy. No. 323/P of Pendyal Village RERA record RERA filing |
| Additional survey reference in layout approval | 80(P) is also named in the HMDA layout approval’s survey list and mortgage condition |
| Registered site extent | 21,172 sq.m in the project land-details filing RERA filing |
| Layout drawing area figures | 23,360.95 sq.m approval covering extent; 21,623.28 sq.m area of plot; 450.57 sq.m road-widening area; 21,172.71 sq.m net area of plot |
| Boundaries filed | East: Sy. No. 291 of Maheshwaram Village; West: Sy. No. 323 Part; North and South: Sy. No. 322 RERA filing |
Development identity
| Field | Record |
|---|---|
| Sanctioning authority | Hyderabad Metropolitan Development Authority (HMDA) Approvals record |
| Principal layout approval | 000050/LO/Plg/HMDA/2024, dated 03-10-2024; HMDA document describes technical approval of a draft layout Approvals record |
| Application / file reference | 062103/SMD/LT/U6/HMDA/17112023 Approvals record |
| Approved built-up area | 21,172 sq.m is recorded in the project filing as approved built-up area RERA filing. The supplied approval is for an open-plot layout; no separate building plan or built-up-area schedule is provided here. |
| Layout land-use figures | Plotted area 12,748.09 sq.m; road area 6,071.62 sq.m; organized open space/park/utility area 1,822.92 sq.m; social infrastructure area 530.08 sq.m Layout record |
| Buildings / floors | No apartment buildings, tower count, floor configuration or building parking levels are established in the supplied project record; this is a plotted layout RERA record |
| Plots subject to HMDA mortgage | Plot Nos. 34 to 42, 9 plots, stated as 2,057.80 sq.m in the layout approval |
Offering and status
| Field | Record |
|---|---|
| RERA-filed offering | Plots; plot count and plot-size schedule are not available in the supplied RERA data RERA record Layout record |
| Saleable-size range | Not disclosed in the supplied RERA unit schedule RERA unit table |
| Booked / available counts | Not available in the supplied data RERA unit table |
| Construction stage | Project is registered as a new project; no independently verified construction progress is supplied RERA record |
| Completion deadline | Form-B declaration undertakes completion by 25/09/2027 |
| Occupancy / completion certificate | No occupancy or completion certificate is included in the supplied project documents. This is a plotted-layout project; the record provided does not establish completion or OC status for the layout works. |
2. The project story
ARCADIAN ARENA is registered as a plotted development at Maheshwaram, in Ranga Reddy district, with land identified in Maheshwaram and Pendyal villages. The registration identifies 290/P and 291/P in Maheshwaram Village and 323/P in Pendyal Village; the HMDA layout documents also refer to 80(P). RERA record
The supplied HMDA record is for technical approval of a draft open-plot layout, not for apartment towers or villas. It describes layout roads, open space/park, social infrastructure and residential plots. The project’s Form-B declaration gives a completion undertaking of 25/09/2027; the supplied material does not establish how much layout infrastructure has been completed on site.
The HMDA document requires development works including road formation, storm-water drains, underground drainage and common septic tank/STP, internal water supply and an overhead tank, electrical lines and street lights, park development, avenue planting and rainwater-harvesting pits. These are approval conditions or specified works, not evidence that the works are complete.
3. Master plan, architecture & building design
The approved drawing identifies an open residential layout. Its land-use schedule records 12,748.09 sq.m of plotted area, 6,071.62 sq.m of roads, 1,822.92 sq.m of organized open space/park/utility area and 530.08 sq.m of social infrastructure area. It records 450.57 sq.m as road-widening area and 21,172.71 sq.m as net area of plot.
The approval’s land-use schedule also lists Amenity Area: 0. The supplied record does not provide a plot-by-plot schedule, plot-size bands, a complete count of plots, or building designs. The layout drawing is reported as two sheets; neither is identified as an apartment floor plan with flats. Floor plans Layout record
The layout approval names roads of 30.00 and 12.19 in its road-width fields; the draft-letter conditions also refer to roads of 18 mts and above. Details of the full internal road hierarchy are not established in the supplied material.
The approval identifies Plot Nos. 34 to 42 as mortgaged to HMDA, stated as 2,057.80 sq.m. The approval conditions restrict sale of those mortgaged plots until release and require completion of layout development works before seeking release and final layout approval.
