OXIGEN is a residential plotted development in Aloor II village, Chevella mandal, Ranga Reddy district. It is being developed by the registered promoter N SQUARE PROJECTS PRIVATE LIMITED. The layout covers a total site area of 37,207.97 sq.m and provides for 107 plots; no building or floor configuration is stated. TG-RERA registration number P02400008331 records a proposed completion date of 30/11/2026.

01What we found

Period endedTG-RERA registration ran to 30 Jun 2026 - check its extension on TG-RERA
42documents on file - each fact links to its page
1court case on this project's land (survey 271, 272, Aloor Ii)
9items to check - 5 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

9 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Aloor Ii, Chevella, Ranga Reddy · geocoded — approximate.

1. Project at a glance

Project identity

FieldRecord
Registered project nameOXIGEN RERA record
Project typePlotted development / open layout RERA record
Phase or registered portionNot separately identified; registration describes the project at Sy. Nos. 271P and 272P
TG-RERA registrationP02400008331
Registration validity3 June 2024 to 30 June 2026; extension not evidenced in the supplied record
Registered promoterN SQUARE PROJECTS PRIVATE LIMITED RERA record
RERA statusThe supplied certificate records registration. Its validity end date has passed; a current registration-status check is not supplied.

Land and geographic identity

FieldRecord
LocalityAloor RERA filing
Revenue villageAloor II RERA record
Mandal / district / PINChevella / Ranga Reddy / 501503 RERA record
Project survey numbersSy. Nos. 271P and 272P
Survey subdivisionsNot specified in the project’s registered survey-number identification. The title materials name subdivisions; see Land & Title. Land records Document index
Total site area37,207.97 sq.m
Road-affected area938.63 sq.m
Net layout area36,269.34 sq.m
BoundariesNorth: neighbour land; south: road; east: neighbour land; west: neighbour land RERA filing

Development identity

FieldRecord
Sanctioning authorityHyderabad Metropolitan Development Authority (HMDA)
Principal layout approvalLayout Permit No. 000130/LO/Plg/HMDA/2023, dated 30 June 2023
File / application reference059957/SKP/LT/U6/HMDA/08032023
Development formResidential open-plot layout
Approved built-up area21,615.65 sq.m is recorded as plotted area; no separate building built-up area is supplied.
Plots107, read from the approved layout drawing; drawing-derived count, not a RERA unit inventory Layout record
Building / floor configurationNot applicable to the approved plotted layout; no building-floor schedule is supplied.
Roads and open-space provisionRoad area 10,310.54 sq.m; parks/open space 3,434.82 sq.m; social infrastructure 908.32 sq.m; amenities area 0.
Mortgage condition24 plots, Nos. 12–14, 17, 37–46 and 92–101, totalling 4,428.98 sq.m, are recorded as mortgaged to HMDA pending development works and release.

Offering and status

FieldRecord
OfferingResidential plots; the approved drawing identifies 107 plots. Layout record
Plot-size rangeSoftware-read from the drawing: 150.5–492.9 sq.m (180–589.5 sq.yd); drawing readings should be verified against the approved plan. Layout record
Booked / available countsNot supplied in the available RERA data. RERA filing
Construction / development stageNo independently verified site-progress evidence is supplied. The RERA record gives a proposed completion date of 30 November 2026. RERA record
Completion dateThe RERA header records proposed completion as 30/11/2026. A promoter Form B separately states 30 June 2026 as the completion undertaking. RERA record
Occupancy / completion certificateNo project completion certificate or occupancy certificate is evidenced in the supplied documents. This is a plotted layout, and the supplied approval is a draft layout letter. Document index

2. The project story

OXIGEN is registered with TG-RERA as a residential plotted development at Aloor II village, Chevella mandal, Ranga Reddy district. The HMDA layout plan identifies Sy. Nos. 271P and 272P and provides for 107 plots, internal roads, park/open-space land and a social-infrastructure area. The land-use schedule records 21,615.65 sq.m as plotted area within a net layout area of 36,269.34 sq.m. Layout record

The supplied HMDA document is described as a draft layout letter, with conditions for completing infrastructure and handing over specified roads, open spaces and social-infrastructure land to the local body before release of the final layout. It also records restricted sale of the HMDA-mortgaged plots until their release. The records do not establish that those works are complete or that the final layout has been released.

