KARNI OPUS is a residential apartment project in Attapur, Rajendranagar, Ranga Reddy. It is being developed by registered promoter Karni Estates India Private Limited. The project has a land area of 3391.51 Sq. Mtrs and one building with 2 Cellar + 1 Stilt + 10 upper floors, comprising 68 apartments: 58 3BHK and 10 4BHK. Its TG-RERA registration number is P02400006131, and the promoter declares completion on or before 23.02.2027.

📘 Project brochure from the promoter’s website ↗

More from Karni Estates India Pvt Ltd · 3 projects →

01What we found

RegisteredTG-RERA - valid till 23 Feb 2027
29documents on file - each fact links to its page
2court cases on this project's land (survey 96, 113, Attapur)
9items to check - 5 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

9 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemProject record
Registered project nameKARNI OPUS RERA record
Project type / phaseResidential apartment project; registered phase or separately named portion: not disclosed. The filed registration describes one building. RERA record RERA filing
TG-RERA registration numberP02400006131
Registration validity24/04/2023 to 23/02/2027; this is registration validity, not an occupancy certificate.
Registered promoterKarni Estates India Private Limited, company. RERA record Corporate record
RERA statusThe supplied record lists the project as New Project and the registration certificate as granted; no extension is recorded in the supplied certificate. RERA record

Land and geographic identity

ItemProject record
Locality / revenue villageAttapur; revenue village: Attapur. RERA record RERA filing
Mandal / district / PINRajendranagar / Ranga Reddy / 500048. RERA record
Project survey numbers96, 113 and 114; no project subdivision numbers are stated in the filed project identity. RERA filing
Registered site extentBuilding-permit plot area 3391.51 Sq. Mtrs; net plot area 3391.51 Sq. Mtrs; road-affected area 0.0 and nala-affected area 0.0 in that permit.
Project-record boundariesNorth: 40 Ft Wide Road; east, west and south: Neighbours Land. RERA filing
Cadastral referenceA supplied cadastral record is for whole Survey No. 96, extent 3424.75 sqm; it is a survey-level record, not a measurement of the full project parcel. Cadastral map

Development identity

ItemProject record
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC).
Principal building approvalBuilding Permit Order 5501/GHMC/CHR/2023-BP, dated 23 February, 2023; file number 010630/GHMC/5227/CHR1/2022-BP.
Approved buildingOne residential building, identified in the permit as “RESIDENTIAL (PROP)”.
Sanctioned configuration2 Cellar + 1 Stilt + 10 upper floors; building height recorded as 29.95 (unit not stated in the supplied extraction).
Approved built-up areasResidential built-up area 12,784.47; commercial built-up area 295.48. The permit separately records cellar area 3600.6, stilt area 1267.1, and total parking area 5172.9; units for these extracted area figures are not stated in the supplied text.
UnitsProject fields record 1 total building unit and 1 proposed building unit; the TG-RERA inventory lists 68 apartments. RERA filing RERA unit table
Other permit identifiersGHMC layout/LRS/subdivision reference C/GHMC/085123/2020; TDR DRC Nos. 01358/TDR/2021 and 01352/TDR/2021.

Offering and status

ItemProject record
Apartment configurations3BHK: 58 units; 4BHK: 10 units. RERA unit table
TG-RERA inventory snapshot12 booked; 56 available in total (11 booked / 47 available 3BHK; 1 booked / 9 available 4BHK). The portal snapshot has no supplied as-of date, so counts are indicative. RERA unit table
RERA-filed saleable area3BHK: 161.37–204.94 sqm; 4BHK: 199.27–271.83 sqm. RERA unit table
Construction-stage evidenceA Form 7 annual audit report for 01.04.2023–31.03.2024 reports 46.74% project completion. This is a filed report for that period, not an independent site inspection or a current progress measurement.
Promoter-declared completionForm B declares completion on or before 23.02.2027.
Occupancy / completion certificateNo occupancy certificate or completion certificate is identified in the supplied project documents. The GHMC permit requires an occupancy certificate before occupation.

