Shree Bhoomi Residency
YESHWANTH RAO · Nizamabad · RERA P03100007703
SHREE BHOOMI RESIDENCY is a residential apartment project in Subhash Nagar, Nizamabad, Nizamabad district; the mandal is not disclosed. The registered promoter is Yeshwanth Rao Pawar, and the RERA filing also identifies M/s Shree Bhoomi Builders & Developers. The project covers 509.08 sq. m. and consists of one residential building with 1 stilt + 5 upper floors and 10 dwelling units; the RERA filing records the unit entry as “3,” without a configuration label. Its TG-RERA registration is P03100007703, and the proposed completion date recorded in the project header is 30 November 2026.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
5 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Record |
|---|---|
| Registered project name | SHREE BHOOMI RESIDENCY RERA record |
| Project type | Residential apartment project RERA record |
| Phase / registered portion | Phase not separately identified in the supplied record; the registration identifies Survey No. 78, Plot Nos. 6 and 7, Nizamabad |
| TG-RERA registration | P03100007703 RERA record |
| Registration validity | 12 February 2024 to 8 March 2026, as stated on the registration certificate; this is the registration period, not a construction-completion or occupancy certificate RERA record |
| Registered promoter | Yeshwanth Rao Pawar is named on the certificate; the RERA filing also names Yeshwanth Rao and identifies M/s Shree Bhoomi Builders & Developers |
| RERA status in supplied record | New Project; no extension or current registration-status order is supplied RERA record |
Land and geographic identity
| Item | Record |
|---|---|
| Locality / address | Subhash Nagar; Janmabhoomi Road; Nizamabad, Telangana, PIN 503002 RERA record RERA filing |
| Revenue village | Subhash Nagar is the registered project identity; the supplied building-permission and plan extracts also use Kanteshwar and Goutham Nagar. The revenue-village identification is not reconciled in the supplied records RERA record |
| Mandal | Not disclosed in the project identity data; the registration certificate identifies Nizamabad East (New), while the project record does not establish a reconciled mandal Land records |
| District | Nizamabad RERA record RERA filing |
| Survey number / subdivisions | Survey No. 78; no subdivision is disclosed. The registered certificate identifies Plot Nos. 6 and 7 Land records |
| Site extent | 509.08 sq. m. total and net area; road-affected area recorded as 0 Land records |
| Boundaries | East: Plot No. 5 of Challa Sambashivarao; West: open place of K. Srinivas and others; North: Plot Nos. 11 and 12; South: 33 ft wide road RERA filing |
Development identity
| Item | Record |
|---|---|
| Sanctioning authority | Nizamabad Municipality/Municipal Corporation Approvals record |
| Principal building approval | 0005/BP/3072/2023, dated 8 March 2023 Approvals record |
| Approved built-up area | 1,243.30 sq. m. residential upper-floor area; the plan extract separately records 1,493.20 sq. m. including parking and total BUA of 1,503.35 sq. m. |
| Building count | One residential building RERA filing |
| Sanctioned floors / height | 1 stilt + 5 upper floors; 14.50 m building height |
| Parking | Plan extract records 2 proposed parkings and 249.90 sq. m. residential parking area; the building approval requires approved stilt/cellar parking space to be used for vehicle parking. No cellar is identified in the supplied floor configuration |
| Units | 10 dwelling units in the plan extract; RERA unit record contains 10 units, filed under the entry “3” rather than a configuration label RERA unit table |
Offering and status
| Item | Record |
|---|---|
| RERA-filed unit entry | “3”; 10 units, with 0 booked and 10 available in the portal data supplied. These figures have no stated as-of date and are indicative RERA unit table |
| RERA-filed saleable area | 143.67 sq. m. per unit in the supplied unit record RERA unit details |
| Construction stage | No dated, independently verified construction-progress information is supplied; RERA amenity progress entries show 0% RERA amenities |
| Completion dates | Promoter’s Form B declaration undertakes completion by 8 March 2026. The project header separately records proposed completion as 30 November 2026; the supplied evidence does not explain the relationship between these dates RERA record |
| Occupancy / completion certificate | No occupancy or completion certificate is included in the supplied documents; status is not established Document index |
2. The project story
SHREE BHOOMI RESIDENCY is registered as a residential apartment project in Nizamabad, identified in the RERA certificate as Survey No. 78, Plot Nos. 6 and 7. The registered project identity gives Subhash Nagar, Nizamabad, PIN 503002; the building-permission materials also refer to Kanteshwar and Goutham Nagar, so the supplied records do not provide a single reconciled revenue-village description. RERA record
The filed approval describes one building, with stilt parking and five upper floors, and the plan extract records 10 dwelling units. The RERA unit table records 10 units under the entry “3,” but does not provide a matching configuration name. The record shows no booked units and 10 available units, without an as-of date. RERA unit table
The supplied evidence establishes the approval and registration documents, but does not establish the building’s current construction stage or an issued occupancy certificate. The promoter’s Form B states a completion undertaking of 8 March 2026; the project header also gives a proposed completion date of 30 November 2026. These are completion-date records, not evidence of completed construction or occupancy certification. RERA record Document index
3. Master plan, architecture & building design
The building approval and plan extract describe a single residential building on a 509.08 sq. m. site, with 249.93 sq. m. proposed coverage (49.1%) and a vacant plot area of 259.14 sq. m. The filed area figures are not interchangeable: the approval records 1,243.30 sq. m. of residential upper-floor area; the plan extract records 1,493.20 sq. m. including parking and total BUA of 1,503.35 sq. m.
