DIKSHITH APARTMENTS is a residential apartment project located on Goushala Road, Goshala, Bodhan, Bodhan mandal, Nizamabad district. The registered promoter is GANGAVARAPU DIKSHITH LAXMI KUMAR. The project is on 836.07 sq.m of land and comprises one residential building, Building A, with 1 Stilt + 5 upper floors and 20 2BHK units. It is registered under TG-RERA number P03100008753, with proposed completion by 14/05/2027.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
8 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
Project at a glance
Project identity
| Field | Record |
|---|---|
| Registered project name | DIKSHITH APARTMENTS RERA record |
| Project type | Residential apartment project RERA record |
| Phase / registered portion | Phase not separately identified in the supplied record; registration is for DIKSHITH APARTMENTS RERA record |
| TG-RERA registration | P03100008753 RERA record |
| Registration validity | 09/09/2024 to 14/05/2027, subject to extension by the Authority Approvals record |
| Registered promoter | GANGAVARAPU DIKSHITH LAXMI KUMAR RERA record Corporate record |
| RERA status | Registered; record identifies the project as “New Project.” RERA record Approvals record |
Land and geographic identity
| Field | Record |
|---|---|
| Locality / address | Goushala Road, Goshala, Bodhan RERA record |
| Revenue village | GOSHALA in the RERA record; the supplied title and approval documents also refer to Bodhan/Bodhan Town or Bodhan Village. The revenue-village identity is not reconciled in the supplied material. RERA record Land records |
| Mandal / district / PIN | Bodhan / Nizamabad / 503185 RERA record |
| Project survey / municipal identifiers | H.NO.MPL NO.1-4-968(OLD); 1-4-1134(NEW)(PART AREA); MPL No. 1-4-968; 1-4-1134(OLD); 1-4-1134/A/1(NEW); and Assessment No. 1044200586. The registration certificate also lists “1-4-1134(NEW) AND 1-4-1134/A/(NEW),ASSESSMENT NO. 1044200586.” RERA record Land records |
| Site extent | 836.07 sq.m stated in the building-permission and commencement-certificate records. Land records |
| Total / net area | Total land area 836.07 sq.m; net area 836.07 sq.m in the commencement-certificate extraction. RERA filing |
| Boundaries in RERA land record | East: open place of owner; West: existing wide road; North: open place of owner; South: open place of owner. RERA filing |
| Road references in filed approval material | Approval-plan extraction refers to a 9.14 MT wide existing road, a 9.14 MT wide proposed road and a 4.5M wide driveway; the commencement-certificate extraction lists road width as 18M. |
Development identity
| Field | Record |
|---|---|
| Principal building permission | Approval No. 0001/BP/3070/2024, dated 15 May, 2024, issued by Bodhan Municipality/Municipal Corporation. Approvals record |
| Other approval reference | File No. 003493/BP/DTCP/3070/0005/2024 appears in the commencement-certificate record. Approvals record |
| Building / floors | One residential building, Building A: 1 Stilt + 5 upper floors. |
| Height | The commencement-certificate extraction states 14.25 m; the approval-plan extraction separately states building height 14.25 MT and total height 20.15mt. |
| Approved built-up area | The approval-plan extraction states 2045.15 total proposed built-up area excluding parking and 2499.55 including parking; the commencement-certificate extraction states 2,045.15 m2 for residential upper floors and 393.43 m2 for stilt. |
| Parking provision in approval extraction | 12 cars proposed; proposed parking area 454.40, required parking area 449.93. The commencement-certificate conditions specify that approved cellar and stilt parking must be used exclusively for vehicle parking. |
| Approved versus RERA-declared units | Approval-plan extraction: 20 units; RERA filing: 20 units. RERA unit table |
Offering and status
| Field | Record |
|---|---|
| RERA-filed configuration | 2BHK, 20 units; saleable area recorded as 26.0 sq.m. RERA unit table RERA unit details |
| Booking / availability | Portal-derived record shows 0 booked and 20 available; the source does not provide an as-of date, so these counts are indicative. RERA unit table RERA unit details |
| Completion dates | Promoter’s Form B declares completion by 14/05/2027; the registration certificate is valid through 14/05/2027. The building-permission record lists validity to 15 May, 2027. |
| Construction stage | RERA classifies the project as “New Project.” The supplied data does not establish independently verified construction progress. RERA record RERA amenities |
| Occupancy / completion certificate | No occupancy or completion certificate is identified in the supplied project documents. The commencement-certificate conditions require an occupancy certificate before occupation. |
The project story
DIKSHITH APARTMENTS is registered as a residential apartment project in Goushala Road, Bodhan, Nizamabad district. The filed development is one building, Building A, comprising a stilt level and five upper floors, on a stated site area of 836.07 sq.m. The approval records identify residential use and 20 units. RERA record
The RERA unit record lists 20 two-bedroom units, all shown as available and none booked in the portal-derived snapshot; that snapshot has no stated retrieval date. The supplied record describes the project as new, but does not provide independently verified construction progress or establish that any portion is complete or occupied. No occupancy or completion certificate is included in the supplied material. RERA unit table RERA unit details RERA record
Master plan, architecture & building design
The RERA-filed approval material describes one residential apartment building on 836.07 sq.m of land. The sanctioned configuration is 1 Stilt + 5 upper floors. The approval-plan extraction records proposed built-up area as 2045.15 excluding parking and 2499.55 including parking; it also records 454.40 as proposed parking area. The commencement-certificate extraction gives 2,045.15 m2 for the residential upper floors and 393.43 m2 for the stilt. These are approval-record figures; the supplied extracts do not identify them as carpet area or FSI-counted area.
