Sunrise Towers
SAI LAXMI BUILDERS · Karimnagar · RERA P02700000220
SUNRISE TOWERS is a residential apartment project in Mukarampura, Karimnagar district; the mandal is not disclosed. The registered promoter is SAI LAXMI BUILDERS. The project has a registered site extent of 1555.01 m² and 2 building units, with 30 apartments: 20 2BHK units of 81.11 m² each and 10 3BHK units of 78.32 m² each; the building permit extraction describes Building A as Cellar + Stilt + 5. It is registered with TG-RERA under P02700000220, and the proposed completion date is 11/11/2024.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
14 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Record |
|---|---|
| Registered project name | SUNRISE TOWERS RERA record |
| Project type | Residential apartment project RERA record RERA filing |
| Phase / registered portion | Phase not disclosed; the RERA record identifies the project and Survey No. 1103. RERA record Land records |
| TG-RERA registration | P02700000220, issued 21/01/2019; recorded validity through 11/11/2024. The registration certificate says extension may be granted by the Authority; no extension is recorded in the supplied certificate data. RERA record |
| Registered promoter | SAI LAXMI BUILDERS; entity type recorded as Partnership. RERA record Corporate record RERA filing |
| RERA status | Listed as On-Going Project in the project record. Registration validity and the completion deadline are separate matters; the supplied record shows the validity date above. RERA record RERA filing |
Land and geographic identity
| Field | Record |
|---|---|
| Locality | Mukarampura / MUKARAMPURA; the building permit describes Mukarampura (Part)_W31. RERA record RERA filing |
| Revenue village | Mukarampura. The record does not disclose a mandal. Land records RERA filing |
| District / PIN | Karimnagar / 505001. RERA record RERA filing |
| Survey number(s) / subdivision(s) | Survey No. 1103; no subdivision is supplied. Land records |
| Registered site extent | 1555.01 m² (also recorded as total area and net area). RERA record Land records |
| Road-affected area | 0 m², as recorded in the project land details and building permit. RERA filing |
| Boundaries | North: 9M WIDE ROAD; South: ROAD AND PLOT OF OTHERS; East: PLOT OF P PRAKASH RAO; West: MEGHA RESIDENCY APARTMENT. RERA filing Land records |
Development identity
| Field | Record |
|---|---|
| Sanctioning authority | Karimnagar Municipal Corporation. Approvals record |
| Principal approval | Building Permit Order 3011/W31/2018/3169, approved 11 July, 2018. Approvals record |
| Approved built-up area | 3,580.65 m² recorded as upper-floors area / approved built-up area. RERA filing |
| Buildings / blocks | The RERA record lists 2 building units. The extracted building-permit details identify Building - A (DR RAMGOPAL); the supplied extraction does not set out a second building’s configuration. RERA filing |
| Sanctioned floor configuration | Building permit extraction: Cellar + Stilt + 5; the same permit’s sanctioned parameters state Residential upper floors: 6. |
| Parking levels / area | Cellar 781.26 m² and stilt 793.47 m² are recorded; the permit condition says the approved cellar and stilt are for vehicle parking. Parking-space counts are not supplied. |
| Unit counts | 30 units in the RERA unit record: 20 2BHK and 10 3BHK. The project fields record 2 total building units; those are not the apartment count. RERA unit table RERA filing |
Offering and status
| Field | Record |
|---|---|
| RERA-filed configurations and saleable area | 2BHK: 20 units, 81.11 m² each; 3BHK: 10 units, 78.32 m² each. RERA unit table |
| Booked / available | Portal snapshot lists 0 booked and 20 available 2BHK units, and 0 booked and 10 available 3BHK units. The portal record provides no as-of date, so counts are indicative, not a current inventory confirmation. RERA unit table |
| Construction stage | Project status is recorded as On-Going Project; no independently verified site progress or tower-by-tower completion stage is supplied. RERA record RERA filing |
| Completion dates | Original and revised proposed completion dates are both 11/11/2024 in the RERA record. RERA record RERA filing |
| Occupancy / completion certificate | No occupancy or completion certificate for this project is present in the supplied evidence. The building-permit conditions require an occupancy certificate before occupation. Document index |