The sanctioned configuration is 1 stilt + 5 upper floors, with a stated building height of 14.50 m. The extracts do not provide a verified floor-by-floor unit schedule, lifts, stairs, entries, internal circulation, or a detailed building footprint drawing in the supplied data.
The approval refers to a tot-lot and greenery around the site, and lists a rainwater-harvesting structure, transformer space and garbage house. These are approval conditions or listed provisions; the supplied record does not establish that they have been completed.
4. Homes, configurations & floor plans
The RERA filing records 10 units under the entry “3,” but does not identify a configuration name. The supplied plan-measurement record identifies 4BHK designs from the approved floor-plan drawing; that is a software measurement from drawings, not a RERA-filed configuration or area disclosure. RERA unit table RERA unit details Floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| RERA entry “3” (configuration not identified) | 10 | 0 | 10 | 143.67 sq. m. | Not established for this RERA entry | Not supplied |
| 4BHK (drawing-measured; not matched to a RERA configuration) | Not stated in RERA filing | Not stated | Not stated | Not supplied for this configuration | Software-measured: median 180.9 sq. m.; range 179.1–182.8 sq. m. (median 1,948 sq. ft.) | Not supplied |
The drawing measurement covers two flat designs and is derived from drawing geometry; it should be checked against the drawing. Carpet area and RERA saleable area are distinct measures: the supplied floor-plan note says the saleable area also counts the home’s share of common areas. No RERA-filed loading figure is supplied. RERA unit details Floor plans
The measured drawing extract labels bedroom, drawing-room, hall, toilet, dress and foyer spaces. It provides dimensions for those spaces, but the supplied record does not establish a complete, verified room schedule for the marketed or RERA-filed unit configuration. RERA unit details
5. Parking & vehicle circulation
The building plan extract records 2 proposed parking spaces and 249.90 sq. m. of residential parking area. The building approval states that stilt/cellar areas approved for parking must be used exclusively for vehicle parking without partition walls or rolling shutters; the supplied floor configuration identifies stilt, but does not identify a cellar.