The project’s RERA header states a proposed completion date of 30 November 2026, while the promoter’s Form B declaration gives 30 June 2026. No site-progress certification, final layout release, or completion/occupancy certificate is included here; these items therefore cannot be treated as independently verified. RERA record Document index

3. Master plan, architecture & building design

This is an open-plot layout, not a building or apartment scheme in the supplied approval. The approved-plan extraction gives a total site area of 37,207.97 sq.m, including 938.63 sq.m affected by a master-plan road, leaving 36,269.34 sq.m net layout area. The recorded land-use split is:

Layout useAreaShare of net layout area
Plotted area21,615.65 sq.m59.6%
Layout roads10,310.54 sq.m28.4%
Parks / organized open space3,434.82 sq.m9.5%
Social infrastructure908.32 sq.m2.5%
Amenities area0.00 sq.m0.0%

The areas and percentages are taken from the approved-drawing extraction; percentages are calculated from that drawing’s net-area statement. Layout record

The drawing-derived plot count is 107, with software-read sizes from 150.5 to 492.9 sq.m (180 to 589.5 sq.yd). The most common printed plot size is 200 sq.yd (167.23 sq.m), appearing 61 times in the drawing extraction. These are drawing readings, not a RERA-filed saleable-area schedule, and should be checked against the plan. Layout record

The approval refers to an abutting road width of 30.00 and calls for underground ducting of utilities. It does not provide building elevations, building footprints, floor configurations, or apartment layouts.

4. Homes, configurations & floor plans

The registered offering is plots, not apartments. The approved drawing extraction identifies 107 plots and provides the following software-read size distribution. RERA-filed booked/available inventory and plot-wise saleable areas are not supplied. Layout record

Drawing-read plot-size bandPlot count
150–200 sq.yd (125–167 sq.m)3
200–250 sq.yd (167–209 sq.m)83
250–300 sq.yd (209–251 sq.m)5
300–400 sq.yd (251–334 sq.m)6
400–500 sq.yd (334–418 sq.m)5
500–1000 sq.yd (418–836 sq.m)5

The supplied floor-plan review reports two layout sheets and no measured residential floor plans. Carpet-area and room-configuration measurements are therefore not applicable or established for this plotted project. Floor plans

5. Parking & vehicle circulation

No sanctioned parking-space count, visitor or accessible parking provision, parking structure, or plot-wise parking allocation is supplied. The approved plan identifies roads within the layout and specifies an abutting road width of 30.00; the extracted record does not state driveway dimensions or a separate vehicle-circulation schedule.

The layout approval restricts sale of the 24 plots mortgaged to HMDA until release of the mortgage. A drawn plot or road does not by itself establish a buyer’s parking entitlement.

6. Amenities, recreation & open spaces

The approved layout records parks/open space and social-infrastructure land, alongside infrastructure and utility works. The RERA amenity record marks several categories as available but records 0% progress; that filing entry is not evidence of completion. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Park / organized open space3,434.82 sq.mIncluded in layout record; completion not verified
Social infrastructure908.32 sq.mIncluded in layout record; completion not verified
Internal roads and footpathsRoad area 10,310.54 sq.mRERA amenitiesRERA amenity entry shows 0%; completion not verified
Park development / avenue plantingNo size suppliedListed in approval document; completion not verified
Cycling tracksNo size suppliedListed in approval document; completion not verified
Community buildingsNo size or facility details suppliedRERA amenitiesProgress shown as 0%; facility details not established

7. Utilities, building services & safety

The HMDA layout document lists proposed layout infrastructure including storm-water drains, underground drainage lines, a common septic tank/STP, internal water-supply pipelines, an overhead tank, transformer, street lighting, rainwater-harvesting pits and underground ducting for utility services. It also lists park development and street lighting. These are approval-document references; no supplied evidence verifies installation, capacity or operational status.

