Ds Rao Green City

SPEED DEVELOPERS · Hanamkonda · RERA P00300005501

DS RAO GREEN CITY is a plotted development at Thimmapur Village, Khila Warangal Mandal, Warangal District. The registered promoter is SPEED DEVELOPERS. The layout covers 227852.10 Sq.mts or Ac..56.12 gts. and records 568 residential plots for individual dwelling houses; plot configurations are not supplied. TG-RERA registration number P00300005501 records a proposed completion date of 01-09-2025.

01What we found

Period endedTG-RERA registration ran to 1 Sep 2025 - check its extension on TG-RERA
25documents on file - each fact links to its page
11court cases on this project's land (survey 126, 127, 129, 130, 135, 153 and 1 more, Thimmapur)
9items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

9 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemProject record
Registered projectDS RAO GREEN CITY RERA record
Project typePlotted development / open-plots layout RERA record
Phase or registered portionPhase not identified in the supplied record; registration is for the project described in the certificate
TG-RERA registrationP00300005501
Registration validity07/12/2022 to 01/09/2025; the certificate says “2 years.” No extension is recorded in the supplied certificate
Registered promoterSPEED DEVELOPERS
RERA statusThe certificate records registration under section 5. It does not establish the project’s current registration status after 01/09/2025

Land and geographic identity

ItemProject record
Locality / revenue villageThimmapur; the layout approval specifies Thimmapur Village, Khila Warangal Mandal, Warangal District RERA record
MandalKhila Warangal in the layout-approval proceedings; the RERA certificate contains a different mandal entry, so the registered mandal is not consistently established by the supplied documents
DistrictWarangal in the layout-approval proceedings; the RERA certificate contains a different district entry. The site’s administrative district is therefore not consistently established by these documents RERA record
PIN506003 in the project header RERA record. The certificate gives a promoter-office PIN, not a verified project-site PIN
Survey numbers and subdivisions126/A, 127/A, 127/B, 128/B, 128/D, 129/A/1, 130/B, 131, 134, 135/A, 152/B, 152/C, 153/B, 154/3/A, 154/3/B RERA record
Registered site extentThe layout proceedings state 227852.10 Sq.mts or Ac..56.12 gts.
Filed area figuresTotal area 227852.10 sq.mts; area affected by road widening/FTL/nala widening 3562.13 sq.mts; net area 224289.97 sq.mts RERA filing
Layout boundariesEast: 45 M ROAD; North: 18 M ROAD; West and South: LAND OF OTHERS RERA filing

Development identity

ItemProject record
Sanctioning authorityKakatiya Urban Development Authority (KUDA), in the layout proceedings
Principal approvalLayout approval D.P.No. 69 /2022, dated 01-09-2022; file CI/000311 /LT/U6/KUDA/2021
Approved net plotted area1.32,898.49 Sq.mts. as extracted from the approval record; the source text also labels it 58.35%
Plot countThe approval extraction records 568 plots. It also contains a separate, inconsistent text entry “Total Plots 46”; the approval describes Plot Nos. 23 to 68 (46 plots) as mortgaged, not as the total layout inventory
Buildings / floorsNo apartment blocks, building count, or floor configuration is established. The approval specifies individual residential dwelling houses on the plotted sites
Approved built-up area132898.49 sq.mts is listed in the RERA-filed land details as “Approved Built up Area”; the supplied material does not establish a building-wise approved built-up schedule RERA filing
RERA-declared housing inventoryPlot count and plot-size schedule are not supplied as a unit-by-unit RERA inventory in the provided data

Offering and status

ItemProject record
OfferingResidential plots; the layout approval says each approved building site is for an individual residential dwelling house
Plot sizes / booked and available countsNot disclosed in the supplied project evidence
Construction stageNo independently verified site-progress record is supplied. The RERA-filed completion undertaking was 01-09-2025; the project header records 70% completeness, but no measurement date or independent verification is provided RERA record
Completion deadlinePromoter-declared completion date: 01-09-2025
Registration validitySeparately, the certificate validity ended 01/09/2025, unless extended by the Authority; no extension is recorded in the supplied certificate
OC / completion certificateNo occupancy or completion certificate is supplied. For a plotted layout, the record does not establish a building-level OC Document index

2. The project story

DS RAO GREEN CITY is recorded as a residential plotted layout in the survey lands listed above at Thimmapur. KUDA’s proceedings describe an open-plots layout in favour of M/s. Speed Developers and approve D.P.No. 69 /2022. The approval identifies 568 plots, residential use for individual dwelling houses, internal roads, open space, utility and water-tank areas, and land reserved or mortgaged for specified purposes.