No resident-versus-visitor allocation, accessible parking provision, parking-unit allocation, mechanical parking, ramp arrangement, EV charging, or vehicle/pedestrian circulation plan is established in the supplied material. The plan’s parking count does not by itself establish exclusive parking rights for a buyer. Document index
6. Amenities, recreation & open spaces
The RERA amenity record lists 14 items. Each supplied progress entry is 0%; this is a filed status record, not an independent site verification. The building approval also sets conditions for greenery, a tot-lot and rainwater harvesting, without supplied evidence that those works are complete. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Water Supply | Listed as available: YES; no source, storage or capacity stated | RERA amenities | 0%; completion not independently verified |
| Sewerage (Chamber, Lines, Septic Tank, STP) | Listed as available: YES; no system detail or capacity stated | RERA amenities | 0%; completion not independently verified |
| Green Strip/TOT LOT/Park | Listed as available: YES; no area stated | RERA amenities | 0%; approval requires tot-lot and greenery; completion not independently verified |
| Solid Waste Management and Disposal | Listed as available: YES; no facility or capacity stated | RERA amenities | 0%; completion not independently verified |
| Water Conservation / Rain Water Harvesting | Listed as available: YES; approval requires a rainwater-harvesting structure/percolation pit; one RWHP is recorded | RERA amenities | 0%; completion not independently verified |
| Electrical Meter Room / Sub-Station / Receiving Station | Listed as available: YES; approval requires transformer space; no capacity stated | RERA amenities | 0%; completion not independently verified |
| Internal Roads & Footpaths | Listed; no size or detail stated | RERA amenities | 0%; completion not independently verified |
| Storm Water Drains | Listed; no size or detail stated | RERA amenities | 0%; completion not independently verified |
| Street Lighting | Listed; no quantity or detail stated | RERA amenities | 0%; completion not independently verified |
| Community Buildings | Listed; no size or description stated | RERA amenities | 0%; completion not independently verified |
| Treatment and Disposal of Sewage and Sullage Water | Listed; no system or capacity stated | RERA amenities | 0%; completion not independently verified |
| Energy management | Listed; no system detail stated | RERA amenities | 0%; completion not independently verified |
| Fire Protection and Fire Safety Requirements | Listed; no system detail stated | RERA amenities | 0%; completion not independently verified |
| Aggregate area of recreational open space | Listed; area not stated | RERA amenities | 0%; completion not independently verified |
No clubhouse or indoor recreation facility is identified in the supplied evidence. RERA amenities Document index
7. Utilities, building services & safety
The amenity filing marks water supply, sewerage, solid-waste management, rainwater harvesting, and an electrical meter room/sub-station/receiving station as available, but the associated progress entries are 0%. It does not provide water-source or storage details, treatment capacity, electrical capacity, or backup-power details. RERA amenities
The building approval requires a rainwater-harvesting percolation pit, transformer space, and a garbage house. The plan extract lists septic tank and sump tank among utilities. These are filed or approval-related provisions; the supplied data does not verify installation or operation.
Fire protection and safety are listed in the amenity record, but no specific fire-system design or completion evidence is supplied. The approval makes fire-safety requirements the responsibility of the owner/builder and states that services including sanitation, plumbing, fire safety and electrical installations are to be executed under qualified technical supervision. No lift, service-lift, accessibility, CCTV, security-access, or EV-charging details are established in the supplied records. RERA amenities
8. Location, access & connectivity
The registered location is Subhash Nagar, Janmabhoomi Road, Nizamabad, Telangana, PIN 503002, with Survey No. 78 and Plot Nos. 6 and 7 identified on the registration certificate. The boundary record identifies a 33 ft wide road on the south. RERA record RERA filing RERA filing
The supplied location record gives a distance of 1.2 km to Financial District (Nanakramguda). The record labels this as a connectivity point but does not provide a route, travel time, public-transport details, or an independently verified access assessment. Location record
9. Developer & development status
The TG-RERA certificate names Yeshwanth Rao Pawar as the registered promoter. The RERA Form B identifies the project as promoted by Yeshwanth Rao Pawar through M/s Shree Bhoomi Builders & Developers. The supplied record does not establish the legal entity type, corporate registration identifiers, or a separately verified registered office and official contact details. Corporate record
Form B, dated 26 October 2023, records the promoter’s undertaking to complete by 8 March 2026. The project header records a proposed completion date of 30 November 2026. The supplied evidence does not establish an approved extension or explain the relationship between these dates. No current construction-progress certification or occupancy certificate is supplied. RERA record Document index
10. Approvals, official records & documents
| Record | Supplied evidence |
|---|---|
