Bliss One
BLISS VENTURES PRIVATE LIMITED · Medchal-Malkajgiri · RERA P02200007437
BLISS ONE is a residential apartment project in Yamnampet, Ghatkesar Mandal, Medchal-Malkajgiri District, developed by registered promoter BLISS VENTURES PRIVATE LIMITED. The project covers 15,008.75 Sq.mts. and comprises 1 building with 1 Cellar + 1 Ground + 5 upper floors and 65 apartments: 42 2BHK and 23 3BHK units. It is registered under TG-RERA **P02200007437**, with proposed completion **06/02/2027**.
More from Bliss Ventures Pvt Ltd · 2 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
9 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered name | BLISS ONE RERA record |
| Project type | Residential apartment project RERA record |
| Phase / registered portion | Phase not separately named. TG-RERA registration covers the project on Survey Nos. 154/A and 154/AA; the filed registration certificate does not state a separately identified phase. |
| TG-RERA registration | P02200007437 |
| Registration validity | 22/12/2023 through 06/10/2026, unless extended by the Authority. This is the registration-validity period, not a statement of completion or occupancy certification. |
| Registered promoter | BLISS VENTURES PRIVATE LIMITED |
| RERA status | The supplied Form ‘C’ records registration; it states no extension on the certificate. |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality / revenue village | Yamnampet (also rendered “Yamnampet Village” in the building-permission document) RERA record |
| Mandal | Ghatkesar RERA record |
| District | Medchal-Malkajgiri RERA record |
| PIN | 501301 RERA record |
| Project survey numbers | 154/A and 154/AA Land records |
| Site extent | 15,008.75 Sq.mts.; the filing gives this as the project’s total and net area, with affected area recorded as 0. RERA filing Land records |
| Boundaries as filed | North: SY NO 166 PART; South: SY NO 134 PART 154 PART AND 40 FEET ROAD; East and West: SY NO 154 PART AND 166 PART. RERA filing |
| Registered office locality shown on certificate | Neknapur, Gandipet Mandal, Ranga Reddy District, PIN 500089. |
Development identity
| Item | Project record |
|---|---|
| Sanctioning authority | Hyderabad Metropolitan Development Authority (HMDA); the building-permission letter records delegation to Pocharam Municipality. Approvals record |
| Principal building-permission number / date | 004443/BP/HMDA/0915/GHT/2023, dated 07-10-2023. Approvals record |
| Approved built-up area | Not stated in the supplied approval extraction. The project filing separately reports 9,348.25 sq.mts. as “Approved Built up Area”; the supplied materials do not clarify the measurement basis. RERA filing |
| Building count | 1 approved building and 1 proposed building in the RERA project record. RERA filing |
| Sanctioned floor configuration | 1 Cellar + 1 Ground + 5 upper floors. The approval states that 10% of the Cellar is to be used for utilities and non-habitation purposes; it also requires the cellar/stilt to be used exclusively for vehicle parking, without partitions or rolling shutters, subject to the stated utility provision. |
| Parking provision / levels | The approval identifies cellar and stilt/cellar parking conditions, but the supplied extracts do not provide a sanctioned parking-space count or a unit-wise parking allocation. |
| Unit count | 65 total units: 42 2BHK and 23 3BHK in the RERA filing. The approved-plan unit count is not separately extracted. RERA unit table RERA unit details |
Offering and status
| Item | Project record |
|---|---|
| RERA-filed configurations | 2BHK: 42 units; 3BHK: 23 units. RERA unit table |
| RERA-filed saleable area | 2BHK: 36.63 sq.m.; 3BHK: 116.33 sq.m. RERA unit table |
| Booked / available | Portal figures last read show 0 booked and 42 available 2BHK units, and 0 booked and 23 available 3BHK units. The portal record has no as-of date, so these counts are indicative. RERA unit table RERA unit details |
| Construction stage | The supplied record does not provide a verified or dated construction-progress percentage or site inspection. RERA amenity-progress fields are recorded as 0%; these entries do not establish independently verified physical progress. RERA amenities |
| Completion date | The Form-B declaration states completion by 06-10-2026; the project header and registration record separately show proposed completion 06/02/2027. The supplied materials do not identify a revised-completion approval, so both dates are reported with their respective source attribution. RERA record |
| Occupancy / completion certificate | No occupancy or completion certificate is included in the supplied project documents. Document index |
2. The project story
