MNA HOMES is a residential apartments project in Katta Rampur, Karimnagar District; the mandal is not disclosed. The registered promoter is GSR CONSTRUCTIONS, a partnership. The project covers 3172.87 m² and comprises 2 blocks, each with 1 stilt and 5 upper floors, with 50 apartments: 10 2BHK and 40 3BHK. It is registered under TG-RERA number P02700006839, with proposed completion on 24/07/2026.

01What we found

Period endedTG-RERA registration ran to 24 Jul 2026 - check its extension on TG-RERA
11documents on file - each fact links to its page
0court cases on this project's land in the court records searched
13items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

13 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

FieldTG-RERA record
Registered project nameMNA HOMES RERA record
Project typeResidential apartments RERA record RERA filing
Phase / registered portionNot separately identified as a phase in the supplied record; registration is for MNA HOMES
TG-RERA registrationP02700006839; granted 01/09/2023; valid to 24/07/2026
Registered promoterGSR CONSTRUCTIONS; partnership RERA record Corporate record RERA filing
RERA statusRegistered under section 5; certificate says validity is subject to extension by the Authority in accordance with the Act and Rules. No extension is recorded in the supplied certificate

Land and geographic identity

FieldRecord
Locality / plot addressKatta Rampur; plot/house number 8-1-21/2
Revenue villageKARIMNAGAR is stated in the building-permit extraction; the RERA land record does not disclose a revenue village Land records
MandalNot disclosed Land records
District / PINKarimnagar District; PIN 505001
Survey number(s)359/A Land records
Site extent3172.87 m² total and net area; road-affected area recorded as 0 m² Land records
Boundaries in RERA recordEast: OTHERS HOUSE; West: WIDE ROAD 12; North: ROAD WIDTH - 30; South: LAND OF OTHERS RERA filing

Development identity

FieldRecord
Sanctioning authorityKarimnagar Municipal Corporation Approvals record
Principal building approval0031/BP/3011/2023, approved 25 July 2023; file number 003472/BP/DTCP/3011/0027/2023 Approvals record
Approved built-up area8,568.01 m² in the RERA project fields RERA filing
Buildings2 blocks: BLOCK 1 and BLOCK 2
Sanctioned configurationEach block: 1 Stilt + 5 upper floors; stated height 14.99 m
Parking levels shown in sanctionCellar: 0; stilt areas recorded as 1,306.06 m² for Block 1 and 211.34 m² for Block 2
Approved versus RERA-filed unitsRERA fields record 2 proposed building units and 50 total building units; the approval extraction describes two residential blocks but does not provide an approved apartment count RERA filing RERA unit table

Offering and status

FieldRecord
RERA-filed configurations2BHK: 10 units; 3BHK: 40 units RERA unit table
Filed saleable areas2BHK: 111.48 m²; 3BHK: 167.22 m² RERA unit table
Booked / available0 booked and 10 available 2BHK; 0 booked and 40 available 3BHK, as last read from TG-RERA with no as-of date recorded RERA unit table
Construction stageNo verified construction progress is supplied. TG-RERA amenity-progress fields show 0% for the listed items; these are not a substitute for building-completion verification RERA amenities
Completion datesBuilding approval states construction to be completed before 25 July 2026; the RERA project record and Form B undertaking state 24/07/2026 RERA record
OC statusNo occupancy certificate is included in the supplied records. The building permission requires an OC before occupation

Registration validity, the completion deadline, and occupancy-certificate status are separate matters: the registration certificate runs to 24/07/2026, the project’s declared completion date is 24/07/2026, and no OC is supplied.

2. The project story

MNA HOMES is a RERA-registered residential apartment project on the recorded 3172.87 m² site at plot/house number 8-1-21/2, Survey No. 359/A, in Katta Rampur, Karimnagar District. The building approval covers two blocks, each sanctioned as stilt plus five upper floors. The project filing lists 50 apartments: 10 two-bedroom and 40 three-bedroom units RERA record Land records RERA unit table.

