F3 INFRA is a plotted development in Battisawargaon, Mavala Mandal, Adilabad District. The registered promoter developing it is F3 INFRA. The layout has a registered land extent of 25,417.44 sq.m and 92 plots, with no buildings or floor configuration identified; the plot-size range is 131.88–167.21 sq.m (157.7–200.0 sq.yd). It is registered with TG-RERA under P00100008745, with proposed completion by 03-05-2025.

01What we found

Period endedTG-RERA registration ran to 3 May 2025 - check its extension on TG-RERA
15documents on file - each fact links to its page
1court case on this project's land (survey 16, Adilabad)
9items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

9 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemProject record
Registered project nameF3 INFRA RERA record
Project typePlotted development / layout with open plots RERA record RERA filing
Phase or registered portionNot separately identified; the registration is for the plotted project on Survey Nos. 16/1/1, 16/1/2 and 16/1/3
TG-RERA registrationP00100008745 RERA record
Registration validity6 September 2024 to 3 May 2025; this is the stated registration validity, not evidence of completion or an occupancy certificate RERA record
Registered promoterF3 INFRA RERA record
RERA project status“New Project” in the project record RERA filing

Land and geographic identity

ItemProject record
Locality / municipalityBattisawargaon; within the limits of Adilabad Municipality, as stated in the layout record
Revenue villageBattisawargaon in the layout approval record; the RERA project record itself gives Adilabad and does not disclose its village or mandal fields RERA filing
MandalMavala in the layout approval record
District / PINAdilabad / 504001 RERA record
Project survey numbers and subdivisions16/1/1, 16/1/2 and 16/1/3 RERA record
Registered site extent25,417.44 sq.m in the RERA land details RERA filing
Layout plan area statementTotal/site extent 25,416.67 sq.m; net layout area 24,843.96 sq.m; the plan also states a 572.71 sq.m deduction for net plot area left over owners’ land
BoundariesEast: Main Road; West, North and South: Others Land RERA filing

Development identity

ItemProject record
Layout sanctioning authorityAdilabad Municipality / Municipal Corporation; the plan identifies delegated authority as Adilabad Municipality
Principal approvalTentative Layout Plan No. 0024/LO/3025/2023, dated 03 May 2023
Other plan identifier on filePermit/application number TS/075164/2022, dated 28-11-2022 in the drawing record Approvals record
Approved development type and scaleNew layout with 92 plots; the plan lists 0.00 proposed coverage and 0.00 total proposed built-up area, with or without parking
Building count / floor configurationNo buildings or floor configuration are identified; this is a plotted layout
ParkingThe plan states 0 proposed number of parkings and 0.00 sq.m common parking area
RERA-declared built-up and mortgage areasApproved built-up area 14,000.95 sq.m and mortgage area 2,204.87 sq.m are recorded in the RERA fields; these are distinct from the plan’s stated proposed built-up area and mortgage-area figure RERA filing

Offering and status

ItemProject record
Unit type and countPlots; 92 in the filed layout schedule Layout record
Plot sizesDrawing-derived schedule covers 92 plots in the 150–200 sq.yd band; smallest 131.88 sq.m (157.7 sq.yd), median 153.31 sq.m (183.4 sq.yd), largest 167.21 sq.m (200.0 sq.yd). These are software-read from the drawing and require verification against it Layout record
Booked / available countsNot disclosed in the supplied project records RERA filing
Construction / development stageNo independently verified site-progress evidence is supplied; the promoter’s Form B undertaking specified completion by 03-05-2025
Completion deadline03-05-2025, as declared in Form B
Occupancy / completion certificateNot supplied; an occupancy certificate is not identified in the supplied records Document index

2. The project story

F3 INFRA is a plotted-development project on Survey Nos. 16/1/1, 16/1/2 and 16/1/3, in the Battisawargaon locality of Adilabad. The layout approval record identifies Mavala Mandal and Adilabad District and describes the site as within Adilabad Municipality; the RERA record gives Adilabad, district Adilabad, PIN 504001 RERA record. TG-RERA records the project under registration P00100008745.

