Sl Temple Town 7
KONERU · Medchal-Malkajgiri · RERA P02200007088
SL TEMPLE TOWN 7 is a plotted development at Rampally Dayara, Keesara Mandal, Medchal-Malkajgiri District. The TG-RERA certificate identifies Koneru Rambabu as the registered promoter. The registered site area is 27,316.24 sq. m, with 26,493.62 sq. m net area after 822.62 sq. m of road-affected area; the record describes plots and does not state a plot count or plot-size configurations. It is registered under TG-RERA number P02200007088, and the promoter’s Form B undertaking gives 27/09/2025 as the proposed completion date.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
10 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Project record |
|---|---|
| Registered project name | SL TEMPLE TOWN 7 RERA record |
| Project type | Plotted development / plotted layout RERA record RERA filing |
| Phase / registered portion | No phase designation is stated in the supplied record; registration is for this registered project. RERA record |
| TG-RERA registration number | P02200007088 |
| Registration validity | 16/10/2023 to 27/09/2025; no extension is recorded in the supplied certificate. Registration validity is distinct from the project’s completion deadline. |
| Registered promoter | Koneru Rambabu in the TG-RERA certificate; the project identity record lists the legal promoter as KONERU. Entity type and corporate identifiers are not verified in the supplied materials. RERA record Corporate record |
| RERA status | The supplied record identifies the project as “New Project.” The certificate records the validity period above; current registration status beyond the certificate is not established here. RERA record |
Land and geographic identity
| Field | Project record |
|---|---|
| Locality / address description | Rampally Dayara; the RERA record also uses “645P 646/P” as locality. RERA record RERA filing |
| Revenue village | Rampally Dayara; the draft HMDA document describes “RampallyDayara-ORRGC Village.” RERA record |
| Mandal | Keesara; the draft HMDA document describes “Keesara-ORRGC Mandal.” RERA record |
| District / PIN | Medchal-Malkajgiri / 501301 RERA record RERA filing |
| Project survey numbers and subdivisions | Survey Nos. 645/P and 646/P. RERA record Land records |
| Registered site extent | The RERA filing states 27,316.24 sq. m total area; 26,493.62 sq. m net area after 822.62 sq. m road-affected area. RERA filing |
| Boundaries in RERA filing | East: OTHERS LAND; West: EXISTING 4O ROAD; North: OTHERS LAND; South: OTHERS LAND. RERA filing |
Development identity
| Field | Project record |
|---|---|
| Sanctioning authority | Hyderabad Metropolitan Development Authority (HMDA) Approvals record |
| Principal approval | Layout Permit No. 000191/LO/Plg/HMDA/2022, approved 28 September 2022; the supplied document describes it as a draft layout letter. Approvals record |
| Application number | 049700/ZOB/LO/U6/HMDA/22102021 Approvals record |
| Approved built-up area | The RERA filing lists 16,647.31 sq. m as “Approved Built up Area”; the drawing-derived area statement labels the same figure “Plotted Area.” It is not a building-floor-area or home-size measurement in this plotted-layout record. RERA filing Layout record |
| Building / tower count and floor configuration | Not applicable to the supplied plotted-layout description; no building or tower count, floor configuration, or parking level is disclosed. RERA filing |
| Layout arrangement | The drawing-derived area statement identifies plots, layout roads, park/open space and social-infrastructure land. Plot count and individual plot sizes are not fully extracted. Layout record |
| Authority-mortgaged plots | 16 plots: Nos. 63–69 and 82–90, stated area 2,533.50 sq. m, mortgaged to HMDA pending layout development and release. Layout record |
| RERA-declared unit count | Not available in the supplied project records. RERA unit table |
Offering and status
| Field | Project record |
|---|---|
| Offered property type | Plots in a plotted development. RERA record RERA filing |
| RERA-filed plot-size range | Not established from the supplied RERA unit data. RERA unit table |
| Booked / available counts | Not supplied. RERA unit table |
| RERA completion deadline | 27/09/2025, as stated in the promoter’s Form B undertaking and project record. RERA record |
| Registration validity | 16/10/2023 to 27/09/2025; this is the registration period stated in the certificate, not a separate confirmation of completion. |