4. Homes, configurations & floor plans
This is a plotted-layout registration. The supplied RERA data does not include a plot inventory or plot-size schedule, so plot counts, booked and available counts, and RERA-filed saleable areas cannot be tabulated. RERA record RERA unit table Layout record
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Plots | Not disclosed | Not disclosed | Not disclosed | Not disclosed | Not measured | Not supplied |
Two supplied drawing sheets are identified as layout sheets; no apartment floor plans or software-measured carpet areas are available. Floor plans The vendor record contains a plot-area claim, but no corresponding RERA plot inventory is supplied, so it is not treated as the registered unit schedule here. Promoter website
5. Parking & vehicle circulation
The supplied project record does not establish a parking-space count, visitor or accessible parking provision, parking allocation to individual plots, or designated parking areas. No apartment-style basement, stilt or podium parking is identified. The layout approval requires internal roads to remain open for access to neighbouring sites and prohibits a compound wall/fencing that would block access.
The drawing’s “Amenity Area” is recorded as zero, and no parking schedule is supplied. A drawn or stated layout provision would not, on its own, establish exclusive parking rights for a buyer.
6. Amenities, recreation & open spaces
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Park / organized open space | 1,822.92 sq.m | HMDA layout approval | Approved/drawing-scheduled; completion not verified |
| Social infrastructure area | 530.08 sq.m | HMDA layout approval | Area shown in land-use schedule; facility details and completion not established |
| Amenity area | 0 in the approval’s land-use schedule | HMDA draft layout letter | No area scheduled in this field |
| Community buildings | Listed in the RERA amenities record; no size or facility description supplied RERA amenities | RERA-filed amenity entry | Progress shown as 0%; completion not verified |
The HMDA draft-layout conditions require park development, including an ornamental compound wall and grill, before the open space is taken over by the Executive Authority. The documents describe required development, not completed delivery.
7. Utilities, building services & safety
The HMDA draft layout letter specifies layout works including internal water-supply pipes and an overhead tank, an assured water-supply source, underground drainage, a common septic tank/STP, storm-water drains, electrical supply lines, street lights, a transformer and rainwater-harvesting pits. It also specifies road formation, avenue planting and park development. These are stated layout requirements; the supplied evidence does not confirm installation, capacity or operational status.
The RERA amenities record lists water supply, sewerage, storm-water drains, street lighting, rainwater harvesting, an electrical meter room/sub-station/receiving station, and fire-protection and energy-management categories. Several entries show progress as 0%; the record does not provide capacities, design details or evidence of completion. RERA amenities
The supplied material does not establish individual water-storage capacity, treatment/reuse arrangements, power-backup capacity, CCTV coverage, waste-management arrangements, accessible circulation, or fire-system specifications. No statutory safety-compliance conclusion can be drawn from the amenity entries alone.
8. Location, access & connectivity
The registered location is Maheshwaram, Maheshwaram Mandal, Ranga Reddy District, Telangana, PIN 501359. The project land is identified across Maheshwaram Village and Pendyal Village. RERA record
The location data gives the nearest sampled Outer Ring Road interchange at approximately 10.6 km. Location record The HMDA layout documents name the Pendyal and Maheshwaram Gram Panchayaths as the local bodies to which plans were forwarded for further action, and require layout roads to provide access to neighbouring sites.
No further measured distances to public transport, schools, airports or other landmarks are established in the supplied official project record.
9. Developer & development status
The registered promoter is SRI SAI BALAJI DEVELOPERS, identified as a partnership. Its listed partners are Lingamaneni Nagesh, Lingamaneni Prameela and Lingamaneni Sri Lakshmi; Lingamaneni Nagesh is also listed as authorized signatory. RERA filing Parties record A project Form-B declaration was signed by Lingamaneni Nagesh as authorized signatory and dated 01/10/2024.
The RERA certificate gives the promoter address as Village: Chanda Nagar, Mandal: Serilingampally, District: Ranga Reddy, Pin: 500050. The project filing separately records a promoter address at Plot No. LIG58, Phase LI Chanda Nagar HUDA Colony, and a project locality of Maheshwaram & Ranchandraguda Village. RERA filing
The project’s Form-B declaration undertakes completion by 25/09/2027. The registration certificate states validity through that date unless extended by the Authority. No construction-progress evidence or completion/occupancy certificate is supplied, so physical progress and completion status cannot be independently confirmed.