BLISS ONE is registered as a residential apartment project in Yamnampet, Ghatkesar Mandal, Medchal-Malkajgiri District, on Survey Nos. 154/A and 154/AA. The RERA filing describes one building and 65 apartments, with 2BHK and 3BHK configurations. RERA record Land records RERA unit table
HMDA’s building-permission letter dated 07-10-2023 describes a residential apartment building with one cellar, one ground floor and five upper floors on 15,008.75 Sq.mts. The available record does not establish a dated construction stage or independently verified completion status. The RERA portal’s amenity progress entries are shown as 0%, which should be read as the filing’s recorded progress data rather than an independent site assessment. RERA amenities
The registration certificate remains valid through 06/10/2026 unless extended; that validity period is distinct from the completion dates stated in the Form-B declaration and project header. No occupancy or completion certificate is present in the supplied materials. RERA record Document index
3. Master plan, architecture & building design
The RERA land record gives a total and net project area of 15,008.75 sq.mts. and identifies a single building. The filed project information reports 9,348.25 sq.mts. as approved built-up area, but the supplied record does not define its measurement basis. It should not be treated as a carpet-area, saleable-area or floor-area figure. RERA filing RERA filing
The HMDA building-permission letter specifies 1 Cellar + 1 Ground + 5 upper floors for the residential apartment. The supplied extraction does not state the building footprint, flats per floor, tower arrangement, lift or stair counts, internal circulation plan, or residential/common-area breakdown.
HMDA conditions include an entry and exit with minimum width 4.5 mtrs and height clearance 5 mts, a requirement to widen the existing approach road to 18 Mts and develop it to the site, and a requirement for joint open space with neighboring premises for fire-vehicle maneuverability. These are conditions recorded in the permission, not confirmation that the works have been completed.
The supplied floor-plan material includes a plan record identified as doc:370722. Software measurement from that drawing covers 11 3BHK designs; it reports measured carpet areas separately from RERA-filed saleable area. The supplied record does not provide a comparable measured carpet figure for 2BHK units. Floor plans
4. Homes, configurations & floor plans
The RERA filing records 65 units across two configurations. Its saleable-area figures are reported below as filed. For 3BHK, software measurement from drawing geometry is available for 11 designs and is not a RERA disclosure; the source itself says the measurements need review. RERA unit table RERA unit details Floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 42 | 0 | 42 | 36.63 sq.m. | Not supplied | Not supplied |
| 3BHK | 23 | 0 | 23 | 116.33 sq.m. | Software-measured median 96.9 sq.m.; range 96.0–98.0 sq.m. across 11 measured designs | 17% (software-measured) |
The portal’s booked/available figures are indicative because the record has no as-of date. The software-measured 3BHK carpet figures come from drawing geometry, not from the RERA filing, and the source notes they need review. Carpet area, balcony or utility space, common-area loading and saleable area are distinct measures; the supplied record does not provide a measured 2BHK carpet area or unit-specific balcony/utility measurements for the project. RERA unit table RERA unit details Floor plans
For one 3BHK shown on the second-floor plan (flat 09), the extracted room schedule records three bedrooms, a living/kitchen area, two toilets, a balcony and a utility. The drawing extraction lists the balcony as 4.99 m² and utility as 2.54 m², both excluded from the software-measured carpet area. These are drawing-based measurements for that plan, not RERA-filed unit-area disclosures.
5. Parking & vehicle circulation
The sanctioned building configuration includes a cellar, and the permission states that the stilt/cellar is to be used exclusively for vehicle parking without partition walls or rolling shutters, subject to the stated 10% cellar utility/non-habitation provision. It also requires no parking or construction in setback areas.
A sanctioned count of car or two-wheeler spaces, visitor or accessible spaces, parking allocation by unit, and a mechanical-parking arrangement are not established by the supplied extracts. A drawn or described parking area does not by itself establish exclusive allocation or ownership. Document index
The permission specifies one entry and one exit, each subject to a minimum width of 4.5 mtrs and height clearance of 5 mts. The supplied record does not establish that these access works are complete.