| TG-RERA registration | Certificate for SHREE BHOOMI RESIDENCY, P03100007703; identifies Survey No. 78 and Plot Nos. 6 and 7, Nizamabad; states validity from 12 February 2024 to 8 March 2026 |
| Principal building approval | Nizamabad Municipality/Municipal Corporation, approval 0005/BP/3072/2023, dated 8 March 2023; building-permission extract describes 1 stilt + 5 upper floors |
| Building-plan extract | Document 370057 records a residential building, 10 dwelling units, 14.50 m height, and proposed parking; it also includes a layout-plan-details extract |
| Promoter declaration | Form B dated 26 October 2023; names the project, promoter and promoter’s completion undertaking |
| Layout-related record | Document 380700 contains a layout approval reference, L.P. No. 83/84, attributed in that extract to the Revenue Office, Kanpur Cantonment (D); it does not establish the project’s Nizamabad layout approval |
| Occupancy / completion certificate | None included in the supplied document set Document index |
The supplied documents also include a title report, an encumbrance statement, a partially completed allotment letter and a partially completed agreement-for-sale form. Their substantive title and encumbrance implications are addressed in the relevant report sections, not resolved by this overview. Document index
1. Project at a glance
Project identity
Registered project name: SHREE BHOOMI RESIDENCY
Project type: Residential apartment project
Phase / registered portion: Phase not separately identified in the supplied record; the registration identifies Survey No. 78, Plot Nos. 6 and 7, Nizamabad
TG-RERA registration: P03100007703
Registration validity: 12 February 2024 to 8 March 2026, as stated on the registration certificate; this is the registration period, not a construction-completion or occupancy certificate
Registered promoter: Yeshwanth Rao Pawar is named on the certificate; the RERA filing also names Yeshwanth Rao and identifies M/s Shree Bhoomi Builders & Developers
RERA status in supplied record: New Project; no extension or current registration-status order is supplied
Land and geographic identity
Locality / address: Subhash Nagar; Janmabhoomi Road; Nizamabad, Telangana, PIN 503002
Revenue village: Subhash Nagar is the registered project identity; the supplied building-permission and plan extracts also use Kanteshwar and Goutham Nagar. The revenue-village identification is not reconciled in the supplied records
Mandal: Not disclosed in the project identity data; the registration certificate identifies Nizamabad East (New), while the project record does not establish a reconciled mandal
District: Nizamabad
Survey number / subdivisions: Survey No. 78; no subdivision is disclosed. The registered certificate identifies Plot Nos. 6 and 7
Site extent: 509.08 sq. m. total and net area; road-affected area recorded as 0
Boundaries: East: Plot No. 5 of Challa Sambashivarao; West: open place of K. Srinivas and others; North: Plot Nos. 11 and 12; South: 33 ft wide road
Development identity
Sanctioning authority: Nizamabad Municipality/Municipal Corporation
Principal building approval: 0005/BP/3072/2023, dated 8 March 2023
Approved built-up area: 1,243.30 sq. m. residential upper-floor area; the plan extract separately records 1,493.20 sq. m. including parking and total BUA of 1,503.35 sq. m.
Building count: One residential building
Sanctioned floors / height: 1 stilt + 5 upper floors; 14.50 m building height
Parking: Plan extract records 2 proposed parkings and 249.90 sq. m. residential parking area; the building approval requires approved stilt/cellar parking space to be used for vehicle parking. No cellar is identified in the supplied floor configuration
Units: 10 dwelling units in the plan extract; RERA unit record contains 10 units, filed under the entry “3” rather than a configuration label
Offering and status
RERA-filed unit entry: “3”; 10 units, with 0 booked and 10 available in the portal data supplied. These figures have no stated as-of date and are indicative
RERA-filed saleable area: 143.67 sq. m. per unit in the supplied unit record
Construction stage: No dated, independently verified construction-progress information is supplied; RERA amenity progress entries show 0%
Completion dates: Promoter’s Form B declaration undertakes completion by 8 March 2026. The project header separately records proposed completion as 30 November 2026; the supplied evidence does not explain the relationship between these dates
Occupancy / completion certificate: No occupancy or completion certificate is included in the supplied documents; status is not established
2. The project story
SHREE BHOOMI RESIDENCY is registered as a residential apartment project in Nizamabad, identified in the RERA certificate as Survey No. 78, Plot Nos. 6 and 7. The registered project identity gives Subhash Nagar, Nizamabad, PIN 503002; the building-permission materials also refer to Kanteshwar and Goutham Nagar, so the supplied records do not provide a single reconciled revenue-village description.
The filed approval describes one building, with stilt parking and five upper floors, and the plan extract records 10 dwelling units. The RERA unit table records 10 units under the entry “3,” but does not provide a matching configuration name. The record shows no booked units and 10 available units, without an as-of date.
The supplied evidence establishes the approval and registration documents, but does not establish the building’s current construction stage or an issued occupancy certificate. The promoter’s Form B states a completion undertaking of 8 March 2026; the project header also gives a proposed completion date of 30 November 2026. These are completion-date records, not evidence of completed construction or occupancy certification.