2. The project story
- SUNRISE TOWERS is a residential apartment project registered with TG-RERA for Survey No. 1103 in Mukarampura, Karimnagar. The registered site extent is 1555.01 m². Its RERA unit schedule lists 30 apartments: 20 2BHK and 10 3BHK. RERA record Land records RERA unit table
- The municipal building permit extraction describes a residential building with cellar, stilt and upper floors, and records parking use for the cellar and stilt. The RERA project fields list two building units, but the supplied permit extraction gives detailed building identification and floor configuration for Building A only. It does not provide a separate construction-stage account for each building. RERA filing
- The RERA record labels the project ongoing and sets the proposed and revised completion date as 11/11/2024. These are recorded project particulars, not independent confirmation of construction progress. No project occupancy or completion certificate is supplied. RERA record RERA filing Document index
3. Master plan, architecture & building design
- The RERA-filed project information records a 1555.01 m² site and 3580.65 m² approved built-up area. The municipal building permit extraction records Building A as residential, with a Cellar + Stilt + 5 configuration, while its sanctioned parameters also state Residential upper floors: 6. The permit records a building height of 14.80 m. These are permit-recorded figures; no separate FSI-counted area or gross built-up-area figure is supplied. RERA filing RERA filing
- The permit records a cellar of 781.26 m² and stilt of 793.47 m², and requires those levels to be used exclusively for vehicle parking. It also records a 390.09 m² third-floor area handed over as mortgaged built-up area. The project fields separately record mortgage area as 390.09 m². RERA filing
- The permit lists setbacks of Front 3.15, Rear 5.01, Side I 5, and Side II 5; units for these setback figures are not specified in the extracted record. It also specifies a tot-lot of 80.89 m², tree planting and a greenery strip around the site, a transformer space, a garbage house and a rainwater-harvesting structure. No supplied drawing extraction establishes building footprints, flats per floor, lift or stair counts, internal circulation, or a complete common-area distribution.
4. Homes, configurations & floor plans
The unit schedule below reports unit counts, bookings and saleable area from the TG-RERA filing. For 2BHKs, software measurement of approved floor-plan drawings provides an indicative carpet-area range; it is not a RERA-filed carpet-area disclosure. No measured carpet area is available for the 3BHK configuration. RERA unit table RERA unit details Floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 20 | 0 | 20 | 81.11 m² | 67.4–80.6 m²; median 75.5 m² (software-measured from drawings; review against drawing) | Not supplied |
| 3BHK | 10 | 0 | 10 | 78.32 m² | Not measured in supplied drawing data | Not supplied |
- For the measured 2BHK drawings, one typical flat panel identifies living, dining, kitchen, two bedrooms, two toilets and a utility area. The utility is marked excluded from carpet area in the drawing measurement. The example’s recorded room areas are: living 22.8 m², dining 9.16 m², kitchen 6.5 m², master bedroom 14.51 m², bedroom 9.63 m², toilets 4.49 m² and 2.8 m², and utility 3.17 m². These are software-measured drawing figures, not separately RERA-filed room dimensions. RERA unit details
- Saleable area and carpet area are distinct measures: the filing provides saleable areas, while the software-measured carpet figures are drawing-based and require verification against the plan. The supplied evidence does not provide loading figures or measurements for 3BHK floor plans. RERA unit table RERA unit details Floor plans
5. Parking & vehicle circulation
- The building permit records a 781.26 m² cellar and 793.47 m² stilt and requires both approved levels to be used exclusively for vehicle parking, without partition walls or rolling shutters. The extracted record does not state the number of car or two-wheeler spaces, visitor or accessible parking provision, ramp arrangement, parking allocation by apartment, or EV charging facilities.