6. Amenities, recreation & open spaces
The RERA amenity schedule contains 14 entries. Each entry below is a filed amenity or site-work label; the supplied schedule records 0% progress for each. No independent completion verification is provided. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Internal roads & footpaths | No size supplied | RERA amenity schedule RERA amenities | 0%; not independently verified |
| Water supply | Marked “YES”; no source or capacity supplied | RERA amenity schedule RERA amenities | 0%; not independently verified |
| Sewerage | Chambers, lines, septic tank and STP listed | RERA amenity schedule RERA amenities | 0%; not independently verified |
| Storm-water drains | No size supplied | RERA amenity schedule RERA amenities | 0%; not independently verified |
| Green strip / tot lot / park | No area supplied | RERA amenity schedule RERA amenities | 0%; not independently verified |
| Street lighting | No quantity supplied | RERA amenity schedule RERA amenities | 0%; not independently verified |
| Community buildings | No size or use supplied | RERA amenity schedule RERA amenities | 0%; not independently verified |
| Treatment and disposal of sewage and sullage water | No capacity supplied | RERA amenity schedule RERA amenities | 0%; not independently verified |
| Solid-waste management and disposal | No system details supplied | RERA amenity schedule RERA amenities | 0%; not independently verified |
| Water conservation / rainwater harvesting | Marked “YES”; no capacity supplied | RERA amenity schedule RERA amenities | 0%; not independently verified |
| Energy management | No system details supplied | RERA amenity schedule RERA amenities | 0%; not independently verified |
| Fire protection and fire-safety requirements | No system-completion status supplied | RERA amenity schedule RERA amenities | 0%; not independently verified |
| Electrical meter room / sub-station / receiving station | Marked “YES”; no capacity supplied | RERA amenity schedule RERA amenities | 0%; not independently verified |
| Aggregate recreational open space | No area supplied | RERA amenity schedule RERA amenities | 0%; not independently verified |
The building-permission letter also requires rainwater-harvesting structures and garbage-house and transformer provisions within the premises. These are approval conditions; the supplied record does not establish delivery.
7. Utilities, building services & safety
- Water and sewerage: The building-permission letter requires separate underground static water storage of 25,000 liters and a separate terrace tank of 25,000 liters. It directs the applicant to approach HMWS & SB for bulk water supply or provide a water-treatment plant. It also requires an STP and septic tank, and states that recycled sewage water is to be used for gardening. These are permission conditions, not proof of installation or operation.
- Electrical and backup: The permission requires a generator as an alternate electricity source, transformer provision, and electrical installation certification by electrical engineers. It also records a requirement for four-hour fire-resistant transformer protection. The supplied documents do not state generator or transformer capacity, or confirm that either has been installed.
- Fire and life safety: Conditions include fire-services clearance before applying for an occupancy certificate; fire-resistant lift swing doors; emergency lighting in corridors, common passages and staircases; hose reels and downcomers; and specified water- and DCP-extinguisher provision. An automatic sprinkler system is required if the basement area exceeds 200 Sq.mts. The approval also sets entry/exit dimensions and calls for joint open space with neighboring premises for fire-vehicle maneuverability. These requirements do not establish that clearance or installation has been completed.