3. Master plan, architecture & building design
The building approval and plan extract describe a single residential building on a 509.08 sq. m. site, with 249.93 sq. m. proposed coverage (49.1%) and a vacant plot area of 259.14 sq. m. The filed area figures are not interchangeable: the approval records 1,243.30 sq. m. of residential upper-floor area; the plan extract records 1,493.20 sq. m. including parking and total BUA of 1,503.35 sq. m.
The sanctioned configuration is 1 stilt + 5 upper floors, with a stated building height of 14.50 m. The extracts do not provide a verified floor-by-floor unit schedule, lifts, stairs, entries, internal circulation, or a detailed building footprint drawing in the supplied data.
The approval refers to a tot-lot and greenery around the site, and lists a rainwater-harvesting structure, transformer space and garbage house. These are approval conditions or listed provisions; the supplied record does not establish that they have been completed.
4. Homes, configurations & floor plans
The RERA filing records 10 units under the entry “3,” but does not identify a configuration name. The supplied plan-measurement record identifies 4BHK designs from the approved floor-plan drawing; that is a software measurement from drawings, not a RERA-filed configuration or area disclosure.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| RERA entry “3” (configuration not identified) | 10 | 0 | 10 | 143.67 sq. m. | Not established for this RERA entry | Not supplied |
| 4BHK (drawing-measured; not matched to a RERA configuration) | Not stated in RERA filing | Not stated | Not stated | Not supplied for this configuration | Software-measured: median 180.9 sq. m.; range 179.1–182.8 sq. m. (median 1,948 sq. ft.) | Not supplied |
The drawing measurement covers two flat designs and is derived from drawing geometry; it should be checked against the drawing. Carpet area and RERA saleable area are distinct measures: the supplied floor-plan note says the saleable area also counts the home’s share of common areas. No RERA-filed loading figure is supplied.
The measured drawing extract labels bedroom, drawing-room, hall, toilet, dress and foyer spaces. It provides dimensions for those spaces, but the supplied record does not establish a complete, verified room schedule for the marketed or RERA-filed unit configuration.
5. Parking & vehicle circulation
The building plan extract records 2 proposed parking spaces and 249.90 sq. m. of residential parking area. The building approval states that stilt/cellar areas approved for parking must be used exclusively for vehicle parking without partition walls or rolling shutters; the supplied floor configuration identifies stilt, but does not identify a cellar.
No resident-versus-visitor allocation, accessible parking provision, parking-unit allocation, mechanical parking, ramp arrangement, EV charging, or vehicle/pedestrian circulation plan is established in the supplied material. The plan’s parking count does not by itself establish exclusive parking rights for a buyer.
6. Amenities, recreation & open spaces
The RERA amenity record lists 14 items. Each supplied progress entry is 0%; this is a filed status record, not an independent site verification. The building approval also sets conditions for greenery, a tot-lot and rainwater harvesting, without supplied evidence that those works are complete.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Water Supply | Listed as available: YES; no source, storage or capacity stated | 0%; completion not independently verified | |
| Sewerage (Chamber, Lines, Septic Tank, STP) | Listed as available: YES; no system detail or capacity stated | 0%; completion not independently verified | |
| Green Strip/TOT LOT/Park | Listed as available: YES; no area stated | 0%; approval requires tot-lot and greenery; completion not independently verified | |
| Solid Waste Management and Disposal | Listed as available: YES; no facility or capacity stated | 0%; completion not independently verified | |
| Water Conservation / Rain Water Harvesting | Listed as available: YES; approval requires a rainwater-harvesting structure/percolation pit; one RWHP is recorded | 0%; completion not independently verified | |
| Electrical Meter Room / Sub-Station / Receiving Station | Listed as available: YES; approval requires transformer space; no capacity stated | 0%; completion not independently verified | |
| Internal Roads & Footpaths | Listed; no size or detail stated | 0%; completion not independently verified | |
| Storm Water Drains | Listed; no size or detail stated | 0%; completion not independently verified | |
| Street Lighting | Listed; no quantity or detail stated | 0%; completion not independently verified | |
| Community Buildings | Listed; no size or description stated | 0%; completion not independently verified | |
| Treatment and Disposal of Sewage and Sullage Water | Listed; no system or capacity stated | 0%; completion not independently verified | |
| Energy management | Listed; no system detail stated | 0%; completion not independently verified | |
| Fire Protection and Fire Safety Requirements | Listed; no system detail stated | 0%; completion not independently verified | |
| Aggregate area of recreational open space | Listed; area not stated | 0%; completion not independently verified |
No clubhouse or indoor recreation facility is identified in the supplied evidence.