2. The project story

KARNI OPUS is a RERA-registered residential apartment project at Attapur, Rajendranagar Mandal, Ranga Reddy District, on land identified in the project record as Survey Nos. 96, 113 and 114. GHMC’s building permit describes one residential building with two cellar levels, a stilt and ten upper floors. The permit also records a commercial built-up area, but the supplied material does not describe its use or identify commercial units for sale. RERA record RERA filing

The TG-RERA inventory comprises 68 homes—58 three-bedroom and 10 four-bedroom apartments. The portal snapshot shows 12 booked and 56 available, but provides no capture date for those counts. The promoter’s Form B undertakes completion by 23.02.2027; separately, the registration certificate is valid to that date. The latest supplied progress figure is the 46.74% completion reported in the annual audit for the year ending 31 March 2024. It should not be read as current or independently verified site progress. No occupancy or completion certificate is present in the supplied evidence. RERA unit table

3. Master plan, architecture & building design

The GHMC permit sanctions one building on a plot area of 3391.51 Sq. Mtrs, with net plot area also recorded as 3391.51 Sq. Mtrs. Its floor arrangement is 2 Cellar + 1 Stilt + 10 upper floors. The permit separately lists 12,784.47 residential built-up area, 295.48 commercial built-up area, 3600.6 cellar area, 1267.1 stilt area and 5172.9 total parking area; the supplied extraction does not state units for these area entries. These are permit-record figures and should not be treated as carpet or saleable area.

The supplied approved drawing files are identified as layout-plan documents, but their contents were not extracted in the supplied record. Accordingly, the evidence here does not establish building footprint, flats per floor, lift or stair count, internal circulation, open-space distribution, or the location and layout of any commercial portion. The permit identifies a Tot Lot 341.6; the unit for this figure is not stated in the supplied extraction. Document index

4. Homes, configurations & floor plans

The apartment counts, availability and saleable-area ranges below are from the TG-RERA unit inventory. Bookings are the portal’s last-read figures, with no as-of date supplied. Carpet-area figures are software measurements from the approved floor-plan drawings, not RERA-filed measurements; the supplied drawing measurement summary gives configuration ranges and medians, not a unit-by-unit crosswalk. RERA unit table RERA unit details Floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
3BHK581147161.37–204.94 sqmSoftware-measured from drawings: 91.0–142.0 sqm; median 112.5 sqmNot supplied
4BHK1019199.27–271.83 sqmSoftware-measured from drawings: 163.1–190.6 sqm; median 165.6 sqmNot supplied

Carpet area is a drawing-based measurement of the home’s internal area under the supplied software measurement method. Saleable area is the RERA-filed area measure and is not interchangeable with carpet area; the supplied measurement notes state that saleable area also counts the home’s share of common areas. The supplied material does not provide a loading figure. RERA unit details Floor plans

Drawing measurements include typical-room examples. A measured 3BHK drawing identifies a drawing room, living/dining area, three bedrooms, kitchen, three toilets and utility; its utility is marked excluded from carpet measurement. A measured 4BHK drawing identifies a drawing room, living/dining area, four bedrooms, kitchen, four toilets and a dress room. These are software measurements from the drawing geometry and should be checked against the drawing itself. RERA unit details

5. Parking & vehicle circulation

The GHMC permit records 2 Cellar + 1 Stilt, with the cellar and stilt approved for vehicle parking, and lists 5172.9 as total parking area (units not stated in the supplied extraction). The permit states that the cellar and stilt approved for parking are to be used exclusively for vehicle parking and not partitioned or converted to another use. No sanctioned car-space or two-wheeler-space count, visitor or accessible-space count, mechanical-parking provision, ramp arrangement, or unit-specific parking allocation is established by the supplied evidence.