10. Approvals, official records & documents
| Record | What it establishes |
|---|---|
| TG-RERA Form-C registration certificate, P02400008971 | Registration of ARCADIAN ARENA and the certificate’s stated validity and promoter conditions. It does not establish a buyer’s unit allotment or sale agreement. |
| HMDA draft layout letter, approval 000050/LO/Plg/HMDA/2024, dated 03 October 2024 | Technical approval of a draft open-plot layout, with stated land-use areas, conditions and a mortgage over Plot Nos. 34 to 42. It expressly states that the permission is not proof of land title. |
| HMDA technical approval/layout plan, approval 000050/LO/Plg/HMDA/2024, dated 03-10-2024 | Layout drawing and land-use schedule, including the approval covering extent, net area, road widening, plots, roads, open space and social infrastructure. |
| Form-B affidavit-cum-declaration, dated 01/10/2024 | Promoter declaration including the completion undertaking of 25/09/2027 and project commitments. |
| Encumbrance statement filed for the project | Statement records transactions for stated search periods; its entries and the need for current-record verification are addressed in the Land & Title section. |
| Completion / occupancy certificate | Not present in the supplied documents. |
| Final layout release / local-body handover evidence | Not present in the supplied documents. The HMDA draft-layout record describes forwarding to Pendyal and Maheshwaram Gram Panchayaths and conditions relating to release of plans and handover of roads/open spaces. |
1. Project at a glance
Project identity
Registered project name: ARCADIAN ARENA
Project type: Plotted development / open layout
Phase / registered portion: Phase not separately identified; registration is for the project as a whole
TG-RERA registration: P02400008971; registered from 27/09/2024
Registration validity: Certificate states 27/09/2024 to 25/09/2027, unless extended by the Authority
Registered promoter: SRI SAI BALAJI DEVELOPERS, partnership
RERA status: Registered; project header classifies it as “New Project”
Land and geographic identity
Locality: MAHESHWARAM & RANCHANDRAGUDA VILLAGE
Revenue villages: Maheshwaram Village and Pendyal Village
Mandal / district / PIN: Maheshwaram / Ranga Reddy / 501359
Project survey identity: 290/P and 291/P of Maheshwaram Village; Sy. No. 323/P of Pendyal Village
Additional survey reference in layout approval: 80(P) is also named in the HMDA layout approval’s survey list and mortgage condition
Registered site extent: 21,172 sq.m in the project land-details filing
Layout drawing area figures: 23,360.95 sq.m approval covering extent; 21,623.28 sq.m area of plot; 450.57 sq.m road-widening area; 21,172.71 sq.m net area of plot
Boundaries filed: East: Sy. No. 291 of Maheshwaram Village; West: Sy. No. 323 Part; North and South: Sy. No. 322
Development identity
Sanctioning authority: Hyderabad Metropolitan Development Authority (HMDA)
Principal layout approval: 000050/LO/Plg/HMDA/2024, dated 03-10-2024; HMDA document describes technical approval of a draft layout
Application / file reference: 062103/SMD/LT/U6/HMDA/17112023
Approved built-up area: 21,172 sq.m is recorded in the project filing as approved built-up area. The supplied approval is for an open-plot layout; no separate building plan or built-up-area schedule is provided here.
Layout land-use figures: Plotted area 12,748.09 sq.m; road area 6,071.62 sq.m; organized open space/park/utility area 1,822.92 sq.m; social infrastructure area 530.08 sq.m
Buildings / floors: No apartment buildings, tower count, floor configuration or building parking levels are established in the supplied project record; this is a plotted layout
Plots subject to HMDA mortgage: Plot Nos. 34 to 42, 9 plots, stated as 2,057.80 sq.m in the layout approval
Offering and status
RERA-filed offering: Plots; plot count and plot-size schedule are not available in the supplied RERA data
Saleable-size range: Not disclosed in the supplied RERA unit schedule
Booked / available counts: Not available in the supplied data
Construction stage: Project is registered as a new project; no independently verified construction progress is supplied
Completion deadline: Form-B declaration undertakes completion by 25/09/2027
Occupancy / completion certificate: No occupancy or completion certificate is included in the supplied project documents. This is a plotted-layout project; the record provided does not establish completion or OC status for the layout works.
