Ds Rao Green City
SPEED DEVELOPERS · Hanamkonda · RERA P00300005501
DS RAO GREEN CITY is a plotted development at Thimmapur Village, Khila Warangal Mandal, Warangal District. The registered promoter is SPEED DEVELOPERS. The layout covers 227852.10 Sq.mts or Ac..56.12 gts. and records 568 residential plots for individual dwelling houses; plot configurations are not supplied. TG-RERA registration number P00300005501 records a proposed completion date of 01-09-2025.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
9 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered project | DS RAO GREEN CITY RERA record |
| Project type | Plotted development / open-plots layout RERA record |
| Phase or registered portion | Phase not identified in the supplied record; registration is for the project described in the certificate |
| TG-RERA registration | P00300005501 |
| Registration validity | 07/12/2022 to 01/09/2025; the certificate says “2 years.” No extension is recorded in the supplied certificate |
| Registered promoter | SPEED DEVELOPERS |
| RERA status | The certificate records registration under section 5. It does not establish the project’s current registration status after 01/09/2025 |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality / revenue village | Thimmapur; the layout approval specifies Thimmapur Village, Khila Warangal Mandal, Warangal District RERA record |
| Mandal | Khila Warangal in the layout-approval proceedings; the RERA certificate contains a different mandal entry, so the registered mandal is not consistently established by the supplied documents |
| District | Warangal in the layout-approval proceedings; the RERA certificate contains a different district entry. The site’s administrative district is therefore not consistently established by these documents RERA record |
| PIN | 506003 in the project header RERA record. The certificate gives a promoter-office PIN, not a verified project-site PIN |
| Survey numbers and subdivisions | 126/A, 127/A, 127/B, 128/B, 128/D, 129/A/1, 130/B, 131, 134, 135/A, 152/B, 152/C, 153/B, 154/3/A, 154/3/B RERA record |
| Registered site extent | The layout proceedings state 227852.10 Sq.mts or Ac..56.12 gts. |
| Filed area figures | Total area 227852.10 sq.mts; area affected by road widening/FTL/nala widening 3562.13 sq.mts; net area 224289.97 sq.mts RERA filing |
| Layout boundaries | East: 45 M ROAD; North: 18 M ROAD; West and South: LAND OF OTHERS RERA filing |
Development identity
| Item | Project record |
|---|---|
| Sanctioning authority | Kakatiya Urban Development Authority (KUDA), in the layout proceedings |
| Principal approval | Layout approval D.P.No. 69 /2022, dated 01-09-2022; file CI/000311 /LT/U6/KUDA/2021 |
| Approved net plotted area | 1.32,898.49 Sq.mts. as extracted from the approval record; the source text also labels it 58.35% |
| Plot count | The approval extraction records 568 plots. It also contains a separate, inconsistent text entry “Total Plots 46”; the approval describes Plot Nos. 23 to 68 (46 plots) as mortgaged, not as the total layout inventory |
| Buildings / floors | No apartment blocks, building count, or floor configuration is established. The approval specifies individual residential dwelling houses on the plotted sites |
| Approved built-up area | 132898.49 sq.mts is listed in the RERA-filed land details as “Approved Built up Area”; the supplied material does not establish a building-wise approved built-up schedule RERA filing |
| RERA-declared housing inventory | Plot count and plot-size schedule are not supplied as a unit-by-unit RERA inventory in the provided data |
Offering and status
| Item | Project record |
|---|---|
| Offering | Residential plots; the layout approval says each approved building site is for an individual residential dwelling house |
| Plot sizes / booked and available counts | Not disclosed in the supplied project evidence |
| Construction stage | No independently verified site-progress record is supplied. The RERA-filed completion undertaking was 01-09-2025; the project header records 70% completeness, but no measurement date or independent verification is provided RERA record |
| Completion deadline | Promoter-declared completion date: 01-09-2025 |
| Registration validity | Separately, the certificate validity ended 01/09/2025, unless extended by the Authority; no extension is recorded in the supplied certificate |
| OC / completion certificate | No occupancy or completion certificate is supplied. For a plotted layout, the record does not establish a building-level OC Document index |
2. The project story
DS RAO GREEN CITY is recorded as a residential plotted layout in the survey lands listed above at Thimmapur. KUDA’s proceedings describe an open-plots layout in favour of M/s. Speed Developers and approve D.P.No. 69 /2022. The approval identifies 568 plots, residential use for individual dwelling houses, internal roads, open space, utility and water-tank areas, and land reserved or mortgaged for specified purposes.