The RERA unit inventory marks some apartments as mortgaged, but this does not establish an individual buyer’s parking allocation. A parking bay shown in a plan, if any, would not by itself establish exclusive ownership; the supplied documents do not provide a unit-wise parking allocation schedule. RERA unit table

6. Amenities, recreation & open spaces

The GHMC permit includes a Tot Lot 341.6 (unit not stated in the supplied extraction), rainwater-harvesting pits, a transformer space and a garbage house. It also requires tree planting around the site and at the front, and says the tot-lot is to be fenced and maintained as greenery before issue of the occupancy certificate. The promoter’s brochure lists additional facilities; these are marketing claims, not evidence that the facilities have been completed or independently inspected. Promoter website

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Tot lot / green areaTot Lot 341.6; unit not stated. Permit requires fencing and maintenance as greenery.GHMC permitSanctioned condition; no completion evidence supplied
GymnasiumSize not suppliedPromoter brochurePromoter-marketed; completion not verified
Indoor games / yoga hallA.C Indoor Games and A.C Yoga Hall; sizes not suppliedPromoter brochurePromoter-marketed; completion not verified
Multi-purpose hallSize and capacity not suppliedPromoter brochurePromoter-marketed; completion not verified
Landscape / lawnLawn with garden lighting and tropical trees claimed; size not suppliedPromoter brochurePromoter-marketed; completion not verified
Kids’ tot-lot zonesQuantity and size not suppliedPromoter brochurePromoter-marketed; completion not verified

7. Utilities, building services & safety

The GHMC permit lists six rainwater-harvesting pits, a transformer space and a garbage house, and requires construction of a rainwater-harvesting structure. It requires public water and electricity connections to be provided only on production of an occupancy certificate. The permit also requires an occupancy fire NOC before an occupancy certificate and assigns responsibility for fire-fighting installation and means of escape to the parties identified in the permit. These are permit requirements; the supplied evidence does not establish completion or current compliance.

Water
Evidence in supplied recordPermit refers to public water supply connections after an occupancy certificate. The promoter’s brochure claims municipal drinking water, treated water supply and a water-treatment plant for borewell water.
Status shownPermit condition and promoter-marketed claims; capacities and completion status not supplied. Promoter website
Sewerage and drainage
Evidence in supplied recordRERA amenity fields mark sewerage, sewage treatment/disposal and storm-water drains as available; all show 0% progress. The brochure claims an STP but provides no capacity.
Status shownRERA-declared facilities; recorded progress is 0%; completion not verified. RERA amenities Promoter website
Rainwater management
Evidence in supplied recordPermit lists Rain Water Harvesting Pits 6 and requires a rainwater-harvesting structure; brochure describes recharge wells.
Status shownPermit requirement; completion not verified. Promoter website
Electrical supply and backup
Evidence in supplied recordPermit identifies space for a transformer. Brochure claims 100% power backup and provision for one 16A slow-charging point in each apartment’s parking area, stated as at extra cost.
Status shownTransformer space is in the permit; backup and charging are promoter-marketed claims.
Lifts
Evidence in supplied recordBrochure claims three high-speed passenger lifts and a service lift.
Status shownPromoter-marketed; lift capacities and installation status not supplied.
Fire and life safety
Evidence in supplied recordPermit requires fire-fighting installation, means-of-escape safety and an occupancy fire NOC before issue of occupancy certificate.
Status shownRequirements recorded in permit; no fire NOC or completed-system evidence supplied.
Waste and security
Evidence in supplied recordPermit requires a garbage house. Brochure claims CCTV, round-the-clock security, solar fencing and boom barriers.
Status shownGarbage-house requirement in permit; security features are promoter-marketed and not independently verified.
Accessibility
Evidence in supplied recordNo project-specific accessible circulation details are established in the supplied material.
Status shownNot disclosed in the available project evidence.

