F3 Infra
F3 INFRA · Adilabad · RERA P00100008745
F3 INFRA is a plotted development in Battisawargaon, Mavala Mandal, Adilabad District. The registered promoter developing it is F3 INFRA. The layout has a registered land extent of 25,417.44 sq.m and 92 plots, with no buildings or floor configuration identified; the plot-size range is 131.88–167.21 sq.m (157.7–200.0 sq.yd). It is registered with TG-RERA under P00100008745, with proposed completion by 03-05-2025.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
9 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered project name | F3 INFRA RERA record |
| Project type | Plotted development / layout with open plots RERA record RERA filing |
| Phase or registered portion | Not separately identified; the registration is for the plotted project on Survey Nos. 16/1/1, 16/1/2 and 16/1/3 |
| TG-RERA registration | P00100008745 RERA record |
| Registration validity | 6 September 2024 to 3 May 2025; this is the stated registration validity, not evidence of completion or an occupancy certificate RERA record |
| Registered promoter | F3 INFRA RERA record |
| RERA project status | “New Project” in the project record RERA filing |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality / municipality | Battisawargaon; within the limits of Adilabad Municipality, as stated in the layout record |
| Revenue village | Battisawargaon in the layout approval record; the RERA project record itself gives Adilabad and does not disclose its village or mandal fields RERA filing |
| Mandal | Mavala in the layout approval record |
| District / PIN | Adilabad / 504001 RERA record |
| Project survey numbers and subdivisions | 16/1/1, 16/1/2 and 16/1/3 RERA record |
| Registered site extent | 25,417.44 sq.m in the RERA land details RERA filing |
| Layout plan area statement | Total/site extent 25,416.67 sq.m; net layout area 24,843.96 sq.m; the plan also states a 572.71 sq.m deduction for net plot area left over owners’ land |
| Boundaries | East: Main Road; West, North and South: Others Land RERA filing |
Development identity
| Item | Project record |
|---|---|
| Layout sanctioning authority | Adilabad Municipality / Municipal Corporation; the plan identifies delegated authority as Adilabad Municipality |
| Principal approval | Tentative Layout Plan No. 0024/LO/3025/2023, dated 03 May 2023 |
| Other plan identifier on file | Permit/application number TS/075164/2022, dated 28-11-2022 in the drawing record Approvals record |
| Approved development type and scale | New layout with 92 plots; the plan lists 0.00 proposed coverage and 0.00 total proposed built-up area, with or without parking |
| Building count / floor configuration | No buildings or floor configuration are identified; this is a plotted layout |
| Parking | The plan states 0 proposed number of parkings and 0.00 sq.m common parking area |
| RERA-declared built-up and mortgage areas | Approved built-up area 14,000.95 sq.m and mortgage area 2,204.87 sq.m are recorded in the RERA fields; these are distinct from the plan’s stated proposed built-up area and mortgage-area figure RERA filing |
Offering and status
| Item | Project record |
|---|---|
| Unit type and count | Plots; 92 in the filed layout schedule Layout record |
| Plot sizes | Drawing-derived schedule covers 92 plots in the 150–200 sq.yd band; smallest 131.88 sq.m (157.7 sq.yd), median 153.31 sq.m (183.4 sq.yd), largest 167.21 sq.m (200.0 sq.yd). These are software-read from the drawing and require verification against it Layout record |
| Booked / available counts | Not disclosed in the supplied project records RERA filing |
| Construction / development stage | No independently verified site-progress evidence is supplied; the promoter’s Form B undertaking specified completion by 03-05-2025 |
| Completion deadline | 03-05-2025, as declared in Form B |
| Occupancy / completion certificate | Not supplied; an occupancy certificate is not identified in the supplied records Document index |
2. The project story
F3 INFRA is a plotted-development project on Survey Nos. 16/1/1, 16/1/2 and 16/1/3, in the Battisawargaon locality of Adilabad. The layout approval record identifies Mavala Mandal and Adilabad District and describes the site as within Adilabad Municipality; the RERA record gives Adilabad, district Adilabad, PIN 504001 RERA record. TG-RERA records the project under registration P00100008745.