- Although the RERA unit data marks the 2BHK configuration as mortgaged, that does not specify an individual parking allocation. A drawn or sanctioned parking provision does not, by itself, establish exclusive ownership or allocation to a particular apartment. RERA unit table
6. Amenities, recreation & open spaces
TG-RERA amenity data marks several facilities as available in the filed schedule but records 0% progress against each listed item. These entries do not independently confirm that a facility has been completed or is operational. The building permit separately specifies a tot-lot of 80.89 m². RERA amenities
| Description / size | No clubhouse or indoor facility is specified in the supplied RERA amenity schedule. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | Not established in the supplied RERA record. |
| Description / size | Green Strip/TOT LOT/Park: size not stated in the amenity schedule; permit records a tot-lot of 80.89 m². |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA amenity schedule shows 0%; no independent completion verification supplied. |
| Description / size | Green Strip/TOT LOT/Park is marked available; permit calls for tree planting, a site-periphery greenery strip and maintenance of the tot-lot. Aggregate recreational open-space area is not stated in the supplied amenity data. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | Schedule shows 0%; no independent completion verification supplied. |
| Description / size | Community Buildings are listed without a stated size or confirmation of availability. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | 0%; no independent completion verification supplied. |
7. Utilities, building services & safety
- The RERA amenity schedule marks water supply, sewerage, storm-water drains, rainwater harvesting and an electrical meter room/sub-station/receiving station as available, but records 0% progress for the listed items. The building permit requires a rainwater-harvesting percolation pit, space for a transformer and a garbage house. No supplied evidence establishes capacities, operating status, or completion of these systems. RERA amenities
- The permit states that public water and electricity connections are to be provided only on production of an occupancy certificate. It also requires sanitation, plumbing, fire-safety requirements, lifts and electrical installations to be executed under qualified technical supervision, and places responsibility for structural and fire safety on the owner, builder/developer and relevant technical personnel. These are permit conditions, not proof of completed installation or statutory compliance.
- The supplied project data does not establish water source or storage capacity, an STP or reuse capacity, backup power, lift count or capacity, fire-system specifications, CCTV, security/access control, waste-segregation arrangements, accessibility routes or accessible parking. A third-party vendor record lists several such features, but those claims are not presented as TG-RERA-filed or independently verified facilities. RERA amenities Promoter website
8. Location, access & connectivity
- The registered location is Mukarampura, Karimnagar district, PIN 505001, in Survey No. 1103; the mandal is not disclosed. The building-permit extraction identifies the site as Mukarampura (Part)_W31 and records a 9M WIDE ROAD on the north boundary. The other recorded boundaries are road and plots to the south, a plot of P Prakash Rao to the east, and Megha Residency Apartment to the west. RERA record Land records
- The supplied connectivity data includes a location point identified as a cadastral parcel centroid (17.41528, 78.35459) and Financial District (Nanakramguda) at 1.2 km. The evidence does not provide verified public-transport routes, approach-road details beyond the boundary description, or travel times. Location record
9. Developer & development status
- The registered promoter is SAI LAXMI BUILDERS, recorded as a partnership. Its supplied address is BHAGATH NAGAR, MUKARAMPURA, Karimnagar, 505001. The project record lists KALAKONDA CHANDRASHEKAR RAO, KOTHA SARALA, KOTHA RADHIKA, KASTHURI MAHESHWARI, BOLLA SATHYA MAHESHWARI and POLINENI NARAYANA RAO as partners, and CHEETI RAMA RAO and KOPPU JAWAHAR BABU as authorized signatories. A promoter PAN-like identifier is partially masked as xxxxxx609K; no company-registration identifier, official contact details or official website are supplied. Corporate record Parties record RERA filing
- The Form-B declaration dated 30/11/2018, made by Cheeti Rama Rao and Koppu Jawahar Babu, states a 30-month completion undertaking and makes declarations regarding title basis, encumbrances and project obligations. This is a promoter declaration. The RERA project record separately shows proposed and revised completion dates of 11/11/2024 and status “On-Going Project”; no independently verified construction progress is supplied. RERA record RERA filing
10. Approvals, official records & documents
| Record | Supplied evidence |
|---|---|
| TG-RERA registration | Form C certificate for SUNRISE TOWERS, registration P02700000220, issued 21/01/2019, with recorded validity to 11/11/2024. |
| Building permit | Karimnagar Municipal Corporation Building Permit Order 3011/W31/2018/3169, approved 11 July, 2018, for Survey No. 1103 and site extent 1555.01 m². Approvals record |
| Commencement / building-plan evidence | The supplied permit document is titled “Commencement Certificates for each building in each phase”; its extraction describes a building permit order and identifies Building A. The supplied records do not include a separate extracted plan set for each of the two RERA-listed building units. Document index |
| Occupancy / completion certificate | None is included in the supplied project documents. Document index |
| Promoter declaration | Form-B affidavit-cum-declaration dated 30/11/2018, signed by Cheeti Rama Rao and Koppu Jawahar Babu. |
| Other project documents | RERA-filed encumbrance statement (document 15002); title-report materials including development agreement/GPA, sale-deed references and municipal mortgage deed; and a partially completed agreement-for-sale template that does not identify a specific allottee or unit. |
The supplied evidence does not include an approved-layout lookup result, a separate extracted floor-plan set beyond the drawing data referenced in the unit section, or an occupancy/completion certificate. HMDA Document index
1. Project at a glance
Project identity
Registered project name: SUNRISE TOWERS
Project type: Residential apartment project
Phase / registered portion: Phase not disclosed; the RERA record identifies the project and Survey No. 1103.