The approval-plan extraction lists a tot-lot, green strip, distribution transformer, rain water harvesting, lift and staircase. The commencement-certificate extraction lists one rainwater-harvesting structure, transformer space and a garbage house, and records tot-lot area as 0 m2. These entries describe filed or approval-record provisions, not verified completed facilities.
The supplied material does not provide a reliable drawing-based account of building footprint, flats per floor, lift or stair count, internal circulation, or residential/common-area distribution. Floor-plan records indicate two drawings were measured, but no flat designs were measured for the 2BHK configuration. Floor plans
Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 20 | 0 | 20 | 26.0 sq.m | Not established | Not supplied |
The unit counts, booking figures and saleable area above are RERA-record fields; booking figures have no supplied as-of date. The floor-plan review did not produce a measured 2BHK flat design, so no software-measured carpet area or room dimensions can be reported. The filing labels the area as saleable; the supplied evidence does not define a carpet-area figure for these units. RERA unit table RERA unit details Floor plans
Parking & vehicle circulation
The approval-plan extraction records 12 cars proposed, 454.40 as proposed parking area and 449.93 as required parking area. The commencement-certificate conditions say the approved cellar and stilt parking are to be used exclusively for vehicle parking, without partition walls or rolling shutters. The plan extraction also refers to a 4.5M wide driveway.
The approval record does not establish visitor or accessible-space counts, EV charger quantities, a parking allocation for individual units, or exclusive ownership rights in any particular bay. The approval conditions require EV charging infrastructure in parking places; the supplied material does not confirm installation or completion.
Amenities, recreation & open spaces
The RERA amenities record lists 14 items. Each item with a stated percentage is recorded at 0%; the record provides no evidence of independent completion verification. RERA amenities
| Description / size | Listed as a project amenity; no size or facility description supplied. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | 0% in RERA amenities record; completion not independently verified. |
| Description / size | Approval-plan extraction lists a tot-lot and green strip; commencement-certificate extraction records tot-lot area as 0 m2. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA amenities record: 0%; completion not independently verified. |
| Description / size | Listed in the RERA amenities record; no area supplied. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | 0%; completion not independently verified. |
| Description / size | Listed in the RERA amenities record; sizes and capacities not supplied. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | 0%; completion not independently verified. |
Utilities, building services & safety
The RERA amenities record marks water supply, sewerage, storm-water drains, rainwater harvesting and electrical meter room/sub-station/receiving station as available, while recording 0% progress for those listed facilities. “Available” is a filing value, not independent confirmation of operational service. The approval records also list a transformer space, rainwater-harvesting structure and garbage house. RERA amenities
The approval-plan extraction lists a lift and staircase but does not state their number, capacity or configuration. It includes a dual-piping-system condition for specified larger developments; the supplied record does not establish whether that threshold applies to this project or confirm installation. The commencement-certificate conditions require an occupancy certificate before occupation and identify rainwater harvesting and transformer space as conditions. Fire-safety systems, sewerage-treatment capacity, water source and storage, power backup, CCTV, access control, waste segregation, accessibility features and completed service capacities are not established by the supplied evidence.
