Sree Nilayam

ASTER INFRA · Rangareddy · RERA P02500000597

SREE NILAYAM is a residential apartment project in Kantareddy Nagar, Attapur, Rajendranagar mandal, Ranga Reddy district, developed by the registered promoter ASTER INFRA. The project occupies 664.5 m² and comprises one residential building with 1 stilt + 5 upper floors and 15 apartments: 5 two-bedroom and 10 three-bedroom units, with 2BHK and 3BHK configurations. It is registered under TG-RERA number P02500000597, with proposed completion on 24/01/2025.

01What we found

Period endedTG-RERA registration ran to 24 Jan 2025 - check its extension on TG-RERA
10documents on file - each fact links to its page
2court cases on this project's land (survey 480, 482, 483, 484, 485, 487 and 1 more, Attapur)
6items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

6 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Project at a glance

Project identity

FieldProject record
Registered name and typeSREE NILAYAM — residential apartment project. RERA record
Registered portion / phaseOne residential building is identified in the supplied records; no separate phase name is disclosed. RERA record
TG-RERA registrationP02500000597; registered from 12/04/2019 to 24/01/2025 for five years. The supplied certificate records no extension. Registration validity is distinct from the building’s completion/occupancy record. RERA record
Registered promoterASTER INFRA; the registration record identifies the promoter as Aster Infra. RERA record
Recorded RERA statusThe project header labels it “New Project.” The registration certificate’s recorded validity ended on 24/01/2025; a current extension or renewed registration is not evidenced in the supplied certificate. RERA record

Land and geographic identity

FieldProject record
Locality / revenue villageKantareddy Nagar, Attapur; revenue village Attapur. RERA record Land records
Mandal / district / PINRajendranagar / Ranga Reddy / 500048. RERA record
Project survey numbers, as filed480PART, 483PART, 408P, 410, 429, 482PART, 484PART, 485P, 487P, 489PART. The certificate and building-permit extraction identify these survey portions. Land records
Plot referencePlot 97 & part of open plot.
Registered site area664.5 m² in the RERA project record; the GHMC occupancy certificate states 664.50 m². RERA record Land records
Total / net / affected areaFiled total and net area: 664.50 m²; road-widening/FTL/nala-affected area: 0 m². Land records
BoundariesNorth: Plot 91/92; South: 9 m road; East: Plot 96 / 9 m road; West: Plot 90 and neighbours’ land. Land records

Development identity

FieldProject record
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC). Approvals record
Principal building permitGHMC Building Permit Order 2/C11/01369/2019, approved 24 January 2019; the permit extraction also identifies Building Permit No. 2/C11/08581/2020. Approvals record
Building / floorsOne residential building, BLDG (PRAVEEN KUMAR REDDY); sanctioned 1 stilt + 5 upper floors.
Approved built-up areaNot separately stated as an approved built-up-area figure in the supplied project fields. The permit extraction lists a cellar area of 1,527.65 m² and stilt area of 317.85 m²; the occupancy-certificate extraction reports floor area of 1,527.65 m² as sanctioned and 1,528.55 m² as per site building plan. These are the document’s separately labelled figures. RERA record
RERA-declared units15 apartments in one building: 5 two-bedroom and 10 three-bedroom units. RERA unit table RERA unit details
ParkingThe permit extraction records sanctioned parking area of 317.8 m²; it does not establish a parking-space count or unit-by-unit allocation.

Offering and status

FieldProject record
Configurations2BHK and 3BHK apartments. RERA unit table RERA unit details
RERA-filed saleable areas2BHK: 83.05 m²; 3BHK: 102.36–120.1 m². RERA unit table RERA unit details
Bookings / availabilityPortal-derived counts, with no as-of date recorded: 5 booked and 10 available overall; 2BHK: 0 booked / 5 available; 3BHK: 5 booked / 5 available. Treat as indicative. RERA unit table RERA unit details
Completion dates in project recordRERA project header proposed completion: 24/01/2025. Form B states an undertaking to complete by 25th January, 2025. The GHMC occupancy-certificate extraction records building completion date 15 July, 2020 and a due date for completion of 24 January, 2025. RERA record
Occupancy-certificate status and scopeA GHMC occupancy certificate is supplied for the identified building at the 664.50 m² site; it records that the inspected building is fit for occupation.
Construction stageNo current independently verified construction-progress measurement is supplied. RERA record Document index