- Other services and safety information: The cellar condition identifies utility and non-habitation uses including an A/C plant room, generator room, STP and electrical installations. The supplied project materials do not specify lift counts or capacities, waste-segregation arrangements, CCTV, access-control systems, accessibility features or EV-charging provision as RERA-filed or sanctioned facilities. Document index
8. Location, access & connectivity
The registered project location is Yamnampet, Ghatkesar Mandal, Medchal-Malkajgiri District, Telangana 501301, on Survey Nos. 154/A and 154/AA. The parcel-centroid geocode supplied for the site is 17.451233023001038, 78.65659679474385; this is a cadastral parcel-centroid reference. RERA record Land records Cadastral map
The location record lists the nearest sampled Outer Ring Road interchange at approximately 2.5 km. The HMDA permission requires widening the existing approach road to 18 Mts and developing the approach road to the proposed site; the supplied record does not establish completion of that work. No public-transport routes, other measured landmark distances or travel times are supplied. Location record
9. Developer & development status
- The registered legal promoter is BLISS VENTURES PRIVATE LIMITED, a private limited company, with GSTIN 36AADCB9791P1ZS. The RERA project record lists Gouthama Venkata Madhuri as authorized signatory and Emmadi Venkata Sai Abhishek as director. Corporate record Parties record
- The registration certificate gives the promoter office as Village: Neknapur, Mandal: Gandipet, District: Ranga Reddy, Pin: 500089. A promoter website is listed at https://www.blissventures.co; the supplied evidence does not provide an official project contact number or email. Parties record
- The RERA filing lists eight landowners/promoter-side parties under area-share arrangements: MADADI VAMSHI KRISHNA, MADADI BHARATH REDDY, MADADI ARUN KUMAR REDDY, SELECT CONSTRUCTIONS, MADIREDDY SUDHEER REDDY, HAREEN KARRA, DIDYALA HANUMANTH, and KONDAPELLI PRAMOD REDDY. The supplied record does not provide a dated, independently verified construction-progress assessment. Parties record Land records
- The Form-B declaration states a completion undertaking of 06-10-2026; the project header records proposed completion 06/02/2027. The supplied materials do not provide an extension order or occupancy certificate. RERA record Document index
10. Approvals, official records & documents
| Record | What the supplied document establishes |
|---|---|
| TG-RERA Form ‘C’ registration certificate, P02200007437 | Registers BLISS ONE; records validity from 22/12/2023 through 06/10/2026, subject to conditions including the separate-account requirement and quarterly updates. No extension is recorded on the certificate. |
| HMDA building-permission letter, 004443/BP/HMDA/0915/GHT/2023, dated 07-10-2023 | Approves a residential apartment described as 1 Cellar + 1 Ground + 5 upper floors on 15,008.75 Sq.mts. in Survey Nos. 154/A and 154/AA, subject to stated conditions. |
| TS-bPASS fee-intimation letter, same file number | The document expressly states it is not approval of the proposal and permission for development. It is not treated here as the building-permission approval. |
| Form-B declaration | Authorized signatory Gouthama Venkata Madhuri, for BLISS VENTURES PRIVATE LIMITED, makes declarations about title, encumbrances, project funds, pending approvals and completion by 06-10-2026. These are promoter declarations. |
| Floor-plan record, doc:370722 | Source drawing used for software measurement of 11 3BHK designs; the resulting carpet-area figures are drawing measurements, not RERA disclosures. |
| Occupancy / completion certificate | None is included in the supplied project documents. Document index |
The supplied materials do not include an extracted approved-layout letter or layout plan, an occupancy/completion certificate, or documentary confirmation of completed construction or amenities. Document index
1. Project at a glance
Project identity
Registered name: BLISS ONE
Project type: Residential apartment project
Phase / registered portion: Phase not separately named. TG-RERA registration covers the project on Survey Nos. 154/A and 154/AA; the filed registration certificate does not state a separately identified phase.
TG-RERA registration: P02200007437
Registration validity: 22/12/2023 through 06/10/2026, unless extended by the Authority. This is the registration-validity period, not a statement of completion or occupancy certification.
Registered promoter: BLISS VENTURES PRIVATE LIMITED
RERA status: The supplied Form ‘C’ records registration; it states no extension on the certificate.
Land and geographic identity
Locality / revenue village: Yamnampet (also rendered “Yamnampet Village” in the building-permission document)
Mandal: Ghatkesar
District: Medchal-Malkajgiri
PIN: 501301
Project survey numbers: 154/A and 154/AA
Site extent: 15,008.75 Sq.mts.; the filing gives this as the project’s total and net area, with affected area recorded as 0.
Boundaries as filed: North: SY NO 166 PART; South: SY NO 134 PART 154 PART AND 40 FEET ROAD; East and West: SY NO 154 PART AND 166 PART.
Registered office locality shown on certificate: Neknapur, Gandipet Mandal, Ranga Reddy District, PIN 500089.
Development identity
Sanctioning authority: Hyderabad Metropolitan Development Authority (HMDA); the building-permission letter records delegation to Pocharam Municipality.
Principal building-permission number / date: 004443/BP/HMDA/0915/GHT/2023, dated 07-10-2023.