The promoter’s Form B affidavit undertakes completion by 01-09-2025. The header reports 70% completeness, but the supplied evidence does not identify the date or method for that figure, and it is not independent site verification. No RERA-filed plot-wise booking or availability schedule, completion certificate, or evidence of delivered infrastructure is included here RERA record Document index.

3. Master plan, architecture & building design

This is a plotted layout, not an apartment-building scheme in the supplied approval. The layout proceedings state a site extent of 227852.10 Sq.mts or Ac..56.12 gts., and list the following land-use components. The extracted figures and formatting are reproduced as recorded; the source includes irregular number formatting.

Layout componentApproval-record figure
Open Space area22,798.70 Sq.mts. (10.00%)
Roads area66.275.82 Sq.mts (29.08%)
Net Plotted area1.32,898.49 Sq.mts. (58.35%)
Social Infrastructure area2,139.19 Sq.mts.
Mortgaged area20.081.04 Sq.mts. (15.11%)
150* Road affected Area (East Side)2,061.17 Sq. mts.
60' Road affected Area (West Side)1,500.96 Sq.mts.
Kunta FTL Area3.133.64 Sg.mts
Utility Arca144.15 Sq.mts
Garbage area150.04 Sq.mts.
Water Tank area234.02 Sq. Mts.

The approval identifies road widths of 40 ft. or 12.192 meters, 60 ft or 18.288 meters, 80 ft. or 24.384 meters, and “not less than 40'0" wide.” It requires plot boundaries and dimensions to follow the approved plan and records a pedestrian-protection condition for footpaths. The approval also states that sites and streets are to be demarcated and that roads and drainage, lighting, culverts and related works are to be formed and handed over as directed by the relevant executive authority.

The approval calls for detached, single-family residential dwelling houses on the plots, and says not less than 50% of each site is to remain vacant open space. No plot-wise layout drawing, dimensions schedule, building design, or phase/tower arrangement is available in the supplied extracts.

4. Homes, configurations & floor plans

No RERA unit-type schedule, plot-size bands, booked/available counts, or plot-wise saleable-area schedule is supplied. Accordingly, a configuration-level inventory cannot be reported from this evidence. The approval identifies 568 plots, but does not provide individual plot sizes or booking status.

Two drawings are listed, but neither has been measured: both remain scans pending, and there are no software-measured carpet areas Floor plans. The project’s recorded offering is plots rather than apartments; apartment carpet-area or loading assumptions do not apply to the supplied layout evidence.

5. Parking & vehicle circulation

The layout approval identifies internal roads and road widths but does not provide a parking count, visitor or accessible-space provision, parking allocation, or vehicle-entry/exit arrangement. A third-party vendor record lists “Open Parking,” without a count or evidence of sanctioned or allocated spaces; this is not established as an approved or delivered provision Promoter website.

The approval requires road formation and includes footpath-related conditions, but the supplied evidence does not establish pedestrian/vehicle separation or a completed circulation system.

6. Amenities, recreation & open spaces

The approval’s layout provisions and the promoter’s RERA filing are not accompanied by verified completion evidence. The RERA amenity entries show 0% progress where a percentage is given; they should therefore be read as filed disclosures, not as proof of delivery RERA amenities.

Open space
Description / size22,798.70 Sq.mts. (10.00%) in the layout approval; a gift settlement deed for open space and garbage-station area is recorded as 6811/2022, dated 05-08-2022
Evidence sourceKUDA layout proceedings
Declared progress / verified statusApproval-record provision; completion not independently verified
Green strip / tot lot / park
Description / sizeListed as available “YES” in the RERA amenity data; no size or quantity supplied RERA amenities
Evidence sourceRERA-filed amenity data
Declared progress / verified status0% progress recorded; completion not verified
Community buildings
Description / sizeListed without a supplied size or description RERA amenities
Evidence sourceRERA-filed amenity data
Declared progress / verified status0% progress recorded
Internal roads and footpaths
Description / sizeInternal roads and footpaths are listed in the RERA amenity data; road widths in the approval are 40 ft. or 12.192 meters, 60 ft or 18.288 meters, 80 ft. or 24.384 meters, and “not less than 40'0" wide” RERA amenities
Evidence sourceRERA-filed amenity data and KUDA layout proceedings
Declared progress / verified statusAmenity progress shown as 0%; no independent completion verification
Street lighting
Description / sizeListed as available “YES”; no specification supplied RERA amenities
Evidence sourceRERA-filed amenity data
Declared progress / verified status0% progress recorded
Open-space compound wall
Description / sizeApproval requires a compound wall around the open space, stated as 4 feet from road level
Evidence sourceKUDA layout proceedings
Declared progress / verified statusRequired by approval; construction not verified
Avenue platform / planting
Description / sizeApproval calls for avenue platforms along roads and open space and says each plot owner is to plant five trees
Evidence sourceKUDA layout proceedings
Declared progress / verified statusRequired or stated in the approval; completion not verified