The project story

SREE NILAYAM is recorded with TG-RERA as a residential apartment project on a 664.50 m² site in Kantareddy Nagar, Attapur, in the Rajendranagar mandal of Ranga Reddy district. The registered parcel description lists ten survey portions and a single building, named BLDG (PRAVEEN KUMAR REDDY) in the GHMC permit and occupancy-certificate extracts. RERA record Land records

The GHMC permit describes a building of 1 stilt + 5 upper floors. The RERA unit record lists 15 apartments: five 2BHKs and ten 3BHKs. A GHMC occupancy-certificate extract is included for this building and describes it as fit for occupation; it records completion on 15 July, 2020. This certificate is building-specific evidence, not a statement about any other phase or building. The supplied records do not provide a current site inspection or independently verified progress report. RERA unit table RERA unit details Document index

Master plan, architecture & building design

The supplied GHMC permit extract identifies one residential building, BLDG (PRAVEEN KUMAR REDDY), on a site of 664.5 m², with a sanctioned height of 14.95 m and configuration of 1 stilt + 5 upper floors. It records a cellar area of 1,527.65 m², stilt area of 317.85 m², and no ground- or upper-floor area in the extracted parameter list. The occupancy-certificate extract separately reports sanctioned floor area of 1,527.65 m² and site-building-plan floor area of 1,528.55 m². These figures are reproduced as labelled in the documents and are not treated as interchangeable area measures.

The occupancy-certificate extract records sanctioned setbacks of Front 3.00 m, Rear 3.50 m, Side-1 2.50 m, and Side-2 4.50 m; it records site-plan setbacks of Front 3.00 m, Rear 3.50 m, Side-1 2.46 m, and Side-2 4.50 m.

  • No supplied drawing-derived record establishes the building footprint, flats per floor, lift or stair configuration, entrances, internal circulation, or a detailed common-area layout. Two floor-plan drawings are listed, but neither has been software-measured; both are marked as scans pending. Floor plans
  • The HMDA Master Plan 2031 sheet for the Moinabad–Rajendranagar area is available as an image, but its map layer is image-only and the exact zoning at the project survey parcel has not been read or verified. HMDA

Homes, configurations & floor plans

The TG-RERA unit record lists the following configurations and saleable areas. Booking and availability counts are portal readings without an as-of date and should be treated as indicative. RERA unit table RERA unit details

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK50583.05 m²Not measured from drawingsNot supplied
3BHK1055102.36–120.1 m²Not measured from drawingsNot supplied

The 2BHK units are filed as “DOUBLE BEDROOM”; the 3BHK units are filed under several “TRIPLE BEDROOM” labels, including unit-specific entries. RERA unit details The supplied floor-plan drawings have not been software-measured, so there are no drawing-based carpet-area or room-dimension measurements to report. RERA-filed saleable area is the available filed area measure; it is not presented here as carpet area. Floor plans RERA unit table

Parking & vehicle circulation

The GHMC permit extract records a sanctioned parking area of 317.8 m². No verified count of car or two-wheeler spaces, visitor or accessible spaces, parking allocation by apartment, or parking-level circulation arrangement is supplied. The permit describes the building as 1 stilt + 5 upper floors; the available evidence does not establish an individual allottee’s exclusive parking rights.

The promoter/vendor listing mentions open and covered car parking, but the supplied project records do not establish the number, sanctioned layout, or allocation of those spaces. Promoter website

Amenities, recreation & open spaces

The RERA amenity record lists the following project infrastructure and facilities. The percentages are as recorded in the amenity data; the evidence supplied does not establish independent on-site verification of completion. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Internal roads and footpathsNo size disclosedRERA amenities0%; no independent completion verification supplied
Green strip / tot-lot / parkNo size disclosedRERA amenitiesAvailable: YES; 100% recorded
Community buildingsNo size disclosedRERA amenities0%; no independent completion verification supplied
Aggregate recreational open spaceNo area disclosedRERA amenities0%; no independent completion verification supplied

The GHMC permit also lists a tot-lot condition and a rain-water-harvesting structure; these are addressed with the project’s utilities below. The vendor listing mentions additional leisure facilities, including a swimming pool, gym, clubhouse, landscaped gardens and play areas, but these are vendor-listed claims rather than verified project delivery evidence. Promoter website

Utilities, building services & safety

The RERA amenity record marks water supply, sewerage, storm-water drains, street lighting, and an electrical meter room/sub-station/receiving station as available at 100%. These are portal-recorded status figures, not an independent inspection. The same record assigns 0% to sewage/sullage treatment and disposal, solid-waste management, water conservation/rainwater harvesting, energy management, and fire-protection/fire-safety requirements. RERA amenities

The GHMC building-permit conditions require a rain-water-harvesting structure (percolation pit), transformer space, and a garbage house; the permit parameter list records 4 rain-water-harvesting points and 30 trees. The occupancy-certificate extract lists RWH as an amenity/utility. These records establish the stated permit provisions, not current operational capacity or independently verified performance.