Approved built-up area: Not stated in the supplied approval extraction. The project filing separately reports 9,348.25 sq.mts. as “Approved Built up Area”; the supplied materials do not clarify the measurement basis.
Building count: 1 approved building and 1 proposed building in the RERA project record.
Sanctioned floor configuration: 1 Cellar + 1 Ground + 5 upper floors. The approval states that 10% of the Cellar is to be used for utilities and non-habitation purposes; it also requires the cellar/stilt to be used exclusively for vehicle parking, without partitions or rolling shutters, subject to the stated utility provision.
Parking provision / levels: The approval identifies cellar and stilt/cellar parking conditions, but the supplied extracts do not provide a sanctioned parking-space count or a unit-wise parking allocation.
Unit count: 65 total units: 42 2BHK and 23 3BHK in the RERA filing. The approved-plan unit count is not separately extracted.
Offering and status
RERA-filed configurations: 2BHK: 42 units; 3BHK: 23 units.
RERA-filed saleable area: 2BHK: 36.63 sq.m.; 3BHK: 116.33 sq.m.
Booked / available: Portal figures last read show 0 booked and 42 available 2BHK units, and 0 booked and 23 available 3BHK units. The portal record has no as-of date, so these counts are indicative.
Construction stage: The supplied record does not provide a verified or dated construction-progress percentage or site inspection. RERA amenity-progress fields are recorded as 0%; these entries do not establish independently verified physical progress.
Completion date: The Form-B declaration states completion by 06-10-2026; the project header and registration record separately show proposed completion 06/02/2027. The supplied materials do not identify a revised-completion approval, so both dates are reported with their respective source attribution.
Occupancy / completion certificate: No occupancy or completion certificate is included in the supplied project documents.
2. The project story
BLISS ONE is registered as a residential apartment project in Yamnampet, Ghatkesar Mandal, Medchal-Malkajgiri District, on Survey Nos. 154/A and 154/AA. The RERA filing describes one building and 65 apartments, with 2BHK and 3BHK configurations.
HMDA’s building-permission letter dated 07-10-2023 describes a residential apartment building with one cellar, one ground floor and five upper floors on 15,008.75 Sq.mts. The available record does not establish a dated construction stage or independently verified completion status. The RERA portal’s amenity progress entries are shown as 0%, which should be read as the filing’s recorded progress data rather than an independent site assessment.
The registration certificate remains valid through 06/10/2026 unless extended; that validity period is distinct from the completion dates stated in the Form-B declaration and project header. No occupancy or completion certificate is present in the supplied materials.
3. Master plan, architecture & building design
The RERA land record gives a total and net project area of 15,008.75 sq.mts. and identifies a single building. The filed project information reports 9,348.25 sq.mts. as approved built-up area, but the supplied record does not define its measurement basis. It should not be treated as a carpet-area, saleable-area or floor-area figure.
The HMDA building-permission letter specifies 1 Cellar + 1 Ground + 5 upper floors for the residential apartment. The supplied extraction does not state the building footprint, flats per floor, tower arrangement, lift or stair counts, internal circulation plan, or residential/common-area breakdown.
HMDA conditions include an entry and exit with minimum width 4.5 mtrs and height clearance 5 mts, a requirement to widen the existing approach road to 18 Mts and develop it to the site, and a requirement for joint open space with neighboring premises for fire-vehicle maneuverability. These are conditions recorded in the permission, not confirmation that the works have been completed.
The supplied floor-plan material includes a plan record identified as doc:370722. Software measurement from that drawing covers 11 3BHK designs; it reports measured carpet areas separately from RERA-filed saleable area. The supplied record does not provide a comparable measured carpet figure for 2BHK units.
4. Homes, configurations & floor plans
The RERA filing records 65 units across two configurations. Its saleable-area figures are reported below as filed. For 3BHK, software measurement from drawing geometry is available for 11 designs and is not a RERA disclosure; the source itself says the measurements need review.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 42 | 0 | 42 | 36.63 sq.m. | Not supplied | Not supplied |
| 3BHK | 23 | 0 | 23 | 116.33 sq.m. | Software-measured median 96.9 sq.m.; range 96.0–98.0 sq.m. across 11 measured designs | 17% (software-measured) |
The portal’s booked/available figures are indicative because the record has no as-of date. The software-measured 3BHK carpet figures come from drawing geometry, not from the RERA filing, and the source notes they need review. Carpet area, balcony or utility space, common-area loading and saleable area are distinct measures; the supplied record does not provide a measured 2BHK carpet area or unit-specific balcony/utility measurements for the project.