| Construction / development stage | No independently verified current site-progress evidence is supplied. The RERA certificate requires quarterly updates, but actual reported progress is not included here. |
| Occupancy / completion certificate | No occupancy or completion certificate is supplied. The cited HMDA document is a draft layout letter and says final layout plans are to follow completion of development works and handover of specified areas. |
2. The project story
SL TEMPLE TOWN 7 is registered with TG-RERA as a plotted development on Survey Nos. 645/P and 646/P at Rampally Dayara, Keesara Mandal, Medchal-Malkajgiri District. The filed land record gives a total site area of 27,316.24 sq. m, including 822.62 sq. m identified as road-affected area, and a net area of 26,493.62 sq. m. RERA record RERA filing
The approved-layout drawing information describes plots and internal roads, together with park/open-space and social-infrastructure land. This is a layout approval record, not evidence of completed homes or buildings. HMDA’s supplied draft layout letter identifies plots 63–69 and 82–90 as mortgaged to the authority and states that roads and specified open and social-infrastructure areas are to be handed over before release of final layout plans. The record does not establish the current completion of those works. Layout record
The promoter’s Form B undertaking gives 27/09/2025 as the completion date. No independent construction inspection, current progress certificate, or occupancy/completion certificate is included in the supplied materials; the extent of development completed therefore remains unverified. Document index
3. Master plan, architecture & building design
The supplied HMDA draft layout letter records a total site area of 27,316.24 sq. m, a Master plan Road affected area of 822.62 sq. m, and a net site area of 26,493.62 sq. m. Its area statement identifies 16,647.31 sq. m as plotted area, 7,016.71 sq. m as layout road area, 2,167.20 sq. m as park area, 662.39 sq. m as social-infrastructure area, and 0 sq. m as amenities area. Layout record
The RERA filing separately labels 16,647.31 sq. m as “Approved Built up Area.” The drawing-derived layout record labels that figure “Plotted Area”; in this plotted project, the supplied records do not identify a building gross floor area, FSI-counted area, saleable area, or carpet area. RERA filing Layout record
The extracted draft-letter conditions specify layout roads of 30 Mts, 18 mts, and 60 feet and above in the referenced road provisions. They also describe road formation, drainage, internal water-supply lines, electrical services, plantation and park development as layout works. No building arrangement, floor plans, tower heights, or residential/commercial building distribution is documented. Approvals record
The drawing extraction is incomplete for plot-level detail: plot count is not complete and no plot sizes were measured from the drawing. The layout sheets are identified as two sheets, but the supplied record does not provide a verified plot schedule. Layout record Floor plans
4. Homes, configurations & floor plans
This is a plotted development, not an apartment configuration record. The supplied TG-RERA unit data does not establish plot counts, plot-size bands, or booked and available inventory. The approved-layout drawing extraction identifies 16,647.31 sq. m of plotted area, but the plot schedule and individual plot dimensions are not available in the supplied data. RERA record RERA unit table Layout record
No software-measured carpet area or apartment floor-plan measurements are available. The supplied drawing review records two layout sheets and no measured home plans. Floor plans
5. Parking & vehicle circulation
The RERA and HMDA materials supplied do not state a count of resident, visitor, accessible, or other parking spaces, nor an allocation of parking to individual plots. The project record identifies a plotted layout and internal road areas; HMDA’s draft conditions refer to road access and layout circulation but do not establish parking provision or exclusive parking rights. RERA unit table Layout record
The HMDA draft letter specifies that roads are to be opened for access to neighbouring sites and that a compound wall or fencing must not block that access. This is an approval condition, not confirmation that the roads are complete or open today.