2. The project story
ARCADIAN ARENA is registered as a plotted development at Maheshwaram, in Ranga Reddy district, with land identified in Maheshwaram and Pendyal villages. The registration identifies 290/P and 291/P in Maheshwaram Village and 323/P in Pendyal Village; the HMDA layout documents also refer to 80(P).
The supplied HMDA record is for technical approval of a draft open-plot layout, not for apartment towers or villas. It describes layout roads, open space/park, social infrastructure and residential plots. The project’s Form-B declaration gives a completion undertaking of 25/09/2027; the supplied material does not establish how much layout infrastructure has been completed on site.
The HMDA document requires development works including road formation, storm-water drains, underground drainage and common septic tank/STP, internal water supply and an overhead tank, electrical lines and street lights, park development, avenue planting and rainwater-harvesting pits. These are approval conditions or specified works, not evidence that the works are complete.
3. Master plan, architecture & building design
The approved drawing identifies an open residential layout. Its land-use schedule records 12,748.09 sq.m of plotted area, 6,071.62 sq.m of roads, 1,822.92 sq.m of organized open space/park/utility area and 530.08 sq.m of social infrastructure area. It records 450.57 sq.m as road-widening area and 21,172.71 sq.m as net area of plot.
The approval’s land-use schedule also lists Amenity Area: 0. The supplied record does not provide a plot-by-plot schedule, plot-size bands, a complete count of plots, or building designs. The layout drawing is reported as two sheets; neither is identified as an apartment floor plan with flats.
The layout approval names roads of 30.00 and 12.19 in its road-width fields; the draft-letter conditions also refer to roads of 18 mts and above. Details of the full internal road hierarchy are not established in the supplied material.
The approval identifies Plot Nos. 34 to 42 as mortgaged to HMDA, stated as 2,057.80 sq.m. The approval conditions restrict sale of those mortgaged plots until release and require completion of layout development works before seeking release and final layout approval.
4. Homes, configurations & floor plans
This is a plotted-layout registration. The supplied RERA data does not include a plot inventory or plot-size schedule, so plot counts, booked and available counts, and RERA-filed saleable areas cannot be tabulated.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Plots | Not disclosed | Not disclosed | Not disclosed | Not disclosed | Not measured | Not supplied |
Two supplied drawing sheets are identified as layout sheets; no apartment floor plans or software-measured carpet areas are available. The vendor record contains a plot-area claim, but no corresponding RERA plot inventory is supplied, so it is not treated as the registered unit schedule here.
5. Parking & vehicle circulation
The supplied project record does not establish a parking-space count, visitor or accessible parking provision, parking allocation to individual plots, or designated parking areas. No apartment-style basement, stilt or podium parking is identified. The layout approval requires internal roads to remain open for access to neighbouring sites and prohibits a compound wall/fencing that would block access.
The drawing’s “Amenity Area” is recorded as zero, and no parking schedule is supplied. A drawn or stated layout provision would not, on its own, establish exclusive parking rights for a buyer.
6. Amenities, recreation & open spaces
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Park / organized open space | 1,822.92 sq.m | HMDA layout approval | Approved/drawing-scheduled; completion not verified |
| Social infrastructure area | 530.08 sq.m | HMDA layout approval | Area shown in land-use schedule; facility details and completion not established |
| Amenity area | 0 in the approval’s land-use schedule | HMDA draft layout letter | No area scheduled in this field |
| Community buildings | Listed in the RERA amenities record; no size or facility description supplied | RERA-filed amenity entry | Progress shown as 0%; completion not verified |
The HMDA draft-layout conditions require park development, including an ornamental compound wall and grill, before the open space is taken over by the Executive Authority. The documents describe required development, not completed delivery.
7. Utilities, building services & safety
The HMDA draft layout letter specifies layout works including internal water-supply pipes and an overhead tank, an assured water-supply source, underground drainage, a common septic tank/STP, storm-water drains, electrical supply lines, street lights, a transformer and rainwater-harvesting pits. It also specifies road formation, avenue planting and park development. These are stated layout requirements; the supplied evidence does not confirm installation, capacity or operational status.