TG-RERA registration: P02700000220, issued 21/01/2019; recorded validity through 11/11/2024. The registration certificate says extension may be granted by the Authority; no extension is recorded in the supplied certificate data.
Registered promoter: SAI LAXMI BUILDERS; entity type recorded as Partnership.
RERA status: Listed as On-Going Project in the project record. Registration validity and the completion deadline are separate matters; the supplied record shows the validity date above.
Land and geographic identity
Locality: Mukarampura / MUKARAMPURA; the building permit describes Mukarampura (Part)_W31.
Revenue village: Mukarampura. The record does not disclose a mandal.
District / PIN: Karimnagar / 505001.
Survey number(s) / subdivision(s): Survey No. 1103; no subdivision is supplied.
Registered site extent: 1555.01 m² (also recorded as total area and net area).
Road-affected area: 0 m², as recorded in the project land details and building permit.
Boundaries: North: 9M WIDE ROAD; South: ROAD AND PLOT OF OTHERS; East: PLOT OF P PRAKASH RAO; West: MEGHA RESIDENCY APARTMENT.
Development identity
Sanctioning authority: Karimnagar Municipal Corporation.
Principal approval: Building Permit Order 3011/W31/2018/3169, approved 11 July, 2018.
Approved built-up area: 3,580.65 m² recorded as upper-floors area / approved built-up area.
Buildings / blocks: The RERA record lists 2 building units. The extracted building-permit details identify Building - A (DR RAMGOPAL); the supplied extraction does not set out a second building’s configuration.
Sanctioned floor configuration: Building permit extraction: Cellar + Stilt + 5; the same permit’s sanctioned parameters state Residential upper floors: 6.
Parking levels / area: Cellar 781.26 m² and stilt 793.47 m² are recorded; the permit condition says the approved cellar and stilt are for vehicle parking. Parking-space counts are not supplied.
Unit counts: 30 units in the RERA unit record: 20 2BHK and 10 3BHK. The project fields record 2 total building units; those are not the apartment count.
Offering and status
RERA-filed configurations and saleable area: 2BHK: 20 units, 81.11 m² each; 3BHK: 10 units, 78.32 m² each.
Booked / available: Portal snapshot lists 0 booked and 20 available 2BHK units, and 0 booked and 10 available 3BHK units. The portal record provides no as-of date, so counts are indicative, not a current inventory confirmation.
Construction stage: Project status is recorded as On-Going Project; no independently verified site progress or tower-by-tower completion stage is supplied.
Completion dates: Original and revised proposed completion dates are both 11/11/2024 in the RERA record.
Occupancy / completion certificate: No occupancy or completion certificate for this project is present in the supplied evidence. The building-permit conditions require an occupancy certificate before occupation.
2. The project story
- SUNRISE TOWERS is a residential apartment project registered with TG-RERA for Survey No. 1103 in Mukarampura, Karimnagar. The registered site extent is 1555.01 m². Its RERA unit schedule lists 30 apartments: 20 2BHK and 10 3BHK.
- The municipal building permit extraction describes a residential building with cellar, stilt and upper floors, and records parking use for the cellar and stilt. The RERA project fields list two building units, but the supplied permit extraction gives detailed building identification and floor configuration for Building A only. It does not provide a separate construction-stage account for each building.
- The RERA record labels the project ongoing and sets the proposed and revised completion date as 11/11/2024. These are recorded project particulars, not independent confirmation of construction progress. No project occupancy or completion certificate is supplied.