The filed plan describes a 92-plot layout, with land allocated to plots, roads, open space/park, social infrastructure and utilities. It does not describe residential buildings or apartment construction Layout record. The plan’s conditions place layout infrastructure works—including road formation, drainage, water supply and park development—on the layout applicant; the supplied evidence does not establish how much of this work has been completed on site.

The promoter’s Form B affidavit undertakes completion by 03-05-2025. That undertaking is not an independent progress assessment, and the supplied records do not establish a completion certificate or occupancy certificate Document index.

3. Master plan, architecture & building design

The project is a land layout rather than a building scheme. The layout plan identifies 25,416.67 sq.m as the site extent, 24,843.96 sq.m as the net layout area, and a 572.71 sq.m deduction for net plot area left over owners’ land. It states 0.00 proposed coverage and 0.00 proposed built-up area, with or without parking.

The plan’s land-use schedule is:

Layout componentAreaShare stated in plan
Plotted area14,000.12 sq.m56.35%
Roads7,674.16 sq.m30.89%
Organized open space / park2,297.56 sq.m9.25%
Social infrastructure622.29 sq.m2.50%
Utility area249.79 sq.m1.01%
Amenity area0.00 sq.m0.00%
LIG and EWS plotted areas0.00 sq.m each0.00% each
Buffer zone and green belt areas0.00 sq.m each0.00% each
Common parking area0.00 sq.m0.00%

The layout drawing identifies 92 plots and lists road widths of 9.14MT. WIDE ROAD, 18.0M SERVICE ROAD, 18.00 MT WIDE EXISTING ROAD and 18.00 MT WIDE PROPOSED ROAD. The drawing-derived plot schedule is software-read and should be checked against the drawing Layout record.

The plan records 2,204.39 sq.m as mortgage area; RERA fields separately state 2,204.87 sq.m RERA filing. The layout approval record describes a mortgage over specified plots in favour of the Municipality / Municipal Corporation.

4. Homes, configurations & floor plans

This is a plotted layout, not an apartment project. The filed layout plan lists 92 plots. The plot schedule was software-read from the approved layout drawing; the supplied measurements are not a RERA-filed saleable-area schedule and should be verified against the drawing Layout record.

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading
Plots92Not disclosedNot disclosedNot disclosedNot applicableNot supplied

The software-read plot-size range is 131.88–167.21 sq.m (157.7–200.0 sq.yd), with a median of 153.31 sq.m (183.4 sq.yd); all 92 plots fall in the 150–200 sq.yd band Layout record. The floor-plan review contains two layout sheets and no flats; no carpet or room measurements are supplied Floor plans.

5. Parking & vehicle circulation

The layout plan states 0 proposed number of parkings and 0.00 sq.m common parking area. The plan identifies internal roads, including the listed 9.14-metre, 18-metre service, 18-metre existing and 18-metre proposed road widths. No parking allocation to individual plots, visitor or accessible parking provision, or vehicle/pedestrian circulation details beyond the road entries are established in the supplied records.

6. Amenities, recreation & open spaces

The layout plan reserves land for open space/park, social infrastructure and utilities. The approval record also describes infrastructure and amenity works expected as part of layout development; the supplied evidence does not verify completion of those works.

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Park / organized open space2,297.56 sq.m; 9.25% of the layout areaReserved in the plan; completion not independently verified
Social infrastructure622.29 sq.m; 2.50%Reserved in the plan; specific facility and completion status not established
Tot-lot plotIdentified among the plan’s amenities/utilities; no separate size suppliedPlan reference only; completion not independently verified
Green strip / parkListed in the project amenities record; no separate size suppliedRERA amenitiesListed as available in the project record; completion not independently verified

No clubhouse or indoor recreation facility is identified in the supplied layout records.

7. Utilities, building services & safety

The tentative layout approval describes proposed development works, including water-supply infrastructure, drainage, electrical works and rainwater harvesting. These are plan/approval descriptions, not evidence of completed or operational facilities.