For one 3BHK shown on the second-floor plan (flat 09), the extracted room schedule records three bedrooms, a living/kitchen area, two toilets, a balcony and a utility. The drawing extraction lists the balcony as 4.99 m² and utility as 2.54 m², both excluded from the software-measured carpet area. These are drawing-based measurements for that plan, not RERA-filed unit-area disclosures.
5. Parking & vehicle circulation
The sanctioned building configuration includes a cellar, and the permission states that the stilt/cellar is to be used exclusively for vehicle parking without partition walls or rolling shutters, subject to the stated 10% cellar utility/non-habitation provision. It also requires no parking or construction in setback areas.
A sanctioned count of car or two-wheeler spaces, visitor or accessible spaces, parking allocation by unit, and a mechanical-parking arrangement are not established by the supplied extracts. A drawn or described parking area does not by itself establish exclusive allocation or ownership.
The permission specifies one entry and one exit, each subject to a minimum width of 4.5 mtrs and height clearance of 5 mts. The supplied record does not establish that these access works are complete.
6. Amenities, recreation & open spaces
The RERA amenity schedule contains 14 entries. Each entry below is a filed amenity or site-work label; the supplied schedule records 0% progress for each. No independent completion verification is provided.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Internal roads & footpaths | No size supplied | RERA amenity schedule | 0%; not independently verified |
| Water supply | Marked “YES”; no source or capacity supplied | RERA amenity schedule | 0%; not independently verified |
| Sewerage | Chambers, lines, septic tank and STP listed | RERA amenity schedule | 0%; not independently verified |
| Storm-water drains | No size supplied | RERA amenity schedule | 0%; not independently verified |
| Green strip / tot lot / park | No area supplied | RERA amenity schedule | 0%; not independently verified |
| Street lighting | No quantity supplied | RERA amenity schedule | 0%; not independently verified |
| Community buildings | No size or use supplied | RERA amenity schedule | 0%; not independently verified |
| Treatment and disposal of sewage and sullage water | No capacity supplied | RERA amenity schedule | 0%; not independently verified |
| Solid-waste management and disposal | No system details supplied | RERA amenity schedule | 0%; not independently verified |
| Water conservation / rainwater harvesting | Marked “YES”; no capacity supplied | RERA amenity schedule | 0%; not independently verified |
| Energy management | No system details supplied | RERA amenity schedule | 0%; not independently verified |
| Fire protection and fire-safety requirements | No system-completion status supplied | RERA amenity schedule | 0%; not independently verified |
| Electrical meter room / sub-station / receiving station | Marked “YES”; no capacity supplied | RERA amenity schedule | 0%; not independently verified |
| Aggregate recreational open space | No area supplied | RERA amenity schedule | 0%; not independently verified |
The building-permission letter also requires rainwater-harvesting structures and garbage-house and transformer provisions within the premises. These are approval conditions; the supplied record does not establish delivery.
7. Utilities, building services & safety
- Water and sewerage: The building-permission letter requires separate underground static water storage of 25,000 liters and a separate terrace tank of 25,000 liters. It directs the applicant to approach HMWS & SB for bulk water supply or provide a water-treatment plant. It also requires an STP and septic tank, and states that recycled sewage water is to be used for gardening. These are permission conditions, not proof of installation or operation.
- Electrical and backup: The permission requires a generator as an alternate electricity source, transformer provision, and electrical installation certification by electrical engineers. It also records a requirement for four-hour fire-resistant transformer protection. The supplied documents do not state generator or transformer capacity, or confirm that either has been installed.
- Fire and life safety: Conditions include fire-services clearance before applying for an occupancy certificate; fire-resistant lift swing doors; emergency lighting in corridors, common passages and staircases; hose reels and downcomers; and specified water- and DCP-extinguisher provision. An automatic sprinkler system is required if the basement area exceeds 200 Sq.mts. The approval also sets entry/exit dimensions and calls for joint open space with neighboring premises for fire-vehicle maneuverability. These requirements do not establish that clearance or installation has been completed.