The promoter’s Form B affidavit undertakes completion by 01-09-2025. The header reports 70% completeness, but the supplied evidence does not identify the date or method for that figure, and it is not independent site verification. No RERA-filed plot-wise booking or availability schedule, completion certificate, or evidence of delivered infrastructure is included here RERA record Document index.
3. Master plan, architecture & building design
This is a plotted layout, not an apartment-building scheme in the supplied approval. The layout proceedings state a site extent of 227852.10 Sq.mts or Ac..56.12 gts., and list the following land-use components. The extracted figures and formatting are reproduced as recorded; the source includes irregular number formatting.
| Layout component | Approval-record figure |
|---|---|
| Open Space area | 22,798.70 Sq.mts. (10.00%) |
| Roads area | 66.275.82 Sq.mts (29.08%) |
| Net Plotted area | 1.32,898.49 Sq.mts. (58.35%) |
| Social Infrastructure area | 2,139.19 Sq.mts. |
| Mortgaged area | 20.081.04 Sq.mts. (15.11%) |
| 150* Road affected Area (East Side) | 2,061.17 Sq. mts. |
| 60' Road affected Area (West Side) | 1,500.96 Sq.mts. |
| Kunta FTL Area | 3.133.64 Sg.mts |
| Utility Arca | 144.15 Sq.mts |
| Garbage area | 150.04 Sq.mts. |
| Water Tank area | 234.02 Sq. Mts. |
The approval identifies road widths of 40 ft. or 12.192 meters, 60 ft or 18.288 meters, 80 ft. or 24.384 meters, and “not less than 40'0" wide.” It requires plot boundaries and dimensions to follow the approved plan and records a pedestrian-protection condition for footpaths. The approval also states that sites and streets are to be demarcated and that roads and drainage, lighting, culverts and related works are to be formed and handed over as directed by the relevant executive authority.
The approval calls for detached, single-family residential dwelling houses on the plots, and says not less than 50% of each site is to remain vacant open space. No plot-wise layout drawing, dimensions schedule, building design, or phase/tower arrangement is available in the supplied extracts.
4. Homes, configurations & floor plans
No RERA unit-type schedule, plot-size bands, booked/available counts, or plot-wise saleable-area schedule is supplied. Accordingly, a configuration-level inventory cannot be reported from this evidence. The approval identifies 568 plots, but does not provide individual plot sizes or booking status.
Two drawings are listed, but neither has been measured: both remain scans pending, and there are no software-measured carpet areas Floor plans. The project’s recorded offering is plots rather than apartments; apartment carpet-area or loading assumptions do not apply to the supplied layout evidence.
5. Parking & vehicle circulation
The layout approval identifies internal roads and road widths but does not provide a parking count, visitor or accessible-space provision, parking allocation, or vehicle-entry/exit arrangement. A third-party vendor record lists “Open Parking,” without a count or evidence of sanctioned or allocated spaces; this is not established as an approved or delivered provision Promoter website.
The approval requires road formation and includes footpath-related conditions, but the supplied evidence does not establish pedestrian/vehicle separation or a completed circulation system.
6. Amenities, recreation & open spaces
The approval’s layout provisions and the promoter’s RERA filing are not accompanied by verified completion evidence. The RERA amenity entries show 0% progress where a percentage is given; they should therefore be read as filed disclosures, not as proof of delivery RERA amenities.