The RERA amenities record lists water supply, sewerage, storm-water drains, street lighting, rainwater harvesting, an electrical meter room/sub-station/receiving station, and fire-protection and energy-management categories. Several entries show progress as 0%; the record does not provide capacities, design details or evidence of completion.
The supplied material does not establish individual water-storage capacity, treatment/reuse arrangements, power-backup capacity, CCTV coverage, waste-management arrangements, accessible circulation, or fire-system specifications. No statutory safety-compliance conclusion can be drawn from the amenity entries alone.
8. Location, access & connectivity
The registered location is Maheshwaram, Maheshwaram Mandal, Ranga Reddy District, Telangana, PIN 501359. The project land is identified across Maheshwaram Village and Pendyal Village.
The location data gives the nearest sampled Outer Ring Road interchange at approximately 10.6 km. The HMDA layout documents name the Pendyal and Maheshwaram Gram Panchayaths as the local bodies to which plans were forwarded for further action, and require layout roads to provide access to neighbouring sites.
No further measured distances to public transport, schools, airports or other landmarks are established in the supplied official project record.
9. Developer & development status
The registered promoter is SRI SAI BALAJI DEVELOPERS, identified as a partnership. Its listed partners are Lingamaneni Nagesh, Lingamaneni Prameela and Lingamaneni Sri Lakshmi; Lingamaneni Nagesh is also listed as authorized signatory. A project Form-B declaration was signed by Lingamaneni Nagesh as authorized signatory and dated 01/10/2024.
The RERA certificate gives the promoter address as Village: Chanda Nagar, Mandal: Serilingampally, District: Ranga Reddy, Pin: 500050. The project filing separately records a promoter address at Plot No. LIG58, Phase LI Chanda Nagar HUDA Colony, and a project locality of Maheshwaram & Ranchandraguda Village.
The project’s Form-B declaration undertakes completion by 25/09/2027. The registration certificate states validity through that date unless extended by the Authority. No construction-progress evidence or completion/occupancy certificate is supplied, so physical progress and completion status cannot be independently confirmed.
10. Approvals, official records & documents
TG-RERA Form-C registration certificate, P02400008971: Registration of ARCADIAN ARENA and the certificate’s stated validity and promoter conditions. It does not establish a buyer’s unit allotment or sale agreement.
HMDA draft layout letter, approval 000050/LO/Plg/HMDA/2024, dated 03 October 2024: Technical approval of a draft open-plot layout, with stated land-use areas, conditions and a mortgage over Plot Nos. 34 to 42. It expressly states that the permission is not proof of land title.
HMDA technical approval/layout plan, approval 000050/LO/Plg/HMDA/2024, dated 03-10-2024: Layout drawing and land-use schedule, including the approval covering extent, net area, road widening, plots, roads, open space and social infrastructure.
Form-B affidavit-cum-declaration, dated 01/10/2024: Promoter declaration including the completion undertaking of 25/09/2027 and project commitments.
Encumbrance statement filed for the project: Statement records transactions for stated search periods; its entries and the need for current-record verification are addressed in the Land & Title section.
Completion / occupancy certificate: Not present in the supplied documents.
Final layout release / local-body handover evidence: Not present in the supplied documents. The HMDA draft-layout record describes forwarding to Pendyal and Maheshwaram Gram Panchayaths and conditions relating to release of plans and handover of roads/open spaces.
Frequently asked questions
Is ARCADIAN ARENA registered with Telangana RERA?
Yes. ARCADIAN ARENA is registered with the Telangana Real Estate Regulatory Authority as P02400008971; the registration status is New Project.
Who is the developer of ARCADIAN ARENA?
The promoter named in the RERA registration is SRI SAI BALAJI DEVELOPERS.
Where is ARCADIAN ARENA located?
ARCADIAN ARENA is in MAHESHWARAM & RANCHANDRAGUDA VILLAGE, Maheshwaram, Rangareddy, Telangana (501359).
When will ARCADIAN ARENA be completed?
The promoter's proposed date of completion filed with RERA is 25/01/2028. This is the promoter's declaration, not a guarantee.
More projects in Maheshwaram