6. Amenities, recreation & open spaces
The following are stated in the supplied layout/approval records. “Available” in the RERA amenity extract is a filing status, not independent confirmation of completed facilities.
| Description / size | 2,167.20 sq. m |
|---|---|
| Evidence source | Layout record |
| Declared progress / verified status | Included in the draft layout area statement; completion and handover are not independently verified. |
| Description / size | 662.39 sq. m |
|---|---|
| Evidence source | Layout record |
| Declared progress / verified status | Included in the draft layout area statement; no specific facility or completed use is identified. |
| Description / size | Avenue plantation and planting are described in the draft conditions; no size or completion measure supplied. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA amenity field lists “Green Strip/TOT LOT/Park” as “YES”; delivered status not independently verified. |
| Description / size | Layout road area 7,016.71 sq. m; draft conditions refer to road formation and paved footpaths. |
|---|---|
| Evidence source | Layout record RERA amenities |
| Declared progress / verified status | RERA amenity field lists “YES”; completed status not independently verified. |
| Description / size | Required by a draft-letter condition; no length or area supplied. |
|---|---|
| Declared progress / verified status | Required in the extracted condition; completion not verified. |
| Description / size | No size or facility details supplied. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | No “available” value or completion evidence supplied. |
| Description / size | Listed in third-party vendor information only; no RERA-filed or sanctioned size, capacity, or delivery status supplied. |
|---|---|
| Evidence source | Promoter website |
| Declared progress / verified status | Vendor-listed; not established as sanctioned or delivered. |
The draft conditions also describe park development and avenue plantation; these are planned layout provisions, not proof of completed amenities.
7. Utilities, building services & safety
The HMDA draft layout letter lists proposed layout infrastructure including storm-water drains, underground drainage lines and a common septic tank/STP, internal water-supply pipe lines and an overhead tank, electrical supply lines, a transformer and street lights, rainwater-harvesting pits, and underground utility ducting. The letter also includes provisions concerning solid-waste disposal space, source segregation, bio-composting, LED street lighting and pedestrian footpaths. These are approval-document provisions; the supplied evidence does not independently verify installation, capacity, commissioning or operation.
The RERA amenity extract marks water supply, sewerage, storm-water drains, street lighting, water conservation/rainwater harvesting and treatment/disposal of sewage and sullage water as “YES.” The extract does not provide capacities or completion percentages. RERA amenities
The draft conditions call for a water-supply connection arrangement to a trunk/connecting pipeline approved by the relevant authorities and set out septage/STP provisions according to layout size. The supplied materials do not document the source, treatment capacity, storage capacity, connection status, electrical backup, security systems, accessibility features, or fire-safety installations. RERA amenities
8. Location, access & connectivity
The registered location is Rampally Dayara, Keesara Mandal, Medchal-Malkajgiri District, Telangana, PIN 501301, with the project site identified as Survey Nos. 645/P and 646/P. The RERA filing gives “ORRGC” as the street description and records the west boundary as EXISTING 4O ROAD. RERA record RERA filing RERA filing
The location dataset identifies the nearest sampled Outer Ring Road interchange at approximately 5.2 km. The supplied data does not identify the interchange by name or provide measured distances to public transport, schools, healthcare, retail or other landmarks. Location record
9. Developer & development status
The TG-RERA certificate identifies Koneru Rambabu as promoter; the project identity record gives the registered promoter name as KONERU. The supplied record does not establish the promoter’s legal entity type, company identification number, registered office, official contact details or official website. RERA record Corporate record
A Form B affidavit-cum-declaration dated 05 April 2023 is attributed to Koneru Rambabu. It declares that the promoter will complete the project by 27/09/2025 and includes statements concerning title documentation, encumbrances, project funds, accounts and pending approvals. These are promoter declarations, not independent verification of the underlying matters.
The RERA record labels the project “New Project.” No project-specific, independently verified construction-progress report or current certificate of completion is supplied. The registration certificate states registration validity from 16/10/2023 to 27/09/2025; the available record does not establish a later extension. RERA record Document index
10. Approvals, official records & documents
| What the supplied material establishes | Form C registration for SL TEMPLE TOWN 7, registration P02200007088, valid 16/10/2023–27/09/2025. |
|---|
| What the supplied material establishes | Layout Permit 000191/LO/Plg/HMDA/2022, approved 28 September 2022; the supplied document is described as a draft layout letter for the plotted layout. |
|---|---|
| Source | Approvals record |
| What the supplied material establishes | 049700/ZOB/LO/U6/HMDA/22102021. |
|---|---|
| Source | Approvals record |
| What the supplied material establishes | Promoter declaration identifying the project and stating completion by 27/09/2025. |
|---|
| What the supplied material establishes | Two layout sheets are recorded; software extraction of plot-level data is incomplete. |
|---|---|
| Source | Layout record Floor plans |
| What the supplied material establishes | No occupancy certificate or completion certificate is included in the supplied documents. |
|---|---|
| Source | Document index |
| What the supplied material establishes | No separate building commencement certificate is established in the supplied records; the document filed under that category is extracted as an HMDA draft layout letter. |
|---|---|
| Source | Document index |
1. Project at a glance
Project identity
Registered project name: SL TEMPLE TOWN 7
Project type: Plotted development / plotted layout
Phase / registered portion: No phase designation is stated in the supplied record; registration is for this registered project.