3. Master plan, architecture & building design
- The RERA-filed project information records a 1555.01 m² site and 3580.65 m² approved built-up area. The municipal building permit extraction records Building A as residential, with a Cellar + Stilt + 5 configuration, while its sanctioned parameters also state Residential upper floors: 6. The permit records a building height of 14.80 m. These are permit-recorded figures; no separate FSI-counted area or gross built-up-area figure is supplied.
- The permit records a cellar of 781.26 m² and stilt of 793.47 m², and requires those levels to be used exclusively for vehicle parking. It also records a 390.09 m² third-floor area handed over as mortgaged built-up area. The project fields separately record mortgage area as 390.09 m².
- The permit lists setbacks of Front 3.15, Rear 5.01, Side I 5, and Side II 5; units for these setback figures are not specified in the extracted record. It also specifies a tot-lot of 80.89 m², tree planting and a greenery strip around the site, a transformer space, a garbage house and a rainwater-harvesting structure. No supplied drawing extraction establishes building footprints, flats per floor, lift or stair counts, internal circulation, or a complete common-area distribution.
4. Homes, configurations & floor plans
The unit schedule below reports unit counts, bookings and saleable area from the TG-RERA filing. For 2BHKs, software measurement of approved floor-plan drawings provides an indicative carpet-area range; it is not a RERA-filed carpet-area disclosure. No measured carpet area is available for the 3BHK configuration.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 20 | 0 | 20 | 81.11 m² | 67.4–80.6 m²; median 75.5 m² (software-measured from drawings; review against drawing) | Not supplied |
| 3BHK | 10 | 0 | 10 | 78.32 m² | Not measured in supplied drawing data | Not supplied |
- For the measured 2BHK drawings, one typical flat panel identifies living, dining, kitchen, two bedrooms, two toilets and a utility area. The utility is marked excluded from carpet area in the drawing measurement. The example’s recorded room areas are: living 22.8 m², dining 9.16 m², kitchen 6.5 m², master bedroom 14.51 m², bedroom 9.63 m², toilets 4.49 m² and 2.8 m², and utility 3.17 m². These are software-measured drawing figures, not separately RERA-filed room dimensions.
- Saleable area and carpet area are distinct measures: the filing provides saleable areas, while the software-measured carpet figures are drawing-based and require verification against the plan. The supplied evidence does not provide loading figures or measurements for 3BHK floor plans.
5. Parking & vehicle circulation
- The building permit records a 781.26 m² cellar and 793.47 m² stilt and requires both approved levels to be used exclusively for vehicle parking, without partition walls or rolling shutters. The extracted record does not state the number of car or two-wheeler spaces, visitor or accessible parking provision, ramp arrangement, parking allocation by apartment, or EV charging facilities.
- Although the RERA unit data marks the 2BHK configuration as mortgaged, that does not specify an individual parking allocation. A drawn or sanctioned parking provision does not, by itself, establish exclusive ownership or allocation to a particular apartment.
6. Amenities, recreation & open spaces
TG-RERA amenity data marks several facilities as available in the filed schedule but records 0% progress against each listed item. These entries do not independently confirm that a facility has been completed or is operational. The building permit separately specifies a tot-lot of 80.89 m².
| Description / size | No clubhouse or indoor facility is specified in the supplied RERA amenity schedule. |
|---|---|
| Declared progress / verified status | Not established in the supplied RERA record. |
| Description / size | Green Strip/TOT LOT/Park: size not stated in the amenity schedule; permit records a tot-lot of 80.89 m². |
|---|---|
| Declared progress / verified status | RERA amenity schedule shows 0%; no independent completion verification supplied. |
| Description / size | Green Strip/TOT LOT/Park is marked available; permit calls for tree planting, a site-periphery greenery strip and maintenance of the tot-lot. Aggregate recreational open-space area is not stated in the supplied amenity data. |
|---|---|
| Declared progress / verified status | Schedule shows 0%; no independent completion verification supplied. |
| Description / size | Community Buildings are listed without a stated size or confirmation of availability. |
|---|---|
| Declared progress / verified status | 0%; no independent completion verification supplied. |
7. Utilities, building services & safety
- The RERA amenity schedule marks water supply, sewerage, storm-water drains, rainwater harvesting and an electrical meter room/sub-station/receiving station as available, but records 0% progress for the listed items. The building permit requires a rainwater-harvesting percolation pit, space for a transformer and a garbage house. No supplied evidence establishes capacities, operating status, or completion of these systems.