The supplied records establish the sanctioned design and the promoter’s completion undertaking, but do not establish current on-site construction progress or completion of either block. The registration certificate and building approval specify their respective validity/completion dates; neither establishes that an occupancy certificate has been issued. The permission says an OC is compulsory before occupation.

3. Master plan, architecture & building design

The sanctioned building-permission extraction identifies two residential blocks on a site area of 3172.87 m², with net area also recorded as 3172.87 m². It states that each block has one stilt level and five upper floors. The approval lists height as 14.99 m and includes a 171.34 m² tot-lot; its open-space field states “5%”.

The RERA project fields give approved built-up area as 8,568.01 m². The approval extraction separately records upper-floor areas of 5,948.21 m² for Block 1 and 1,068.20 m² for Block 2, and stilt areas of 1,306.06 m² and 211.34 m² respectively. These are approval-extraction area entries, not RERA-filed saleable or carpet areas RERA filing.

The supplied material does not establish building footprints, flats per floor, lift or stair specifications, entrances and exits, internal circulation details, or a detailed residential/common-area schedule. The building-permission conditions require a tot-lot to be fenced and maintained as greenery, tree planting along the periphery and in front, and a peripheral green strip.

4. Homes, configurations & floor plans

TG-RERA records 50 units across two configurations. The floor-plan drawing review provides software-measured carpet-area estimates; these are measurements from drawing geometry, not RERA disclosures, and the extraction says they need review. Saleable area is the separately filed RERA figure and may include the home’s share of common areas; it should not be treated as carpet area RERA unit table Floor plans.

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK10010111.48 m²71.6–96.9 m²; median 79.6 m² (software-measured)29%
3BHK40040167.22 m²109.6–140.7 m²; median 113.7 m² (software-measured)32%

Drawing review measured 7 two-bedroom and 12 three-bedroom flat designs. The extracted example 2BHK plan labels bedrooms, living/dining, kitchen, two toilets and a 1.20 m-wide balcony. The example 3BHK plan labels bedrooms, living, hall, kitchen, toilets, 1.75 m- and 1.20 m-wide balconies, and a utility area RERA unit details.

The filing records the 2BHK and 3BHK counts and saleable areas; the drawing-based carpet figures are not filed carpet-area declarations. No RERA-filed carpet-area figures or unit-specific common-area allocation are supplied RERA unit table Floor plans.

5. Parking & vehicle circulation

The building-permission extraction records no cellar parking level and stilt areas of 1,306.06 m² for Block 1 and 211.34 m² for Block 2. The approval conditions state that approved cellar and stilt areas are to be used exclusively for vehicle parking, without partition walls or rolling shutters.

The supplied data does not establish the number of parking bays, two-wheeler spaces, visitor or accessible spaces, ramps, internal driveways, EV charging locations, or parking allocations to particular apartments. The approval includes a condition that parking places in buildings are to provide Electric Vehicle Charging Infrastructure; this is a sanctioned condition, not evidence that charging facilities are installed or operational.

6. Amenities, recreation & open spaces

The building-permission extraction includes a tot-lot and requires a percolation-pit rainwater-harvesting structure, transformer space and a garbage house. The RERA amenity record lists the following items and shows 0% progress for each supplied progress field; that record does not independently verify whether any facility has been completed RERA amenities.

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Tot-lot171.34 m²; approval requires fencing and maintenance as greenerySanctioned building-permission extractionNo completion verified; RERA amenity progress 0%
Green strip / tot-lot / parkRERA-listed category; approval requires peripheral greeneryRERA amenity record and building-permission conditionsRERA amenity progress 0%; no independent completion evidence
Community buildingsListed in RERA amenity record; no size or specification suppliedRERA amenity record0%; completion not verified
Internal roads and footpathsListed; no dimensions or specification suppliedRERA amenity record0%; completion not verified
Street lightingListed; no specification suppliedRERA amenity record0%; completion not verified

7. Utilities, building services & safety

The RERA amenity record marks water supply, sewerage and storm-water drains as “YES,” and also marks water conservation/rainwater harvesting and an electrical meter room/sub-station/receiving station as “YES.” Its progress entries are 0%; these entries do not establish completed or operational services RERA amenities.