TG-RERA registration number: P02200007088
Registration validity: 16/10/2023 to 27/09/2025; no extension is recorded in the supplied certificate. Registration validity is distinct from the project’s completion deadline.
Registered promoter: Koneru Rambabu in the TG-RERA certificate; the project identity record lists the legal promoter as KONERU. Entity type and corporate identifiers are not verified in the supplied materials.
RERA status: The supplied record identifies the project as “New Project.” The certificate records the validity period above; current registration status beyond the certificate is not established here.
Land and geographic identity
Locality / address description: Rampally Dayara; the RERA record also uses “645P 646/P” as locality.
Revenue village: Rampally Dayara; the draft HMDA document describes “RampallyDayara-ORRGC Village.”
Mandal: Keesara; the draft HMDA document describes “Keesara-ORRGC Mandal.”
District / PIN: Medchal-Malkajgiri / 501301
Project survey numbers and subdivisions: Survey Nos. 645/P and 646/P.
Registered site extent: The RERA filing states 27,316.24 sq. m total area; 26,493.62 sq. m net area after 822.62 sq. m road-affected area.
Boundaries in RERA filing: East: OTHERS LAND; West: EXISTING 4O ROAD; North: OTHERS LAND; South: OTHERS LAND.
Development identity
Sanctioning authority: Hyderabad Metropolitan Development Authority (HMDA)
Principal approval: Layout Permit No. 000191/LO/Plg/HMDA/2022, approved 28 September 2022; the supplied document describes it as a draft layout letter.
Application number: 049700/ZOB/LO/U6/HMDA/22102021
Approved built-up area: The RERA filing lists 16,647.31 sq. m as “Approved Built up Area”; the drawing-derived area statement labels the same figure “Plotted Area.” It is not a building-floor-area or home-size measurement in this plotted-layout record.
Building / tower count and floor configuration: Not applicable to the supplied plotted-layout description; no building or tower count, floor configuration, or parking level is disclosed.
Layout arrangement: The drawing-derived area statement identifies plots, layout roads, park/open space and social-infrastructure land. Plot count and individual plot sizes are not fully extracted.
Authority-mortgaged plots: 16 plots: Nos. 63–69 and 82–90, stated area 2,533.50 sq. m, mortgaged to HMDA pending layout development and release.
RERA-declared unit count: Not available in the supplied project records.
Offering and status
Offered property type: Plots in a plotted development.
RERA-filed plot-size range: Not established from the supplied RERA unit data.
Booked / available counts: Not supplied.
RERA completion deadline: 27/09/2025, as stated in the promoter’s Form B undertaking and project record.
Registration validity: 16/10/2023 to 27/09/2025; this is the registration period stated in the certificate, not a separate confirmation of completion.
Construction / development stage: No independently verified current site-progress evidence is supplied. The RERA certificate requires quarterly updates, but actual reported progress is not included here.
Occupancy / completion certificate: No occupancy or completion certificate is supplied. The cited HMDA document is a draft layout letter and says final layout plans are to follow completion of development works and handover of specified areas.
2. The project story
SL TEMPLE TOWN 7 is registered with TG-RERA as a plotted development on Survey Nos. 645/P and 646/P at Rampally Dayara, Keesara Mandal, Medchal-Malkajgiri District. The filed land record gives a total site area of 27,316.24 sq. m, including 822.62 sq. m identified as road-affected area, and a net area of 26,493.62 sq. m.