Water
What the record saysInternal water-supply pipelines and overhead tank listed in the layout approval
Status evidenceCompletion and capacity not verified
Sewerage and drainage
What the record saysUnderground drainage lines, common septic tank/STP and storm-water drains listed
Status evidenceCompletion, capacity and operating status not verified
Rainwater management
What the record saysRainwater-harvesting pits listed
Status evidenceCompletion and capacity not verified
Electrical
What the record saysTransformer/transformer yard and street lighting listed; RERA amenity record includes an electrical meter room/sub-station/receiving-station category
Status evidenceInstallation and capacity not verified RERA amenities
Utility corridors
What the record saysUnderground ducting of utility/service lines required by the approval
Status evidenceCompletion not verified
Fire and life safety
What the record saysRERA amenity record includes a fire-protection/fire-safety category, but no supplied project-specific system details or completion evidence
Status evidenceNot established RERA amenities
Waste management
What the record saysRERA amenity record lists solid-waste management and disposal
Status evidenceCompletion and operating arrangements not verified RERA amenities
Security / accessibility
What the record saysNo project-specific details supplied
Status evidenceNot established Document index

8. Location, access & connectivity

The registered project location is Aloor II village, Chevella mandal, Ranga Reddy district, Telangana, PIN 501503. The project is identified in the HMDA layout document as being in the extended area of the erstwhile HUDA/HMDA planning area. RERA record

The supplied location record gives a cadastral parcel-centroid coordinate of 17.31993, 78.06931 and an approximate distance of 30.8 km to the nearest sampled Outer Ring Road interchange. No measured distances to public transport, schools, hospitals or other landmarks are supplied. Location record

9. Developer & development status

The registered promoter is N SQUARE PROJECTS PRIVATE LIMITED, a private limited company. Its supplied corporate identifier is GSTIN 36AAHCN2933K1Z8. The promoter address recorded in the project evidence is H. No. 8-2-293/82/J/A/122, Plot No. A-122, Journalist Colony, Aloor, Chevella, Ranga Reddy, PIN 501503. RERA record Corporate record Parties record

The promoter’s Form B, dated 19 September 2023, states a completion undertaking of 30 June 2026 and makes declarations about landowners’ title and project-account arrangements. The RERA header separately gives proposed completion as 30 November 2026. The available material does not include a certified progress update or independent verification of works completed. RERA record

10. Approvals, official records & documents

RecordSupplied evidence
TG-RERA registrationForm C certificate for OXIGEN, registration P02400008331, valid 3 June 2024–30 June 2026.
HMDA layout approvalLayout Permit 000130/LO/Plg/HMDA/2023, dated 30 June 2023; file/application reference 059957/SKP/LT/U6/HMDA/08032023.
Layout-plan documentDrawing for proposed residential open plots in Sy. Nos. 271P and 272P, Aloor II village, Chevella mandal, Ranga Reddy district.
Draft layout letterHMDA draft layout letter describing the 36,269.34 sq.m net layout and conditions for infrastructure development, mortgage plots and handover of roads/open space/social-infrastructure land.
Local-body NOCAloor Gramapanchayath NOC included in the supplied document set.
Road-affected land gift deedDeed No. 4067/2023, dated 3 May 2023, recorded for transfer of the 938.63 sq.m road-affected area to the local body.
HMDA mortgage deedsDeed No. 4065/2023, dated 17 April 2023, and Deed No. 4066/2023, dated 3 June 2023, covering specified plots totalling 4,428.98 sq.m.
Promoter declarationForm B declaration by authorized signatories, dated 19 September 2023.
Completion / occupancy certificateNot present in the supplied project documents. Document index

The supplied records do not include evidence of final-layout release or completed infrastructure works. The HMDA layout document itself states that the layout permission is not proof of land title.

Frequently asked questions

Is OXIGEN registered with Telangana RERA?

Yes. OXIGEN is registered with the Telangana Real Estate Regulatory Authority as P02400008331; the registration status is New Project.

Who is the developer of OXIGEN?

The promoter named in the RERA registration is N SQUARE PROJECTS PRIVATE LIMITED.

Where is OXIGEN located?

OXIGEN is in Aloor, Aloor II, Chevella, Rangareddy, Telangana (501503).

When will OXIGEN be completed?

The promoter's proposed date of completion filed with RERA is 30/11/2026. This is the promoter's declaration, not a guarantee.