The filed plan describes a 92-plot layout, with land allocated to plots, roads, open space/park, social infrastructure and utilities. It does not describe residential buildings or apartment construction Layout record. The plan’s conditions place layout infrastructure works—including road formation, drainage, water supply and park development—on the layout applicant; the supplied evidence does not establish how much of this work has been completed on site.
The promoter’s Form B affidavit undertakes completion by 03-05-2025. That undertaking is not an independent progress assessment, and the supplied records do not establish a completion certificate or occupancy certificate Document index.
3. Master plan, architecture & building design
The project is a land layout rather than a building scheme. The layout plan identifies 25,416.67 sq.m as the site extent, 24,843.96 sq.m as the net layout area, and a 572.71 sq.m deduction for net plot area left over owners’ land. It states 0.00 proposed coverage and 0.00 proposed built-up area, with or without parking.
The plan’s land-use schedule is:
| Layout component | Area | Share stated in plan |
|---|---|---|
| Plotted area | 14,000.12 sq.m | 56.35% |
| Roads | 7,674.16 sq.m | 30.89% |
| Organized open space / park | 2,297.56 sq.m | 9.25% |
| Social infrastructure | 622.29 sq.m | 2.50% |
| Utility area | 249.79 sq.m | 1.01% |
| Amenity area | 0.00 sq.m | 0.00% |
| LIG and EWS plotted areas | 0.00 sq.m each | 0.00% each |
| Buffer zone and green belt areas | 0.00 sq.m each | 0.00% each |
| Common parking area | 0.00 sq.m | 0.00% |
The layout drawing identifies 92 plots and lists road widths of 9.14MT. WIDE ROAD, 18.0M SERVICE ROAD, 18.00 MT WIDE EXISTING ROAD and 18.00 MT WIDE PROPOSED ROAD. The drawing-derived plot schedule is software-read and should be checked against the drawing Layout record.
The plan records 2,204.39 sq.m as mortgage area; RERA fields separately state 2,204.87 sq.m RERA filing. The layout approval record describes a mortgage over specified plots in favour of the Municipality / Municipal Corporation.
4. Homes, configurations & floor plans
This is a plotted layout, not an apartment project. The filed layout plan lists 92 plots. The plot schedule was software-read from the approved layout drawing; the supplied measurements are not a RERA-filed saleable-area schedule and should be verified against the drawing Layout record.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading |
|---|---|---|---|---|---|---|
| Plots | 92 | Not disclosed | Not disclosed | Not disclosed | Not applicable | Not supplied |
The software-read plot-size range is 131.88–167.21 sq.m (157.7–200.0 sq.yd), with a median of 153.31 sq.m (183.4 sq.yd); all 92 plots fall in the 150–200 sq.yd band Layout record. The floor-plan review contains two layout sheets and no flats; no carpet or room measurements are supplied Floor plans.
5. Parking & vehicle circulation
The layout plan states 0 proposed number of parkings and 0.00 sq.m common parking area. The plan identifies internal roads, including the listed 9.14-metre, 18-metre service, 18-metre existing and 18-metre proposed road widths. No parking allocation to individual plots, visitor or accessible parking provision, or vehicle/pedestrian circulation details beyond the road entries are established in the supplied records.
6. Amenities, recreation & open spaces
The layout plan reserves land for open space/park, social infrastructure and utilities. The approval record also describes infrastructure and amenity works expected as part of layout development; the supplied evidence does not verify completion of those works.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Park / organized open space | 2,297.56 sq.m; 9.25% of the layout area | Reserved in the plan; completion not independently verified | |
| Social infrastructure | 622.29 sq.m; 2.50% | Reserved in the plan; specific facility and completion status not established | |
| Tot-lot plot | Identified among the plan’s amenities/utilities; no separate size supplied | Plan reference only; completion not independently verified | |
| Green strip / park | Listed in the project amenities record; no separate size supplied | RERA amenities | Listed as available in the project record; completion not independently verified |
No clubhouse or indoor recreation facility is identified in the supplied layout records.