The approved-layout drawing information describes plots and internal roads, together with park/open-space and social-infrastructure land. This is a layout approval record, not evidence of completed homes or buildings. HMDA’s supplied draft layout letter identifies plots 63–69 and 82–90 as mortgaged to the authority and states that roads and specified open and social-infrastructure areas are to be handed over before release of final layout plans. The record does not establish the current completion of those works.
The promoter’s Form B undertaking gives 27/09/2025 as the completion date. No independent construction inspection, current progress certificate, or occupancy/completion certificate is included in the supplied materials; the extent of development completed therefore remains unverified.
3. Master plan, architecture & building design
The supplied HMDA draft layout letter records a total site area of 27,316.24 sq. m, a Master plan Road affected area of 822.62 sq. m, and a net site area of 26,493.62 sq. m. Its area statement identifies 16,647.31 sq. m as plotted area, 7,016.71 sq. m as layout road area, 2,167.20 sq. m as park area, 662.39 sq. m as social-infrastructure area, and 0 sq. m as amenities area.
The RERA filing separately labels 16,647.31 sq. m as “Approved Built up Area.” The drawing-derived layout record labels that figure “Plotted Area”; in this plotted project, the supplied records do not identify a building gross floor area, FSI-counted area, saleable area, or carpet area.
The extracted draft-letter conditions specify layout roads of 30 Mts, 18 mts, and 60 feet and above in the referenced road provisions. They also describe road formation, drainage, internal water-supply lines, electrical services, plantation and park development as layout works. No building arrangement, floor plans, tower heights, or residential/commercial building distribution is documented.
The drawing extraction is incomplete for plot-level detail: plot count is not complete and no plot sizes were measured from the drawing. The layout sheets are identified as two sheets, but the supplied record does not provide a verified plot schedule.
4. Homes, configurations & floor plans
This is a plotted development, not an apartment configuration record. The supplied TG-RERA unit data does not establish plot counts, plot-size bands, or booked and available inventory. The approved-layout drawing extraction identifies 16,647.31 sq. m of plotted area, but the plot schedule and individual plot dimensions are not available in the supplied data.
No software-measured carpet area or apartment floor-plan measurements are available. The supplied drawing review records two layout sheets and no measured home plans.
5. Parking & vehicle circulation
The RERA and HMDA materials supplied do not state a count of resident, visitor, accessible, or other parking spaces, nor an allocation of parking to individual plots. The project record identifies a plotted layout and internal road areas; HMDA’s draft conditions refer to road access and layout circulation but do not establish parking provision or exclusive parking rights.
The HMDA draft letter specifies that roads are to be opened for access to neighbouring sites and that a compound wall or fencing must not block that access. This is an approval condition, not confirmation that the roads are complete or open today.
6. Amenities, recreation & open spaces
The following are stated in the supplied layout/approval records. “Available” in the RERA amenity extract is a filing status, not independent confirmation of completed facilities.
| Description / size | 2,167.20 sq. m |
|---|---|
| Declared progress / verified status | Included in the draft layout area statement; completion and handover are not independently verified. |
| Description / size | 662.39 sq. m |
|---|---|
| Declared progress / verified status | Included in the draft layout area statement; no specific facility or completed use is identified. |
| Description / size | Avenue plantation and planting are described in the draft conditions; no size or completion measure supplied. |
|---|---|
| Declared progress / verified status | RERA amenity field lists “Green Strip/TOT LOT/Park” as “YES”; delivered status not independently verified. |
| Description / size | Layout road area 7,016.71 sq. m; draft conditions refer to road formation and paved footpaths. |
|---|---|
| Declared progress / verified status | RERA amenity field lists “YES”; completed status not independently verified. |
| Description / size | Required by a draft-letter condition; no length or area supplied. |
|---|---|
| Declared progress / verified status | Required in the extracted condition; completion not verified. |
| Description / size | No size or facility details supplied. |
|---|---|
| Declared progress / verified status | No “available” value or completion evidence supplied. |
| Description / size | Listed in third-party vendor information only; no RERA-filed or sanctioned size, capacity, or delivery status supplied. |
|---|---|
| Declared progress / verified status | Vendor-listed; not established as sanctioned or delivered. |
The draft conditions also describe park development and avenue plantation; these are planned layout provisions, not proof of completed amenities.