| Description / size | 22,798.70 Sq.mts. (10.00%) in the layout approval; a gift settlement deed for open space and garbage-station area is recorded as 6811/2022, dated 05-08-2022 |
|---|---|
| Evidence source | KUDA layout proceedings |
| Declared progress / verified status | Approval-record provision; completion not independently verified |
| Description / size | Listed as available “YES” in the RERA amenity data; no size or quantity supplied RERA amenities |
|---|---|
| Evidence source | RERA-filed amenity data |
| Declared progress / verified status | 0% progress recorded; completion not verified |
| Description / size | Listed without a supplied size or description RERA amenities |
|---|---|
| Evidence source | RERA-filed amenity data |
| Declared progress / verified status | 0% progress recorded |
| Description / size | Internal roads and footpaths are listed in the RERA amenity data; road widths in the approval are 40 ft. or 12.192 meters, 60 ft or 18.288 meters, 80 ft. or 24.384 meters, and “not less than 40'0" wide” RERA amenities |
|---|---|
| Evidence source | RERA-filed amenity data and KUDA layout proceedings |
| Declared progress / verified status | Amenity progress shown as 0%; no independent completion verification |
| Description / size | Listed as available “YES”; no specification supplied RERA amenities |
|---|---|
| Evidence source | RERA-filed amenity data |
| Declared progress / verified status | 0% progress recorded |
| Description / size | Approval requires a compound wall around the open space, stated as 4 feet from road level |
|---|---|
| Evidence source | KUDA layout proceedings |
| Declared progress / verified status | Required by approval; construction not verified |
| Description / size | Approval calls for avenue platforms along roads and open space and says each plot owner is to plant five trees |
|---|---|
| Evidence source | KUDA layout proceedings |
| Declared progress / verified status | Required or stated in the approval; completion not verified |
7. Utilities, building services & safety
The RERA amenity filing lists water supply, sewerage, storm-water drains, sewage/sullage treatment and disposal, solid-waste management, rainwater harvesting, energy management, fire protection, and an electrical meter room/sub-station/receiving station. It gives no capacities, technical specifications, or verified completion evidence; entries with a progress percentage show 0% RERA amenities.
The layout approval identifies a Water Tank area of 234.02 Sq. Mts., a Utility Arca of 144.15 Sq.mts, and a Garbage area of 150.04 Sq.mts. It requires rainwater-harvesting structures and a water-harvesting pit. These are approval-record provisions, not evidence that the facilities have been completed or commissioned.
The supplied documents do not establish water source or storage capacity, an STP design or capacity, treated-water reuse, electrical supply or backup capacity, fire-system design, security systems, or accessibility provisions.
8. Location, access & connectivity
The layout-approval proceedings place the project at Thimmapur Village, Khila Warangal Mandal, Warangal District. The project header identifies Thimmapur, Warangal Urban, PIN 506003. The RERA certificate contains different administrative location entries; the evidence supplied does not resolve those entries into one consistent site-address record RERA record.
The project boundaries recorded in the RERA filing are 45 M ROAD to the east and 18 M ROAD to the north; the other two boundaries are land of others RERA filing. The layout approval provides for internal roads and lists several approved road widths. The location record also reports Financial District (Nanakramguda): 1.2 km from a cadastral parcel centroid; this is a recorded distance, not a travel-time estimate Location record.
9. Developer & development status
The registered promoter is SPEED DEVELOPERS, identified in the RERA filing as a partnership. The supplied corporate identifier is GSTIN 36AELFS3865E1ZP. The RERA filing gives a promoter address at Semushi Towers, Rao and Raju Colony, Road No. 2, Thimmapur, Hanamkonda, Warangal, Telangana, PIN 506003 Corporate record RERA filing.
The Form B affidavit is made by Harish Dugyala on behalf of SPEED DEVELOPERS and declares a completion date of 01-09-2025. The header records 70% completeness, but the supplied evidence does not state its as-of date or independently verify progress RERA record. No project-specific official contact details or confirmed promoter website are supplied in the RERA evidence.