7. Utilities, building services & safety
The tentative layout approval describes proposed development works, including water-supply infrastructure, drainage, electrical works and rainwater harvesting. These are plan/approval descriptions, not evidence of completed or operational facilities.
| Evidence in the project record | Utility land is reserved (249.79 sq.m; 1.01%). The approval conditions refer to a water reservoir, internal water-supply pipelines, overhead tank and assured water-supply source |
|---|---|
| Status established by supplied evidence | Proposed/described; capacity and completion not established |
| Evidence in the project record | Approval conditions refer to underground drainage lines, a common septic tank / STP and storm-water drains |
|---|---|
| Status established by supplied evidence | Proposed/described; capacity and completion not established |
| Evidence in the project record | Rainwater-harvesting pits are included in the approval conditions and water-conservation/rainwater-harvesting is listed in the amenities record RERA amenities |
|---|---|
| Status established by supplied evidence | Listed/proposed; installation and operation not verified |
| Evidence in the project record | Approval conditions refer to electrical supply lines, a transformer and street lights |
|---|---|
| Status established by supplied evidence | Proposed/described; capacity and completion not established |
| Evidence in the project record | Solid-waste management is listed among the utility works |
|---|---|
| Status established by supplied evidence | Proposed/described; operating arrangements not established |
| Evidence in the project record | No project-specific fire-system or accessibility details are established in the supplied records |
|---|---|
| Status established by supplied evidence | Not disclosed |
8. Location, access & connectivity
The layout approval record places the project within Adilabad Municipality and identifies Battisawargaon, Mavala Mandal, Adilabad District. The RERA record gives the project’s locality as Adilabad, district Adilabad, PIN 504001 RERA record. The recorded site boundaries are Main Road to the east and other land to the west, north and south RERA filing.
The layout plan lists 9.14-metre, 18-metre service, 18-metre existing and 18-metre proposed roads. No project-specific public-transport information or verified travel distances to landmarks is supplied.
9. Developer & development status
The registered promoter is F3 INFRA, recorded as a partnership in the project information. The supplied record identifies the promoter address as Teachers Colony, Adilabad, Adilabad, Telangana, PIN 504001; the project registration certificate gives the office location as Adilabad, PIN 504001 RERA record RERA filing Parties record. A registration certificate page is the supplied project record for the promoter; no separate official website or contact details are provided.
Form B, signed by Gadharla Sangeetha for F3 INFRA, declares a completion undertaking of 03-05-2025. No independent construction-progress evidence or occupancy/completion certificate is supplied; the records therefore do not establish that the promised development works have been completed Document index.
10. Approvals, official records & documents
| Identifier / date | P00100008745; valid 6 September 2024–3 May 2025 |
|---|---|
| What the supplied document establishes | Registration of F3 INFRA’s plotted project in Adilabad, including Survey Nos. 16/1/1, 16/1/2 and 16/1/3 |
| Identifier / date | TS/075164/2022; drawing dated 28-11-2022 |
|---|---|
| What the supplied document establishes | Layout drawing and land-use schedule filed for the project |
| Identifier / date | 0024/LO/3025/2023, dated 03 May 2023 |
|---|---|
| What the supplied document establishes | Approval for a tentative layout plan issued by Adilabad Municipality / Municipal Corporation |
| Identifier / date | Dated 02-08-2024 |
|---|---|
| What the supplied document establishes | Promoter affidavit and completion undertaking |
| Identifier / date | Not identified for buildings; the supplied record is a layout approval |
|---|---|
| What the supplied document establishes | No building-specific commencement certificate is established |
| Identifier / date | Not supplied |
|---|---|
| What the supplied document establishes | No completion or occupancy certificate is established in the supplied documents Document index |
The tentative layout approval describes development obligations and records mortgaged plots in favour of the Municipality / Municipal Corporation. The supplied project records include no occupancy/completion certificate or evidence verifying completion of the listed infrastructure works.