7. Utilities, building services & safety
The HMDA draft layout letter lists proposed layout infrastructure including storm-water drains, underground drainage lines and a common septic tank/STP, internal water-supply pipe lines and an overhead tank, electrical supply lines, a transformer and street lights, rainwater-harvesting pits, and underground utility ducting. The letter also includes provisions concerning solid-waste disposal space, source segregation, bio-composting, LED street lighting and pedestrian footpaths. These are approval-document provisions; the supplied evidence does not independently verify installation, capacity, commissioning or operation.
The RERA amenity extract marks water supply, sewerage, storm-water drains, street lighting, water conservation/rainwater harvesting and treatment/disposal of sewage and sullage water as “YES.” The extract does not provide capacities or completion percentages.
The draft conditions call for a water-supply connection arrangement to a trunk/connecting pipeline approved by the relevant authorities and set out septage/STP provisions according to layout size. The supplied materials do not document the source, treatment capacity, storage capacity, connection status, electrical backup, security systems, accessibility features, or fire-safety installations.
8. Location, access & connectivity
The registered location is Rampally Dayara, Keesara Mandal, Medchal-Malkajgiri District, Telangana, PIN 501301, with the project site identified as Survey Nos. 645/P and 646/P. The RERA filing gives “ORRGC” as the street description and records the west boundary as EXISTING 4O ROAD.
The location dataset identifies the nearest sampled Outer Ring Road interchange at approximately 5.2 km. The supplied data does not identify the interchange by name or provide measured distances to public transport, schools, healthcare, retail or other landmarks.
9. Developer & development status
The TG-RERA certificate identifies Koneru Rambabu as promoter; the project identity record gives the registered promoter name as KONERU. The supplied record does not establish the promoter’s legal entity type, company identification number, registered office, official contact details or official website.
A Form B affidavit-cum-declaration dated 05 April 2023 is attributed to Koneru Rambabu. It declares that the promoter will complete the project by 27/09/2025 and includes statements concerning title documentation, encumbrances, project funds, accounts and pending approvals. These are promoter declarations, not independent verification of the underlying matters.
The RERA record labels the project “New Project.” No project-specific, independently verified construction-progress report or current certificate of completion is supplied. The registration certificate states registration validity from 16/10/2023 to 27/09/2025; the available record does not establish a later extension.
10. Approvals, official records & documents
| What the supplied material establishes | Form C registration for SL TEMPLE TOWN 7, registration P02200007088, valid 16/10/2023–27/09/2025. |
|---|
| What the supplied material establishes | Layout Permit 000191/LO/Plg/HMDA/2022, approved 28 September 2022; the supplied document is described as a draft layout letter for the plotted layout. |
|---|
| What the supplied material establishes | 049700/ZOB/LO/U6/HMDA/22102021. |
|---|
| What the supplied material establishes | Promoter declaration identifying the project and stating completion by 27/09/2025. |
|---|
| What the supplied material establishes | Two layout sheets are recorded; software extraction of plot-level data is incomplete. |
|---|
| What the supplied material establishes | No occupancy certificate or completion certificate is included in the supplied documents. |
|---|
| What the supplied material establishes | No separate building commencement certificate is established in the supplied records; the document filed under that category is extracted as an HMDA draft layout letter. |
|---|
Frequently asked questions
Is SL TEMPLE TOWN 7 registered with Telangana RERA?
Yes. SL TEMPLE TOWN 7 is registered with the Telangana Real Estate Regulatory Authority as P02200007088; the registration status is New Project.
Who is the developer of SL TEMPLE TOWN 7?
The promoter named in the RERA registration is KONERU.
Where is SL TEMPLE TOWN 7 located?
SL TEMPLE TOWN 7 is in 645P 646/P, Rampally Dayara, Keesara, Medchal-Malkajgiri, Telangana (501301).
When will SL TEMPLE TOWN 7 be completed?
The promoter's proposed date of completion filed with RERA is 27/09/2025. This is the promoter's declaration, not a guarantee.