7. Utilities, building services & safety

The RERA amenity filing lists water supply, sewerage, storm-water drains, sewage/sullage treatment and disposal, solid-waste management, rainwater harvesting, energy management, fire protection, and an electrical meter room/sub-station/receiving station. It gives no capacities, technical specifications, or verified completion evidence; entries with a progress percentage show 0% RERA amenities.

The layout approval identifies a Water Tank area of 234.02 Sq. Mts., a Utility Arca of 144.15 Sq.mts, and a Garbage area of 150.04 Sq.mts. It requires rainwater-harvesting structures and a water-harvesting pit. These are approval-record provisions, not evidence that the facilities have been completed or commissioned.

The supplied documents do not establish water source or storage capacity, an STP design or capacity, treated-water reuse, electrical supply or backup capacity, fire-system design, security systems, or accessibility provisions.

8. Location, access & connectivity

The layout-approval proceedings place the project at Thimmapur Village, Khila Warangal Mandal, Warangal District. The project header identifies Thimmapur, Warangal Urban, PIN 506003. The RERA certificate contains different administrative location entries; the evidence supplied does not resolve those entries into one consistent site-address record RERA record.

The project boundaries recorded in the RERA filing are 45 M ROAD to the east and 18 M ROAD to the north; the other two boundaries are land of others RERA filing. The layout approval provides for internal roads and lists several approved road widths. The location record also reports Financial District (Nanakramguda): 1.2 km from a cadastral parcel centroid; this is a recorded distance, not a travel-time estimate Location record.

9. Developer & development status

The registered promoter is SPEED DEVELOPERS, identified in the RERA filing as a partnership. The supplied corporate identifier is GSTIN 36AELFS3865E1ZP. The RERA filing gives a promoter address at Semushi Towers, Rao and Raju Colony, Road No. 2, Thimmapur, Hanamkonda, Warangal, Telangana, PIN 506003 Corporate record RERA filing.

The Form B affidavit is made by Harish Dugyala on behalf of SPEED DEVELOPERS and declares a completion date of 01-09-2025. The header records 70% completeness, but the supplied evidence does not state its as-of date or independently verify progress RERA record. No project-specific official contact details or confirmed promoter website are supplied in the RERA evidence.

10. Approvals, official records & documents

RecordWhat the supplied evidence establishes
TG-RERA registration certificate, P00300005501Form C registration for DS RAO GREEN CITY; valid from 07/12/2022 to 01/09/2025, unless extended by the Authority. No extension is shown in the certificate
KUDA layout proceedings, D.P.No. 69 /2022Layout approval dated 01-09-2022, file CI/000311 /LT/U6/KUDA/2021, for an open-plots layout at Thimmapur; the proceedings record the listed land-use components and conditions
RERA Form B declarationHarish Dugyala’s affidavit on behalf of SPEED DEVELOPERS declares the land free from encumbrances and undertakes completion by 01-09-2025
Layout-related deeds cited in the approvalGift settlement deed 6811/2022 for open space and garbage-station area; mortgage deed 6810/2022; gift settlement deed 6812/2022 for roads, each dated 05-08-2022
Occupancy/completion certificateNo such certificate is included in the supplied project documents Document index
Building plans / commencement evidenceThe supplied approval extract concerns the plotted layout. It does not provide a building-wise commencement or sanctioned-building-plan schedule

Frequently asked questions

Is DS RAO GREEN CITY registered with Telangana RERA?

Yes. DS RAO GREEN CITY is registered with the Telangana Real Estate Regulatory Authority as P00300005501; the registration status is New Project.

Who is the developer of DS RAO GREEN CITY?

The promoter named in the RERA registration is SPEED DEVELOPERS.

Where is DS RAO GREEN CITY located?

DS RAO GREEN CITY is in THIMMAPUR,HANAMKONDA, Hanamkonda, Telangana (506003).

When will DS RAO GREEN CITY be completed?

The promoter's proposed date of completion filed with RERA is 01/09/2025. This is the promoter's declaration, not a guarantee.