1. Project at a glance
Project identity
Registered project name: F3 INFRA
Project type: Plotted development / layout with open plots
Phase or registered portion: Not separately identified; the registration is for the plotted project on Survey Nos. 16/1/1, 16/1/2 and 16/1/3
TG-RERA registration: P00100008745
Registration validity: 6 September 2024 to 3 May 2025; this is the stated registration validity, not evidence of completion or an occupancy certificate
Registered promoter: F3 INFRA
RERA project status: “New Project” in the project record
Land and geographic identity
Locality / municipality: Battisawargaon; within the limits of Adilabad Municipality, as stated in the layout record
Revenue village: Battisawargaon in the layout approval record; the RERA project record itself gives Adilabad and does not disclose its village or mandal fields
Mandal: Mavala in the layout approval record
District / PIN: Adilabad / 504001
Project survey numbers and subdivisions: 16/1/1, 16/1/2 and 16/1/3
Registered site extent: 25,417.44 sq.m in the RERA land details
Layout plan area statement: Total/site extent 25,416.67 sq.m; net layout area 24,843.96 sq.m; the plan also states a 572.71 sq.m deduction for net plot area left over owners’ land
Boundaries: East: Main Road; West, North and South: Others Land
Development identity
Layout sanctioning authority: Adilabad Municipality / Municipal Corporation; the plan identifies delegated authority as Adilabad Municipality
Principal approval: Tentative Layout Plan No. 0024/LO/3025/2023, dated 03 May 2023
Other plan identifier on file: Permit/application number TS/075164/2022, dated 28-11-2022 in the drawing record
Approved development type and scale: New layout with 92 plots; the plan lists 0.00 proposed coverage and 0.00 total proposed built-up area, with or without parking
Building count / floor configuration: No buildings or floor configuration are identified; this is a plotted layout
Parking: The plan states 0 proposed number of parkings and 0.00 sq.m common parking area
RERA-declared built-up and mortgage areas: Approved built-up area 14,000.95 sq.m and mortgage area 2,204.87 sq.m are recorded in the RERA fields; these are distinct from the plan’s stated proposed built-up area and mortgage-area figure
Offering and status
Unit type and count: Plots; 92 in the filed layout schedule
Plot sizes: Drawing-derived schedule covers 92 plots in the 150–200 sq.yd band; smallest 131.88 sq.m (157.7 sq.yd), median 153.31 sq.m (183.4 sq.yd), largest 167.21 sq.m (200.0 sq.yd). These are software-read from the drawing and require verification against it
Booked / available counts: Not disclosed in the supplied project records
Construction / development stage: No independently verified site-progress evidence is supplied; the promoter’s Form B undertaking specified completion by 03-05-2025
Completion deadline: 03-05-2025, as declared in Form B
Occupancy / completion certificate: Not supplied; an occupancy certificate is not identified in the supplied records
2. The project story
F3 INFRA is a plotted-development project on Survey Nos. 16/1/1, 16/1/2 and 16/1/3, in the Battisawargaon locality of Adilabad. The layout approval record identifies Mavala Mandal and Adilabad District and describes the site as within Adilabad Municipality; the RERA record gives Adilabad, district Adilabad, PIN 504001. TG-RERA records the project under registration P00100008745.
The filed plan describes a 92-plot layout, with land allocated to plots, roads, open space/park, social infrastructure and utilities. It does not describe residential buildings or apartment construction. The plan’s conditions place layout infrastructure works—including road formation, drainage, water supply and park development—on the layout applicant; the supplied evidence does not establish how much of this work has been completed on site.
The promoter’s Form B affidavit undertakes completion by 03-05-2025. That undertaking is not an independent progress assessment, and the supplied records do not establish a completion certificate or occupancy certificate.