7. Utilities, building services & safety
The amenity filing marks water supply, sewerage, solid-waste management, rainwater harvesting, and an electrical meter room/sub-station/receiving station as available, but the associated progress entries are 0%. It does not provide water-source or storage details, treatment capacity, electrical capacity, or backup-power details.
The building approval requires a rainwater-harvesting percolation pit, transformer space, and a garbage house. The plan extract lists septic tank and sump tank among utilities. These are filed or approval-related provisions; the supplied data does not verify installation or operation.
Fire protection and safety are listed in the amenity record, but no specific fire-system design or completion evidence is supplied. The approval makes fire-safety requirements the responsibility of the owner/builder and states that services including sanitation, plumbing, fire safety and electrical installations are to be executed under qualified technical supervision. No lift, service-lift, accessibility, CCTV, security-access, or EV-charging details are established in the supplied records.
8. Location, access & connectivity
The registered location is Subhash Nagar, Janmabhoomi Road, Nizamabad, Telangana, PIN 503002, with Survey No. 78 and Plot Nos. 6 and 7 identified on the registration certificate. The boundary record identifies a 33 ft wide road on the south.
The supplied location record gives a distance of 1.2 km to Financial District (Nanakramguda). The record labels this as a connectivity point but does not provide a route, travel time, public-transport details, or an independently verified access assessment.
9. Developer & development status
The TG-RERA certificate names Yeshwanth Rao Pawar as the registered promoter. The RERA Form B identifies the project as promoted by Yeshwanth Rao Pawar through M/s Shree Bhoomi Builders & Developers. The supplied record does not establish the legal entity type, corporate registration identifiers, or a separately verified registered office and official contact details.
Form B, dated 26 October 2023, records the promoter’s undertaking to complete by 8 March 2026. The project header records a proposed completion date of 30 November 2026. The supplied evidence does not establish an approved extension or explain the relationship between these dates. No current construction-progress certification or occupancy certificate is supplied.
10. Approvals, official records & documents
TG-RERA registration: Certificate for SHREE BHOOMI RESIDENCY, P03100007703; identifies Survey No. 78 and Plot Nos. 6 and 7, Nizamabad; states validity from 12 February 2024 to 8 March 2026
Principal building approval: Nizamabad Municipality/Municipal Corporation, approval 0005/BP/3072/2023, dated 8 March 2023; building-permission extract describes 1 stilt + 5 upper floors
Building-plan extract: Document 370057 records a residential building, 10 dwelling units, 14.50 m height, and proposed parking; it also includes a layout-plan-details extract
Promoter declaration: Form B dated 26 October 2023; names the project, promoter and promoter’s completion undertaking
Layout-related record: Document 380700 contains a layout approval reference, L.P. No. 83/84, attributed in that extract to the Revenue Office, Kanpur Cantonment (D); it does not establish the project’s Nizamabad layout approval
Occupancy / completion certificate: None included in the supplied document set
The supplied documents also include a title report, an encumbrance statement, a partially completed allotment letter and a partially completed agreement-for-sale form. Their substantive title and encumbrance implications are addressed in the relevant report sections, not resolved by this overview.
Frequently asked questions
Is SHREE BHOOMI RESIDENCY registered with Telangana RERA?
Yes. SHREE BHOOMI RESIDENCY is registered with the Telangana Real Estate Regulatory Authority as P03100007703; the registration status is New Project.
Who is the developer of SHREE BHOOMI RESIDENCY?
The promoter named in the RERA registration is YESHWANTH RAO.
Where is SHREE BHOOMI RESIDENCY located?
SHREE BHOOMI RESIDENCY is in SUBHASH NAGAR, Nizamabad, Telangana (503002).
When will SHREE BHOOMI RESIDENCY be completed?
The promoter's proposed date of completion filed with RERA is 30/11/2026. This is the promoter's declaration, not a guarantee.