Water
Evidence in the project recordUtility land is reserved (249.79 sq.m; 1.01%). The approval conditions refer to a water reservoir, internal water-supply pipelines, overhead tank and assured water-supply source
Status established by supplied evidenceProposed/described; capacity and completion not established
Sewerage and drainage
Evidence in the project recordApproval conditions refer to underground drainage lines, a common septic tank / STP and storm-water drains
Status established by supplied evidenceProposed/described; capacity and completion not established
Rainwater
Evidence in the project recordRainwater-harvesting pits are included in the approval conditions and water-conservation/rainwater-harvesting is listed in the amenities record RERA amenities
Status established by supplied evidenceListed/proposed; installation and operation not verified
Electrical and street lighting
Evidence in the project recordApproval conditions refer to electrical supply lines, a transformer and street lights
Status established by supplied evidenceProposed/described; capacity and completion not established
Waste management
Evidence in the project recordSolid-waste management is listed among the utility works
Status established by supplied evidenceProposed/described; operating arrangements not established
Fire and accessibility
Evidence in the project recordNo project-specific fire-system or accessibility details are established in the supplied records
Status established by supplied evidenceNot disclosed

8. Location, access & connectivity

The layout approval record places the project within Adilabad Municipality and identifies Battisawargaon, Mavala Mandal, Adilabad District. The RERA record gives the project’s locality as Adilabad, district Adilabad, PIN 504001 RERA record. The recorded site boundaries are Main Road to the east and other land to the west, north and south RERA filing.

The layout plan lists 9.14-metre, 18-metre service, 18-metre existing and 18-metre proposed roads. No project-specific public-transport information or verified travel distances to landmarks is supplied.

9. Developer & development status

The registered promoter is F3 INFRA, recorded as a partnership in the project information. The supplied record identifies the promoter address as Teachers Colony, Adilabad, Adilabad, Telangana, PIN 504001; the project registration certificate gives the office location as Adilabad, PIN 504001 RERA record RERA filing Parties record. A registration certificate page is the supplied project record for the promoter; no separate official website or contact details are provided.

Form B, signed by Gadharla Sangeetha for F3 INFRA, declares a completion undertaking of 03-05-2025. No independent construction-progress evidence or occupancy/completion certificate is supplied; the records therefore do not establish that the promised development works have been completed Document index.

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP00100008745; valid 6 September 2024–3 May 2025
What the supplied document establishesRegistration of F3 INFRA’s plotted project in Adilabad, including Survey Nos. 16/1/1, 16/1/2 and 16/1/3
Layout plan / plan identifier
Identifier / dateTS/075164/2022; drawing dated 28-11-2022
What the supplied document establishesLayout drawing and land-use schedule filed for the project
Tentative layout approval
Identifier / date0024/LO/3025/2023, dated 03 May 2023
What the supplied document establishesApproval for a tentative layout plan issued by Adilabad Municipality / Municipal Corporation
Form B declaration
Identifier / dateDated 02-08-2024
What the supplied document establishesPromoter affidavit and completion undertaking
Commencement / building certificates
Identifier / dateNot identified for buildings; the supplied record is a layout approval
What the supplied document establishesNo building-specific commencement certificate is established
Completion / occupancy certificate
Identifier / dateNot supplied
What the supplied document establishesNo completion or occupancy certificate is established in the supplied documents Document index

The tentative layout approval describes development obligations and records mortgaged plots in favour of the Municipality / Municipal Corporation. The supplied project records include no occupancy/completion certificate or evidence verifying completion of the listed infrastructure works.

Frequently asked questions

Is F3 INFRA registered with Telangana RERA?

Yes. F3 INFRA is registered with the Telangana Real Estate Regulatory Authority as P00100008745; the registration status is New Project.

Who is the developer of F3 INFRA?

The promoter named in the RERA registration is F3 INFRA.

Where is F3 INFRA located?

F3 INFRA is in Adilabad, Telangana (504001).

When will F3 INFRA be completed?

The promoter's proposed date of completion filed with RERA is 03/05/2025. This is the promoter's declaration, not a guarantee.

More projects in Adilabad