8. Location, access & connectivity

The registered revenue location is Attapur village, Rajendranagar Mandal, Ranga Reddy District, PIN 500048. The GHMC permit records the project north boundary as a 40 Ft Wide Road. The supplied cadastral centroid is 17.365545728119688, 78.43693117630664; it is a survey-level reference. RERA record RERA filing Cadastral map

A supplied location record gives HITEC City — 10.7 km. The promoter’s brochure lists nearby destinations and distances, including ISKCON Temple 1.1 km, ZOI Hospital 1.4 km, Ratnadeep Supermarket 1.6 km, Reliance Digital 1.9 km, Mantra Mall 2.6 km, Edify World School 3.0 km, Charminar 5.5 km, Banjara Hills 10 km, Appa Junction 11 km and RGI Airport 22 km; these are brochure-provided distances. No public-transport details are supplied. Location record Promoter website

9. Developer & development status

The registered promoter is KARNI ESTATES INDIA PRIVATE LIMITED, a company, with GSTIN 36AADCK1945Q1Z1. The project record gives the promoter address as H.No-4-6-26/3, PV Narasimha Rao Expy, Inner Ring Road, Attapur, Rajendranagar, Ranga Reddy, 500048. The promoter’s website is listed as https://karni.co.in/projects/opus.html. The RERA registration resolution authorises Amit Kumar Sarda to submit and sign project-registration documents. Corporate record Parties record

The promoter’s Form B declares completion on or before 23.02.2027. The supplied annual audit report covers 01.04.2023 to 31.03.2024 and reports 46.74% project completion; no later progress certificate or independent site verification is supplied. No occupancy or completion certificate is identified in the available project documents. Document index

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP02400006131; issued 24/04/2023, valid to 23/02/2027
What the supplied record establishesForm C registration for KARNI OPUS, promoted by Karni Estates India Private Limited; survey numbers 96, 113 and 114 are stated.
GHMC building permit
Identifier / date5501/GHMC/CHR/2023-BP; 23 February, 2023; file no. 010630/GHMC/5227/CHR1/2022-BP
What the supplied record establishesBuilding permit for the Attapur residential building and sanctioned floor configuration.
GHMC layout/LRS/subdivision reference
Identifier / dateC/GHMC/085123/2020
What the supplied record establishesNumber recorded in the building-permit document; the supplied record does not include an extracted approved-layout drawing.
TDR references
Identifier / date01358/TDR/2021 and 01352/TDR/2021
What the supplied record establishesNumbers recorded in the building-permit document.
Promoter declaration
Identifier / dateForm B, verified at Hyderabad 02nd March, 2023
What the supplied record establishesPromoter’s declarations on title, encumbrances, project accounts, pending approvals and completion by 23.02.2027.
Annual audit report
Identifier / datePeriod 01.04.2023–31.03.2024; Doc. No. 2024-25/RSB/151
What the supplied record establishesReports 46.74% project completion and project-account collections and withdrawals; the supplied extraction identifies it as a Form 7 annual audit report.
Occupancy / completion certificate
Identifier / dateNot identified in the supplied project documents
What the supplied record establishesNo certificate is available in the reviewed evidence. Document index

The GHMC permit states that construction must follow the sanctioned plan, that commencement and completion notices are required, and that an occupancy certificate is compulsory before occupation. Its full conditions remain part of the permit record; the table above is a summary, not a substitute for the complete document.

Frequently asked questions

Is KARNI OPUS registered with Telangana RERA?

Yes. KARNI OPUS is registered with the Telangana Real Estate Regulatory Authority as P02400006131; the registration status is New Project.

Who is the developer of KARNI OPUS?

The promoter named in the RERA registration is KARNI ESTATES INDIA PRIVATE LIMITED.

Where is KARNI OPUS located?

KARNI OPUS is in Attapur, Rajendranagar, Rangareddy, Telangana (500048).

When will KARNI OPUS be completed?

The promoter's proposed date of completion filed with RERA is 23/02/2027. This is the promoter's declaration, not a guarantee.

More projects in Attapur