10. Approvals, official records & documents
| Record | What the supplied evidence establishes |
|---|---|
| TG-RERA registration certificate, P00300005501 | Form C registration for DS RAO GREEN CITY; valid from 07/12/2022 to 01/09/2025, unless extended by the Authority. No extension is shown in the certificate |
| KUDA layout proceedings, D.P.No. 69 /2022 | Layout approval dated 01-09-2022, file CI/000311 /LT/U6/KUDA/2021, for an open-plots layout at Thimmapur; the proceedings record the listed land-use components and conditions |
| RERA Form B declaration | Harish Dugyala’s affidavit on behalf of SPEED DEVELOPERS declares the land free from encumbrances and undertakes completion by 01-09-2025 |
| Layout-related deeds cited in the approval | Gift settlement deed 6811/2022 for open space and garbage-station area; mortgage deed 6810/2022; gift settlement deed 6812/2022 for roads, each dated 05-08-2022 |
| Occupancy/completion certificate | No such certificate is included in the supplied project documents Document index |
| Building plans / commencement evidence | The supplied approval extract concerns the plotted layout. It does not provide a building-wise commencement or sanctioned-building-plan schedule |
1. Project at a glance
Project identity
Registered project: DS RAO GREEN CITY
Project type: Plotted development / open-plots layout
Phase or registered portion: Phase not identified in the supplied record; registration is for the project described in the certificate
TG-RERA registration: P00300005501
Registration validity: 07/12/2022 to 01/09/2025; the certificate says “2 years.” No extension is recorded in the supplied certificate
Registered promoter: SPEED DEVELOPERS
RERA status: The certificate records registration under section 5. It does not establish the project’s current registration status after 01/09/2025
Land and geographic identity
Locality / revenue village: Thimmapur; the layout approval specifies Thimmapur Village, Khila Warangal Mandal, Warangal District
Mandal: Khila Warangal in the layout-approval proceedings; the RERA certificate contains a different mandal entry, so the registered mandal is not consistently established by the supplied documents
District: Warangal in the layout-approval proceedings; the RERA certificate contains a different district entry. The site’s administrative district is therefore not consistently established by these documents
PIN: 506003 in the project header. The certificate gives a promoter-office PIN, not a verified project-site PIN
Survey numbers and subdivisions: 126/A, 127/A, 127/B, 128/B, 128/D, 129/A/1, 130/B, 131, 134, 135/A, 152/B, 152/C, 153/B, 154/3/A, 154/3/B
Registered site extent: The layout proceedings state 227852.10 Sq.mts or Ac..56.12 gts.
Filed area figures: Total area 227852.10 sq.mts; area affected by road widening/FTL/nala widening 3562.13 sq.mts; net area 224289.97 sq.mts
Layout boundaries: East: 45 M ROAD; North: 18 M ROAD; West and South: LAND OF OTHERS
Development identity
Sanctioning authority: Kakatiya Urban Development Authority (KUDA), in the layout proceedings
Principal approval: Layout approval D.P.No. 69 /2022, dated 01-09-2022; file CI/000311 /LT/U6/KUDA/2021
Approved net plotted area: 1.32,898.49 Sq.mts. as extracted from the approval record; the source text also labels it 58.35%
Plot count: The approval extraction records 568 plots. It also contains a separate, inconsistent text entry “Total Plots 46”; the approval describes Plot Nos. 23 to 68 (46 plots) as mortgaged, not as the total layout inventory
Buildings / floors: No apartment blocks, building count, or floor configuration is established. The approval specifies individual residential dwelling houses on the plotted sites
Approved built-up area: 132898.49 sq.mts is listed in the RERA-filed land details as “Approved Built up Area”; the supplied material does not establish a building-wise approved built-up schedule
RERA-declared housing inventory: Plot count and plot-size schedule are not supplied as a unit-by-unit RERA inventory in the provided data
Offering and status
Offering: Residential plots; the layout approval says each approved building site is for an individual residential dwelling house
Plot sizes / booked and available counts: Not disclosed in the supplied project evidence
Construction stage: No independently verified site-progress record is supplied. The RERA-filed completion undertaking was 01-09-2025; the project header records 70% completeness, but no measurement date or independent verification is provided
Completion deadline: Promoter-declared completion date: 01-09-2025
Registration validity: Separately, the certificate validity ended 01/09/2025, unless extended by the Authority; no extension is recorded in the supplied certificate
OC / completion certificate: No occupancy or completion certificate is supplied. For a plotted layout, the record does not establish a building-level OC
2. The project story
DS RAO GREEN CITY is recorded as a residential plotted layout in the survey lands listed above at Thimmapur. KUDA’s proceedings describe an open-plots layout in favour of M/s. Speed Developers and approve D.P.No. 69 /2022. The approval identifies 568 plots, residential use for individual dwelling houses, internal roads, open space, utility and water-tank areas, and land reserved or mortgaged for specified purposes.
The promoter’s Form B affidavit undertakes completion by 01-09-2025. The header reports 70% completeness, but the supplied evidence does not identify the date or method for that figure, and it is not independent site verification. No RERA-filed plot-wise booking or availability schedule, completion certificate, or evidence of delivered infrastructure is included here.