No supplied evidence gives water source or storage capacity, treatment capacity, sewerage reuse arrangements, electrical backup capacity, lift number or capacity, fire-system details, CCTV or access-control installation, or accessible routes and facilities. Vendor-listed utilities and safety features are not treated as verified project provisions. Promoter website

Location, access & connectivity

The registered location is Kantareddy Nagar, Attapur, in Rajendranagar mandal, Ranga Reddy district, PIN 500048. The land record describes road boundaries to the south and east, each stated as 9 m wide; the GHMC permit extract separately records an 18 mt. road width. RERA record Land records

The supplied location data gives the cadastral parcel centroid as 17.370993930009327, 78.42655864421324 and lists HITEC City — 9.6 km as a connectivity point. Location record The vendor listing describes schools, airports, restaurants, bus stops and railway stations as being in proximity, but supplies no measured distances or travel times. Promoter website

Developer & development status

The registered promoter is ASTER INFRA, identified in the RERA record as a partnership. The listed promoter address is Jayasekhara Nivas, Nallakunta, Kantareddy Nagar, Attapur, Rajendranagar, Ranga Reddy, PIN 500048. The registration certificate separately prints a promoter office address in Nallakunta (Sultan Bazar), Himayatha Nagar, Hyderabad, PIN 500044. Corporate record RERA record

The project’s Form B affidavit is dated 08th March, 2019 and states an undertaking to complete the project by 25th January, 2025. The RERA header gives 24/01/2025 as the proposed completion date. The GHMC occupancy-certificate extract records completion on 15 July, 2020 for the identified building. No current construction-progress report or independent site-status inspection is supplied. RERA record

The GHMC permit identifies AVL CONSTRUCTIONS as developer/builder; the supplied records do not establish that it is the registered TG-RERA promoter.

Approvals, official records & documents

RecordSupplied evidence
TG-RERA registrationForm C certificate for SREE NILAYAM, registration P02500000597, issued 12/04/2019, valid to 24/01/2025; the certificate records no extension.
GHMC building permitBuilding Permit Order 2/C11/01369/2019, dated 24 January 2019, for one residential building on the listed Attapur survey portions. The extraction also lists Building Permit No. 2/C11/08581/2020.
GHMC occupancy certificateOccupancy Certificate 2/C11/01369/2019, approved 13/08/2020, for the identified building and 664.50 m² site; the extract states the inspected building is fit for occupation.
Building completion noticeForm–1A architect’s certificate/building completion notice associated with Building Permit/Proceedings No. 2/C11/01369/2019.
Promoter declarationForm B affidavit-cum-declaration by authorised signatories of ASTER INFRA, dated 08th March, 2019.
Title reportAdvocate’s title-cum-search report concerning Plot No. 97 and part of an open plot at Attapur; document extraction identifies Sale Deed No. 10831/2018 in favour of M/s Aster Infra.
Land-use / layout lookupHMDA Master Plan 2031 sheet is image-only for the area; exact survey-level zone is not verified. The HMDA approved-layout lookup is unavailable through the public portal in the supplied record; no LP number is listed in the RERA record. HMDA
Additional permit referencesGHMC permit extraction lists LRS/13467/VI/SZ/08, LRS/13466/VI/SZ/08, Contractor’s All Risk Policy No. 417052/44/19/000083, Notarised Affidavit No. 326/2019, and compound-wall references BL/1574/2010 and CA/2012/57139.

Frequently asked questions

Is SREE NILAYAM registered with Telangana RERA?

Yes. SREE NILAYAM is registered with the Telangana Real Estate Regulatory Authority as P02500000597; the registration status is New Project.

Who is the developer of SREE NILAYAM?

The promoter named in the RERA registration is ASTER INFRA.

Where is SREE NILAYAM located?

SREE NILAYAM is in ATTAPUR, Rajendranagar, Rangareddy, Telangana (500048).

When will SREE NILAYAM be completed?

The promoter's proposed date of completion filed with RERA is 24/01/2025. This is the promoter's declaration, not a guarantee.

More projects in Attapur