Location, access & connectivity
The registered location is Goushala Road, Goshala, Bodhan, Nizamabad, Telangana, 503185. The project record also identifies Bodhan mandal and Nizamabad district. RERA record
A location record provides a geocoded point in Bodhan and an approximate 129.6 km distance to the nearest sampled Outer Ring Road interchange. No other measured distances, public-transport details or project-specific approach-road descriptions are supplied. Location record
Developer & development status
The registered promoter is GANGAVARAPU DIKSHITH LAXMI KUMAR, identified in the project record as a proprietorship. The supplied material gives the promoter’s address as B, Goshala Road, Bodhan Ward 27, Goushala Road, Bodhan, Nizamabad, 503185. It does not provide a verified corporate registration identifier, official contact details or official website. Corporate record Parties record
The promoter’s Form B declares completion by 14/05/2027. The project is recorded as a new project, and the supplied evidence does not establish construction progress through an independent site inspection. Registration validity, the promoter’s declared completion date and the absence of an occupancy certificate are separate record points; the supplied documents identify no occupancy or completion certificate. RERA record
Approvals, official records & documents
| Identifier / date | P03100008753; valid 09/09/2024–14/05/2027 |
|---|---|
| What the supplied record establishes | Registration certificate identifies DIKSHITH APARTMENTS and promoter Gangavarapu Dikshith Laxmi Kumar. |
| Identifier / date | Approval No. 0001/BP/3070/2024; 15 May, 2024 |
|---|---|
| What the supplied record establishes | Bodhan Municipality/Municipal Corporation approval for a residential apartment building; the extraction records Building A as 1 stilt + 5 upper floors. |
| Identifier / date | File No. G1/987/TP/MCB/2020-21; approved date 01-04-2024 |
|---|---|
| What the supplied record establishes | Approval-plan extraction records Building A, 20 units, site extent 836.07 sq.mt, floor configuration and plan conditions. |
| Identifier / date | 003493/BP/DTCP/3070/0005/2024 |
|---|---|
| What the supplied record establishes | File number recorded in the commencement-certificate extraction. |
| Identifier / date | Form B |
|---|---|
| What the supplied record establishes | Promoter declaration includes the title basis, encumbrance statement and completion undertaking; these are promoter assertions. |
| Identifier / date | Not identified in supplied documents |
|---|---|
| What the supplied record establishes | The commencement-certificate conditions require an occupancy certificate before occupation. |
Project at a glance
Project identity
Registered project name: DIKSHITH APARTMENTS
Project type: Residential apartment project
Phase / registered portion: Phase not separately identified in the supplied record; registration is for DIKSHITH APARTMENTS
TG-RERA registration: P03100008753
Registration validity: 09/09/2024 to 14/05/2027, subject to extension by the Authority
Registered promoter: GANGAVARAPU DIKSHITH LAXMI KUMAR
RERA status: Registered; record identifies the project as “New Project.”
Land and geographic identity
Locality / address: Goushala Road, Goshala, Bodhan
Revenue village: GOSHALA in the RERA record; the supplied title and approval documents also refer to Bodhan/Bodhan Town or Bodhan Village. The revenue-village identity is not reconciled in the supplied material.
Mandal / district / PIN: Bodhan / Nizamabad / 503185
Project survey / municipal identifiers: H.NO.MPL NO.1-4-968(OLD); 1-4-1134(NEW)(PART AREA); MPL No. 1-4-968; 1-4-1134(OLD); 1-4-1134/A/1(NEW); and Assessment No. 1044200586. The registration certificate also lists “1-4-1134(NEW) AND 1-4-1134/A/(NEW),ASSESSMENT NO. 1044200586.”
Site extent: 836.07 sq.m stated in the building-permission and commencement-certificate records.
Total / net area: Total land area 836.07 sq.m; net area 836.07 sq.m in the commencement-certificate extraction.
Boundaries in RERA land record: East: open place of owner; West: existing wide road; North: open place of owner; South: open place of owner.
Road references in filed approval material: Approval-plan extraction refers to a 9.14 MT wide existing road, a 9.14 MT wide proposed road and a 4.5M wide driveway; the commencement-certificate extraction lists road width as 18M.
Development identity
Principal building permission: Approval No. 0001/BP/3070/2024, dated 15 May, 2024, issued by Bodhan Municipality/Municipal Corporation.
Other approval reference: File No. 003493/BP/DTCP/3070/0005/2024 appears in the commencement-certificate record.