3. Master plan, architecture & building design
This is a plotted layout, not an apartment-building scheme in the supplied approval. The layout proceedings state a site extent of 227852.10 Sq.mts or Ac..56.12 gts., and list the following land-use components. The extracted figures and formatting are reproduced as recorded; the source includes irregular number formatting.
Open Space area: 22,798.70 Sq.mts. (10.00%)
Roads area: 66.275.82 Sq.mts (29.08%)
Net Plotted area: 1.32,898.49 Sq.mts. (58.35%)
Social Infrastructure area: 2,139.19 Sq.mts.
Mortgaged area: 20.081.04 Sq.mts. (15.11%)
150* Road affected Area (East Side): 2,061.17 Sq. mts.
60' Road affected Area (West Side): 1,500.96 Sq.mts.
Kunta FTL Area: 3.133.64 Sg.mts
Utility Arca: 144.15 Sq.mts
Garbage area: 150.04 Sq.mts.
Water Tank area: 234.02 Sq. Mts.
The approval identifies road widths of 40 ft. or 12.192 meters, 60 ft or 18.288 meters, 80 ft. or 24.384 meters, and “not less than 40'0" wide.” It requires plot boundaries and dimensions to follow the approved plan and records a pedestrian-protection condition for footpaths. The approval also states that sites and streets are to be demarcated and that roads and drainage, lighting, culverts and related works are to be formed and handed over as directed by the relevant executive authority.
The approval calls for detached, single-family residential dwelling houses on the plots, and says not less than 50% of each site is to remain vacant open space. No plot-wise layout drawing, dimensions schedule, building design, or phase/tower arrangement is available in the supplied extracts.
4. Homes, configurations & floor plans
No RERA unit-type schedule, plot-size bands, booked/available counts, or plot-wise saleable-area schedule is supplied. Accordingly, a configuration-level inventory cannot be reported from this evidence. The approval identifies 568 plots, but does not provide individual plot sizes or booking status.
Two drawings are listed, but neither has been measured: both remain scans pending, and there are no software-measured carpet areas. The project’s recorded offering is plots rather than apartments; apartment carpet-area or loading assumptions do not apply to the supplied layout evidence.
5. Parking & vehicle circulation
The layout approval identifies internal roads and road widths but does not provide a parking count, visitor or accessible-space provision, parking allocation, or vehicle-entry/exit arrangement. A third-party vendor record lists “Open Parking,” without a count or evidence of sanctioned or allocated spaces; this is not established as an approved or delivered provision.
The approval requires road formation and includes footpath-related conditions, but the supplied evidence does not establish pedestrian/vehicle separation or a completed circulation system.
6. Amenities, recreation & open spaces
The approval’s layout provisions and the promoter’s RERA filing are not accompanied by verified completion evidence. The RERA amenity entries show 0% progress where a percentage is given; they should therefore be read as filed disclosures, not as proof of delivery.
| Description / size | 22,798.70 Sq.mts. (10.00%) in the layout approval; a gift settlement deed for open space and garbage-station area is recorded as 6811/2022, dated 05-08-2022 |
|---|---|
| Evidence source | KUDA layout proceedings |
| Declared progress / verified status | Approval-record provision; completion not independently verified |
| Description / size | Listed as available “YES” in the RERA amenity data; no size or quantity supplied |
|---|---|
| Evidence source | RERA-filed amenity data |
| Declared progress / verified status | 0% progress recorded; completion not verified |
| Description / size | Listed without a supplied size or description |
|---|---|
| Evidence source | RERA-filed amenity data |
| Declared progress / verified status | 0% progress recorded |
| Description / size | Internal roads and footpaths are listed in the RERA amenity data; road widths in the approval are 40 ft. or 12.192 meters, 60 ft or 18.288 meters, 80 ft. or 24.384 meters, and “not less than 40'0" wide” |
|---|---|
| Evidence source | RERA-filed amenity data and KUDA layout proceedings |
| Declared progress / verified status | Amenity progress shown as 0%; no independent completion verification |
| Description / size | Listed as available “YES”; no specification supplied |
|---|---|
| Evidence source | RERA-filed amenity data |
| Declared progress / verified status | 0% progress recorded |
| Description / size | Approval requires a compound wall around the open space, stated as 4 feet from road level |
|---|---|
| Evidence source | KUDA layout proceedings |
| Declared progress / verified status | Required by approval; construction not verified |
| Description / size | Approval calls for avenue platforms along roads and open space and says each plot owner is to plant five trees |
|---|---|
| Evidence source | KUDA layout proceedings |
| Declared progress / verified status | Required or stated in the approval; completion not verified |
7. Utilities, building services & safety
The RERA amenity filing lists water supply, sewerage, storm-water drains, sewage/sullage treatment and disposal, solid-waste management, rainwater harvesting, energy management, fire protection, and an electrical meter room/sub-station/receiving station. It gives no capacities, technical specifications, or verified completion evidence; entries with a progress percentage show 0%.