3. Master plan, architecture & building design
The project is a land layout rather than a building scheme. The layout plan identifies 25,416.67 sq.m as the site extent, 24,843.96 sq.m as the net layout area, and a 572.71 sq.m deduction for net plot area left over owners’ land. It states 0.00 proposed coverage and 0.00 proposed built-up area, with or without parking.
The plan’s land-use schedule is:
| Layout component | Area | Share stated in plan |
|---|---|---|
| Plotted area | 14,000.12 sq.m | 56.35% |
| Roads | 7,674.16 sq.m | 30.89% |
| Organized open space / park | 2,297.56 sq.m | 9.25% |
| Social infrastructure | 622.29 sq.m | 2.50% |
| Utility area | 249.79 sq.m | 1.01% |
| Amenity area | 0.00 sq.m | 0.00% |
| LIG and EWS plotted areas | 0.00 sq.m each | 0.00% each |
| Buffer zone and green belt areas | 0.00 sq.m each | 0.00% each |
| Common parking area | 0.00 sq.m | 0.00% |
The layout drawing identifies 92 plots and lists road widths of 9.14MT. WIDE ROAD, 18.0M SERVICE ROAD, 18.00 MT WIDE EXISTING ROAD and 18.00 MT WIDE PROPOSED ROAD. The drawing-derived plot schedule is software-read and should be checked against the drawing.
The plan records 2,204.39 sq.m as mortgage area; RERA fields separately state 2,204.87 sq.m. The layout approval record describes a mortgage over specified plots in favour of the Municipality / Municipal Corporation.
4. Homes, configurations & floor plans
This is a plotted layout, not an apartment project. The filed layout plan lists 92 plots. The plot schedule was software-read from the approved layout drawing; the supplied measurements are not a RERA-filed saleable-area schedule and should be verified against the drawing.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading |
|---|---|---|---|---|---|---|
| Plots | 92 | Not disclosed | Not disclosed | Not disclosed | Not applicable | Not supplied |
The software-read plot-size range is 131.88–167.21 sq.m (157.7–200.0 sq.yd), with a median of 153.31 sq.m (183.4 sq.yd); all 92 plots fall in the 150–200 sq.yd band. The floor-plan review contains two layout sheets and no flats; no carpet or room measurements are supplied.
5. Parking & vehicle circulation
The layout plan states 0 proposed number of parkings and 0.00 sq.m common parking area. The plan identifies internal roads, including the listed 9.14-metre, 18-metre service, 18-metre existing and 18-metre proposed road widths. No parking allocation to individual plots, visitor or accessible parking provision, or vehicle/pedestrian circulation details beyond the road entries are established in the supplied records.
6. Amenities, recreation & open spaces
The layout plan reserves land for open space/park, social infrastructure and utilities. The approval record also describes infrastructure and amenity works expected as part of layout development; the supplied evidence does not verify completion of those works.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Park / organized open space | 2,297.56 sq.m; 9.25% of the layout area | Reserved in the plan; completion not independently verified | |
| Social infrastructure | 622.29 sq.m; 2.50% | Reserved in the plan; specific facility and completion status not established | |
| Tot-lot plot | Identified among the plan’s amenities/utilities; no separate size supplied | Plan reference only; completion not independently verified | |
| Green strip / park | Listed in the project amenities record; no separate size supplied | Listed as available in the project record; completion not independently verified |
No clubhouse or indoor recreation facility is identified in the supplied layout records.