The building permission requires a rainwater-harvesting percolation pit, transformer space and a garbage house. It also includes conditions for a dual piping system for potable and non-potable water, EV charging infrastructure in building parking places, and broadband/digital-connectivity infrastructure demarcation. The supplied documents do not specify water source or storage capacity, sewage-treatment capacity, reuse arrangements, electrical backup, lift numbers or capacities, or installed waste/security systems RERA amenities.

The approval assigns responsibility for structural and fire safety to the owner, builder/developer, architect and site engineer, and requires relevant services—including sanitation, plumbing, fire safety, lifts and electrical installations—to be executed under qualified technical supervision. These are approval conditions, not evidence of installation, inspection or statutory clearance.

8. Location, access & connectivity

The official project record identifies the site as plot/house number 8-1-21/2, Survey No. 359/A, at Katta Rampur, Karimnagar District, PIN 505001. The building-permission extraction names KARIMNAGAR as the village, while the RERA land record does not disclose a revenue village or mandal Land records.

The RERA boundary entries describe a road to the north as “ROAD WIDTH - 30” and a west-side “WIDE ROAD 12”; the building-permission extraction also refers to an 18M road width in its conditions RERA filing. No public-transport details, local landmarks, or measured access distances are supplied for this project.

9. Developer & development status

The TG-RERA-registered promoter is GSR CONSTRUCTIONS, recorded as a partnership, with GSTIN 36AAYFG6899D1ZI. The RERA address record is Kanukadhar Residency, Chaitanyapuri, Katta Rampur W 10, Karimnagar, Telangana 505001. Macherla Venu is identified in the registration materials as authorized signatory Corporate record Parties record.

The building-permission record identifies the landowners as Nandala Karuna, Nandala Sai Manoj and Nandala Vardhan and names GSR CONSTRUCTIONS as development-agreement-cum-GPA holder represented by its managing partner, Gujjula Shireesh Reddy. The supplied records provide completion undertakings and approval deadlines but no independently verified construction progress or OC.

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP02700006839; issued 01/09/2023; valid to 24/07/2026
Scope and available evidenceForm C for MNA HOMES; records Survey No. 359/A and plot/house number 8-1-21/2
Building-construction approval
Identifier / date0031/BP/3011/2023; 25 July 2023
Scope and available evidenceKarimnagar Municipal Corporation approval for two residential blocks on 3172.87 m²; file number 003472/BP/DTCP/3011/0027/2023
Commencement certificate / approved building plan material
Identifier / dateDocument 344482
Scope and available evidenceFiled as “Commencement Certificates for each building in each phase”; extraction describes two blocks, each stilt plus five upper floors
Form-B declaration
Identifier / date31-07-2023
Scope and available evidencePromoter declaration includes a completion undertaking of 24/07/2026 and a declaration that the land is free from encumbrances
Occupancy / completion certificate
Identifier / dateNot supplied
Scope and available evidenceThe building permission requires an occupancy certificate before occupation; no OC is established by the supplied documents
Layout approval
Identifier / dateNot supplied as an extracted approved layout
Scope and available evidenceThe supplied record includes a layout-plan document entry but no extracted approval particulars Document index

The building-permission extraction lists approval conditions including display and adherence to the sanctioned plan, a commencement notice before construction, a completion notice after construction, and an OC before occupation. The full conditions are not reproduced here.

Frequently asked questions

Is MNA HOMES registered with Telangana RERA?

Yes. MNA HOMES is registered with the Telangana Real Estate Regulatory Authority as P02700006839; the registration status is New Project.

Who is the developer of MNA HOMES?

The promoter named in the RERA registration is GSR CONSTRUCTIONS.

Where is MNA HOMES located?

MNA HOMES is in KARIMNAGAR, Telangana (505001).

When will MNA HOMES be completed?

The promoter's proposed date of completion filed with RERA is 30/11/2026. This is the promoter's declaration, not a guarantee.

More projects in Karimnagar