- The permit states that public water and electricity connections are to be provided only on production of an occupancy certificate. It also requires sanitation, plumbing, fire-safety requirements, lifts and electrical installations to be executed under qualified technical supervision, and places responsibility for structural and fire safety on the owner, builder/developer and relevant technical personnel. These are permit conditions, not proof of completed installation or statutory compliance.
- The supplied project data does not establish water source or storage capacity, an STP or reuse capacity, backup power, lift count or capacity, fire-system specifications, CCTV, security/access control, waste-segregation arrangements, accessibility routes or accessible parking. A third-party vendor record lists several such features, but those claims are not presented as TG-RERA-filed or independently verified facilities.
8. Location, access & connectivity
- The registered location is Mukarampura, Karimnagar district, PIN 505001, in Survey No. 1103; the mandal is not disclosed. The building-permit extraction identifies the site as Mukarampura (Part)_W31 and records a 9M WIDE ROAD on the north boundary. The other recorded boundaries are road and plots to the south, a plot of P Prakash Rao to the east, and Megha Residency Apartment to the west.
- The supplied connectivity data includes a location point identified as a cadastral parcel centroid (17.41528, 78.35459) and Financial District (Nanakramguda) at 1.2 km. The evidence does not provide verified public-transport routes, approach-road details beyond the boundary description, or travel times.
9. Developer & development status
- The registered promoter is SAI LAXMI BUILDERS, recorded as a partnership. Its supplied address is BHAGATH NAGAR, MUKARAMPURA, Karimnagar, 505001. The project record lists KALAKONDA CHANDRASHEKAR RAO, KOTHA SARALA, KOTHA RADHIKA, KASTHURI MAHESHWARI, BOLLA SATHYA MAHESHWARI and POLINENI NARAYANA RAO as partners, and CHEETI RAMA RAO and KOPPU JAWAHAR BABU as authorized signatories. A promoter PAN-like identifier is partially masked as xxxxxx609K; no company-registration identifier, official contact details or official website are supplied.
- The Form-B declaration dated 30/11/2018, made by Cheeti Rama Rao and Koppu Jawahar Babu, states a 30-month completion undertaking and makes declarations regarding title basis, encumbrances and project obligations. This is a promoter declaration. The RERA project record separately shows proposed and revised completion dates of 11/11/2024 and status “On-Going Project”; no independently verified construction progress is supplied.
10. Approvals, official records & documents
TG-RERA registration: Form C certificate for SUNRISE TOWERS, registration P02700000220, issued 21/01/2019, with recorded validity to 11/11/2024.
Building permit: Karimnagar Municipal Corporation Building Permit Order 3011/W31/2018/3169, approved 11 July, 2018, for Survey No. 1103 and site extent 1555.01 m².
Commencement / building-plan evidence: The supplied permit document is titled “Commencement Certificates for each building in each phase”; its extraction describes a building permit order and identifies Building A. The supplied records do not include a separate extracted plan set for each of the two RERA-listed building units.
Occupancy / completion certificate: None is included in the supplied project documents.
Promoter declaration: Form-B affidavit-cum-declaration dated 30/11/2018, signed by Cheeti Rama Rao and Koppu Jawahar Babu.
Other project documents: RERA-filed encumbrance statement (document 15002); title-report materials including development agreement/GPA, sale-deed references and municipal mortgage deed; and a partially completed agreement-for-sale template that does not identify a specific allottee or unit.
The supplied evidence does not include an approved-layout lookup result, a separate extracted floor-plan set beyond the drawing data referenced in the unit section, or an occupancy/completion certificate.
Frequently asked questions
Is SUNRISE TOWERS registered with Telangana RERA?
Yes. SUNRISE TOWERS is registered with the Telangana Real Estate Regulatory Authority as P02700000220; the registration status is On-Going Project.
Who is the developer of SUNRISE TOWERS?
The promoter named in the RERA registration is SAI LAXMI BUILDERS.
Where is SUNRISE TOWERS located?
SUNRISE TOWERS is in MUKARAMPURA, Karimnagar, Telangana (505001).
When will SUNRISE TOWERS be completed?
The promoter's proposed date of completion filed with RERA is 11/11/2024. This is the promoter's declaration, not a guarantee.
More projects in Karimnagar