Building / floors: One residential building, Building A: 1 Stilt + 5 upper floors.
Height: The commencement-certificate extraction states 14.25 m; the approval-plan extraction separately states building height 14.25 MT and total height 20.15mt.
Approved built-up area: The approval-plan extraction states 2045.15 total proposed built-up area excluding parking and 2499.55 including parking; the commencement-certificate extraction states 2,045.15 m2 for residential upper floors and 393.43 m2 for stilt.
Parking provision in approval extraction: 12 cars proposed; proposed parking area 454.40, required parking area 449.93. The commencement-certificate conditions specify that approved cellar and stilt parking must be used exclusively for vehicle parking.
Approved versus RERA-declared units: Approval-plan extraction: 20 units; RERA filing: 20 units.
Offering and status
RERA-filed configuration: 2BHK, 20 units; saleable area recorded as 26.0 sq.m.
Booking / availability: Portal-derived record shows 0 booked and 20 available; the source does not provide an as-of date, so these counts are indicative.
Completion dates: Promoter’s Form B declares completion by 14/05/2027; the registration certificate is valid through 14/05/2027. The building-permission record lists validity to 15 May, 2027.
Construction stage: RERA classifies the project as “New Project.” The supplied data does not establish independently verified construction progress.
Occupancy / completion certificate: No occupancy or completion certificate is identified in the supplied project documents. The commencement-certificate conditions require an occupancy certificate before occupation.
The project story
DIKSHITH APARTMENTS is registered as a residential apartment project in Goushala Road, Bodhan, Nizamabad district. The filed development is one building, Building A, comprising a stilt level and five upper floors, on a stated site area of 836.07 sq.m. The approval records identify residential use and 20 units.
The RERA unit record lists 20 two-bedroom units, all shown as available and none booked in the portal-derived snapshot; that snapshot has no stated retrieval date. The supplied record describes the project as new, but does not provide independently verified construction progress or establish that any portion is complete or occupied. No occupancy or completion certificate is included in the supplied material.
Master plan, architecture & building design
The RERA-filed approval material describes one residential apartment building on 836.07 sq.m of land. The sanctioned configuration is 1 Stilt + 5 upper floors. The approval-plan extraction records proposed built-up area as 2045.15 excluding parking and 2499.55 including parking; it also records 454.40 as proposed parking area. The commencement-certificate extraction gives 2,045.15 m2 for the residential upper floors and 393.43 m2 for the stilt. These are approval-record figures; the supplied extracts do not identify them as carpet area or FSI-counted area.
The approval-plan extraction lists a tot-lot, green strip, distribution transformer, rain water harvesting, lift and staircase. The commencement-certificate extraction lists one rainwater-harvesting structure, transformer space and a garbage house, and records tot-lot area as 0 m2. These entries describe filed or approval-record provisions, not verified completed facilities.
The supplied material does not provide a reliable drawing-based account of building footprint, flats per floor, lift or stair count, internal circulation, or residential/common-area distribution. Floor-plan records indicate two drawings were measured, but no flat designs were measured for the 2BHK configuration.
Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 20 | 0 | 20 | 26.0 sq.m | Not established | Not supplied |
The unit counts, booking figures and saleable area above are RERA-record fields; booking figures have no supplied as-of date. The floor-plan review did not produce a measured 2BHK flat design, so no software-measured carpet area or room dimensions can be reported. The filing labels the area as saleable; the supplied evidence does not define a carpet-area figure for these units.
Parking & vehicle circulation
The approval-plan extraction records 12 cars proposed, 454.40 as proposed parking area and 449.93 as required parking area. The commencement-certificate conditions say the approved cellar and stilt parking are to be used exclusively for vehicle parking, without partition walls or rolling shutters. The plan extraction also refers to a 4.5M wide driveway.
The approval record does not establish visitor or accessible-space counts, EV charger quantities, a parking allocation for individual units, or exclusive ownership rights in any particular bay. The approval conditions require EV charging infrastructure in parking places; the supplied material does not confirm installation or completion.