7. Utilities, building services & safety
The tentative layout approval describes proposed development works, including water-supply infrastructure, drainage, electrical works and rainwater harvesting. These are plan/approval descriptions, not evidence of completed or operational facilities.
| Evidence in the project record | Utility land is reserved (249.79 sq.m; 1.01%). The approval conditions refer to a water reservoir, internal water-supply pipelines, overhead tank and assured water-supply source |
|---|---|
| Status established by supplied evidence | Proposed/described; capacity and completion not established |
| Evidence in the project record | Approval conditions refer to underground drainage lines, a common septic tank / STP and storm-water drains |
|---|---|
| Status established by supplied evidence | Proposed/described; capacity and completion not established |
| Evidence in the project record | Rainwater-harvesting pits are included in the approval conditions and water-conservation/rainwater-harvesting is listed in the amenities record |
|---|---|
| Status established by supplied evidence | Listed/proposed; installation and operation not verified |
| Evidence in the project record | Approval conditions refer to electrical supply lines, a transformer and street lights |
|---|---|
| Status established by supplied evidence | Proposed/described; capacity and completion not established |
| Evidence in the project record | Solid-waste management is listed among the utility works |
|---|---|
| Status established by supplied evidence | Proposed/described; operating arrangements not established |
| Evidence in the project record | No project-specific fire-system or accessibility details are established in the supplied records |
|---|---|
| Status established by supplied evidence | Not disclosed |
8. Location, access & connectivity
The layout approval record places the project within Adilabad Municipality and identifies Battisawargaon, Mavala Mandal, Adilabad District. The RERA record gives the project’s locality as Adilabad, district Adilabad, PIN 504001. The recorded site boundaries are Main Road to the east and other land to the west, north and south.
The layout plan lists 9.14-metre, 18-metre service, 18-metre existing and 18-metre proposed roads. No project-specific public-transport information or verified travel distances to landmarks is supplied.
9. Developer & development status
The registered promoter is F3 INFRA, recorded as a partnership in the project information. The supplied record identifies the promoter address as Teachers Colony, Adilabad, Adilabad, Telangana, PIN 504001; the project registration certificate gives the office location as Adilabad, PIN 504001. A registration certificate page is the supplied project record for the promoter; no separate official website or contact details are provided.
Form B, signed by Gadharla Sangeetha for F3 INFRA, declares a completion undertaking of 03-05-2025. No independent construction-progress evidence or occupancy/completion certificate is supplied; the records therefore do not establish that the promised development works have been completed.
10. Approvals, official records & documents
| Identifier / date | P00100008745; valid 6 September 2024–3 May 2025 |
|---|---|
| What the supplied document establishes | Registration of F3 INFRA’s plotted project in Adilabad, including Survey Nos. 16/1/1, 16/1/2 and 16/1/3 |
| Identifier / date | TS/075164/2022; drawing dated 28-11-2022 |
|---|---|
| What the supplied document establishes | Layout drawing and land-use schedule filed for the project |
| Identifier / date | 0024/LO/3025/2023, dated 03 May 2023 |
|---|---|
| What the supplied document establishes | Approval for a tentative layout plan issued by Adilabad Municipality / Municipal Corporation |
| Identifier / date | Dated 02-08-2024 |
|---|---|
| What the supplied document establishes | Promoter affidavit and completion undertaking |
| Identifier / date | Not identified for buildings; the supplied record is a layout approval |
|---|---|
| What the supplied document establishes | No building-specific commencement certificate is established |
| Identifier / date | Not supplied |
|---|---|
| What the supplied document establishes | No completion or occupancy certificate is established in the supplied documents |
The tentative layout approval describes development obligations and records mortgaged plots in favour of the Municipality / Municipal Corporation. The supplied project records include no occupancy/completion certificate or evidence verifying completion of the listed infrastructure works.
Frequently asked questions
Is F3 INFRA registered with Telangana RERA?
Yes. F3 INFRA is registered with the Telangana Real Estate Regulatory Authority as P00100008745; the registration status is New Project.
Who is the developer of F3 INFRA?
The promoter named in the RERA registration is F3 INFRA.
Where is F3 INFRA located?
F3 INFRA is in Adilabad, Telangana (504001).
When will F3 INFRA be completed?
The promoter's proposed date of completion filed with RERA is 03/05/2025. This is the promoter's declaration, not a guarantee.