The layout approval identifies a Water Tank area of 234.02 Sq. Mts., a Utility Arca of 144.15 Sq.mts, and a Garbage area of 150.04 Sq.mts. It requires rainwater-harvesting structures and a water-harvesting pit. These are approval-record provisions, not evidence that the facilities have been completed or commissioned.
The supplied documents do not establish water source or storage capacity, an STP design or capacity, treated-water reuse, electrical supply or backup capacity, fire-system design, security systems, or accessibility provisions.
8. Location, access & connectivity
The layout-approval proceedings place the project at Thimmapur Village, Khila Warangal Mandal, Warangal District. The project header identifies Thimmapur, Warangal Urban, PIN 506003. The RERA certificate contains different administrative location entries; the evidence supplied does not resolve those entries into one consistent site-address record.
The project boundaries recorded in the RERA filing are 45 M ROAD to the east and 18 M ROAD to the north; the other two boundaries are land of others. The layout approval provides for internal roads and lists several approved road widths. The location record also reports Financial District (Nanakramguda): 1.2 km from a cadastral parcel centroid; this is a recorded distance, not a travel-time estimate.
9. Developer & development status
The registered promoter is SPEED DEVELOPERS, identified in the RERA filing as a partnership. The supplied corporate identifier is GSTIN 36AELFS3865E1ZP. The RERA filing gives a promoter address at Semushi Towers, Rao and Raju Colony, Road No. 2, Thimmapur, Hanamkonda, Warangal, Telangana, PIN 506003.
The Form B affidavit is made by Harish Dugyala on behalf of SPEED DEVELOPERS and declares a completion date of 01-09-2025. The header records 70% completeness, but the supplied evidence does not state its as-of date or independently verify progress. No project-specific official contact details or confirmed promoter website are supplied in the RERA evidence.
10. Approvals, official records & documents
TG-RERA registration certificate, P00300005501: Form C registration for DS RAO GREEN CITY; valid from 07/12/2022 to 01/09/2025, unless extended by the Authority. No extension is shown in the certificate
KUDA layout proceedings, D.P.No. 69 /2022: Layout approval dated 01-09-2022, file CI/000311 /LT/U6/KUDA/2021, for an open-plots layout at Thimmapur; the proceedings record the listed land-use components and conditions
RERA Form B declaration: Harish Dugyala’s affidavit on behalf of SPEED DEVELOPERS declares the land free from encumbrances and undertakes completion by 01-09-2025
Layout-related deeds cited in the approval: Gift settlement deed 6811/2022 for open space and garbage-station area; mortgage deed 6810/2022; gift settlement deed 6812/2022 for roads, each dated 05-08-2022
Occupancy/completion certificate: No such certificate is included in the supplied project documents
Building plans / commencement evidence: The supplied approval extract concerns the plotted layout. It does not provide a building-wise commencement or sanctioned-building-plan schedule
Frequently asked questions
Is DS RAO GREEN CITY registered with Telangana RERA?
Yes. DS RAO GREEN CITY is registered with the Telangana Real Estate Regulatory Authority as P00300005501; the registration status is New Project.
Who is the developer of DS RAO GREEN CITY?
The promoter named in the RERA registration is SPEED DEVELOPERS.
Where is DS RAO GREEN CITY located?
DS RAO GREEN CITY is in THIMMAPUR,HANAMKONDA, Hanamkonda, Telangana (506003).
When will DS RAO GREEN CITY be completed?
The promoter's proposed date of completion filed with RERA is 01/09/2025. This is the promoter's declaration, not a guarantee.