- Other services and safety information: The cellar condition identifies utility and non-habitation uses including an A/C plant room, generator room, STP and electrical installations. The supplied project materials do not specify lift counts or capacities, waste-segregation arrangements, CCTV, access-control systems, accessibility features or EV-charging provision as RERA-filed or sanctioned facilities.
8. Location, access & connectivity
The registered project location is Yamnampet, Ghatkesar Mandal, Medchal-Malkajgiri District, Telangana 501301, on Survey Nos. 154/A and 154/AA. The parcel-centroid geocode supplied for the site is 17.451233023001038, 78.65659679474385; this is a cadastral parcel-centroid reference.
The location record lists the nearest sampled Outer Ring Road interchange at approximately 2.5 km. The HMDA permission requires widening the existing approach road to 18 Mts and developing the approach road to the proposed site; the supplied record does not establish completion of that work. No public-transport routes, other measured landmark distances or travel times are supplied.
9. Developer & development status
- The registered legal promoter is BLISS VENTURES PRIVATE LIMITED, a private limited company, with GSTIN 36AADCB9791P1ZS. The RERA project record lists Gouthama Venkata Madhuri as authorized signatory and Emmadi Venkata Sai Abhishek as director.
- The registration certificate gives the promoter office as Village: Neknapur, Mandal: Gandipet, District: Ranga Reddy, Pin: 500089. A promoter website is listed at https://www.blissventures.co; the supplied evidence does not provide an official project contact number or email.
- The RERA filing lists eight landowners/promoter-side parties under area-share arrangements: MADADI VAMSHI KRISHNA, MADADI BHARATH REDDY, MADADI ARUN KUMAR REDDY, SELECT CONSTRUCTIONS, MADIREDDY SUDHEER REDDY, HAREEN KARRA, DIDYALA HANUMANTH, and KONDAPELLI PRAMOD REDDY. The supplied record does not provide a dated, independently verified construction-progress assessment.
- The Form-B declaration states a completion undertaking of 06-10-2026; the project header records proposed completion 06/02/2027. The supplied materials do not provide an extension order or occupancy certificate.
10. Approvals, official records & documents
TG-RERA Form ‘C’ registration certificate, P02200007437: Registers BLISS ONE; records validity from 22/12/2023 through 06/10/2026, subject to conditions including the separate-account requirement and quarterly updates. No extension is recorded on the certificate.
HMDA building-permission letter, 004443/BP/HMDA/0915/GHT/2023, dated 07-10-2023: Approves a residential apartment described as 1 Cellar + 1 Ground + 5 upper floors on 15,008.75 Sq.mts. in Survey Nos. 154/A and 154/AA, subject to stated conditions.
TS-bPASS fee-intimation letter, same file number: The document expressly states it is not approval of the proposal and permission for development. It is not treated here as the building-permission approval.
Form-B declaration: Authorized signatory Gouthama Venkata Madhuri, for BLISS VENTURES PRIVATE LIMITED, makes declarations about title, encumbrances, project funds, pending approvals and completion by 06-10-2026. These are promoter declarations.
Floor-plan record, doc:370722: Source drawing used for software measurement of 11 3BHK designs; the resulting carpet-area figures are drawing measurements, not RERA disclosures.
Occupancy / completion certificate: None is included in the supplied project documents.
The supplied materials do not include an extracted approved-layout letter or layout plan, an occupancy/completion certificate, or documentary confirmation of completed construction or amenities.
Other registrations of Bliss One
Frequently asked questions
Is BLISS ONE registered with Telangana RERA?
Yes. BLISS ONE is registered with the Telangana Real Estate Regulatory Authority as P02200007437; the registration status is New Project.
Who is the developer of BLISS ONE?
The promoter named in the RERA registration is BLISS VENTURES PRIVATE LIMITED.
Where is BLISS ONE located?
BLISS ONE is in GHATKESAR, Yamnampet, Medchal-Malkajgiri, Telangana (501301).
When will BLISS ONE be completed?
The promoter's proposed date of completion filed with RERA is 06/02/2027. This is the promoter's declaration, not a guarantee.
More projects in Yamnampet