Amenities, recreation & open spaces
The RERA amenities record lists 14 items. Each item with a stated percentage is recorded at 0%; the record provides no evidence of independent completion verification.
| Description / size | Listed as a project amenity; no size or facility description supplied. |
|---|---|
| Declared progress / verified status | 0% in RERA amenities record; completion not independently verified. |
| Description / size | Approval-plan extraction lists a tot-lot and green strip; commencement-certificate extraction records tot-lot area as 0 m2. |
|---|---|
| Declared progress / verified status | RERA amenities record: 0%; completion not independently verified. |
| Description / size | Listed in the RERA amenities record; no area supplied. |
|---|---|
| Declared progress / verified status | 0%; completion not independently verified. |
| Description / size | Listed in the RERA amenities record; sizes and capacities not supplied. |
|---|---|
| Declared progress / verified status | 0%; completion not independently verified. |
Utilities, building services & safety
The RERA amenities record marks water supply, sewerage, storm-water drains, rainwater harvesting and electrical meter room/sub-station/receiving station as available, while recording 0% progress for those listed facilities. “Available” is a filing value, not independent confirmation of operational service. The approval records also list a transformer space, rainwater-harvesting structure and garbage house.
The approval-plan extraction lists a lift and staircase but does not state their number, capacity or configuration. It includes a dual-piping-system condition for specified larger developments; the supplied record does not establish whether that threshold applies to this project or confirm installation. The commencement-certificate conditions require an occupancy certificate before occupation and identify rainwater harvesting and transformer space as conditions. Fire-safety systems, sewerage-treatment capacity, water source and storage, power backup, CCTV, access control, waste segregation, accessibility features and completed service capacities are not established by the supplied evidence.
Location, access & connectivity
The registered location is Goushala Road, Goshala, Bodhan, Nizamabad, Telangana, 503185. The project record also identifies Bodhan mandal and Nizamabad district.
A location record provides a geocoded point in Bodhan and an approximate 129.6 km distance to the nearest sampled Outer Ring Road interchange. No other measured distances, public-transport details or project-specific approach-road descriptions are supplied.
Developer & development status
The registered promoter is GANGAVARAPU DIKSHITH LAXMI KUMAR, identified in the project record as a proprietorship. The supplied material gives the promoter’s address as B, Goshala Road, Bodhan Ward 27, Goushala Road, Bodhan, Nizamabad, 503185. It does not provide a verified corporate registration identifier, official contact details or official website.
The promoter’s Form B declares completion by 14/05/2027. The project is recorded as a new project, and the supplied evidence does not establish construction progress through an independent site inspection. Registration validity, the promoter’s declared completion date and the absence of an occupancy certificate are separate record points; the supplied documents identify no occupancy or completion certificate.
Approvals, official records & documents
| Identifier / date | P03100008753; valid 09/09/2024–14/05/2027 |
|---|---|
| What the supplied record establishes | Registration certificate identifies DIKSHITH APARTMENTS and promoter Gangavarapu Dikshith Laxmi Kumar. |
| Identifier / date | Approval No. 0001/BP/3070/2024; 15 May, 2024 |
|---|---|
| What the supplied record establishes | Bodhan Municipality/Municipal Corporation approval for a residential apartment building; the extraction records Building A as 1 stilt + 5 upper floors. |
| Identifier / date | File No. G1/987/TP/MCB/2020-21; approved date 01-04-2024 |
|---|---|
| What the supplied record establishes | Approval-plan extraction records Building A, 20 units, site extent 836.07 sq.mt, floor configuration and plan conditions. |
| Identifier / date | 003493/BP/DTCP/3070/0005/2024 |
|---|---|
| What the supplied record establishes | File number recorded in the commencement-certificate extraction. |
| Identifier / date | Form B |
|---|---|
| What the supplied record establishes | Promoter declaration includes the title basis, encumbrance statement and completion undertaking; these are promoter assertions. |
| Identifier / date | Not identified in supplied documents |
|---|---|
| What the supplied record establishes | The commencement-certificate conditions require an occupancy certificate before occupation. |
Frequently asked questions
Is DIKSHITH APARTMENTS registered with Telangana RERA?
Yes. DIKSHITH APARTMENTS is registered with the Telangana Real Estate Regulatory Authority as P03100008753; the registration status is New Project.
Who is the developer of DIKSHITH APARTMENTS?
The promoter named in the RERA registration is GANGAVARAPU DIKSHITH LAXMI KUMAR.
Where is DIKSHITH APARTMENTS located?
DIKSHITH APARTMENTS is in GOUSHALA ROAD, GOSHALA, BODHAN, Nizamabad, Telangana (503185).
When will DIKSHITH APARTMENTS be completed?
The promoter's proposed date of completion filed with RERA is 14/09/2027. This is the promoter's declaration, not a guarantee.